CN105970993A - Underwater connection structure for precast piles and precast bearing platform, and construction method thereof - Google Patents

Underwater connection structure for precast piles and precast bearing platform, and construction method thereof Download PDF

Info

Publication number
CN105970993A
CN105970993A CN201610505940.5A CN201610505940A CN105970993A CN 105970993 A CN105970993 A CN 105970993A CN 201610505940 A CN201610505940 A CN 201610505940A CN 105970993 A CN105970993 A CN 105970993A
Authority
CN
China
Prior art keywords
pile
prefabricated
cushion cap
diameter
crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610505940.5A
Other languages
Chinese (zh)
Other versions
CN105970993B (en
Inventor
高金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CN201610505940.5A priority Critical patent/CN105970993B/en
Publication of CN105970993A publication Critical patent/CN105970993A/en
Application granted granted Critical
Publication of CN105970993B publication Critical patent/CN105970993B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an underwater connection structure for precast piles and precast bearing platform, and a construction method thereof. The precast bearing platform is fixedly connected to the top ends of the precast piles; the top end of each precast pile is provided with a pile head; the diameter of each pile head is less than the diameter of the corresponding precast pile below the pile head; through holes connected with the pile heads are arranged in the bearing platform; the diameter of each through hole is greater than the diameter of the corresponding pile head and less than the diameter of the corresponding precast pile below the pile head; and concrete is poured between the through holes and the pile heads in a manner of underwater concrete pouring, so that the precast piles are fixedly connected together with the bearing platform.

Description

The attachment structure under water of prefabricated pile and prefabricated cushion cap and construction method thereof
Technical field
The present invention relates to a kind of underwater pile structure, further relate to the construction method of this underwater pile structure.
Background technology
In the foundation engineerings such as bridge, harbour, harbour, hydraulic engineering, pile foundation of bearing platform plinth is conventional base form.Work as construction When period cushion cap is positioned at below the water surface, general employing cofferdam method construction, but the cost of cofferdam construction is high, cycle length, technical difficulty Greatly, it is also possible to affect navigation.At present, precast assembly structure uses the most more and more widely, if pile foundation of bearing platform plinth uses Precast construction, on-site consolidation, then cofferdam construction operation be can remove from, construction cost reduction of erection time are substantially reduced.Precast assembly Pile foundation of bearing platform plinth, what key node was how to process stake and cushion cap is connected node under water, but in the prior art, prefabricated pile with The attachment structure under water of prefabricated cushion cap is the most unreasonable, there is the shortcoming that difficulty of construction is big, reliability is low.
Summary of the invention
The technical problem to be solved in the present invention there is provided a kind of is easy to rapid construction, prefabricated pile reliable for effect and prefabricated cushion cap Attachment structure under water, to overcome the drawbacks described above of prior art.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that being connected under water of a kind of prefabricated pile and prefabricated cushion cap Structure, described prefabricated cushion cap is fixedly connected on the top of prefabricated pile, and the top of prefabricated pile has pile crown, and the diameter of described pile crown is little Prefabricated pile diameter below pile crown, described prefabricated cushion cap is provided with the through hole being connected with pile crown, and the diameter of described through hole is more than stake The diameter of head, but less than the prefabricated pile diameter below pile crown, fixing even by subaqueous concreting between described through hole and pile crown It is connected together.
Preferably, described prefabricated pile is concrete square pile, concrete circular pile or concrete tubular pile.
Preferably, described prefabricated pile is provided with the bulb adjacent with pile crown, and bulb is positioned at below pile crown, described prefabricated holds On platform, the diameter of through hole is less than the diameter of bulb.
Preferably, the prefabricated pile diameter below pile crown is identical.
Preferably, described prefabricated pile is solid concrete stake, is embedded with reinforcing bar, tendon in constituting the concrete of described prefabricated pile Or steel pipe, described reinforcing bar, tendon or steel pipe expose from the top of prefabricated pile and form described pile crown.
Preferably, described pile crown is additionally provided with shear key.
Another technical problem that the invention solves the problems that is to provide the construction method of above-mentioned attachment structure.
The method comprises the following steps:
A, first prefabricated pile is installed under water put in place;
B, then prefabricated cushion cap is lifted into prefabricated pile top, makes the through hole on prefabricated cushion cap match with pile crown, and pile crown with Toroidal cavity is formed between through-hole wall;
C, by subaqueous concreting technique concrete perfusion in the toroidal cavity between pile crown and through-hole wall, by prefabricated pile Connect fixing with prefabricated cushion cap.
Compared with prior art, the invention have the advantages that.
The present invention is connected the structure of node under water and has carried out reasonable design prefabricated pile with prefabricated cushion cap, prefabricated pile pile crown with Toroidal cavity is formed between the through-hole wall of prefabricated cushion cap, and by, by the way of subaqueous concreting in this toroidal cavity, making Prefabricated pile and prefabricated cushion cap connect fixing.This simple structure of connected mode under water, easy construction, low cost, quality of connection Reliably, and construction period can be greatly shortened, have huge economic benefit and important realistic meaning.
Accompanying drawing explanation
Fig. 1 is the elevational schematic view of prefabricated pile of the present invention and the first embodiment of attachment structure under water of prefabricated cushion cap.
Fig. 2 is the elevational schematic view of prefabricated pile of the present invention and the second embodiment of attachment structure under water of prefabricated cushion cap.
Fig. 3 is the elevational schematic view of prefabricated pile of the present invention and the third embodiment of attachment structure under water of prefabricated cushion cap.
Fig. 4 is the top plan view of prefabricated pile of the present invention and the attachment structure under water of prefabricated cushion cap.
In figure:
1, prefabricated cushion cap 2, prefabricated pile 3, subaqueous concreting
11, through hole 21, pile crown 22, bulb
23, reinforcing bar, tendon or steel pipe
Detailed description of the invention
Below in conjunction with the accompanying drawings the detailed description of the invention of the present invention is described in further detail.These embodiments are merely to illustrate this Invention, and not limitation of the present invention.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " install ", " being connected ", " connect " and should be interpreted broadly, connect for example, it may be fixing, it is also possible to be to removably connect, or be integrally connected;Can To be mechanical connection, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, can understand that above-mentioned term exists as the case may be Concrete meaning in the present invention.
Additionally, in describing the invention, except as otherwise noted, " multiple " are meant that two or more.
As it is shown in figure 1, be the first embodiment of the present invention, this prefabricated pile includes pre-with the attachment structure under water of prefabricated cushion cap Cushion cap 1 and Duo Gen prefabricated pile 2 processed, the top of prefabricated pile 2 has pile crown 21, and the diameter of pile crown 21 is less than the prefabricated of below pile crown The diameter of stake 2, prefabricated pile 2 diameter of pile crown less than 21 is all identical.Prefabricated cushion cap 1 is provided with and is connected with pile crown 21 The through hole 11 connect, the diameter of through hole 11 is more than the diameter of pile crown 21, but is less than prefabricated pile 2 diameter of below pile crown, therefore, Prefabricated cushion cap 1 can be located in the top of prefabricated pile 2, and prefabricated pile pile crown 21 and prefabricated cushion cap 1 through-hole wall it Between formed toroidal cavity (as shown in Figure 4), by the way of subaqueous concreting in this toroidal cavity concrete perfusion 3, Prefabricated cushion cap 1 and prefabricated pile 2 is made to be fixed together.Prefabricated pile 2 one aspect can play the effect supporting prefabricated cushion cap 1, On the other hand the bed die of subaqueous concreting can be doubled as.Above-mentioned prefabricated pile 2 can be concrete square pile, concrete circular pile or Concrete tubular piles etc., for square pile, above-mentioned diameter is appreciated that the circumscribed circle diameter of square-section.
As in figure 2 it is shown, be the second embodiment of the present invention, unlike the first embodiment, pile crown less than 21 The diameter of prefabricated pile 2 is not impartial.Prefabricated pile 2 is provided with the bulb 22 adjacent with pile crown 21, bulb 22 It is positioned at pile crown less than 21, and the diameter of bulb 22 is more than the diameter at other position of prefabricated pile 2, and through hole 11 on prefabricated cushion cap Diameter less than the diameter of bulb 22.So, bulb 22 can support prefabricated cushion cap 1, and doubles as underwater grouting coagulation The bed die of soil.As for the diameter of the prefabricated pile 2 of bulb less than 22, can be identical with the diameter of pile crown 21, it is also possible to compare stake The diameter of 21 is big.
In above-mentioned two embodiment, it is also possible to increase the partial structurtes such as shear key on pile crown 21, prefabricated to improve further The reliability that cushion cap 1 bonds with pile crown 21.
As it is shown on figure 3, be the third embodiment of the present invention, unlike above two embodiment, pile crown 21 is not It it is xoncrete structure.Prefabricated pile 2 is solid concrete stake, constitute prefabricated pile 2 concrete in be embedded with reinforcing bar, tendon or Steel pipe 23, described reinforcing bar, tendon or steel pipe 23 expose from the concrete on prefabricated pile 2 top, and form described pile crown 21. It is to say, pile crown 21 is to be made up of reinforcing bar upwardly extending from concrete, tendon or steel pipe.Work as subaqueous concreting After 3 have constructed, these exposed reinforcing bars, tendon or steel pipe are just attached in concrete, and by prefabricated cushion cap 1 and prefabricated Stake 2 is connected as a single entity.
Above-mentioned attachment structure can be constructed according to the following steps.
A, first each prefabricated pile 2 is installed under water put in place;
B, then prefabricated cushion cap 1 is lifted into prefabricated pile 2 top and it is enclosed within pile crown 21, make the through hole on prefabricated cushion cap and stake 21 match, and form toroidal cavity between the inwall of pile crown 21 and through hole 11;
C, by subaqueous concreting technique concrete perfusion in the toroidal cavity between pile crown 21 and through hole 11 inwall, will Prefabricated pile 2 and prefabricated cushion cap 1 connect fixing.
Present invention, avoiding tradition cofferdam construction method, achieve precast construction under water by ripe subaqueous concreting technique Connection, simple structure, easy construction, low cost, quality of connection are reliable, have huge economic benefit.
The above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, On the premise of without departing from the technology of the present invention principle, it is also possible to make some improvement and replacement, these improve and replace and also should be regarded as Protection scope of the present invention.

Claims (7)

1. prefabricated pile and an attachment structure under water for prefabricated cushion cap, described prefabricated cushion cap (1) is fixedly connected on prefabricated pile (2) Top, is characterized in that, the top of prefabricated pile (2) has pile crown (21), and the diameter of described pile crown (21) is less than pile crown Following prefabricated pile (2) diameter, described prefabricated cushion cap (1) is provided with the through hole (11) being connected with pile crown (21), institute State the diameter diameter more than pile crown (21) of through hole (11), but less than pile crown (21) prefabricated pile (2) diameter below, It is fixed together by subaqueous concreting (3) between described through hole (11) and pile crown (21).
Prefabricated pile the most according to claim 1 and the attachment structure under water of prefabricated cushion cap, is characterized in that, described prefabricated pile (2) For concrete square pile, concrete circular pile or concrete tubular pile.
Prefabricated pile the most according to claim 1 and the attachment structure under water of prefabricated cushion cap, is characterized in that, described prefabricated pile (2) Being provided with the bulb (22) adjacent with pile crown (21), bulb (22) is positioned at pile crown (21) below, described pre- On cushion cap processed, the diameter of through hole (11) is less than the diameter of bulb (22).
The attachment structure under water of prefabricated pile the most according to claim 1 and prefabricated cushion cap, is characterized in that, pile crown (21) with Under prefabricated pile (2) diameter be identical.
Prefabricated pile the most according to claim 1 and the attachment structure under water of prefabricated cushion cap, is characterized in that, described prefabricated pile (2) For solid concrete stake, in constituting the concrete of described prefabricated pile (2), it is embedded with reinforcing bar, tendon or steel pipe (23), Described reinforcing bar, tendon or steel pipe expose from the top of prefabricated pile (2) and form described pile crown (21).
Prefabricated pile the most according to claim 1 and the attachment structure under water of prefabricated cushion cap, is characterized in that, described pile crown (21) On be additionally provided with shear key.
7. the prefabricated pile described in claim 1 and a construction method for the attachment structure under water of prefabricated cushion cap, is characterized in that, including Following steps:
A, first prefabricated pile is installed under water put in place;
B, then prefabricated cushion cap is lifted into prefabricated pile top, makes the through hole on prefabricated cushion cap match with pile crown, and in stake Toroidal cavity is formed between head and through-hole wall;
C, by subaqueous concreting technique concrete perfusion in the toroidal cavity between pile crown and through-hole wall, will be pre- Stake processed and prefabricated cushion cap connect fixing.
CN201610505940.5A 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap Withdrawn - After Issue CN105970993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610505940.5A CN105970993B (en) 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610505940.5A CN105970993B (en) 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap

Publications (2)

Publication Number Publication Date
CN105970993A true CN105970993A (en) 2016-09-28
CN105970993B CN105970993B (en) 2018-11-27

Family

ID=56954930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610505940.5A Withdrawn - After Issue CN105970993B (en) 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap

Country Status (1)

Country Link
CN (1) CN105970993B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059774A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 A kind of assembled high-rise pile cap revetment structure and construction method
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN108265737A (en) * 2018-03-27 2018-07-10 淮海工学院 A kind of assembly concrete cushion cap and micro-pile combined basis and construction method
CN109183827A (en) * 2018-09-18 2019-01-11 何文峰 Underwater reinforced concrete foundation construction operation engineering method
CN109797765A (en) * 2018-12-25 2019-05-24 广州市市政集团设计院有限公司 It is a kind of to carry out the construction method that cushion cap is connect with pile foundation by attachment device
CN109989415A (en) * 2019-05-06 2019-07-09 河南绿建建筑科技有限公司 The construction method of assembling type base
CN110158475A (en) * 2019-05-21 2019-08-23 北京工业大学 A kind of prefabricated assembled bridge substructure and its construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100744693B1 (en) * 2005-10-24 2007-08-01 (주) 선암기술연구소 Concrete-steel house and pile foundation footing construction method using thereof
CN103628504A (en) * 2013-11-28 2014-03-12 广州市恒盛建设工程有限公司 Connecting method of splicing type prefabricated reinforced concrete platform structure underground joints
CN103711139A (en) * 2012-09-29 2014-04-09 上海中技桩业股份有限公司 Semi-rigid connection structure between pile foundation and bearing platform
CN204456160U (en) * 2014-12-12 2015-07-08 中交公路规划设计院有限公司 A kind of bridge prefabrication cushion cap
JP2015183367A (en) * 2014-03-20 2015-10-22 ジャパンパイル株式会社 Precast pile and support method of precast pile
CN204919635U (en) * 2015-09-18 2015-12-30 贵州省公路局 Bridge foundation reinforced structure
CN205857219U (en) * 2016-06-30 2017-01-04 上海勘测设计研究院有限公司 Prefabricated pile and the attachment structure under water of prefabricated cushion cap

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100744693B1 (en) * 2005-10-24 2007-08-01 (주) 선암기술연구소 Concrete-steel house and pile foundation footing construction method using thereof
CN103711139A (en) * 2012-09-29 2014-04-09 上海中技桩业股份有限公司 Semi-rigid connection structure between pile foundation and bearing platform
CN103628504A (en) * 2013-11-28 2014-03-12 广州市恒盛建设工程有限公司 Connecting method of splicing type prefabricated reinforced concrete platform structure underground joints
JP2015183367A (en) * 2014-03-20 2015-10-22 ジャパンパイル株式会社 Precast pile and support method of precast pile
CN204456160U (en) * 2014-12-12 2015-07-08 中交公路规划设计院有限公司 A kind of bridge prefabrication cushion cap
CN204919635U (en) * 2015-09-18 2015-12-30 贵州省公路局 Bridge foundation reinforced structure
CN205857219U (en) * 2016-06-30 2017-01-04 上海勘测设计研究院有限公司 Prefabricated pile and the attachment structure under water of prefabricated cushion cap

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059774A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 A kind of assembled high-rise pile cap revetment structure and construction method
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN108265737A (en) * 2018-03-27 2018-07-10 淮海工学院 A kind of assembly concrete cushion cap and micro-pile combined basis and construction method
CN108265737B (en) * 2018-03-27 2024-03-08 淮海工学院 Assembled concrete bearing platform and micro pile combined foundation and construction method
CN109183827A (en) * 2018-09-18 2019-01-11 何文峰 Underwater reinforced concrete foundation construction operation engineering method
CN109797765A (en) * 2018-12-25 2019-05-24 广州市市政集团设计院有限公司 It is a kind of to carry out the construction method that cushion cap is connect with pile foundation by attachment device
CN109989415A (en) * 2019-05-06 2019-07-09 河南绿建建筑科技有限公司 The construction method of assembling type base
CN109989415B (en) * 2019-05-06 2021-05-28 河南绿建建筑科技有限公司 Construction method of fabricated foundation
CN110158475A (en) * 2019-05-21 2019-08-23 北京工业大学 A kind of prefabricated assembled bridge substructure and its construction method

Also Published As

Publication number Publication date
CN105970993B (en) 2018-11-27

Similar Documents

Publication Publication Date Title
CN105970993A (en) Underwater connection structure for precast piles and precast bearing platform, and construction method thereof
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN203296175U (en) Rectangular steel pipe column assembly type column foot
CN108360678B (en) A kind of assembled beam-column node tenon connection structure
CN103628504B (en) The method of attachment of a kind of pin-connected panel prefabricated reinforced concrete platform structure node under water
CN109267472A (en) Precast assembly bridge piers with pile foundation and its construction method
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN105544593A (en) Wind power generation tower foundation with prefabricated foundation prestressed beams and slab
CN106088120B (en) A kind of cofferdam decentralization construction method
CN205857219U (en) Prefabricated pile and the attachment structure under water of prefabricated cushion cap
CN104711931B (en) Temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection
CN205676882U (en) A kind of novel supporting construction
CN112813983B (en) Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN110424548A (en) A kind of steel core concrete column-arch without beam connecting node and its construction method
KR20100109654A (en) Prestressed concrete girder with plural steel wires disposed at shear surface of tension port, manufacturing method thereof, and assembling bridge construction method using the same
CN103061334B (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN213896714U (en) Prefabricated beam type arch bridge
CN109555173A (en) A kind of separate type bridge integrally lifts stake reinforcement means
CN212294679U (en) Combined lattice column-concrete precast pile inclined support structure
CN209292868U (en) Precast assembly bridge piers with pile foundation
CN104343129B (en) For manufacturing the reversion template of cast-in-situ prestressed concrete cylinder blower foundation
CN208455613U (en) A kind of sleeve connection assembled pile foundation
CN111236464A (en) Shock insulation construction process based on LRBLNR type support
KR101131631B1 (en) Assembling bridge construction method using Prestressed concrete girder with plural steel wires disposed at shear surface of tension port

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20181127

Effective date of abandoning: 20220329

AV01 Patent right actively abandoned

Granted publication date: 20181127

Effective date of abandoning: 20220329

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned