CN106010589A - Integrated replacement method of key export equipment for crude gas from large-capacity coke oven - Google Patents

Integrated replacement method of key export equipment for crude gas from large-capacity coke oven Download PDF

Info

Publication number
CN106010589A
CN106010589A CN201610346402.6A CN201610346402A CN106010589A CN 106010589 A CN106010589 A CN 106010589A CN 201610346402 A CN201610346402 A CN 201610346402A CN 106010589 A CN106010589 A CN 106010589A
Authority
CN
China
Prior art keywords
coke oven
tedge
key equipment
molectron
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610346402.6A
Other languages
Chinese (zh)
Inventor
张建
仇振东
王玉敏
迟法铭
李福成
骆春嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Inner Mongolia Baotou Steel Union Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN201610346402.6A priority Critical patent/CN106010589A/en
Publication of CN106010589A publication Critical patent/CN106010589A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B27/00Arrangements for withdrawal of the distillation gases
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B27/00Arrangements for withdrawal of the distillation gases
    • C10B27/06Conduit details, e.g. valves
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/02Brickwork, e.g. casings, linings, walls

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Coke Industry (AREA)

Abstract

The invention discloses an integrated replacement method of key export equipment for crude gas from a large-capacity coke oven. The method comprises the following steps: assembling the key export equipment into an assembly; checking the auxiliary equipment of the assembly, coordinating the planned maintenance time of the coke oven, coordinating the operating personnel, identifying dangerous sources, and preparing preventive measures according to the operation characters; integrally taking down the key export equipment by operating a lifting appliance, replacing and taking down the key export equipment by utilizing the assembly, installing the assembly in a position of the key export equipment, and installing and connecting the auxiliary equipment of the assembly. By the integrated replacement method provided by the invention, the key export equipment for crude gas is integrally replaced in a production state of the large-capacity coke oven, i.e., a water seal seat, a bridge pipe, a riser pipe and a riser pipe base are replaced, so that the replacement is relatively time-saving and the maneuverability is relatively strong.

Description

Key equipment integral replacing method derived by large capacity coke oven raw coke oven gas
Technical field
The present invention relates to the maintenance technology of a kind of large capacity coke oven, specifically, relate to a kind of large capacity coke oven Key equipment integral replacing method derived by raw coke oven gas.
Background technology
The key equipment order from bottom to top that derives of raw coke oven gas is: tedge base, tedge, bridge tube And water seal seat, the raw coke oven gas in coke oven sequentially passes through tedge base, tedge, bridge tube and water seal seat, Water seal seat is connected with coke-stove gas conveyance conduit.After coke oven is gone into operation, production has continuous, continual Feature.Along with the coke oven life-span steps into middle and late stage, because of design or original construction quality problem, tedge or on Phenomenon is snapped owing to serious scaling loss there will be in the local of riser base, in causing tedge and tedge base The raw coke oven gas leakage of conveying, causes environmental pollution;Or cause bridge tube and water seal seat entirety imbalance to be inclined Tiltedly, so cause tedge water seal segregation, water seal height not, water seal weak effect, cause raw coke oven gas from Water seal seat is excessive.It addition, often occur that water seal water tilts to burner position, cause jamb brick well damage, Tie rod corrodes and then makes burner position tie rod hook that string leakage occur.
Comprehensive factors above analysis, coke oven produces the regular period and is accomplished by tedge or tedge base It is replaced.It is individually replaced any equipment and is required for first taking away the equipment on its top, operation is complicated, Replacing requires time for longer, at least needs 4-5 hour, has typically been difficult within the coke oven normal service phase Replacing task.
Summary of the invention
It is whole that technical problem solved by the invention is to provide a kind of large capacity coke oven raw coke oven gas derivation key equipment Body replacing options so that replacing more saves time, operability is higher.
Technical scheme is as follows:
Key equipment integral replacing method derived by a kind of large capacity coke oven raw coke oven gas, including:
Derivation key equipment is combined into molectron;
Check the auxiliary device of molectron, coordinate the coke oven scheduled overhaul time, coordinative operation personnel, according to Operating feature, carries out hazard Identification identification, gets out safe precaution measure;
Operation suspender entirety takes off derivation key equipment, utilizes molectron to change and takes off derivation key equipment, Molectron is installed to derive the position of key equipment, is mounted and connected the auxiliary device of molectron.
Further, the step that derivation key equipment is combined into molectron includes:
Make upper semisection and the lower semisection of tedge to be replaced, at the two ends welded flange of upper semisection, The two ends welded flange of lower semisection;
Resistance to by carrying out as requested inside tedge base to be replaced, upper semisection, lower semisection, bridge tube building Firebrick;
After building refractory brick, upper semisection and lower semisection are passed through flange and bolt assembly and connection, and in method Blue junction flange packing seal, forms tedge to be replaced;
With bolt, tedge base to be replaced, tedge, bridge tube are connected, the flange outside tedge Connect flange and the flange of bridge tube of tedge base respectively, water seal seat is arranged on bridge tube, and uses stone Cotton cord seals, and is combined into molectron.
Further, the step utilizing molectron replacing to take off derivation key equipment includes:
Calculate the coke pushing time, clear up to be changed bell and spigot, push the refractory material of tedge base position aside, and Disconnect water in be changed ammonia and water seal;
Sling and derive key equipment and remove;
Cleaning tedge base position refractory material, is newly built tedge base brick, and it is tight to be in the milk by code;
Sling molectron, and have bad luck to be changed position, install as requested and put in place;
Confirm that installation site and relative dimensions are errorless, tight tedge base and bell and spigot, connect bridge tube ammonia Water sprays and water in water seal.
Further, also include: after all installing tightly, site clearing rubbish, make that newly changes to lead Go out key equipment to recover to production status.
Compared with prior art, the technology of the present invention effect includes:
1, utilizing the present invention, large capacity coke oven carries out integral replacing raw coke oven gas under production status derives key Equipment, i.e. changes water seal seat, bridge tube, tedge and tedge base so that replacing more saves time, can grasp The property made is higher.
2, the present invention uses integral replacing method to change in large capacity coke oven by tedge, tedge base, bridge Pipe and the molectron of water seal seat composition, have the features such as the used time is short, intensity is low, by major part furnace roof high temperature The regional work time is transferred in preliminary preparation, it is ensured that more changing jobs can be in the shorter maintenance of coke oven Complete in time, general at most need 2.5 hours, thus neither affect coke oven and normally produce and turn avoid In furnace roof high-temperature area long working.
3, remarkable in economical benefits of the present invention, and the potential safety hazard in production process can be eliminated.
The equipment loss that smoldering by every coal oven dithio-gas equipment leading out catches fire causes is with gas leak benefit about 350000 yuan/year, the environmental pollution caused of catching fire but effective solution coal oven dithio-gas equipment leading out is smoldered, carry Rising coking technique management level, the social benefit highlighted is bigger, also eliminates raw coke oven gas equipment leading out simultaneously The potential safety hazard that breakage brings.
Detailed description of the invention
Below with reference to preferred embodiment, contrast technical solution of the present invention elaborates.
Do not affect coke oven production to save the operating time, substantial amounts of work is all placed on early-stage preparations as far as possible In work, carry out raw coke oven gas derivation key equipment integral replacing and large capacity coke oven hot repair is safeguarded have extremely Important meaning.
Operation in order to overcome coke oven coke oven uprising tube or tedge base to change is complicated, affect the tired of coke oven production Difficult.The present invention replaces with the method for riser or tedge base and is made that new elaboration large capacity coke oven, Propose integral replacing tedge base, tedge, bridge tube and water seal seat, using above-mentioned parts as combination Part carrys out integral replacing, and early-stage preparations and operating procedure have been carried out system specifications and optimization.Integral replacing is Tedge, tedge base, bridge tube and water seal seat are measured in advance and be assembled into molectron, when changing After first the worn part entirety changing heat (batch) number being needed to unload, directly new equipment entirety good for overall package is hung Fill and install and put in place.
Specifically comprising the following steps that of key equipment integral replacing method derived by large capacity coke oven raw coke oven gas
Step 1: derivation key equipment is combined into molectron;
Step 11: make upper semisection and the lower semisection of tedge to be replaced, welds at the two ends of upper semisection Flange, at the two ends welded flange of lower semisection;
Measure every size of tedge to be replaced, and consult the tedge size of drawing and to be replaced number Verification calibration, it is ensured that need the every size of tedge changed suitable, prepare simultaneously new tedge base, Bridge tube and water seal seat.
Step 12: by inside tedge base to be replaced, upper semisection, lower semisection, bridge tube as requested Carry out building refractory brick;
Step 13: after building refractory brick, passes through flange and bolt assembly and connection by upper semisection and lower semisection, And in the flange packing seal of the junction of flange, form tedge to be replaced;
The height of lower semisection is 1.6m, according to the slope requirement of discharge, upper semisection determines that size, flange are filled out Material is selectedAsbestos cord.New tedge can make thermal stress expansion concentrate at flange packing, it is to avoid on Riser deformation or weld seam crack because of expansion, and segment design facilitates internal operation of laying bricks because shortening height.
Step 14: tedge base to be replaced, tedge, bridge tube are connected, outside tedge with bolt The flange of side connects the flange of tedge base and the flange of bridge tube respectively, is arranged on bridge tube by water seal seat, And seal with asbestos cord, it is combined into molectron.
Asbestos cord is selectedAsbestos cord.
Step 2: check the auxiliary device of molectron, coordinates coke oven scheduled overhaul time, coordinative operation people Member, according to operating feature, carries out hazard Identification identification, gets out safe precaution measure;
Check the auxiliary device of molectron, including: to be changed valve body turnover panel, low pressure ammonia cock, high pressure Ball valve and water seal water supply valve, airduct, coal car ceiling mounted arm or crane tool put in place.Coordinate coke oven scheduled overhaul Time, make to be changed number after 2/3 coking time, and replacing construction to be ensured is at more than 2h.Coordinate to make Industry personnel, mainly have frame work, plumber, pneumoelectric welder, bricklayer and coal tar car driver etc..
Step 1 and step 2 are the preliminary preparations of replacement operation.
Step 3: operation suspender entirety takes off derivation key equipment, utilizes molectron to change and takes off derivation pass Button apparatus, is installed to molectron derive the position of key equipment, is mounted and connected the attached of molectron and sets Standby.
Step 31: calculate the coke pushing time;
Preferably within first about 4 hours, start to change molectron in be changed coke pushing.
Step 32: clear up to be changed bell and spigot, pushs the refractory material of tedge base position aside, and disconnection is treated Water on the number of changing ammonia and water seal;
Step 32: derivation key equipment of slinging (tedge base, tedge, bridge tube and water seal seat combination Part), and remove;
Paying special attention to, when hoisting facilities is installed, coal car is crossed in sling height to be considered molectron to be met bottom Track, in order to have bad luck molectron time-consuming;
Step 33: cleaning tedge base position refractory material, is newly built tedge base brick by code, and Grouting is tight;
Step 33: molectron of slinging, and have bad luck to be changed position, install as requested and put in place;
Step 34: confirm that installation site and relative dimensions are errorless, tight tedge base and bell and spigot, even Connect bridge tube ammonia to spray and water in water seal;
Step 35: after all installing tightly, site clearing rubbish, make the derivation key newly changed set Standby recovery is to production status.

Claims (4)

1. a key equipment integral replacing method derived by large capacity coke oven raw coke oven gas, including:
Derivation key equipment is combined into molectron;
Check the auxiliary device of molectron, coordinate the coke oven scheduled overhaul time, coordinative operation personnel, according to Operating feature, carries out hazard Identification identification, gets out safe precaution measure;
Operation suspender entirety takes off derivation key equipment, utilizes molectron to change and takes off derivation key equipment, Molectron is installed to derive the position of key equipment, is mounted and connected the auxiliary device of molectron.
2. key equipment integral replacing method derived by large capacity coke oven raw coke oven gas as claimed in claim 1, It is characterized in that, the step that derivation key equipment is combined into molectron is included:
Make upper semisection and the lower semisection of tedge to be replaced, at the two ends welded flange of upper semisection, The two ends welded flange of lower semisection;
Resistance to by carrying out as requested inside tedge base to be replaced, upper semisection, lower semisection, bridge tube building Firebrick;
After building refractory brick, upper semisection and lower semisection are passed through flange and bolt assembly and connection, and in method Blue junction flange packing seal, forms tedge to be replaced;
With bolt, tedge base to be replaced, tedge, bridge tube are connected, the flange outside tedge Connect flange and the flange of bridge tube of tedge base respectively, water seal seat is arranged on bridge tube, and uses stone Cotton cord seals, and is combined into molectron.
3. key equipment integral replacing method derived by large capacity coke oven raw coke oven gas as claimed in claim 1, It is characterized in that, the step utilizing molectron replacing to take off derivation key equipment includes:
Calculate the coke pushing time, clear up to be changed bell and spigot, push the refractory material of tedge base position aside, and Disconnect water in be changed ammonia and water seal;
Sling and derive key equipment and remove;
Cleaning tedge base position refractory material, is newly built tedge base brick, and it is tight to be in the milk by code;
Sling molectron, and have bad luck to be changed position, install as requested and put in place;
Confirm that installation site and relative dimensions are errorless, tight tedge base and bell and spigot, connect bridge tube ammonia Water sprays and water in water seal.
4. key equipment integral replacing method derived by large capacity coke oven raw coke oven gas as claimed in claim 3, It is characterized in that, also include: after all installing tightly that site clearing rubbish makes that newly changes to lead Go out key equipment to recover to production status.
CN201610346402.6A 2016-05-23 2016-05-23 Integrated replacement method of key export equipment for crude gas from large-capacity coke oven Pending CN106010589A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610346402.6A CN106010589A (en) 2016-05-23 2016-05-23 Integrated replacement method of key export equipment for crude gas from large-capacity coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610346402.6A CN106010589A (en) 2016-05-23 2016-05-23 Integrated replacement method of key export equipment for crude gas from large-capacity coke oven

Publications (1)

Publication Number Publication Date
CN106010589A true CN106010589A (en) 2016-10-12

Family

ID=57096768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610346402.6A Pending CN106010589A (en) 2016-05-23 2016-05-23 Integrated replacement method of key export equipment for crude gas from large-capacity coke oven

Country Status (1)

Country Link
CN (1) CN106010589A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107286960A (en) * 2017-07-12 2017-10-24 攀钢集团攀枝花钢钒有限公司 Replacing options for the tall and big volume list discharge coke oven coke oven uprising tubes of 5~8m
CN111961480A (en) * 2020-07-06 2020-11-20 甘肃酒钢集团宏兴钢铁股份有限公司 Coke oven water-sealed bridge pipe valve body replacing method
CN112724988A (en) * 2020-12-29 2021-04-30 黑龙江建龙化工有限公司 New method for replacing riser bridge pipe

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6121187A (en) * 1984-07-10 1986-01-29 Nippon Steel Corp Method of removing attached carbon in coking chamber of coke oven
CN102304366A (en) * 2011-08-03 2012-01-04 莱芜钢铁股份有限公司 Correction method for detachment of connection position of coke oven bridge pipe and bell and spigot faucet
CN104877692A (en) * 2015-04-27 2015-09-02 北京市中科天一环境技术有限公司 Heat recovery unit for raw coke oven gas of ascending pipe of coke oven

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6121187A (en) * 1984-07-10 1986-01-29 Nippon Steel Corp Method of removing attached carbon in coking chamber of coke oven
CN102304366A (en) * 2011-08-03 2012-01-04 莱芜钢铁股份有限公司 Correction method for detachment of connection position of coke oven bridge pipe and bell and spigot faucet
CN104877692A (en) * 2015-04-27 2015-09-02 北京市中科天一环境技术有限公司 Heat recovery unit for raw coke oven gas of ascending pipe of coke oven

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李文祥等: "焦炉桥管水封阀体的更换方法", 《燃料与化工》 *
杨宏彪: "浅谈焦炉生产中桥管开裂的几种处理办法", 《民营科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107286960A (en) * 2017-07-12 2017-10-24 攀钢集团攀枝花钢钒有限公司 Replacing options for the tall and big volume list discharge coke oven coke oven uprising tubes of 5~8m
CN111961480A (en) * 2020-07-06 2020-11-20 甘肃酒钢集团宏兴钢铁股份有限公司 Coke oven water-sealed bridge pipe valve body replacing method
CN112724988A (en) * 2020-12-29 2021-04-30 黑龙江建龙化工有限公司 New method for replacing riser bridge pipe

Similar Documents

Publication Publication Date Title
CN108003901B (en) Coke oven bridge pipe replacing method and replacing auxiliary device thereof
CN106010589A (en) Integrated replacement method of key export equipment for crude gas from large-capacity coke oven
CN105238420B (en) Coke oven coke oven uprising tube more exchange device and coke oven coke oven uprising tube replacing options
CN105369002B (en) A kind of hot air furnace hot air branch pipe repairing inner liner frock and its method for repairing and mending
CN109182630A (en) The restorative procedure of damaged cooling wall of blast furnace
CN110079338B (en) Coke oven body dismantling and rebuilding method
CN107699650A (en) A kind of installation method of blast furnace cooling stave
CN105018112A (en) Method for replacing ascending pipe base of coke oven
CN106834589B (en) Converter Maintenance method
CN110643766B (en) Blast furnace taphole mud sleeve safety detection and repair operation method
CN111961480A (en) Coke oven water-sealed bridge pipe valve body replacing method
CN107446595A (en) A kind of method of full stove integral replacing coke oven coke oven uprising tube
CN104061784B (en) Annular lime kiln maintenance construction method
CN107699254A (en) The maintenance process of coke oven coke oven uprising tube
CN102134620B (en) Blast furnace shaft upper part rapid heating for producing lining by wet method
CN104342175A (en) Method for hot repairing of local damage of coking chamber wall of coke oven
CN204874566U (en) Device is changed to blast furnace hot -blast valve
CN104560065A (en) False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute
CN203904257U (en) Improved coal gas weight connecting rod for coke oven exchange shutter
CN110779336A (en) Hot-state repairing device and method for burn-through molten hole of carbon pot type calcining furnace
CN107671790B (en) A kind of online replacing options of coke oven valve body
CN207108918U (en) A kind of cracking apparatus for preparing water tar of highly effective and safe
CN211739877U (en) Plain pot-type calcining furnace burn-through molten tunnel hot state patching device of charcoal
CN104946835B (en) Blast furnace hot-blast valve maintenance platform
CN204848742U (en) Coke oven crude gas cutting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication