CN105976273A - Highly roller compacted concrete dam construction procedure quality evaluation system and method - Google Patents

Highly roller compacted concrete dam construction procedure quality evaluation system and method Download PDF

Info

Publication number
CN105976273A
CN105976273A CN201610276983.0A CN201610276983A CN105976273A CN 105976273 A CN105976273 A CN 105976273A CN 201610276983 A CN201610276983 A CN 201610276983A CN 105976273 A CN105976273 A CN 105976273A
Authority
CN
China
Prior art keywords
concrete dam
quality
dam construction
project
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610276983.0A
Other languages
Chinese (zh)
Inventor
马洪琪
黄光明
郑爱武
彭华
艾永平
周华
陈江
龚永生
林恩德
汪强
迟福东
李艳伟
董立安
张攀峰
庞博慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN INS ENGINEERING TECHNOLOGY Corp
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
WUHAN INS ENGINEERING TECHNOLOGY Corp
Huaneng Lancang River Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN INS ENGINEERING TECHNOLOGY Corp, Huaneng Lancang River Hydropower Co Ltd filed Critical WUHAN INS ENGINEERING TECHNOLOGY Corp
Priority to CN201610276983.0A priority Critical patent/CN105976273A/en
Publication of CN105976273A publication Critical patent/CN105976273A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Mechanical Engineering (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Civil Engineering (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a highly roller compacted concrete dam construction procedure quality evaluation system and method. The highly roller compacted concrete dam construction procedure quality evaluation system includes a data acquisition module, a check result judgment module and a quality grade automatic evaluation module which are arranged in a mobile terminal. According to the system and method of the invention, detection or inspection records of a concrete dam construction procedure check project are acquired in situ based on the mobile terminal; concrete dam construction procedure quality evaluation records are verified in situ; based on the judgment rules of construction procedure check project quality standards, whether the check project is qualified is judged, and the qualified rate of the project is calculated; and a procedure quality grade is calculated based on set compacted concrete dam construction procedure quality grade evaluation standards and evaluation rules. With the system and method of the invention adopted, a traditional highly roller compacted concrete dam construction procedure quality evaluation method is changed, construction efficiency and management level are greatly improved. The method of the invention is simple and practical. The method can be in conjunction with quality acceptance standards and procedure evaluation standards in different sectors in the infrastructure construction field.

Description

A kind of high roller compacted concrete dam working procedure quality evaluation system and method
Technical field
The invention belongs to construction work assessment technology field, be specifically related to a kind of high roller compacted concrete dam working procedure quality Assessment system and method.
Background technology
High RCC gravity dam is to construct in strict accordance with the working procedure of code requirement, overall construction quality Depending on the construction quality of every one procedure, process quality is checked, is checked and accepted and evaluate, and is to ensure that the necessary means of construction quality.
Traditional high roller compacted concrete dam working procedure inspection of quality all uses the mode of paper record with evaluation, carries out work The record of sequence quality test results, and according to corresponding quality acceptance standard and rule, manual calculation draws quality inspection project Assay, then in conjunction with quality inspection item-test result, operation evaluation criteria and decision rule, artificially calculate Go out working procedure credit rating.The work efficiency ratio of this kind of working method is relatively low.
Therefore be badly in need of the working procedure performance rating method of the new high roller compacted concrete dam of development improve efficiency of construction and Management level.
Summary of the invention
For overcoming the deficiency of above-mentioned traditional construction process quality assessment method, improve efficiency of construction and management level, this Bright provide a kind of high roller compacted concrete dam working procedure quality evaluation system and method, tested item by intelligent terminal system Purpose data acquisition, automatically calculating working procedure assay, automatically judge process quality grade, thus be greatly improved construction effect Rate and management level.
The present invention is realized by following technical proposal: a kind of high roller compacted concrete dam working procedure quality evaluation system, bag Include data acquisition module, assay determination module and the credit rating automatic evaluation module being arranged in mobile terminal:
Mobile terminal is used for inputting and checking information;
Data acquisition module is for gathering detection or the inspection record of Concrete Dam Construction process inspection project;
Assay determination module is for presetting the quality standard decision rule of Concrete Dam Construction process inspection project, by number According to acquisition module by the most qualified for project of testing in the detection of collection or inspection record transmission to assay determination module Judgement and to detection project qualification rate calculating;
Credit rating automatic evaluation module is used for presetting Concrete Dam Construction process quality grading standard, and assay judges The most qualified and calculating qualification rate result of determination is transferred in credit rating automatic evaluation module carry out operation matter by module The calculating of amount grade.
Described mobile terminal is the mobile device such as smart mobile phone or panel computer.
Another object of the present invention also resides in a kind of high roller compacted concrete dam working procedure performance rating method of offer, uses Above-mentioned high roller compacted concrete dam working procedure quality evaluation system, comprises the following steps:
(1) detection of collection in worksite Concrete Dam Construction process inspection project or inspection record;
(2) detection step (1) gathered or inspection record, with the judgement of default working procedure inspection project quality standard Rule compares, it is determined that inspection project is the most qualified, and calculates qualification rate;
(3) according to the result of determination of step (2), with default Concrete Dam Construction process quality grading standard and evaluation rule Then compare, it is determined that the credit rating of this Concrete Dam Construction operation.
Present invention detection based on mobile terminal collection in worksite Concrete Dam Construction process inspection project or inspection record, existing Field examination & verification Concrete Dam Construction process quality evaluation record;Advise by setting the judgement of working procedure inspection project quality standard Then, the judgement that project of testing is the most qualified, the calculating of qualification rate;Comment by setting Concrete Dam Construction process quality grade Calibration standard and assessment rules, calculation process credit rating.
The invention have the advantages that
1, the present invention is to carry out working procedure performance rating based on Android intelligent terminal, checks project data collection, checks item Mesh result judges and process quality grade automatic evaluation, has changed traditional high roller compacted concrete dam working procedure performance rating Method, substantially increases efficiency of construction and management level.
2, the method for the present invention is simple, practical, can comment in conjunction with the quality acceptance standard of capital construction field different majors and operation Calibration standard uses, applied widely.
Accompanying drawing explanation
Fig. 1 is the structural representation of high roller compacted concrete dam working procedure quality evaluation system;
Fig. 2 is the schematic flow sheet of high roller compacted concrete dam working procedure performance rating method.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1: high roller compacted concrete dam working procedure quality evaluation system, including being arranged in mobile terminal 1 Data acquisition module 2, assay determination module 3 and credit rating automatic evaluation module 4:
Data acquisition module 2 is for gathering detection or the inspection record of Concrete Dam Construction process inspection project;
Assay determination module 3, for presetting the quality standard decision rule of Concrete Dam Construction process inspection project, passes through Detection or the inspection record of collection are transmitted whether project of testing to assay determination module closes by data acquisition module The judgement of lattice and the calculating to detection project qualification rate;
Credit rating automatic evaluation module 4 is used for presetting Concrete Dam Construction process quality grading standard, and assay is sentenced The most qualified and calculating qualification rate result of determination is transferred in credit rating automatic evaluation module carry out operation by cover half block The calculating of credit rating.
Wherein mobile terminal 1 is the mobile device such as smart mobile phone or panel computer.
As in figure 2 it is shown, below high roller compacted concrete dam working procedure performance rating method is comprised the following steps:
(1) detection of collection in worksite Concrete Dam Construction process inspection project or inspection record:
RCCD concrete construction operation is divided into grinding concrete construction operation and Normal Concrete Construction operation, its Middle grinding concrete construction operation includes: roller compacted concrete interlayer and seam face process and protection operation, grinding coagulation soil form fixer Sequence, grinding coagulation soil reinforcing bar operation, built-in fitting operation, sealing piece (carrying) installation procedure, expanded joint material installation procedure, draining set Execute installation procedure, cooling and joint grouting pipeline installation procedure, ironware installation quality operation etc.;Normal Concrete Construction operation bag Include: base surface or concrete construction joint operation, template operation, concrete reinforcement operation, sealing piece (carrying), waterproof cloth erector Sequence, expanded joint material installation procedure, pumping equipment operation, cooling and joint grouting pipeline installation procedure, ironware installation procedure, pre- Embedded part operation, concreting operation etc..
Below as a example by " grinding coagulation clay model plate operation ", the inspection project of this operation and detection thereof or inspection record content As shown in the table, and the data acquisition module in typing mobile terminal:
(2) the inspection result of working procedure inspection project judges and testing result calculates: the assay of mobile terminal judges mould Inspection project quality standard set in advance in block, detection step (1) gathered or inspection record, with default construction work The decision rule of sequence inspection project quality standard compares, it is determined that inspection project is the most qualified, and calculates qualification rate and (including: total Count, qualified count, qualification rate), it is determined that and testing result shows, in the terminal for unit in charge of construction's initial survey, reinspection, eventually inspection And management consults;
As a example by " grinding coagulation clay model plate operation ", check judgement and the detection purpose result of calculation such as following table institute of project result Show:
(3) automatic evaluation of working procedure credit rating:
The credit rating automatic evaluation module of mobile terminal presets process quality grading standard, by step (2) Result of determination compares with the Concrete Dam Construction process quality grading standard preset and assessment rules, carries out process quality The calculating of grade and judgement, finally show that process quality grade is qualified, defective or excellent conclusion;
As a example by " grinding coagulation clay model plate operation ", the evaluation criteria of this operation is as shown in the table:
Its dominant item 1. stability, rigidity and intensity are qualified;Dominant item 2. works sideline with design sideline qualification rate is 100%, the most qualified;3. and 4. dominant item is not involved in this time checking, and does not include calculating evaluation category, therefore dominant item in Result is the most qualified, and general data 1. template flatness 2. gap, plate face is detection project, its measuring point qualification rate=(qualified point Count/always count) * 100%=(51/51) * 100%=100% > 90%, therefore meet the condition that operation evaluation criteria is " excellent ", work Sequence credit rating automatic evaluation result is " excellent ".

Claims (3)

1. a high roller compacted concrete dam working procedure quality evaluation system, it is characterised in that include being arranged in mobile terminal Data acquisition module, assay determination module and credit rating automatic evaluation module:
Mobile terminal is used for inputting and checking information;
Data acquisition module is for gathering detection or the inspection record of Concrete Dam Construction process inspection project;
Assay determination module is for presetting the quality standard decision rule of Concrete Dam Construction process inspection project, by number According to acquisition module by the most qualified for project of testing in the detection of collection or inspection record transmission to assay determination module Judgement and to detection project qualification rate calculating;
Credit rating automatic evaluation module is used for presetting Concrete Dam Construction process quality grading standard, and assay judges The most qualified and calculating qualification rate result of determination is transferred in credit rating automatic evaluation module carry out operation matter by module The calculating of amount grade.
High roller compacted concrete dam working procedure quality evaluation system the most according to claim 1, it is characterised in that: described shifting Dynamic terminal is smart mobile phone or panel computer.
3. a high roller compacted concrete dam working procedure performance rating method, uses the high grinding coagulation described in claim 1 or 2 Earth Dam Construction process quality assessment system, it is characterised in that comprise the following steps:
(1) detection of collection in worksite Concrete Dam Construction process inspection project or inspection record;
(2) detection step (1) gathered or inspection record, with the judgement of default working procedure inspection project quality standard Rule compares, it is determined that inspection project is the most qualified, and calculates qualification rate;
(3) according to the result of determination of step (2), with default Concrete Dam Construction process quality grading standard and evaluation rule Then compare, it is determined that the credit rating of this Concrete Dam Construction operation.
CN201610276983.0A 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction procedure quality evaluation system and method Pending CN105976273A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610276983.0A CN105976273A (en) 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction procedure quality evaluation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610276983.0A CN105976273A (en) 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction procedure quality evaluation system and method

Publications (1)

Publication Number Publication Date
CN105976273A true CN105976273A (en) 2016-09-28

Family

ID=56994827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610276983.0A Pending CN105976273A (en) 2016-04-29 2016-04-29 Highly roller compacted concrete dam construction procedure quality evaluation system and method

Country Status (1)

Country Link
CN (1) CN105976273A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685354A (en) * 2018-12-18 2019-04-26 中国地质科学院探矿工艺研究所 Debris flow sand blocking dam defect classification evaluation system based on mobile terminal and computer
CN116151698A (en) * 2023-04-24 2023-05-23 安徽常力达电气有限公司 Analysis processing method for power engineering quality inspection

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102750443A (en) * 2012-06-04 2012-10-24 河海大学 Comprehensive evaluation method of roller compacted concrete dam layer characteristics and states
CN103337041A (en) * 2013-06-13 2013-10-02 中国葛洲坝集团股份有限公司 System for intelligent decision-making of concrete dam pouring construction based on knowledge engineering and method thereof
CN104536421A (en) * 2014-12-31 2015-04-22 天津大学 Method for monitoring pouring and rolling construction quality of roller compacted concrete dam in real time

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102750443A (en) * 2012-06-04 2012-10-24 河海大学 Comprehensive evaluation method of roller compacted concrete dam layer characteristics and states
CN103337041A (en) * 2013-06-13 2013-10-02 中国葛洲坝集团股份有限公司 System for intelligent decision-making of concrete dam pouring construction based on knowledge engineering and method thereof
CN104536421A (en) * 2014-12-31 2015-04-22 天津大学 Method for monitoring pouring and rolling construction quality of roller compacted concrete dam in real time

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685354A (en) * 2018-12-18 2019-04-26 中国地质科学院探矿工艺研究所 Debris flow sand blocking dam defect classification evaluation system based on mobile terminal and computer
CN116151698A (en) * 2023-04-24 2023-05-23 安徽常力达电气有限公司 Analysis processing method for power engineering quality inspection

Similar Documents

Publication Publication Date Title
US20230019362A1 (en) Sequential estimate automation
CN105547602B (en) A kind of telemeasurement method of subway tunnel section of jurisdiction percolating water
Beainy et al. Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer
CN109118123B (en) BIM management method for evaluating construction quality of water conservancy and hydropower engineering
CN107230021A (en) The method of high frequency zone water supply network leakage region
CN109460947A (en) Highway engineering process based on BIM+GIS technology is applied for checking and examination system
CN112525255B (en) Concealed culvert water outlet inspection process and drainage port tracing method
KR101606002B1 (en) Method for Safety Inspection and Maintenance of Infrastructure Based Information Communication Technology
CN103177187A (en) Highway tunnel health status dynamic evaluation method based on variable fuzzy set theory
CN106203796B (en) A kind of actual measurement actual quantities method marked in situ based on engineering electronic drawing
CN113256082A (en) Intelligent geological sketch and geological evaluation method for tunnel face
CN105844423A (en) Method for assessing immersed tunnel operation phase health state
CN110223035A (en) Fire control acceptance intelligent quantization method and fire control acceptance intelligent quantization system
CN105976273A (en) Highly roller compacted concrete dam construction procedure quality evaluation system and method
CN104764486A (en) Civil engineering surveying informatization system
CN105976159A (en) Highly roller compacted concrete dam construction management flow verification system and method
CN107942383A (en) Roof sandstone watery grade prediction technique
CN106290152A (en) A kind of in-situ detection method for composite complex profile bonding quality
CN112035940B (en) Prediction method for highway subgrade settlement data
Barber The Deterioration and Reliability of Pavements.
CN114819506A (en) Online intelligent management and control platform and method for roadbed layered compaction quality
CN205538916U (en) Intellectual detection system workstation
KR20210105307A (en) Apparatus and method for predicting rock mass classification using artificial intelligence
Massahi et al. Implementing a smartphone application for assessing the raveling performance of asphalt pavements
CN109598049B (en) Method for drilling rock fracture development degree and regional rock fracture development rule

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination