CN106054789A - Building project intelligent management system - Google Patents

Building project intelligent management system Download PDF

Info

Publication number
CN106054789A
CN106054789A CN201610701141.5A CN201610701141A CN106054789A CN 106054789 A CN106054789 A CN 106054789A CN 201610701141 A CN201610701141 A CN 201610701141A CN 106054789 A CN106054789 A CN 106054789A
Authority
CN
China
Prior art keywords
project
data
module
server
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610701141.5A
Other languages
Chinese (zh)
Inventor
谢海亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Rui Hong Mdt Info Tech Ltd
Original Assignee
Anhui Rui Hong Mdt Info Tech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Rui Hong Mdt Info Tech Ltd filed Critical Anhui Rui Hong Mdt Info Tech Ltd
Priority to CN201610701141.5A priority Critical patent/CN106054789A/en
Publication of CN106054789A publication Critical patent/CN106054789A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a building project intelligent management system which comprises a project control processing module, a project data collection module, a project data transmission module and a project alarm module. The project data collection module is used for collecting data of each item of a building project, the data is sent to the project control processing module through the project data transmission module, and the project control processing module controls the project alarm module to emit an alarm signal. The project control processing module comprises a UPS power supply, a main server, a slave server and a network communication module. The UPS power supply is used for providing power to the main server and the slave server. The main server and the slave server is connected with the project data collection module through the network communication module. The main server is used for calculating, analyzing and processing received data and reflecting the energy consuming condition by graphs, digital display and sounds. The main server is further used for data forwarding and providing a data interface for the internal part or external part of the system. The building project intelligent management system is capable of monitoring, processing and controlling the building project in real time.

Description

Construction project intellectualized management system
Technical field
The present invention relates to construction project administration technical field, particularly relate to a kind of construction project intellectualized management system.
Background technology
Building trade is in the middle of the process of Bussiness development, along with the management and control of project and engineering becomes increasingly complex, urgent Need a set of management system that the project information of enterprise is managed, instruct and the promotion of item of service enterprise, save and manage into This, promote the efficiency of management.At present, domestic heavy construction design companies is also making great efforts reinforcement production informationization construction conscientiously, from The most single, artificial specialty puies forward condition mutually to the overall planning managed by project information, manages institute more efficiently There is project design information, thus shorten Project design cycle time.But, in prior art, also there is no the building of maturation Project management system.
Summary of the invention
The present invention proposes a kind of construction project intellectualized management system, it is possible to is monitored construction project in real time and locates Reason controls.
The technical scheme is that and be achieved in that:
A kind of construction project intellectualized management system, including project control processing module, project data acquisition module, project Data transmission module and project alarm module, described project data acquisition module is for gathering each item data of construction project, logical Crossing described project data transport module to send to described project control processing module, described project control processing module controls described Project alarm module sends warning signal;
Described project control processing module include ups power, master server, from server and network communication module, described Ups power for for described master server and described from server provide electricity, described master server and described from server lead to Cross described network communication module to be connected with described project data acquisition module;Described master server is for entering the data received Row calculate, analyze and process, graphically, digital display and sound reflection energy resource consumption situation;Described master server is additionally operable to data and turns Send out, for internal system or outside offer data-interface.
Further, described project data acquisition module includes that the variable connector being sequentially connected with, gain amplifier, A/D turn Parallel operation, digital signal processor and PXI interface circuit, also include that CPLD, described CPLD amplify with variable connector, gain respectively Device, A/D converter, digital signal processor are connected with PXI interface circuit.
Further, described project data transport module uses CAN to constitute.
Further, described project alarm module includes sound light alarming circuit.
Further, described project control processing module also includes that data server, described data server are used for storing Receive data, described master server and described from server from described data server extracted data, to extraction data Carry out calculating, analyze and processing.
Further, described network communication module includes communication manager, ethernet device and bus network, described ether Net equipment includes Ethernet switch.
The beneficial effects of the present invention is: utilize project data acquisition module to gather each item data of construction project, pass through Project data transport module transmits to project control processing module, project control processing module count the data received Calculating, analyze and process, if noting abnormalities, alarm can be sent by project alarm module.The portability of the present invention is stronger, energy It is enough in various construction project.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, also may be used To obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the theory diagram of construction project intellectualized management system of the present invention.
In figure, 1-project control processing module, 2-project data acquisition module, 3-project data transport module, 4-project Alarm module.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
As it is shown in figure 1, the present invention proposes a kind of construction project intellectualized management system, including project control processing module 1, project data acquisition module 2, project data transport module 3 and project alarm module 4, project data acquisition module 2 is used for adopting Each item data of collection construction project, is sent to project control processing module 1 by project data transport module 3, at the project control Reason module 1 item controlled alarm module 4 sends warning signal;
Project control processing module 1 include ups power, master server, from server and network communication module, ups power For providing electricity for master server with from server, master server and from server by network communication module and project data Acquisition module 2 connects;Master server is for calculating the data received, analyze and process, graphically, digital display and sound Reflection energy resource consumption situation;Master server is additionally operable to data and forwards, for internal system or outside offer data-interface.
Utilize master server and can ensure that the properly functioning of project control processing module 1 from server, and, at main clothes The when that the business device speed of service being crossed slow, add the control to construction project from server.
The present invention utilizes project data acquisition module 2 to gather each item data of construction project, transmits mould by project data Block 3 transmits to project control processing module 1, project control processing module 1 data received are calculated, analyze and Reason, if noting abnormalities, can be sent alarm by project alarm module 4.The portability of the present invention is stronger, it is possible to for various Construction project.
Variable connector that project data acquisition module 2 includes being sequentially connected with, gain amplifier, A/D converter, digital signal Processor and PXI interface circuit, also include that CPLD, CPLD believe with variable connector, gain amplifier, A/D converter, numeral respectively Number processor is connected with PXI interface circuit.
Project data transport module 3 uses CAN to constitute.
Project alarm module 4 includes sound light alarming circuit.
Project control processing module 1 also includes data server, and data server is for storing the data of reception, main service The data of extraction are calculated, analyze and process by device and from server extracted data from data server.
Network communication module includes communication manager, ethernet device and bus network, and ethernet device includes Ethernet Switch.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Within god and principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (6)

1. a construction project intellectualized management system, including project control processing module, it is characterised in that: project data collection Module, project data transport module and project alarm module, described project data acquisition module is for gathering each of construction project Item data, is sent to described project control processing module by described project data transport module, and the described project control processes mould Block controls described project alarm module and sends warning signal;
Described project control processing module include ups power, master server, from server and network communication module, described UPS electricity Source for for described master server with described provide electricity from server, described master server and described from server by described Network communication module is connected with described project data acquisition module;Described master server is based on carrying out the data received Calculate, analyze and process, graphically, digital display and sound reflection energy resource consumption situation;Described master server is additionally operable to data and forwards, for Internal system or outside offer data-interface.
Construction project intellectualized management system the most according to claim 1, it is characterised in that: described project data gathers mould Block includes variable connector, gain amplifier, A/D converter, digital signal processor and the PXI interface circuit being sequentially connected with, also Including CPLD, described CPLD respectively with variable connector, gain amplifier, A/D converter, digital signal processor and PXI interface Circuit is connected.
Construction project intellectualized management system the most according to claim 1 and 2, it is characterised in that: described project data passes Defeated module uses CAN to constitute.
Construction project intellectualized management system the most according to claim 3, it is characterised in that: described project alarm module bag Include sound light alarming circuit.
Construction project intellectualized management system the most according to claim 1, it is characterised in that: the described project control processes mould Block also includes data server, described data server for storing the data of reception, described master server and described from service Device is extracted data from described data server, and the data of extraction are calculated, analyze and processed.
Construction project intellectualized management system the most according to claim 1, it is characterised in that: described network communication module bag Including communication manager, ethernet device and bus network, described ethernet device includes Ethernet switch.
CN201610701141.5A 2016-08-22 2016-08-22 Building project intelligent management system Pending CN106054789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610701141.5A CN106054789A (en) 2016-08-22 2016-08-22 Building project intelligent management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610701141.5A CN106054789A (en) 2016-08-22 2016-08-22 Building project intelligent management system

Publications (1)

Publication Number Publication Date
CN106054789A true CN106054789A (en) 2016-10-26

Family

ID=57195444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610701141.5A Pending CN106054789A (en) 2016-08-22 2016-08-22 Building project intelligent management system

Country Status (1)

Country Link
CN (1) CN106054789A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860076A (en) * 2010-04-21 2010-10-13 东北大学 Multifunctional electric energy quality monitoring and analyzing system
CN102128520A (en) * 2010-10-09 2011-07-20 苏州新亚科技有限公司 Comprehensive energy-saving control system for building
CN103269381A (en) * 2013-06-08 2013-08-28 南京因泰莱电器股份有限公司 Cloud-computing-based WEB-supervisory control and data acquisition (SCADA) energy management and monitoring system
CN203224746U (en) * 2013-05-08 2013-10-02 中州大学 Real-time parallel multichannel signal acquisition system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860076A (en) * 2010-04-21 2010-10-13 东北大学 Multifunctional electric energy quality monitoring and analyzing system
CN102128520A (en) * 2010-10-09 2011-07-20 苏州新亚科技有限公司 Comprehensive energy-saving control system for building
CN203224746U (en) * 2013-05-08 2013-10-02 中州大学 Real-time parallel multichannel signal acquisition system
CN103269381A (en) * 2013-06-08 2013-08-28 南京因泰莱电器股份有限公司 Cloud-computing-based WEB-supervisory control and data acquisition (SCADA) energy management and monitoring system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
郑明明 等: "建筑能耗监测平台的研究", 《建筑节能》 *
钱国平 等: "基于PXI 总线的数据采集模块设计", 《哈尔滨理工大学学报》 *

Similar Documents

Publication Publication Date Title
CN206060359U (en) A kind of Centralized Monitoring operational system of photovoltaic power station
CN203689663U (en) Self-networking air quality monitoring system
CN106487612A (en) A kind of server node monitoring method, monitoring server and system
CN105446196B (en) Intelligent spraying system with real-time monitoring function and control method thereof
CN207408770U (en) General Internet of Things centralized monitoring system
CN106160222B (en) A kind of Industrial Concentrated Area power consumer load information big data acquisition system
CN107943670A (en) A kind of ups power equipment monitoring system
CN110445762A (en) Intelligent environment protection monitoring management system in highway network based on Internet of Things
CN105894748A (en) Active power failure alarm equipment for distribution network
CN205177135U (en) Mechanical equipment monitoring devices
CN204389937U (en) Transit equipment overall process monitoring operation device
CN106371356A (en) Base station power and environment monitoring system, interface protocol and base station power and environment monitoring method
CN107920348A (en) Device network status information
CN202404707U (en) Monitoring and alarming equipment
CN205353708U (en) Two real -time monitoring system that live of application data
CN102571893B (en) Intelligent control platform of multi-media power energy managing system
CN106054789A (en) Building project intelligent management system
CN105720687A (en) Electric meter incorrect-installation monitoring system
CN108599372A (en) A kind of novel distribution network automatic measure control terminal
CN105045155A (en) Charging pile electric energy collection device
CN104573987A (en) Method for achieving interoperability integration of PCS and power grid multi-source service system
CN103916458A (en) Power enterprise internal application program remote monitoring system based on short message technology
CN205665849U (en) Join in marriage power system blackouts initiative alarm equipment
CN207216356U (en) Distributed intelligence harvester
CN207518631U (en) The long-range power failure alarm device of power information acquisition system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026

RJ01 Rejection of invention patent application after publication