CN105971287B - Counter force wall vertical prestressing construction method - Google Patents

Counter force wall vertical prestressing construction method Download PDF

Info

Publication number
CN105971287B
CN105971287B CN201610400155.3A CN201610400155A CN105971287B CN 105971287 B CN105971287 B CN 105971287B CN 201610400155 A CN201610400155 A CN 201610400155A CN 105971287 B CN105971287 B CN 105971287B
Authority
CN
China
Prior art keywords
steel
force wall
counter force
jack
presstressed reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610400155.3A
Other languages
Chinese (zh)
Other versions
CN105971287A (en
Inventor
范冬冬
黄海鲲
许宽
胡鹏
王浩
陈瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Original Assignee
JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd filed Critical JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Priority to CN201610400155.3A priority Critical patent/CN105971287B/en
Publication of CN105971287A publication Critical patent/CN105971287A/en
Application granted granted Critical
Publication of CN105971287B publication Critical patent/CN105971287B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/121Construction of stressing jacks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a kind of counter force wall vertical prestressing construction method, including following specific steps:A, steel girder erection, the scaffold top around counter force wall set up girder steel, and the hole that up/down perforation supplies presstressed reinforcing steel to pass through is provided with girder steel;B, presstressed reinforcing steel is arranged, presstressed reinforcing steel lower end is fixed in counter-force foundation of wall, and upper end passes through hole, is lifted up presstressed reinforcing steel and pretension, is then fixed temporarily with work anchor on girder steel top;C, casting concrete is segmented in counter-force wall form, after concrete reaches design strength, is put into several jack between girder steel at the top of counter force wall, several jack operations at the same time, jack girder steel, to each presstressed reinforcing steel synchronous tension;D, after tensioning in place, every presstressed reinforcing steel is anchored in the upper end of counter force wall.By the above-mentioned means, the present invention can effectively solve the problem that presstressed reinforcing steel straightening, fixation during fabrication and installation, get rid of loss of prestress problem caused by the problem of muscle is comparatively laborious and pulling anchor cable stage Multi-stage prestress.

Description

Counter force wall vertical prestressing construction method
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of counter force wall vertical prestressing construction method.
Background technology
Counter force wall is a kind of large special structure, has more large volume, hole, prestressing force effect, bears very big static(al) And the features such as dynamic load.This just needs counter force wall to have very big rigidity, and theoretical according to armored concrete, when concrete goes out Behind existing crack, the rigidity of structure has a very big weakening, to avoid structure from crack occur, then need to be answered in counter force wall using pre- Power technology.
The more ripe horizontal pre-stressed construction method of existing counter force wall vertical prestressing construction method Primary Reference, but exist Following defect and deficiency:
(1)Fabrication and installation.Counter force wall height is nearly 10 meters, and thickness is larger general, and concrete need to pour in batches, this is just Be related to presstressed reinforcing steel fixes and gets rid of muscle work.It is fixed using Steel bar rack, but since steel strand wires material is flexible in itself It is good, it is yielding, and manually constantly straightening, righting, binding is needed in fixed work progress, it is also easy to produce error, steel strand wires verticality It is not easy to control.Need to carry out getting rid of muscle work after a section concrete has been poured, vertical prestressing bar gets rid of muscle unlike horizontal presstressed reinforcing steel It is easy to get rid of muscle construction, needs tower crane to coordinate and carries out, difficulty of construction is big, manually expends big.
(2)Tensioning.Using the small jack of 25t by root tensioning, it is contemplated that counter force wall vertical prestressing bar radical is more, adopts With this kind of tensioning process, the concrete elastic compression that rear batch of tensioning produces can produce a setting loss to the presstressed reinforcing steel of preceding batch of tensioning Lose, the precompressed force value for ultimately resulting in total foundation is less than normal.
The content of the invention
The invention mainly solves the technical problem of providing a kind of counter force wall vertical prestressing construction method, can effectively solve Certainly existing presstressed reinforcing steel straightening, fixation, get rid of the problem of the problem of muscle is comparatively laborious and pulling anchor cable stage loss of prestress.
In order to solve the above technical problems, one aspect of the present invention is:A kind of counter force wall is provided vertically in advance should Power construction method, including following specific steps:
A, steel girder erection, the scaffold top around counter force wall set up girder steel, steel beam position and presstressed reinforcing steel position phase It is corresponding, the hole that up/down perforation supplies presstressed reinforcing steel to pass through is provided with girder steel;
B, presstressed reinforcing steel is arranged, presstressed reinforcing steel lower end is fixed in counter-force foundation of wall, and upper end passes through hole, is lifted up pre- Stress rib and pretension, are then fixed temporarily on girder steel top with work anchor;
C, the casting concrete in the counter-force wall form put up, after counter force wall concrete reaches design strength, in counter-force Several jack are put between wall top portion and girder steel, several jack operations at the same time, shore girder steel, so as to each presstressed reinforcing steel Synchronous tension;
D, after tensioning in place, each presstressed reinforcing steel is anchored in the upper end of counter force wall, jack, girder steel is removed and faces When work anchor, prestress application complete.
In a preferred embodiment of the present invention, the girder steel is welding box-shaped girder steel, including two pieces of horizontal steel plates and two The vertical steel plate of block, centre form inner cavity.
In a preferred embodiment of the present invention, the both sides of the horizontal steel plate form the edge of a wing, are offered on the edge of a wing Hole, the edge polishing of described hole are in the arc-shaped.
In a preferred embodiment of the present invention, multiple structures are arranged at intervals with along on girder steel length direction in the inner cavity Ribbed stiffener is made, the construction ribbed stiffener is perpendicular with horizontal steel plate, vertical steel plate at the same time, and the construction ribbed stiffener avoids hole position Put.
In a preferred embodiment of the present invention, supporting is provided with the inner cavity on the position at jack center to add Strength rib, the bearing stiffener are perpendicular with horizontal steel plate, vertical steel plate at the same time.
In a preferred embodiment of the present invention, the jack uses centre-hole jack, and the top of jack is equipped with Upper steel plate bed course, the top of the upper steel plate bed course are equipped with flitch bed course.
In a preferred embodiment of the present invention, strengthen on the counter force wall positioned at the position of jack lower part for counter force wall Portion, the counter force wall strengthening portion are internally provided with reinforcing steel bar mesh sheet, lower steel plate are embedded with the top of the counter force wall strengthening portion Bed course, the lower steel plate bed course pass through more dowels and counter force wall anchor connection.
In a preferred embodiment of the present invention, the anchoring in step d to presstressed reinforcing steel, jack center both sides are about each Raised type stretching end is used in the range of 300mm, remaining position uses concave stretching end.
In a preferred embodiment of the present invention, the presstressed reinforcing steel is steel strand wires.
In a preferred embodiment of the present invention, in step b, hoist engine is set up on scaffold, by hoist engine to steel Twisted wire lifted and pretension.
The invention has the advantages that:
1st, presstressed reinforcing steel once completes straightening, fixed work, and degree control is preferable, improves work efficiency, saves cumbersome Fixing bracket works, and fixed;
2nd, presstressed reinforcing steel once mounting is to top, halfway without carrying out getting rid of muscle again, reduce during muscle is got rid of with other work posts The influence of cross-operation, reduces difficulty of construction, accelerates speed of application;
3rd, realize that more jack synchronously shore tensioning with girder steel, solve the problems, such as stress loss existing for single tendon stretch, press Design requirement reaches precompressed force value;
4th, construction method of the invention can be for provided from now on similar to counter force wall and vertical structure using prestressed project can By experience, it will promote the development of whole prestressing technique, create more social and economic benefits.
Brief description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, wherein:
Fig. 1 is counter force wall presstressed reinforcing steel plane of arrangement figure;
Fig. 2 is the sectional view along A-A of Fig. 1;
Fig. 3 is the B-B direction sectional view of Fig. 1;
Fig. 4 is the enlarged structure schematic diagram of box beam in Fig. 2.
The mark of each component is as follows in attached drawing:1st, counter force wall, 2, girder steel, 3, presstressed reinforcing steel, 4, hole, 5, jack, 6, Horizontal steel plate, 7, vertical steel plate, 8, inner cavity, 9, the edge of a wing, 10, construction ribbed stiffener, 11, bearing stiffener, 12, upper steel plate bed course, 13rd, flitch bed course, 14, reinforcing steel bar mesh sheet, 15, lower steel plate bed course, 16, dowel, 17, raised type stretching end, 18, concave Pull end, 19, hoist engine, 20, scaffold.
Embodiment
The technical solution in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example is only the part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this area is common All other embodiment that technical staff is obtained without making creative work, belongs to the model that the present invention protects Enclose.
Please refer to Fig.1 to Fig.4, the embodiment of the present invention includes:
A kind of counter force wall vertical prestressing construction method, including following specific steps:
A, steel girder erection, the top of scaffold 20 around counter force wall 1 set up girder steel 2, steel beam position and presstressed reinforcing steel 3 Put corresponding, up/down perforation is provided with steel beam flange and supplies the hole 4 that passes through of presstressed reinforcing steel;
B, presstressed reinforcing steel is arranged, general presstressed reinforcing steel uses steel strand wires, and presstressed reinforcing steel lower end is fixed in counter-force foundation of wall, Upper end passes through hole, presstressed reinforcing steel and pretension is lifted up by the hoist engine being erected on scaffold, then on girder steel top Fixed temporarily with work anchor, 2 points determine straight line, achieve the purpose that steel strand wires straightening, pretension, and steel strand wires once mounting arrives Top, gets rid of muscle problem and is also resolved;
C, casting concrete is segmented in the counter-force wall form put up, treats that counter force wall mixes the solidifying soil that last time pours and reaches After design strength, several jack 5 are put between girder steel at the top of counter force wall, 250t jack are used in the present embodiment, number The operation at the same time of platform jack, jacks girder steel, so as to each presstressed reinforcing steel synchronous tension, solves stress damage existing for single tendon stretch Mistake problem;
D, after tensioning in place, every presstressed reinforcing steel is anchored in the upper end of counter force wall, herein to the anchor of presstressed reinforcing steel Gu using raised type stretching end in the range of the about each 300mm in jack center both sides, remaining position uses concave stretching end, After the completion of anchoring, jack, girder steel and odd-job anchor are removed, prestress application is completed.
Preferably, the girder steel is welding box-shaped girder steel, including two pieces of horizontal steel plates 6 and two blocks of vertical steel plates 7, middle shape Into inner cavity 8, the both sides of the horizontal steel plate 6 form the edge of a wing 9, and hole, the edge polishing of described hole are opened up on the edge of a wing 9 It is in the arc-shaped, avoid causing scratch to steel strand wires.
Multiple construction ribbed stiffeners 10, the construction ribbed stiffener are arranged at intervals with the inner cavity along on girder steel length direction Perpendicular with horizontal steel plate, vertical steel plate at the same time, the construction ribbed stiffener avoids hole location, and construction ribbed stiffener effectively enhances The integral strength of girder steel.
Bearing stiffener 11 is provided with the position at jack center in the inner cavity, the bearing stiffener is at the same time Perpendicular with horizontal steel plate, vertical steel plate, bearing stiffener effectively enhances girder steel and bears intensity at jack pressure.
Preferably, the jack uses centre-hole jack, uses more steady.
The top of jack is equipped with upper steel plate bed course 12, and the top of the upper steel plate bed course is equipped with flitch bed course 13, reduces Between jack and girder steel because of compression and caused by mutually damage.
Position on the counter force wall positioned at jack lower part is counter force wall strengthening portion, is set inside the counter force wall strengthening portion Reinforcing steel bar mesh sheet 14 is equipped with, counter force wall enhanced portion improves the local strength of counter force wall, can be good at bearing jack Pressure.
Lower steel plate bed course 15 is embedded with the top of the counter force wall strengthening portion, the lower steel plate bed course 15 passes through more dowels 16 directly contact with counter force wall anchor connection, lower steel plate bed course 15 with very heavy top/bottom part, can reduce jack pair counter force wall Damage.
The invention has the advantages that:
1st, presstressed reinforcing steel once completes straightening, fixed work, and degree control is preferable, improves work efficiency, saves cumbersome Fixing bracket works, and fixed;
2nd, presstressed reinforcing steel once mounting is to top, halfway without carrying out getting rid of muscle again, reduce during muscle is got rid of with other work posts The influence of cross-operation, reduces difficulty of construction, accelerates speed of application;
3rd, realize that more jack synchronously shore tensioning with girder steel, solve the problems, such as stress loss existing for single tendon stretch, press Design requirement reaches precompressed force value;
4th, construction method of the invention can be for provided from now on similar to counter force wall and vertical structure using prestressed project can By experience, it will promote the development of whole prestressing technique, create more social and economic benefits.
The foregoing is merely the embodiment of the present invention, is not intended to limit the scope of the invention, every to utilize this hair The equivalent structure or equivalent flow shift that bright description is made, is directly or indirectly used in other relevant technology necks Domain, is included within the scope of the present invention.

Claims (10)

1. a kind of counter force wall vertical prestressing construction method, it is characterised in that including following specific steps:
A, steel girder erection, the scaffold top around counter force wall set up girder steel, and steel beam position is corresponding with presstressed reinforcing steel position, The hole that up/down perforation supplies presstressed reinforcing steel to pass through is provided with girder steel;
B, presstressed reinforcing steel is arranged, presstressed reinforcing steel lower end is fixed in counter-force foundation of wall, and upper end passes through hole, is lifted up prestressing force Muscle and pretension, are then fixed temporarily on girder steel top with work anchor;
C, casting concrete is segmented in the counter-force wall form put up, treats that the concrete that counter force wall last time pours reaches design After intensity, several jack are put between girder steel at the top of counter force wall, several jack operations at the same time, jack girder steel, so that To every presstressed reinforcing steel synchronous tension;
D, after tensioning in place, every presstressed reinforcing steel is anchored in the upper end of counter force wall, after the completion of anchoring, jack release, Jack, girder steel and odd-job anchor are removed, prestress application is completed.
2. counter force wall vertical prestressing construction method according to claim 1, it is characterised in that the girder steel is welding case Section steel beam, including two pieces of horizontal steel plates and two blocks of vertical steel plates, centre form inner cavity.
3. counter force wall vertical prestressing construction method according to claim 2, it is characterised in that the two of the horizontal steel plate Side forms the edge of a wing, and hole is opened up on the edge of a wing, and the edge polishing of described hole is in the arc-shaped.
4. counter force wall vertical prestressing construction method according to claim 3, it is characterised in that along steel in the inner cavity Be arranged at intervals with multiple construction ribbed stiffeners on beam length direction, the construction ribbed stiffener at the same time with horizontal steel plate, vertical steel plate phase Vertically, the construction ribbed stiffener avoids hole location.
5. according to claim 1 ~ 4 any one of them counter force wall vertical prestressing construction method, it is characterised in that the inner cavity In be provided with bearing stiffener on the position at jack center, the bearing stiffener at the same time with horizontal steel plate, vertical steel Plate is perpendicular.
6. counter force wall vertical prestressing construction method according to claim 1, it is characterised in that the jack is used and worn Core type jack, the top of jack are equipped with upper steel plate bed course, and the top of the upper steel plate bed course is equipped with flitch bed course.
7. counter force wall vertical prestressing construction method according to claim 1, it is characterised in that be located on the counter force wall The position of jack lower part is counter force wall strengthening portion, and the counter force wall strengthening portion is internally provided with reinforcing steel bar mesh sheet, described anti- Lower steel plate bed course is embedded with the top of power wall strengthening portion, the lower steel plate bed course passes through more dowels and counter force wall anchor connection.
8. counter force wall vertical prestressing construction method according to claim 1, it is characterised in that to prestressing force in step d The anchoring of muscle, uses raised type stretching end in the range of each 300mm in jack center both sides, remaining position uses concave tensioning End.
9. counter force wall vertical prestressing construction method according to claim 1, it is characterised in that the presstressed reinforcing steel is steel Twisted wire.
10. counter force wall vertical prestressing construction method according to claim 9, it is characterised in that in step b, in foot hand Hoist engine is set up on frame, by hoist engine steel strand wires lifted with simultaneously pretension.
CN201610400155.3A 2016-06-08 2016-06-08 Counter force wall vertical prestressing construction method Active CN105971287B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610400155.3A CN105971287B (en) 2016-06-08 2016-06-08 Counter force wall vertical prestressing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610400155.3A CN105971287B (en) 2016-06-08 2016-06-08 Counter force wall vertical prestressing construction method

Publications (2)

Publication Number Publication Date
CN105971287A CN105971287A (en) 2016-09-28
CN105971287B true CN105971287B (en) 2018-04-20

Family

ID=57010248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610400155.3A Active CN105971287B (en) 2016-06-08 2016-06-08 Counter force wall vertical prestressing construction method

Country Status (1)

Country Link
CN (1) CN105971287B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106525471B (en) * 2016-10-12 2018-11-02 北京工业大学 A kind of steel frame continuous collapse dynamic test device
CN109537905A (en) * 2017-09-22 2019-03-29 上海宝冶集团有限公司 The fast hoisting method of counter force wall presstressed reinforcing steel

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002089043A (en) * 2000-09-19 2002-03-27 Maeda Corp Reinforced concrete structure and construction method for steel framed reinforced concrete, structure
CN101251448B (en) * 2008-03-28 2010-11-10 福建省九龙建设集团有限公司 Construction method of inverse force wall and inverse force dado
CN102720362B (en) * 2012-06-20 2015-08-05 山东寿光第一建筑有限公司 A kind of high accuracy steel concrete counter force wall construction technology
CN102926538B (en) * 2012-11-19 2015-04-29 中建八局第四建设有限公司 Reaction box and construction method of reaction wall

Also Published As

Publication number Publication date
CN105971287A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN110331668B (en) Construction method of bidirectional inclined V-shaped bridge tower of cable-stayed bridge without back cables
CN108978471B (en) Supporting device for increasing rigidity of cable-stayed bridge special-shaped cable tower and mounting method thereof
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN110965474A (en) Construction method of cable tower cross beam
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN203923924U (en) No. 0 section bracket prepressing device
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107386327A (en) U-type groove side wall no pulling rod formwork integrated with barricade and the faced wall being made up of the template
CN105971287B (en) Counter force wall vertical prestressing construction method
CN107829444B (en) Wind turbine generator system prestressing force foundation structure
CN212714951U (en) A template for cantilever type shore protection barricade
CN105672672B (en) A kind of pier stud construction system and construction method
CN104790299A (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN107326812A (en) No. 1 plate installation and positioning structure and operating method in No. 0 block of Wavelike steel webplate bridge
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN208748518U (en) A kind of formwork for placing support device
CN110847113A (en) Cast-in-place deep arc type wave wall construction method based on sliding formwork
CN216892017U (en) Tie beam integral casting template in template connecting piece and lower stand
CN205531393U (en) Pier stud construction system
CN202099748U (en) Hoisting device used for box girder embedding erection of box girder
CN101537660A (en) Process for assembling and disassembling flexible FRP (=Fiberglass-Reinforced Plastic) cylindrical formwork
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN206591624U (en) A kind of prefabricated PC concrete overlaps groove type plate sheet-pile composite frame structure
CN216864836U (en) Cast-in-place section template of boundary span handing-over mound department
CN204728212U (en) Bridge cast-in-situ box-beam is across the convenient construction bracket of interior nothing supporting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Vertical prestress construction method of reaction wall

Effective date of registration: 20191126

Granted publication date: 20180420

Pledgee: Changzhou Institute of building science group Limited by Share Ltd

Pledgor: Jiangsu Dingda Building New Technology Co., Ltd.

Registration number: Y2019980000723

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200630

Granted publication date: 20180420

Pledgee: CHANGZHOU ARCHITECTUAL RESEARCH INSTITUTE GROUP Co.,Ltd.

Pledgor: JIANGSU DINGDA HIGH-TECH CONSTRUCTION Co.,Ltd.

Registration number: Y2019980000723

PC01 Cancellation of the registration of the contract for pledge of patent right