CN105970900A - Offshore wind turbine gravity type foundation installation seabed treatment process - Google Patents

Offshore wind turbine gravity type foundation installation seabed treatment process Download PDF

Info

Publication number
CN105970900A
CN105970900A CN201610446628.3A CN201610446628A CN105970900A CN 105970900 A CN105970900 A CN 105970900A CN 201610446628 A CN201610446628 A CN 201610446628A CN 105970900 A CN105970900 A CN 105970900A
Authority
CN
China
Prior art keywords
rail
foundation
bedding
compacting
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610446628.3A
Other languages
Chinese (zh)
Inventor
高宏飙
王健
龚镇
罗雯雯
孙小钎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longyuan Offshore Wind Power Co Ltd
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Zhongneng Power Tech Development Co Ltd
Original Assignee
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Zhongneng Power Tech Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Marine Longyuan Wind Power Generation Co Ltd, Zhongneng Power Tech Development Co Ltd filed Critical Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority to CN201610446628.3A priority Critical patent/CN105970900A/en
Publication of CN105970900A publication Critical patent/CN105970900A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/30Wind power

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Foundations (AREA)

Abstract

The invention discloses an offshore wind turbine gravity type foundation installation seabed treatment process. The offshore wind turbine gravity type foundation installation seabed treatment process is characterized in that the process includes the following steps of foundation trench excavation, foundation trench riprapping, foundation bed tamping and foundation bed leveling. According to the offshore wind turbine gravity type foundation installation seabed treatment process, an existing domestic construction device is utilized, the domestic port engineering construction technology is used for reference, the gravity type seabed treatment process is designed in combination with characteristics of an offshore wind turbine gravity type foundation, the problem of treatment of a large gravity type offshore wind turbine foundation seabed is effectively solved, powerful support is provided for introducing the gravity type draught fan foundation technology in the offshore wind power industry, and engineering cost is reduced.

Description

A kind of offshore wind turbine gravity type foundation is installed sea bed and is processed technique
Technical field
The present invention relates to offshore wind farm blower foundation technical field of construction, particularly relate to a kind of offshore wind turbine weight Power formula basis is installed sea bed and is processed technique.
Background technology
What the fixed basis of offshore wind farm unit was the most frequently used has 3 kinds, single pile formula, gravity type, multi-angular bracket Formula.Gravity type foundation offshore construction operation is less, preferable at seabed conditions, the offshore wind farm that the depth of water is shallower Field possesses the possibility commonly used.The general height overall of gravity type foundation about 25 meters, bottom is by about 25 meters The steel bar concrete foundation slab of diameter forms with armored concrete outer cylinder body, and top is diameter about 6 meters Prestressed reinforced concrete column.Gravity type foundation can complete by one-piece casting the most on the bank, and weight exists 2000~3000 tons, the rear dragging that completes is transported to marine wind electric field, and sinking is located on the sea bed after leveling. Weight and basis that gravity type foundation body is huge are directly delivered to sea by blower fan, wave with the load of ocean current Bed surface, has high requirements with bearing capacity to sea bed surface smoothness, so needing before gravity type foundation is in place Carry out sea bed processing and ensure its engineering property.The most domestic precedent that there is no the construction of gravity type blower foundation.
Solve above-mentioned accordingly, it is desirable to provide a kind of offshore wind turbine gravity type foundation installs sea bed process technique Problem.
Summary of the invention
In order to solve this problem, the invention discloses a kind of offshore wind turbine gravity type foundation and sea bed process is installed Technique, it solves the difficult problem that sea bed processes, introduces gravity type offshore wind turbine foundation technology for sea turn electric industry Provide and provide powerful support for.A kind of offshore wind turbine gravity type foundation is installed sea bed and is processed technique, it is characterised in that: Described technique comprises the following steps: foundation trench excavation-foundation trench jackstone-bedding compacting-base bed flattening;
1) foundation trench excavation
Foundation trench excavation selects backacter or grab boat to carry out foundation trench dredging, cuts out sea bed surface Soft layer until exposing the hard soil layer in bottom meeting foundation bearing capacity and stability requirement, thickness of dredging Spending different because of the difference of engineering geological condition, generally 0.5-10 rice, when excavating thickness more than 3m Taking stage excavation, the foundation trench thick less than 3m once excavates;
Foundation trench excavation notices on the premise of thickness of subgrade bed and width meet requirement whether excavation slope meets and sets Meter requirement, excavation slope is surely as the criterion with depositional gradient, and water under diver should be sent in foundation trench digging process to have checked Digging part to back-silt situation, according to back-silting, situation formulates corresponding dredging measure, timely jackstone after excavation in case Foundation ditch back silting;
2) foundation trench jackstone
Jackstone uses 600t side to refute location, and side is refuted across bedding demarcating position, and flat board is refuted shipment block stone and (joined Grab bucket loop wheel machine) refute throwing by location side, the grab bucket that flat board is refuted captures building stones, and by float drum funnel Connecting chute or elephant trunk and carry building stones to excavation sea bed successively with s shape order, bedding jackstone staged and layered is entered OK, every layer thickness≤2.0m, every layer of jackstone thickness should have more 10%-20% as reserved than design thickness Ramming volume;
3) bedding compacting
The method of bedding compacting mainly has heavy tamping method and underwater demolition compacting method two kinds: tamping is used Crane gear is sling weight, requires in order to carry out compacting construction;Underwater demolition compacting method utilizes explosion to rush Hit power and shaking force is tamped;
Majority of case uses heavy tamping method to carry out bedding compacting, before rammer, in order to promote compacting effect, Arrange the thick flat bedding of diver;For irregular region, local, employing side refutes loop wheel machine, carry out pinpointing, Quantitatively cover, it is ensured that locally the discrepancy in elevation is not more than 300mm;
Hammer ram selects plane bottom hammer, hammer weight 8t or 12t, controls to fall away from, it is ensured that the impact energy often hammered into shape, presses Order point vertical, horizontal compacting, for preventing bedding local eminence or leakage from ramming, each tamping area should be with adjacent Partly overlap 1/3-1/4;Divide twice compacting (just ram and ram with multiple) in principle, specifically ram pass and impact Energy should be determined by examination rammer, and bedding staged and layered is tamped, and every layer thickness should be roughly equal, and compacted thickness is not More than 2m, the lap of splice of segmentation compacting is not less than 2m, if heavy tamping energy is bigger, lift height can be fitted Work as increasing;
4) base bed flattening
Base bed flattening uses " Dow process scraped by guide rail ", and construction procedure is workboat location, measures and controls plane position Put and absolute altitude, lower railway of diving under water, scrape leveling, rubble filling-in;
The jack-up unit that leveling workboat outfit band 500t level sea work is hung, as construction ship, is equipped with simultaneously The underwater ship of underwater performance, measures according to design leveling width, discharges front rail, middle rail and rear rail and measure control Processed, control its plan-position;
Each time one of scope sideline of toe leveling rail before and after leveling basis, forward position, rail passes through drag-line and top Crossbeam and jack up drilling platform on extra large work hang connection, during lower rail, jack-up unit bedding side position, Precalculated position, sea bed face transferred to by loop wheel machine lifting rail, controls rail direction with total powerstation, simultaneously according to drawing Plumb bob to upper end, sea bed face adjusts lowered position;It is high that diver controls rail by concrete pad under water Journey, after rail two ends sinking to concrete pad, diver then with in the middle part of block stone pad rail, go along with sb. to guard him Around rail, being sequentially completed all of rail and lay work, rail top is leveling absolute altitude;
Rail has positioned rear diver and has operated under water and leveling scrapes location and installation on rail, along leading Rail direction promotes and scrapes, and to scrape bottom surface for leveling absolute altitude, goes high to mend low, flattens bedding.At the bottom of floating rule It is as the criterion and flattens, taken out of outside bedding higher than the block stone at the bottom of floating rule by diver, less than between the stone at the bottom of floating rule Out-of-flatness part is filled with two slabstones, and the rubble of the space between two slabstones is filled, with two slabstones at the bottom of floating rule Space rubble is clogged.
The invention have the benefit that
The present invention utilizes domestic existing construction equipment, uses for reference domestic harbor work's construction technology, in conjunction with offshore wind turbine Gravity type foundation feature, devises gravity type sea bed and processes technique, effectively solves large-scale gravity type sea The difficult problem that fan basis sea bed processes, introduces gravity type blower foundation technology for sea turn electric industry and provides Provide powerful support for, reduce construction costs.
Introducing the concept of a series of reduced form in Summary, this will be in detailed description of the invention Part further describes.Present invention part is not meant to attempt to limit required guarantor The key feature of the technical scheme protected and essential features, more do not mean that attempt to determine claimed The protection domain of technical scheme.
In conjunction with advantages and features of the invention described further below.
Accompanying drawing explanation
Fig. 1 is that foundation trench of the present invention excavates floor map schematic diagram;
Fig. 2 is foundation trench jackstone floor map of the present invention;
Fig. 3 is foundation trench jackstone elevational schematic view of the present invention;
Fig. 4 is that foundation trench of the present invention tamps floor map;
Fig. 5 is that foundation trench of the present invention flattens elevational schematic view;
Detailed description of the invention
In the following description, a large amount of concrete details is given to provide to the present invention the most thoroughly Understand.It will be apparent, however, to one skilled in the art that the present invention can be without one Or multiple these details and be carried out.In other example, in order to avoid obscuring with the present invention, Technical characteristics more well known in the art are not described.
In order to thoroughly understand the present invention, detailed technique will be proposed in following description.Obviously, this Bright execution is not limited to the specific details that those skilled in the art is familiar with.The present invention's is preferable real Execute example to be described in detail as follows, but in addition to these describe in detail, the present invention can also have other and implement Mode.
Hereinafter embodiments of the invention are described in detail.
With reference to Fig. 1-Fig. 5, a kind of offshore wind turbine gravity type foundation is installed sea bed and is processed technique, and its feature exists In: described technique comprises the following steps: foundation trench excavation-foundation trench jackstone-bedding compacting-base bed flattening;
1) foundation trench excavation
Foundation trench excavation selects backacter or grab boat to carry out foundation trench dredging, cuts out sea bed surface Soft layer until exposing the hard soil layer in bottom meeting foundation bearing capacity and stability requirement, thickness of dredging Spending different because of the difference of engineering geological condition, generally 0.5-10 rice, when excavating thickness more than 3m Taking stage excavation, the foundation trench thick less than 3m once excavates;
Foundation trench excavation notices on the premise of thickness of subgrade bed and width meet requirement whether excavation slope meets and sets Meter requirement, excavation slope is surely as the criterion with depositional gradient, and water under diver should be sent in foundation trench digging process to have checked Digging part to back-silt situation, according to back-silting, situation formulates corresponding dredging measure, timely jackstone after excavation in case Foundation ditch back silting;
2) foundation trench jackstone
Jackstone uses 600t side to refute location, and side is refuted across bedding demarcating position, and flat board is refuted shipment block stone and (joined Grab bucket loop wheel machine) refute throwing by location side, the grab bucket that flat board is refuted captures building stones, and by float drum funnel Connecting chute or elephant trunk and carry building stones to excavation sea bed successively with s shape order, bedding jackstone staged and layered is entered OK, every layer thickness≤2.0m, every layer of jackstone thickness should have more 10%-20% as reserved than design thickness Ramming volume;
3) bedding compacting
The method of bedding compacting mainly has heavy tamping method and underwater demolition compacting method two kinds: tamping is used Crane gear is sling weight, requires in order to carry out compacting construction;Underwater demolition compacting method utilizes explosion to rush Hit power and shaking force is tamped;
Majority of case uses heavy tamping method to carry out bedding compacting, before rammer, in order to promote compacting effect, Arrange the thick flat bedding of diver;For irregular region, local, employing side refutes loop wheel machine, carry out pinpointing, Quantitatively cover, it is ensured that locally the discrepancy in elevation is not more than 300mm;
Hammer ram selects plane bottom hammer, hammer weight 8t or 12t, controls to fall away from, it is ensured that the impact energy often hammered into shape, presses Order point vertical, horizontal compacting, for preventing bedding local eminence or leakage from ramming, each tamping area should be with adjacent Partly overlap 1/3-1/4;Divide twice compacting (just ram and ram with multiple) in principle, specifically ram pass and impact Energy should be determined by examination rammer, and bedding staged and layered is tamped, and every layer thickness should be roughly equal, and compacted thickness is not More than 2m, the lap of splice of segmentation compacting is not less than 2m, if heavy tamping energy is bigger, lift height can be fitted Work as increasing;
4) base bed flattening
Base bed flattening uses " Dow process scraped by guide rail ", and construction procedure is workboat location, measures and controls plane position Put and absolute altitude, lower railway of diving under water, scrape leveling, rubble filling-in;
The jack-up unit that leveling workboat outfit band 500t level sea work is hung, as construction ship, is equipped with simultaneously The underwater ship of underwater performance, measures according to design leveling width, discharges front rail, middle rail and rear rail and measure control Processed, control its plan-position;
Each time one of scope sideline of toe leveling rail before and after leveling basis, forward position, rail passes through drag-line and top Crossbeam and jack up drilling platform on extra large work hang connection, during lower rail, jack-up unit bedding side position, Precalculated position, sea bed face transferred to by loop wheel machine lifting rail, controls rail direction with total powerstation, simultaneously according to drawing Plumb bob to upper end, sea bed face adjusts lowered position;It is high that diver controls rail by concrete pad under water Journey, after rail two ends sinking to concrete pad, diver then with in the middle part of block stone pad rail, go along with sb. to guard him Around rail, being sequentially completed all of rail and lay work, rail top is leveling absolute altitude;
Rail has positioned rear diver and has operated under water and leveling scrapes location and installation on rail, along leading Rail direction promotes and scrapes, and to scrape bottom surface for leveling absolute altitude, goes high to mend low, flattens bedding.At the bottom of floating rule It is as the criterion and flattens, taken out of outside bedding higher than the block stone at the bottom of floating rule by diver, less than between the stone at the bottom of floating rule Out-of-flatness part is filled with two slabstones, and the rubble of the space between two slabstones is filled, with two slabstones at the bottom of floating rule Space rubble is clogged.
Having the beneficial effect that of the present embodiment
The present invention it utilize domestic existing construction equipment, use for reference domestic harbor work's construction technology, in conjunction with marine Blower fan gravity type foundation feature, devises gravity type sea bed and processes technique, effectively solve large-scale gravity The difficult problem that formula offshore wind turbine foundation sea bed processes, introduces gravity type blower foundation technology for sea turn electric industry and carries Supply to provide powerful support for, reduced construction costs.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment It is only intended to citing and descriptive purpose, and is not intended to limit the invention to described scope of embodiments In.In addition it will be appreciated by persons skilled in the art that and the invention is not limited in above-described embodiment, root Can also make more kinds of variants and modifications according to the teachings of the present invention, these variants and modifications all fall within this Within inventing scope required for protection.Protection scope of the present invention by the appended claims and etc. Effect scope is defined.

Claims (1)

1. an offshore wind turbine gravity type foundation is installed sea bed and is processed technique, it is characterised in that: described technique Comprise the following steps: foundation trench excavation-foundation trench jackstone-bedding compacting-base bed flattening;
1) foundation trench excavation
Foundation trench excavation selects backacter or grab boat to carry out foundation trench dredging, cuts out sea bed surface Soft layer until exposing the hard soil layer in bottom meeting foundation bearing capacity and stability requirement, thickness of dredging Spending different because of the difference of engineering geological condition, generally 0.5-10 rice, when excavating thickness more than 3m Taking stage excavation, the foundation trench thick less than 3m once excavates;
Foundation trench excavation notices on the premise of thickness of subgrade bed and width meet requirement whether excavation slope meets and sets Meter requirement, excavation slope is surely as the criterion with depositional gradient, and water under diver should be sent in foundation trench digging process to have checked Digging part to back-silt situation, according to back-silting, situation formulates corresponding dredging measure, timely jackstone after excavation in case Foundation ditch back silting;
2) foundation trench jackstone
Jackstone uses 600t side to refute location, and side is refuted across bedding demarcating position, and flat board is refuted shipment block stone and (joined Grab bucket loop wheel machine) refute throwing by location side, the grab bucket that flat board is refuted captures building stones, and by float drum funnel Connecting chute or elephant trunk and carry building stones to excavation sea bed successively with s shape order, bedding jackstone staged and layered is entered OK, every layer thickness≤2.0m, every layer of jackstone thickness should have more 10%-20% as reserved than design thickness Ramming volume;
3) bedding compacting
The method of bedding compacting mainly has heavy tamping method and underwater demolition compacting method two kinds: tamping is used Crane gear is sling weight, requires in order to carry out compacting construction;Underwater demolition compacting method utilizes explosion to rush Hit power and shaking force is tamped;
Majority of case uses heavy tamping method to carry out bedding compacting, before rammer, in order to promote compacting effect, Arrange the thick flat bedding of diver;For irregular region, local, employing side refutes loop wheel machine, carry out pinpointing, Quantitatively cover, it is ensured that locally the discrepancy in elevation is not more than 300mm;
Hammer ram selects plane bottom hammer, hammer weight 8t or 12t, controls to fall away from, it is ensured that the impact energy often hammered into shape, presses Order point vertical, horizontal compacting, for preventing bedding local eminence or leakage from ramming, each tamping area should be with adjacent Partly overlap 1/3-1/4;Divide twice compacting (just ram and ram with multiple) in principle, specifically ram pass and impact Energy should be determined by examination rammer, and bedding staged and layered is tamped, and every layer thickness should be roughly equal, and compacted thickness is not More than 2m, the lap of splice of segmentation compacting is not less than 2m, if heavy tamping energy is bigger, lift height can be fitted Work as increasing;
4) base bed flattening
Base bed flattening uses " Dow process scraped by guide rail ", and construction procedure is workboat location, measures and controls plane position Put and absolute altitude, lower railway of diving under water, scrape leveling, rubble filling-in;
The jack-up unit that leveling workboat outfit band 500t level sea work is hung, as construction ship, is equipped with simultaneously The underwater ship of underwater performance, measures according to design leveling width, discharges front rail, middle rail and rear rail and measure control Processed, control its plan-position;
Each time one of scope sideline of toe leveling rail before and after leveling basis, forward position, rail passes through drag-line and top Crossbeam and jack up drilling platform on extra large work hang connection, during lower rail, jack-up unit bedding side position, Precalculated position, sea bed face transferred to by loop wheel machine lifting rail, controls rail direction with total powerstation, simultaneously according to drawing Plumb bob to upper end, sea bed face adjusts lowered position;It is high that diver controls rail by concrete pad under water Journey, after rail two ends sinking to concrete pad, diver then with in the middle part of block stone pad rail, go along with sb. to guard him Around rail, being sequentially completed all of rail and lay work, rail top is leveling absolute altitude;
Rail has positioned rear diver and has operated under water and leveling scrapes location and installation on rail, along leading Rail direction promotes and scrapes, and to scrape bottom surface for leveling absolute altitude, goes high to mend low, flattens bedding.At the bottom of floating rule It is as the criterion and flattens, taken out of outside bedding higher than the block stone at the bottom of floating rule by diver, less than between the stone at the bottom of floating rule Out-of-flatness part is filled with two slabstones, and the rubble of the space between two slabstones is filled, with two slabstones at the bottom of floating rule Space rubble is clogged.
CN201610446628.3A 2016-06-16 2016-06-16 Offshore wind turbine gravity type foundation installation seabed treatment process Withdrawn CN105970900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610446628.3A CN105970900A (en) 2016-06-16 2016-06-16 Offshore wind turbine gravity type foundation installation seabed treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610446628.3A CN105970900A (en) 2016-06-16 2016-06-16 Offshore wind turbine gravity type foundation installation seabed treatment process

Publications (1)

Publication Number Publication Date
CN105970900A true CN105970900A (en) 2016-09-28

Family

ID=57022394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610446628.3A Withdrawn CN105970900A (en) 2016-06-16 2016-06-16 Offshore wind turbine gravity type foundation installation seabed treatment process

Country Status (1)

Country Link
CN (1) CN105970900A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989061A (en) * 2018-01-12 2018-05-04 中交第三航务工程勘察设计院有限公司 A kind of floating LNG liquefaction plants sit bottom foundation structure and its method of construction
CN108313219A (en) * 2018-04-02 2018-07-24 长江南京航道工程局 Stone dumper, jackstone system waterborne and jackstone method waterborne waterborne
CN108330977A (en) * 2017-12-28 2018-07-27 中交烟台环保疏浚有限公司 SA sand bedding course throwing constructions
CN108360499A (en) * 2018-02-11 2018-08-03 北京中科力***技术工程有限公司 A kind of closely knit processing method of runway basis large area explosion
CN109680647A (en) * 2018-12-21 2019-04-26 大连交通大学 A kind of Construction at ports technique convenient for later maintenance
CN109898557A (en) * 2019-01-21 2019-06-18 中交第二航务工程局有限公司 Underwater rubble bedding laying method
CN111456017A (en) * 2020-04-13 2020-07-28 河海大学 Construction device for underwater riprap foundation bed
CN113882421A (en) * 2021-09-24 2022-01-04 中交一航局第三工程有限公司 Offshore wind power generation gravity type foundation and installation method
CN116084381A (en) * 2023-03-07 2023-05-09 中交第一航务工程局有限公司 Method for feeding, tamping and leveling after underwater block stone foundation bed is blasted
CN116202728A (en) * 2023-01-18 2023-06-02 天津大学 Submarine cross pipe cable local three-dimensional scouring experiment simulation device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330977A (en) * 2017-12-28 2018-07-27 中交烟台环保疏浚有限公司 SA sand bedding course throwing constructions
CN107989061B (en) * 2018-01-12 2023-08-11 中交第三航务工程勘察设计院有限公司 Construction method of floating LNG liquefaction plant foundation structure
CN107989061A (en) * 2018-01-12 2018-05-04 中交第三航务工程勘察设计院有限公司 A kind of floating LNG liquefaction plants sit bottom foundation structure and its method of construction
CN108360499A (en) * 2018-02-11 2018-08-03 北京中科力***技术工程有限公司 A kind of closely knit processing method of runway basis large area explosion
CN108313219A (en) * 2018-04-02 2018-07-24 长江南京航道工程局 Stone dumper, jackstone system waterborne and jackstone method waterborne waterborne
CN109680647A (en) * 2018-12-21 2019-04-26 大连交通大学 A kind of Construction at ports technique convenient for later maintenance
CN109898557A (en) * 2019-01-21 2019-06-18 中交第二航务工程局有限公司 Underwater rubble bedding laying method
CN109898557B (en) * 2019-01-21 2024-02-20 中交第二航务工程局有限公司 Laying method of underwater broken stone foundation bed
CN111456017A (en) * 2020-04-13 2020-07-28 河海大学 Construction device for underwater riprap foundation bed
CN111456017B (en) * 2020-04-13 2021-04-16 河海大学 Construction device for underwater riprap foundation bed
CN113882421A (en) * 2021-09-24 2022-01-04 中交一航局第三工程有限公司 Offshore wind power generation gravity type foundation and installation method
CN116202728A (en) * 2023-01-18 2023-06-02 天津大学 Submarine cross pipe cable local three-dimensional scouring experiment simulation device
CN116202728B (en) * 2023-01-18 2023-08-25 天津大学 Submarine cross pipe cable local three-dimensional scouring experiment simulation device
CN116084381A (en) * 2023-03-07 2023-05-09 中交第一航务工程局有限公司 Method for feeding, tamping and leveling after underwater block stone foundation bed is blasted
CN116084381B (en) * 2023-03-07 2023-06-20 中交第一航务工程局有限公司 Method for feeding, tamping and leveling after underwater block stone foundation bed is blasted

Similar Documents

Publication Publication Date Title
CN105970900A (en) Offshore wind turbine gravity type foundation installation seabed treatment process
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN109780325B (en) Installation method of underwater pipeline of water taking tunnel of water plant
CN106381866A (en) Construction method of ultra-deep underground diaphragm wall in water-rich soft-soil area
CN108914931A (en) A kind of ring-like foundation pile of the vertical shield of assembled and construction method
WO2020198897A1 (en) Wall sinking construction method
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN106988334B (en) A kind of open caisson support construction and open caisson construction method
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
CN105953078B (en) The protective device of high-pressure gas pipeline and guard method
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN112482358A (en) Diaphragm wall construction method for diaphragm wall penetrating stratum
CN104878779B (en) The anti-silting cover plate of immersed tube tunnel rubble bedding cover type, anti-silting system and construction method
CN112064751A (en) Deep groove construction method for drainage pipeline
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN103374900A (en) Gravity wharf built on silt foundation and method for constructing gravity wharf
CN102888847A (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN113846618A (en) Dynamic compaction replacement reinforcing method for foundation treatment
CN108625368A (en) A kind of Deep Thick Soft Ground Area Rigid Long-Short-Pile Composite Foundation construction method
CN106400807B (en) Extra large work barge grouting method and its equipment
CN111764417A (en) Construction method for dismantling riverbank cofferdam structure
CN206143760U (en) Ally oneself with formula of arranging bored concrete pile device on water
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN106049467A (en) Method for treating slurry leakage of bored pile through percussion drill under complex geology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20160928