CN105986755A - Integrated climbing device - Google Patents
Integrated climbing device Download PDFInfo
- Publication number
- CN105986755A CN105986755A CN201610503847.0A CN201610503847A CN105986755A CN 105986755 A CN105986755 A CN 105986755A CN 201610503847 A CN201610503847 A CN 201610503847A CN 105986755 A CN105986755 A CN 105986755A
- Authority
- CN
- China
- Prior art keywords
- main body
- expansion link
- integral type
- climbing device
- holding table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C5/00—Ladders characterised by being mounted on undercarriages or vehicles Securing ladders on vehicles
- E06C5/02—Ladders characterised by being mounted on undercarriages or vehicles Securing ladders on vehicles with rigid longitudinal members
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C5/00—Ladders characterised by being mounted on undercarriages or vehicles Securing ladders on vehicles
- E06C5/32—Accessories, e.g. brakes on ladders
- E06C5/44—Other accessories on ladders, e.g. acoustical signalling devices, dismountable switchboards
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C7/00—Component parts, supporting parts, or accessories
- E06C7/14—Holders for pails or other equipment on or for ladders
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ladders (AREA)
Abstract
The invention provides an integrated climbing device. The integrated climbing device comprises a main body, a climbing part and an object placement part, wherein the climbing part is mounted on the main body; and the object placement part is mounted on the main body in a stretchable manner and is used for placing tools. A worker climbs to an appointed height by virtue of the integrated climbing device and can place and fetch the tools only through the object placement part, so that the problems that the time and the force are wasted by the repeated climbing of the worker when the tools are fetched are avoided.
Description
Technical field
The present invention relates to emergency staircase technical field, in particular to a kind of integral type climbing device.
Background technology
In the regular maintenance of communications equipment room and operation, due to attendant and the height differences of various distributing frame, and from safety
Angle considers, emergency staircase is the most frequent Work tool being used, the emergency staircase of existing machine room there is problems in that 1 in use,
Emergency staircase is heavy, there is strength defect when pulling;Upper and lower emergency staircase access is needed repeatedly to need to use when 2, the line inspection, wire jumper
Instrument;3, stand in the rubbish such as the end of a thread produced in wire jumper on emergency staircase, bonding process to concentrate placement and process.
Summary of the invention
Present invention is primarily targeted at a kind of integral type climbing device of offer, to solve during staff uses emergency staircase
The problem needing repeatedly to climb fetching tool.
To achieve these goals, the invention provides a kind of integral type climbing device, this integral type climbing device includes: main body;
Climbing section, climbing section is arranged in main body;Placing part, placing part is retractably installed in main body for place tool.
Further, placing part includes: pars contractilis, and pars contractilis is arranged in main body;Rack, rack is arranged on pars contractilis
On.
Further, the short transverse of pars contractilis and body normal, pars contractilis includes: the first expansion link, the of the first expansion link
One end is connected with main body, and the second end of the first expansion link is provided with the first telescopic mouth, and the first expansion link is internally provided with to be stretched with first
First receiving chamber of reducing connection;Second expansion link, the second expansion link is telescopically disposed in the first receiving chamber, and rack is pacified
It is contained on the second expansion link.
Further, rack includes link and articles holding table, and the first end of link is arranged on the second expansion link, articles holding table
The first end be connected with link, the second end of articles holding table and the second expansion link connect.
Further, the second expansion link includes: the first telescopic section, and the first telescopic section is telescopically disposed in the first receiving chamber,
First telescopic section is provided with the second telescopic mouth away from one end of main body, and the first telescopic section is internally provided with and connects with the second telescopic mouth
Second accommodates chamber;Second telescopic section, the second telescopic section is movably disposed in the second receiving chamber;First end of link and
One telescopic section is hinged, and the second end of link is hinged with the first end of articles holding table, and the second end and second telescopic section of articles holding table are hinged.
Further, the first end of articles holding table is provided with shutter, and shutter is used for preventing instrument from dropping.
Further, the top of climbing section is provided with receiving box.
Further, climbing section is emergency staircase.
Further, the bottom of main body is provided with roller.
Further, main body is provided with control portion.
Application technical scheme, owing to the integral type climbing device of the present invention not only has climbing section but also have placing part, work
When making, staff upwards climbs specified altitude assignment by climbing section and is operated, meanwhile, equipped with instrument on placing part, and work
Personnel only need to be carried out by placing part when taking instrument, it is to avoid repeatedly climb, when staff takes instrument, the expense caused
Time laborious problem.
Accompanying drawing explanation
The Figure of description of the part constituting the application is used for providing a further understanding of the present invention, and the present invention's is schematic real
Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 diagrammatically illustrates the structure chart of the integral type climbing device of the present invention.
Wherein, above-mentioned accompanying drawing includes the following drawings labelling:
10, main body;11, roller;12, control portion;20, climbing section;30, placing part;31, the first expansion link;32,
Two expansion links;321, the first telescopic section;322, the second telescopic section;33, articles holding table;331, shutter;34, link;
40, box is accommodated.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can be mutually combined.
Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
It it is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless otherwise finger
Bright, all technology used herein and scientific terminology have and are generally understood that with the application person of an ordinary skill in the technical field
Identical meanings.
It should be noted that term used herein above merely to describe detailed description of the invention, and be not intended to restricted root according to this Shen
Illustrative embodiments please.As used herein, unless the context clearly indicates otherwise, otherwise singulative is also intended to
Including plural form, additionally, it should be understood that, when using term " to comprise " in this manual and/or time " including ", its
Indicate existing characteristics, step, operation, device, assembly and/or combinations thereof.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, " second " etc.
It is for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that the term of so use
Can exchange in the appropriate case, in order to presently filed embodiment described herein such as can be with except here illustrating or retouching
Order beyond those stated is implemented.
Additionally, term " includes " and " having " and their any deformation, it is intended that cover non-exclusive comprising, example
As, contain series of steps or the process of unit, method, system, product or equipment are not necessarily limited to those that clearly list
Step or unit, but can include the most clearly listing or for intrinsic other of these processes, method, product or equipment
Step or unit.
For the ease of describing, space relative terms here can be used, as " ... on ", " ... top ", " ...
Upper surface ", " above " etc., be used for describing such as a device shown in the figure or feature and other devices or the space bit of feature
Put relation.It should be appreciated that space relative terms is intended to comprise using in addition to the orientation that device is described in the drawings
Or the different azimuth in operation.
Such as, " above other devices or structure " if the device in accompanying drawing is squeezed, then it are described as or " at other devices or structure
On making " device after will be positioned as " other devices or structure below " or " other devices or structure under ".Thus,
Exemplary term " in ... top " can include " in ... top " and " in ... lower section " two kinds of orientation.This device can also other
Different modes location (90-degree rotation or be in other orientation), and space used herein above is described relatively make corresponding solution
Release.
Shown in Figure 1, the invention provides a kind of integral type climbing device, this integral type climbing device includes main body 10, climbs
Climbing portion 20 and placing part 30, wherein, climbing section 20 is arranged in main body 10, and placing part 30 is retractably installed at main body 10
Upper for place tool.When the integral type climbing device of the present invention works, staff arrives specified altitude assignment by climbing section 20 climbing,
The most corresponding height regulating placing part 30, when needs exchange instrument for, staff only need to exchange instrument for i.e. by placing part
Can, it is to avoid repeatedly climb, when staff takes instrument, the problem that wastes time and energy caused.
Specifically, the placing part 30 in the present invention includes pars contractilis and rack, and during installation, pars contractilis is arranged on main body 10
On, rack is arranged on pars contractilis.During work, instrument is loaded in rack, regulates rack by pars contractilis
Height, to adapt to the climbing height of staff, facilitates staff to carry out exchanging instrument for.
Shown in Figure 1, the short transverse of the pars contractilis in the present invention is vertical with main body 10, and pars contractilis includes the first expansion link 31
With the second expansion link 32, the first end of the first expansion link 31 is connected with main body 10, and the second end of the first expansion link 31 is provided with
One telescopic mouth, the first expansion link 31 is internally provided with the first receiving chamber connected with the first telescopic mouth;Second expansion link 32 can be stretched
Being arranged in the first receiving chamber to contracting, rack is arranged on the second expansion link 32.When the height of rack is insufficient for work
During the climbing height of personnel, the second expansion link 32 stretches out from the first of the first expansion link 31 the receiving chamber, drives rack to raise,
Till the height enabling rack facilitates staff to exchange instrument in climbing section 20.Wherein, second in the present invention
It can be to be manually pulled out that expansion link 32 accommodates, from first, the mode stretched out chamber, it is also possible to drive second by driving means such as motors
Expansion link 32 stretches out.
In order to make the second expansion link 32 in the present invention can be stably maintained at this specified altitude assignment, preferably after arriving specified altitude assignment
Ground, is provided with lockable mechanism, after the second expansion link 32 moves to specified altitude assignment, by lockable mechanism pair at the first telescopic mouth
Second expansion link 32 locks so that it is be maintained at this specified altitude assignment.This locking structure can be latch locking mechanism, it is possible to
To be screw fastening locking mechanism, certainly, as long as other mechanisms of the latch functions of the lockable mechanism met in the present invention.
In order to prevent the instrument landing on rack, it is preferable that the rack in the present invention includes link 34 and articles holding table 33,
First end of link 34 is arranged on the second expansion link 32, and the first end of articles holding table 33 is connected with link 34, articles holding table
Second end and second expansion link 32 of 33 connect.During work, articles holding table 33 is connected frame 34 and supports, and makes articles holding table 33 incline
(angle of inclination of articles holding table 33 mentioned herein refers to when articles holding table rotates clockwise and level side the most certain angle
Angle between to), after instrument is placed on articles holding table 33, the direction slant setting that instrument tilts along articles holding table 33, make instrument weight
The heart leans against on articles holding table, prevents instrument landing.
Place to adapt to Different Weight and various sizes of instrument to make articles holding table 33 can change its angle of inclination, it is preferable that
Second expansion link 32 includes the first telescopic section 321 and the second telescopic section 322, and wherein, the first telescopic section 321 is telescopically arranged
Accommodating in chamber first, the first telescopic section 321 is provided with the second telescopic mouth, in the first telescopic section 321 away from one end of main body 10
Portion is provided with the second receiving chamber connected with the second telescopic mouth, and the second telescopic section 322 is movably disposed in the second receiving chamber;
First end and first telescopic section 321 of link 34 are hinged, and the second end of link 34 is hinged with the first end of articles holding table 33,
Second end and second telescopic section 322 of articles holding table 33 are hinged.(the institute here when needing the angle of inclination making articles holding table 33 to become big
The angle of inclination of the articles holding table 33 mentioned refers to angle when articles holding table rotates clockwise and between horizontal direction), make
Two telescopic sections 322 accommodate chamber from second stretches out, and the second end of articles holding table 33 moves along with the second telescopic section 322, articles holding table 33
Angle of inclination become larger.When needing to make the angle of inclination of articles holding table 33 diminish, the second telescopic section 322 is made to accommodate to second
Moving in chamber, the second end of articles holding table 33 moves facing to the second telescopic section 322, and the angle of inclination of articles holding table 33 tapers into.
In order to prevent instrument from dropping from articles holding table 33 further, it is preferable that the first end of articles holding table 33 is provided with shutter 331,
Wherein, the first end of articles holding table 33 refers to articles holding table 33 one end away from pars contractilis, and shutter 331 is used for preventing instrument from dropping.
During work, the instrument on articles holding table 33 is blocked by shutter 331, prevents instrument from dropping.Certainly, the glove in the present invention
First end of platform 33 can also arrange other barrier structures, is not limited only to shutter 331.
Staff can produce certain waste material during working in climbing section 20, is collected these waste materials for convenience,
Avoiding waste material to drop, the top of the climbing section 20 in the present invention is provided with receiving box 40.
Preferably, the climbing section 20 in the present invention is emergency staircase.During work, staff is arrived by climbing emergency staircase and specifies height
Degree.
The movement of the integral type climbing device of the present invention for convenience, it is preferable that the bottom of main body 10 is provided with roller 11.Work
Time, reduce the frictional force between integral type climbing device and ground by the rolling of roller 11, and then make the integral type of the present invention
Climbing device is more smooth during movement.
For the ease of controlling the movement of the integral type climbing device in the present invention, it is preferable that be provided with in the main body 10 in the present invention
Control portion 12.Specifically, the control portion 12 in the present invention includes connecting rod and handle, the first end of connecting rod and main body 10
Fixing connection, handle is arranged on the second end of connecting rod.During work, handle or pull handle is promoted to make main body to specifying position
Motion.
Climbing section 20 in the present invention is made up of metal material anti-skidding, heat release.
Articles holding table in the present invention is high by rough surface, anticorrosion, insulating properties and is difficult to aging material and makes.
As can be seen from the above description, the above embodiments of the present invention achieve following technique effect:
Staff climbs specified altitude assignment by climbing section, and the most corresponding height regulating placing part, when needs exchange instrument for
Time, staff only need to be carried out by placing part, it is to avoid repeatedly climb, when staff takes instrument, the time-consuming expense caused
Power problem.The top of climbing section is provided with receiving box, produced waste material during facilitating collection work.Bottom in main body
It is provided with roller and in main body, is provided with control portion simultaneously, more smooth during making the integral type climbing device of the mobile present invention
Laborsaving.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art
For, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any amendment of being made, etc.
With replacement, improvement etc., should be included within the scope of the present invention.
Claims (10)
1. an integral type climbing device, it is characterised in that including:
Main body (10);
Climbing section (20), described climbing section (20) is arranged in described main body (10);
Placing part (30), it is upper for place tool that described placing part (30) is retractably installed at described main body (10).
Integral type climbing device the most according to claim 1, it is characterised in that described placing part (30) including:
Pars contractilis, described pars contractilis is arranged in described main body (10);
Rack, described rack is arranged on described pars contractilis.
Integral type climbing device the most according to claim 2, it is characterised in that the short transverse of described pars contractilis and described master
Body (10) is vertical, and described pars contractilis includes:
First expansion link (31), the first end of described first expansion link (31) is connected with described main body (10), and described
Second end of one expansion link (31) is provided with the first telescopic mouth, and described first expansion link (31) is internally provided with described
First receiving chamber of the first telescopic mouth connection;
Second expansion link (32), described second expansion link (32) is telescopically disposed in described first and accommodates in chamber, described
Rack is arranged on described second expansion link (32).
Integral type climbing device the most according to claim 3, it is characterised in that described rack include link (34) and
Articles holding table (33), the first end of described link (34) is arranged on described second expansion link (32), described articles holding table
(33) the first end is connected with described link (34), and the second end of described articles holding table (33) stretches with described second
Bar (32) connects.
Integral type climbing device the most according to claim 4, it is characterised in that described second expansion link (32) including:
First telescopic section (321), described first telescopic section (321) is telescopically disposed in described first and accommodates in chamber, institute
State the first telescopic section (321) and one end of described main body (10) is provided with the second telescopic mouth, described first telescopic section (321)
It is internally provided with the second receiving chamber connected with described second telescopic mouth;
Second telescopic section (322), described second telescopic section (322) is movably disposed at described second and accommodates in chamber;
First end of described link (34) is hinged with described first telescopic section (321), the of described link (34)
Two ends are hinged with the first end of described articles holding table (33), the second end of described articles holding table (33) and described second telescopic section
(322) hinged.
Integral type climbing device the most according to claim 4, it is characterised in that the first end of described articles holding table (33) is arranged
Shutter (331), described shutter (331) is had to be used for preventing instrument from dropping.
Integral type climbing device the most according to claim 1, it is characterised in that the top of described climbing section (20) is provided with
Accommodate box (40).
Integral type climbing device the most according to claim 1, it is characterised in that described climbing section (20) is emergency staircase.
Integral type climbing device the most according to claim 1, it is characterised in that the bottom of described main body (10) is provided with rolling
Wheel (11).
Integral type climbing device the most according to claim 1, it is characterised in that described main body is provided with control portion on (10)
(12)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610503847.0A CN105986755B (en) | 2016-06-30 | 2016-06-30 | Integral type climbing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610503847.0A CN105986755B (en) | 2016-06-30 | 2016-06-30 | Integral type climbing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105986755A true CN105986755A (en) | 2016-10-05 |
CN105986755B CN105986755B (en) | 2018-12-28 |
Family
ID=57044760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610503847.0A Active CN105986755B (en) | 2016-06-30 | 2016-06-30 | Integral type climbing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105986755B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107747397A (en) * | 2017-10-24 | 2018-03-02 | 廖方奎 | The instrument used suitable for Civil Engineering Construction |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0087325A2 (en) * | 1982-02-24 | 1983-08-31 | Jack Riley | Ladder-mountable device |
US5584357A (en) * | 1994-12-29 | 1996-12-17 | Gugel; Leslie H. | Ladder |
CN201280898Y (en) * | 2008-09-17 | 2009-07-29 | 西安秦海通信设备有限公司 | Assembly slide |
CN201826745U (en) * | 2010-05-31 | 2011-05-11 | 丑纪行 | Hydraulic aerial ladder for moving house |
CN203308375U (en) * | 2013-05-22 | 2013-11-27 | 苏州飞华铝制工业有限公司 | Herringbone ladder tool shelf |
CN204960784U (en) * | 2015-10-08 | 2016-01-13 | 白捷东 | Multifunctional ladder |
CN205936375U (en) * | 2016-06-30 | 2017-02-08 | 国网新疆电力公司信息通信公司 | Integral type climbing device |
-
2016
- 2016-06-30 CN CN201610503847.0A patent/CN105986755B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0087325A2 (en) * | 1982-02-24 | 1983-08-31 | Jack Riley | Ladder-mountable device |
US5584357A (en) * | 1994-12-29 | 1996-12-17 | Gugel; Leslie H. | Ladder |
CN201280898Y (en) * | 2008-09-17 | 2009-07-29 | 西安秦海通信设备有限公司 | Assembly slide |
CN201826745U (en) * | 2010-05-31 | 2011-05-11 | 丑纪行 | Hydraulic aerial ladder for moving house |
CN203308375U (en) * | 2013-05-22 | 2013-11-27 | 苏州飞华铝制工业有限公司 | Herringbone ladder tool shelf |
CN204960784U (en) * | 2015-10-08 | 2016-01-13 | 白捷东 | Multifunctional ladder |
CN205936375U (en) * | 2016-06-30 | 2017-02-08 | 国网新疆电力公司信息通信公司 | Integral type climbing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107747397A (en) * | 2017-10-24 | 2018-03-02 | 廖方奎 | The instrument used suitable for Civil Engineering Construction |
Also Published As
Publication number | Publication date |
---|---|
CN105986755B (en) | 2018-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2014504137A (en) | Method and apparatus for transporting a tool along a long body to a working position and use of the apparatus | |
CN106463940A (en) | Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same | |
CN109804160B (en) | Apparatus and system for moving along a tower structure | |
CN109138897B (en) | Well head centering device and well repair equipment with same | |
CN105350901B (en) | A kind of electric power overhaul multistage climbing ladder | |
CN206769848U (en) | Thribble automatic discharge device | |
CN105986755A (en) | Integrated climbing device | |
CN205936375U (en) | Integral type climbing device | |
CN108706531A (en) | A kind of walking lift workbench certainly | |
CN207027479U (en) | A kind of numerically controlled lathe repairs climbing frame | |
CN107572428A (en) | A kind of electronic heavy lift machinery device | |
CN208747579U (en) | A kind of walking lift workbench certainly | |
CN210710569U (en) | Go up and down well device | |
CN107394651A (en) | It is grounded operating assist device | |
WO2005009620A1 (en) | A mill relining apparatus | |
CN111794696A (en) | Device for quickly disassembling and assembling and placing hook guide and hydraulic elevator positioning device | |
CN201648416U (en) | Holding pole device for installation of cooling wall of blast furnace | |
CN108006883A (en) | The assembly and disassembly methods that the attaching/detaching apparatus and furred ceiling exhaust blower of furred ceiling exhaust blower are safeguarded | |
CN105442826A (en) | Elevating construction assisting device | |
CN205117246U (en) | Oil pipe lifted and puts device under rose in oil field | |
NL2024446B1 (en) | Portable device for driving a rope | |
CN109292694B (en) | Power equipment lifting transport vehicle | |
CN220684625U (en) | Lifting equipment | |
CN203112440U (en) | Mobile rescue elevator and rescue car | |
KR102675864B1 (en) | Gondola |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |