CN106049971A - Installation method of non-contact-point lifting appliance for towering noble metal tower mast - Google Patents
Installation method of non-contact-point lifting appliance for towering noble metal tower mast Download PDFInfo
- Publication number
- CN106049971A CN106049971A CN201610191760.4A CN201610191760A CN106049971A CN 106049971 A CN106049971 A CN 106049971A CN 201610191760 A CN201610191760 A CN 201610191760A CN 106049971 A CN106049971 A CN 106049971A
- Authority
- CN
- China
- Prior art keywords
- noble metal
- tower mast
- contactless
- towering
- metal tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/28—Duplicate, e.g. pivoted, members engaging the loads from two sides
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides an installation method of a non-contact-point lifting appliance for a towering noble metal tower mast. The method comprises the steps that four vertically-unfolded rods, a non-contact insurance support and a lower hoop of the non-contact-point lifting appliance are opened; a claw-shaped insertion type cantilever stress lever support of the non-contact-point lifting appliance is inserted into a preformed hole in the lower portion of the towering noble metal tower mast; the lower hoop is connected to the four vertically-unfolded rods; the non-contact insurance support is extended in place to fix and support the towering noble metal tower mast; and after the non-contact-point lifting appliance is hoisted in place through a crane, the non-contact-point lifting appliance is dismounted from the towering noble metal tower mast. The installation method can hoist the towering noble metal tower mast without damage, and can support the towering noble metal tower mast and protect the towering noble metal tower mast against damage by external force friction, so that the hoisting process is safe enough, horizontal and vertical movement and accurate one-time installation in place of the towering noble metal tower mast without damage and high-altitude dismounting and mounting rapidness and convenience of the lifting appliance can be achieved, and one-time hoisting is achieved.
Description
Technical field
The present invention relates to the installation method of a kind of towering contactless suspender of noble metal tower mast.
Background technology
Architectural engineering is frequently encountered by and by plant equipment such as tower cranes, tower mast cannot be carried out mechanical erection, on-the-spot tower crane without
The problems such as local attached wall, often through dead man by lifting component, splicing, exist that difficulty of construction coefficient is big, the high spy of danger coefficient
Point.On the other hand, tower mast rod member is more, assembled complicated.Its technological requirement is the highest, particularly relates to noble metal towering tower mast knot
Structure, it is increasingly complex that its art component forms more common tower mast, and the requirement for semi-finished product protection is the most harsh, and on-site hoisting is necessary
Accomplish lossless lifting.
The hoisting technology of China also has change with rapid changepl. never-ending changes and improvements along with the emergence of architectural engineering, substantially can be summarized as profit
With mast lifting, crane hanging component, grid lifting, auxiliary device lifting, draw the mode such as armed lever and pull rope lifting, but no matter
All there is techniques below drawback in the hoisting technology of which kind of form:
1, need to carry out component lifting by crane after colligation is fixed, hanging piece surface can be had damage in various degree, at present, also
There is no the most touchless a kind of, the lifting device of lossless formula;
2, component need to split into multiple unit multiple bearing, installation rate is slow;
3, upper air installing need to set up the supporting scaffold equipment of more than 50m;
4, cannot an integral hoisting, need use vertical transport equipment component is transported in advance eminence, difficulty of construction
Strengthen;
5, high-altitude dismounting inconvenience, safety is not enough.
So, above-mentioned existing hoisting technology cannot meet the lifting demand of noble metal tower mast, for ensureing to gild layer in surface
And the carve of fineness is injury-free during integral hoisting, it is impossible to use traditional binding mode to lift, therefore, mesh
Before need the design specialized noble metal tower mast supporting suspender of non-contact type integral hoisting badly.
Summary of the invention
It is an object of the invention to provide the installation method of a kind of towering contactless suspender of noble metal tower mast, it is possible to it is right to realize
The non-contact type integral hoisting of towering noble metal tower mast.
For solving the problems referred to above, the present invention provides the installation method of a kind of towering contactless suspender of noble metal tower mast, including:
Open the rod member of four vertical expandable types of contactless suspender, contactless insurance support, bottom hoop;
Stress levers support of the claw-like plug-in type of contactless suspender being encorbelmented inserts the reserved of towering noble metal tower mast bottom
Kong Zhong;
Bottom hoop is connected to the rod member of four vertical expandable types;
Contactless insurance is supported extension put in place, the towering noble metal tower mast of fixing support;
After contactless suspender being lifted into position to be installed with crane, contactless suspender is torn open from towering noble metal tower mast
Remove.
Further, in the installation method of the above-mentioned towering contactless suspender of noble metal tower mast, contactless insurance is supported
Extension puts in place, after the fixing step supporting towering noble metal tower mast, also includes:
Stress levers support of tower mast bolt claw-like plug-in type being encorbelmented is connected fixing with towering noble metal tower mast.
Further, in the installation method of the above-mentioned towering contactless suspender of noble metal tower mast, described contactless insurance is propped up
Support supports for the contactless insurance of driven type or the contactless insurance of rod-pulling type supports.
Further, in the installation method of the above-mentioned towering contactless suspender of noble metal tower mast, when described contactless insurance
When being supported for driven type contactless insurance support, contactless insurance is supported extension and puts in place, including:
Control the flexible of the flexible gimbal lever by actuating device, make latch engage with the teeth groove of correspondence position.
Further, in the installation method of the above-mentioned towering contactless suspender of noble metal tower mast, when described contactless insurance
When being supported for rod-pulling type contactless insurance support, contactless insurance is supported extension and puts in place, including:
Carry out stretching and positioning by activity cross bar with pulley structure by steel wire rope, retractor device.
Further, in the installation method of the above-mentioned towering contactless suspender of noble metal tower mast, the tight flange plate bolt of bolt, will
After the step that contactless suspender is removed from towering noble metal tower mast, also include:
Cover plate is installed at the preformed hole position of the bottom of towering noble metal tower mast.
Further, in the installation method of the above-mentioned towering contactless suspender of noble metal tower mast, when every vertical deployable
When being respectively arranged with a L-shaped angle bar on the rod member of formula, bottom hoop is connected to the rod member of four vertical expandable types, bag
Include:
Two free ends of each L-shaped angle bar are connected by bolt and a transverse bar member respectively.
Compared with prior art, the present invention is by opening the rod member of four vertical expandable types of contactless suspender, without connecing
Touch insurance support, bottom hoop;Stress levers support of the claw-like plug-in type of contactless suspender being encorbelmented inserts towering noble metal tower
In the preformed hole of mast bottom;Bottom hoop is connected to the rod member of four vertical expandable types;Contactless insurance is supported and extends
Put in place, the towering noble metal tower mast of fixing support;After contactless suspender being lifted into position to be installed with crane, by contactless suspender from
Removing on towering noble metal tower mast, the present invention can accomplish lossless lifting towering noble metal tower mast, can support, protect towering noble metal
Tower mast is not by external force friction damage so that it is have enough safeties in hoisting process, can realize lossless under the conditions of towering expensive
The horizontal and vertical of metal tower mast moves, it is the most in place precisely to install, the dismounting of suspender high-altitude is quick and easy, it is achieved once lift
Complete, decrease towering noble metal tower mast in high-altitude vertical transport and assembling operation time, improve the safety of its high-altitude application
Property, the present invention can utilize contactless suspender and lifting rope entirety to lift by crane towering noble metal tower mast, it is to avoid work high above the ground is endangered
Danger, it is not necessary to setting up more than 50 meters of high scaffolds, safety is high.
Accompanying drawing explanation
Fig. 1 is the structure chart of the towering contactless sling system of noble metal tower mast of one embodiment of the invention;
Fig. 2 is that the blind of one embodiment of the invention wears installation guide frame figure;
Fig. 3 is the structure chart of the cross antitorque hanging dish-type hoop of one embodiment of the invention;
Fig. 4 is the connection of the rod member of the cross antitorque hanging dish-type hoop of one embodiment of the invention and four vertical expandable types
Schematic diagram;
Fig. 5 is the structure chart of the driven type contactless insurance support of one embodiment of the invention;
Fig. 6 is the structure chart of the rod-pulling type contactless insurance support of one embodiment of the invention;
Fig. 7 is the Guan Bi schematic diagram of the bottom hoop of one embodiment of the invention;
Fig. 8 is the dismounting schematic diagram of the bottom hoop of one embodiment of the invention;
Fig. 9 is that the claw-like plug-in type of one embodiment of the invention is encorbelmented the structure chart of stress levers support;
Figure 10 is the structure chart that the cover of one embodiment of the invention enters formula double flange;
Figure 11 be one embodiment of the invention on ground, tower mast is assembled the schematic diagram that complete, contactless suspender is in place;
Figure 12 is that the stress levers support of claw-like plug-in type being encorbelmented of one embodiment of the invention inserts towering noble metal tower mast
Schematic diagram in the preformed hole of bottom;
Figure 13 is the schematic diagram of the rod member that bottom hoop is connected to four vertical expandable types of one embodiment of the invention;
Figure 14 is that contactless insurance being supported of one embodiment of the invention extends the schematic diagram put in place;
Figure 15 is the schematic diagram that contactless suspender is lifted into position to be installed with crane of one embodiment of the invention;
Figure 16 is the schematic diagram removed from towering noble metal tower mast by contactless suspender of one embodiment of the invention;
Figure 17 is that cover plate is installed at the preformed hole position in the bottom of towering noble metal tower mast of one embodiment of the invention
Schematic diagram;
Figure 18 is that the guide post of one embodiment of the invention dismantles schematic diagram with flange bolt.
Detailed description of the invention
Understandable for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from, real with concrete below in conjunction with the accompanying drawings
The present invention is further detailed explanation to execute mode.
As illustrated in fig. 1 and 2, the present invention provides a kind of towering contactless sling system of noble metal tower mast, including:
Contactless suspender, described contactless suspender includes the cross antitorque hanging dish-type hoop 3 being arranged at top, with described ten
The rod member 5 of four vertical expandable types that word antitorque hanging dish-type hoop 1 connects, contactless with what described rod member 5 middle and upper part was connected
Insurance support 2, the bottom hoop 3 being connected with described rod member 5 middle and lower part, and with the claw-like plug-in type being connected bottom described rod member 5
Stress of encorbelmenting levers support 4, wherein, described contactless insurance support 2, for the middle and upper part to described towering noble metal tower mast 6
Carrying out contactless support, described claw-like plug-in type is encorbelmented stress levers support 4, for described towering noble metal tower mast 6
Bottom is supported;Here, the cross at top antitorque hanging dish-type hoop 1 encircles system with lower loop hoop 3 is integral, it is ensured that nothing
Contact suspender stability in the large, the claw-like of the contactless insurance support 2 of middle and upper part, the bottom hoop 3 of middle and lower part and bottom inserts
Formula stress levers support 4 of encorbelmenting forms three-point support trimming moment, it is ensured that the safety of hoisting process, by contactless suspender,
Lossless lifting towering noble metal tower mast 6 can be accomplished, can support, protect towering noble metal tower mast 6 not by external force friction damage so that it is
In hoisting process, have enough safeties, can realize lossless under the conditions of the horizontal and vertical of towering noble metal tower mast move,
Precisely installation is the most in place, the dismounting of suspender high-altitude is quick and easy, it is achieved has once lifted, has decreased towering noble metal tower mast
In high-altitude vertical transport and assembling operation time, improve the safety of its high-altitude application, the present invention can utilize contactless hanging
Towering noble metal tower mast is lifted by crane by tool and lifting rope entirety, it is to avoid work high above the ground is dangerous, it is not necessary to set up more than 50 meters high foot handss
Frame, safety is high,
Blind installation guide frame of wearing, described blind installation guide frame of wearing includes being arranged at the bottom of towering noble metal tower mast 6
Upper flange plate 7, be arranged at the lower flange 8 at position to be installed, wherein, described upper flange plate 7 is the most corresponding with on lower flange 8
It is provided with bolt hole 9, is provided with female thread in described bolt hole 9, in the bolt hole 9 of described lower flange 8, ring flange is installed
Bolt 10, described flange plate bolt 10 is provided with external screw thread, is used for and the bolt on described upper flange plate 7 and lower flange 8
The screw-internal thread fit in hole 9, connecting away from screw cap end of described flange plate bolt 10 has guide post 11.Here, guide post is easy to blind
When wearing, detect upper flange plate hole location, utilize guide post can detect upper flange plate docking location in hoisting process, blind
By overall for lower flange asymptotic movement during wearing, when touching upper flange plate hole location, form upper and lower two-way ring flange, lead
To the overall connection of bar, and it is effectively prevented bolt yawing moment in hoisting process and causes the spy of upper flange perforation difficulty
Point, it is achieved be directed to bar vertebral body principle and import upper flange plate smoothly, can be by the external screw thread on bolt and described upper flange plate
With the bolt hole screw-internal thread fit on lower flange, the tight flange plate bolt of bolt, carry out removing guide post.By towering noble metal tower mast
It is fixed on position to be installed, accomplishes the disposable location and installation of towering noble metal tower mast, operate and become simple by numerous, efficient, quick, steady
Fixed.
Preferably, as it is shown on figure 3, described cross antitorque hanging dish-type hoop 1 includes:
Cross hang 12, is formed by two cross angle steel interconnections;
With the described top hoop 13 supporting and being connected.Here, the design of cross antitorque hanging dish-type hoop can be effective against hanging
The moment of torsion effect of process of assembling, plays antitorque effect.
Preferably, as it is shown on figure 3, described top hoop 13 be shaped as square, to ensure cross antitorque hanging dish-type ring
The torsional strength of hoop.
Preferably, as it is shown on figure 3, one of each angle of described foursquare top hoop 13 and described cross hang from
Connected by end, to be further ensured that the torsional strength of cross antitorque hanging dish-type hoop.
Preferably, as it is shown on figure 3, be additionally provided with lifting rope hole 14 in described cross hang, during convenient lifting, wear lifting rope.
Preferably, as it is shown on figure 3, the rod member 5 of every vertical expandable type, respectively with one of described cross hang 12 from
Connected by end, it is ensured that the torsional strength of contactless suspender, can not reverse.
Preferably, as shown in Figure 4, the rod member 5 of every vertical expandable type is by scalable code part 15 and described cross-shaped
One free end of support 12 connects, and facilitates freely the launching and close of rod member of every vertical expandable type.
Preferably, described contactless insurance is supported for driven type contactless insurance support or the contactless insurance of rod-pulling type is propped up
Support.
Preferably, as it is shown in figure 5, the contactless insurance of described driven type supports 2 and includes being arranged at described vertical expandable type
Rod member 5 on actuating device 21, the four flexible gimbal levers 22 being connected with described actuating device 21, four latches 23, each
Latch 23 and the every flexible gimbal lever 22 are arranged on the rod member 5 of a described vertical expandable type, the every flexible gimbal lever 22
On be provided with the teeth groove coordinated with one of them latch, the free end of the every flexible gimbal lever 22 is provided with one 1/4th and closes
Cyclization 24, each 1/4th Guan Bi rings 24 are provided with rubber ring.Here, control stretching of the flexible gimbal lever by actuating device
Contracting, makes latch engage with the teeth groove of correspondence position, thus regulates four flexible gimbal lever collapsing lengths, the freedom of four gimbal levers
End forms close ring, and close ring inner side uses rubber ring, can be fixed on the middle and upper part of towering noble metal tower mast described
In close ring, it is achieved the contactless insurance clamping to towering noble metal tower mast, accomplish lossless fixing, prevent tower mast from lifting
Because rocking excessive and lateral tilt, collision in journey.
Preferably, as shown in Figure 6, described rod-pulling type contactless insurance support 2 includes being respectively arranged at vertical expandable type
Rod member 5 on pulley 25, four movable cross bars 26, be arranged at the retractor device 27 on movable cross bar 26, with described flexible dress
Put 27 and the steel wire rope 28 that connects of pulley 25, wherein, the movable company of the rod member 5 of every movable cross bar 26 and a vertical expandable type
Connecing, the free end of every movable cross bar 26 is provided with one 1/4th Guan Bi ring 24, and each 1/4th Guan Bi rings 24 set
It is equipped with rubber ring.Here, carry out stretching and positioning by activity cross bar with pulley structure by steel wire rope, retractor device, thus adjust
The collapsing length of four movable cross bars of joint, the free end of four cross bars forms close ring, and close ring inner side uses rubber
Circle, can be fixed on the middle and upper part of towering noble metal tower mast in described close ring, it is achieved connect the nothing of towering noble metal tower mast
Touch insurance clamping, accomplish lossless fixing, prevent tower mast in hoisting process because rocking excessive and lateral tilt, collision.
Preferably, as it is shown in fig. 7, described bottom hoop 3 include that the rod member 5 with vertical expandable type is connected four laterally
Rod member 31, encircles design up and down to be formed with top hoop 13, forms entirety.
Preferably, as it is shown in fig. 7, be respectively arranged with a L-shaped angle bar 32 on the rod member 5 of every vertical expandable type, often
Two free ends of individual L-shaped angle bar 32 are connected with a transverse bar member 31 respectively, thus ensure the rod member of vertical expandable type with
The bonding strength of transverse bar member.
Preferably, two free ends of each L-shaped angle bar 32 are connected with a transverse bar member 31 by bolt 33 respectively, from
And realize conveniently being removed completely by bottom hoop as shown in Figure 8 when fixing towering noble metal tower mast, fixing your gold towering
Again bottom hoop is loaded onto after belonging to tower mast, then lift by crane.
Preferably, the stress levers support 4 as it is shown in figure 9, claw-like plug-in type is encorbelmented, including four claw-like support lever 41,
Every claw-like support lever 41 is connected with the rod member 5 of a vertical expandable type, is used for extending into towering noble metal tower mast 6 and reserves
Kong Zhong.
Preferably, every claw-like support lever 41 is extensible with the rod member 5 of a vertical expandable type to be connected, and facilitates every
Support lever extend in towering noble metal tower mast preformed hole.
Preferably, every claw-like support lever 41 is additionally provided with bolt hole, facilitates every support lever to extend into towering
After in noble metal tower mast preformed hole, by coordinating of tower mast bolt and described bolt hole, every support lever is fixed on towering
On noble metal tower mast.
Preferably, as shown in figs. 2 and 10, being shaped as of described guide post 11 is cone-shaped, and point bottom, top is thick, i.e. with described
The connection end of flange bolt 10 is relatively thick, and the free end away from described flange bolt 10 is relatively thin, meets it accurate and the most in place
Requirement.
Preferably, as shown in figure 18, described guide post 11 makes dismountable two parts with described flange bolt 10, with
Guide post is removed at the tight flange plate bolt of bolt.
Preferably, as shown in Figure 10, described system also include being arranged at bottom described towering noble metal tower mast 6 blind wear peace
Outer housing 61 outside dress guide frame, is used for accommodating and blind wears installation guide frame, here, be the aesthetic property not destroying tower mast moulding,
Ad hoc meter one is covered into formula double flange, can upper flange plate and lower flange be hidden in completely bottom tower mast.
The installation method that the present invention also provides for a kind of towering contactless suspender of noble metal tower mast is as follows:
The first step: as shown in figure 11, opens the rod member 5 of four vertical expandable types of contactless suspender, contactless insurance
Support 2, bottom hoop 3;Now, the claw-like plug-in type of contactless suspender stress levers support 4 of encorbelmenting vertically may be used also with four
The expansion of the rod member of expansion and open;
Second step: as shown in figure 12, stress levers support of the claw-like plug-in type of contactless suspender being encorbelmented inserts towering expensive
In the preformed hole 62 of metal tower mast 6 bottom, thus, form bottom stress of encorbelmenting and support, contactless suspender and towering noble metal tower
Mast forms entirety, it is preferred that stress levers support of tower mast bolt claw-like plug-in type being encorbelmented is connected solid with towering noble metal tower mast
Fixed, to improve support effect;
3rd step: as shown in figure 13, is connected to the rod member 5 of four vertical expandable types by bottom hoop 3;Preferably, when
When being respectively arranged with a L-shaped angle bar on the rod member of every vertical expandable type, bottom hoop is connected to four and vertically can open up
The rod member of open type, including: two free ends of each L-shaped angle bar are connected by bolt and a transverse bar member respectively;
4th step: as shown in figure 14, supports 2 extensions by contactless insurance and puts in place, the towering noble metal tower mast 6 of fixing support,
To prevent its lateral tilt, collision, it is preferred that contactless insurance supports provides the selective use of two schemes, can be without connecing
Touch insurance to support, it is also possible to be that the contactless insurance of rod-pulling type supports, here, when described contactless insurance is supported for driven type without connecing
When touching insurance support, contactless insurance is supported extension and puts in place, including: control stretching of the flexible gimbal lever by actuating device,
Latch is made to engage with the teeth groove of correspondence position;When described contactless insurance is supported for rod-pulling type contactless insurance support, by nothing
Contact insurance supports extension and puts in place, including: carry out stretching and determining by activity cross bar with pulley structure by steel wire rope, retractor device
Position.
5th step: as shown in figure 15, is lifted into position to be installed with crane by contactless suspender;
6th step: as shown in Fig. 2 and 15, utilizes upper by towering noble metal tower mast 6 of the guide post 11 on flange plate bolt
After ring flange 7 is directed at the bolt hole 9 of the lower flange 8 at position to be installed, as shown in figure 16 by contactless suspender from your gold towering
Dismounting on genus tower mast 6, thus accomplish the disposable location and installation of towering noble metal tower mast, operate and become simple by numerous, efficient, quick,
Stable;Preferably, utilize the guide post on flange plate bolt by under the upper flange plate of towering noble metal tower mast and position to be installed
The bolt hole alignment of ring flange, including: utilize the guide post detection upper flange plate hole location on lower flange, blind through journey
Middle by overall for lower flange asymptotic movement, when guide post touches the hole location of upper flange plate, it is directed to bar and inserts upper method
Blue dish.
7th step: the tight flange plate bolt of bolt 10, to connect upper flange plate 7 and lower flange 8, it is achieved by towering noble metal
Tower mast is fixed on position to be installed.
Preferably, also include the 8th step after above-mentioned 6th step or the 7th step: as shown in figure 17, at towering noble metal tower mast
Cover plate 63 is installed at preformed hole 62 position of the bottom of 6, blind wears installation guide frame to cover, reaches the effect of overall appearance,
Thus complete the lifting of tower mast.
In sum, the present invention opens the rod member of four vertical expandable types of contactless suspender, contactless insurance supports,
Bottom hoop;Stress levers support of the claw-like plug-in type of contactless suspender being encorbelmented inserts the reserved of towering noble metal tower mast bottom
Kong Zhong;Bottom hoop is connected to the rod member of four vertical expandable types;Contactless insurance is supported extension put in place, fixing support
Towering noble metal tower mast;After contactless suspender being lifted into position to be installed with crane, by contactless suspender from towering noble metal tower
Removing on mast, the present invention can accomplish lossless lifting towering noble metal tower mast, can support, protect towering noble metal tower mast not by external force
Friction damage so that it is have enough safeties in hoisting process, can realize lossless under the conditions of the water of towering noble metal tower mast
Gentle vertically move, precisely install the most in place, the dismounting of suspender high-altitude is quick and easy, it is achieved once lifted, decreased height
Towering noble metal tower mast, in high-altitude vertical transport and assembling operation time, improves the safety of its high-altitude application, and the present invention is permissible
Utilize contactless suspender and lifting rope entirety that towering noble metal tower mast is lifted by crane, it is to avoid work high above the ground is dangerous, it is not necessary to set up super
Crossing 50 meters of high scaffolds, safety is high.
In this specification, each embodiment uses the mode gone forward one by one to describe, and what each embodiment stressed is and other
The difference of embodiment, between each embodiment, identical similar portion sees mutually.
Obviously, those skilled in the art can carry out various change and the modification spirit without deviating from the present invention to invention
And scope.So, if the present invention these amendment and modification belong to the claims in the present invention and equivalent technologies thereof scope it
In, then the present invention is also intended to change and including modification include these.
Claims (7)
1. the installation method of the towering contactless suspender of noble metal tower mast, it is characterised in that including:
Open the rod member of four vertical expandable types of contactless suspender, contactless insurance support, bottom hoop;
Stress levers support of the claw-like plug-in type of contactless suspender being encorbelmented inserts in the preformed hole of towering noble metal tower mast bottom;
Bottom hoop is connected to the rod member of four vertical expandable types;
Contactless insurance is supported extension put in place, the towering noble metal tower mast of fixing support;
After contactless suspender being lifted into position to be installed with crane, contactless suspender is removed from towering noble metal tower mast.
The installation method of the towering contactless suspender of noble metal tower mast the most as claimed in claim 1, it is characterised in that by contactless
Insurance supports extension and puts in place, after the fixing step supporting towering noble metal tower mast, also includes:
Stress levers support of tower mast bolt claw-like plug-in type being encorbelmented is connected fixing with towering noble metal tower mast.
The installation method of the towering contactless suspender of noble metal tower mast the most as claimed in claim 2, it is characterised in that described nothing connects
Tactile insurance is supported for the contactless insurance of driven type and supports or rod-pulling type contactless insurance support.
The installation method of the towering contactless suspender of noble metal tower mast the most as claimed in claim 2, it is characterised in that when described nothing
When contact insurance is supported for driven type contactless insurance support, contactless insurance is supported extension and puts in place, including:
Control the flexible of the flexible gimbal lever by actuating device, make latch engage with the teeth groove of correspondence position.
The installation method of the towering contactless suspender of noble metal tower mast the most as claimed in claim 2, it is characterised in that when described nothing
When contact insurance is supported for rod-pulling type contactless insurance support, contactless insurance is supported extension and puts in place, including:
Carry out stretching and positioning by activity cross bar with pulley structure by steel wire rope, retractor device.
The installation method of the towering contactless suspender of noble metal tower mast the most as claimed in claim 1, it is characterised in that by contactless
After the step that suspender is removed from towering noble metal tower mast, also include:
Cover plate is installed at the preformed hole position of the bottom of towering noble metal tower mast.
The installation method of the towering contactless suspender of noble metal tower mast the most as claimed in claim 1, it is characterised in that when every is erected
When being respectively arranged with a L-shaped angle bar on the rod member of expandable type, bottom hoop is connected to four vertical expandable types
Rod member, including:
Two free ends of each L-shaped angle bar are connected by bolt and a transverse bar member respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610191760.4A CN106049971B (en) | 2016-03-30 | 2016-03-30 | The installation method of the towering contactless suspender of noble metal tower mast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610191760.4A CN106049971B (en) | 2016-03-30 | 2016-03-30 | The installation method of the towering contactless suspender of noble metal tower mast |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106049971A true CN106049971A (en) | 2016-10-26 |
CN106049971B CN106049971B (en) | 2018-08-17 |
Family
ID=57484274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610191760.4A Active CN106049971B (en) | 2016-03-30 | 2016-03-30 | The installation method of the towering contactless suspender of noble metal tower mast |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106049971B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107985323A (en) * | 2017-12-07 | 2018-05-04 | 上海宇航***工程研究所 | A kind of carrier rocket entrucking and railway transportation method |
CN110469097A (en) * | 2019-07-15 | 2019-11-19 | 上海市建筑装饰工程集团有限公司 | A kind of inside and outside shelf of tower mast structure lifting |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CS275842B6 (en) * | 1988-06-28 | 1992-03-18 | Montas | Equipment for steel chimneys dismantling |
CN202414958U (en) * | 2012-01-05 | 2012-09-05 | 湖南南方搏云新材料有限责任公司 | Multifunctional lifting appliance |
CN203319499U (en) * | 2013-05-08 | 2013-12-04 | 中国海洋石油总公司 | Shaft tube hoisting device |
CN103626022A (en) * | 2013-12-09 | 2014-03-12 | 天津市金万方钢结构有限公司 | Steel coil hoisting tool |
CN204096903U (en) * | 2014-08-12 | 2015-01-14 | 中国南方电网有限责任公司超高压输电公司天生桥局 | A kind of change of current becomes winding hoisting structure |
-
2016
- 2016-03-30 CN CN201610191760.4A patent/CN106049971B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CS275842B6 (en) * | 1988-06-28 | 1992-03-18 | Montas | Equipment for steel chimneys dismantling |
CN202414958U (en) * | 2012-01-05 | 2012-09-05 | 湖南南方搏云新材料有限责任公司 | Multifunctional lifting appliance |
CN203319499U (en) * | 2013-05-08 | 2013-12-04 | 中国海洋石油总公司 | Shaft tube hoisting device |
CN103626022A (en) * | 2013-12-09 | 2014-03-12 | 天津市金万方钢结构有限公司 | Steel coil hoisting tool |
CN204096903U (en) * | 2014-08-12 | 2015-01-14 | 中国南方电网有限责任公司超高压输电公司天生桥局 | A kind of change of current becomes winding hoisting structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107985323A (en) * | 2017-12-07 | 2018-05-04 | 上海宇航***工程研究所 | A kind of carrier rocket entrucking and railway transportation method |
CN110469097A (en) * | 2019-07-15 | 2019-11-19 | 上海市建筑装饰工程集团有限公司 | A kind of inside and outside shelf of tower mast structure lifting |
CN110469097B (en) * | 2019-07-15 | 2024-06-04 | 上海市建筑装饰工程集团有限公司 | Lifting inner and outer frame of tower mast structure |
Also Published As
Publication number | Publication date |
---|---|
CN106049971B (en) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106044564A (en) | Installation method for blind penetrating installation guide structure | |
CN205114843U (en) | Prefabricated post hoist device with unhook function | |
CN106049971A (en) | Installation method of non-contact-point lifting appliance for towering noble metal tower mast | |
CN102979297B (en) | Hanging type stairwell operating platform mechanism and construction method thereof | |
CN207554968U (en) | A kind of lifting pipeline stent | |
CN205857889U (en) | The towering contactless suspender of noble metal tower mast | |
CN205855781U (en) | The lower flange of guide | |
CN103332624B (en) | A kind of pulley for high-altitude circuit or caliber and installation method thereof | |
CN106044544A (en) | Installation method for contactless lifting sling system of towering precious metal tower mast | |
CN106049970A (en) | Installation method of non-contact-point lifting appliance system for towering noble metal tower mast | |
CN204474202U (en) | Large-tonnage steel member integrated hoisting fixture | |
CN207684728U (en) | Towering noble metal tower mast sling system | |
CN202785255U (en) | Turnover hoisting tool for reinforced concrete pipe joint | |
CN106049969A (en) | Non-contact-point lifting appliance for towering noble metal tower mast | |
CN206569893U (en) | Contactless insurance supporting construction | |
CN106044542A (en) | Contactless lifting sling system for towering precious metal tower mast | |
CN106044545A (en) | Blind penetrating installation guide structure | |
CN206544866U (en) | It is blind to wear installation guide frame | |
CN205653104U (en) | Walking crane of cell board curtain installation | |
CN204355947U (en) | Large-scale without eye plate lifting beam device | |
CN206014235U (en) | Three point supporting balance structure | |
CN106044549B (en) | It covers and wears installation guide frame into formula double flange bolt is blind | |
CN205348817U (en) | Safety belt pendant | |
CN101003350B (en) | Erecting and mounting method for up-rotation self erecting tower crane | |
CN106044543A (en) | Contactless lifting sling system for towering precious metal tower mast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |