CN105952162A - All-weather truss splicing method - Google Patents

All-weather truss splicing method Download PDF

Info

Publication number
CN105952162A
CN105952162A CN201610295295.9A CN201610295295A CN105952162A CN 105952162 A CN105952162 A CN 105952162A CN 201610295295 A CN201610295295 A CN 201610295295A CN 105952162 A CN105952162 A CN 105952162A
Authority
CN
China
Prior art keywords
moulding bed
truss
tarpaulin
crane
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610295295.9A
Other languages
Chinese (zh)
Other versions
CN105952162B (en
Inventor
邱仙荣
张友恩
章露露
方国华
项杰
刘圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201610295295.9A priority Critical patent/CN105952162B/en
Publication of CN105952162A publication Critical patent/CN105952162A/en
Application granted granted Critical
Publication of CN105952162B publication Critical patent/CN105952162B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an all-weather truss splicing method. The method is characterized in that a first step, adopting a trunk crane to splice a jig frame; step 2, adopting the trunk crane to hoist a truss chord member on the jig frame; step 3, pulling protection tarpaulin; step 4, adopting the trunk crane to stack truss web members within the crane hoisting range on one side of the jig frame and then utilizing the crane to splice web members; step 5, finishing welding the truss; step 6, removing the protection tarpaulin and utilizing the trunk crane to hoist the truss and splicing a next truss. The all-weather truss splicing method is convenient in operation and can avoid influence of harsh weather on splicing on the site and the usage of splicing machinery is reduced.

Description

A kind of round-the-clock truss assembling method
Technical field:
The present invention relates to construction steel structure technical field, a kind of round-the-clock truss assembling method.
Background technology:
Steel construction is because its processing and fabricating all completes in workshop, and quality is easily controlled, but owing to truss often size is bigger, it is impossible to delivering after factory is assembled into entirety, scene need nonetheless remain for carrying out substantial amounts of assembled work.The most general assembling method is: set up assembled moulding bed, uses truck crane to carry out on-site consolidation, and is mostly outdoor and carries out, even if being provided with the measure of going along with sb. to guard him or the simplest and the crudest, it is difficult to deal with vile weather, or cost is high, it is difficult to popularization and application.
Summary of the invention:
The one that a first aspect of the present invention purpose is to provide is easy to operate, it is possible to avoid on-site consolidation to be affected by boisterous, can reduce the truss assembling method that assembled machinery uses simultaneously.
To achieve these goals, the present invention is achieved through the following technical solutions:
A kind of round-the-clock truss assembling method, it is characterised in that comprise the following steps:
1st step, employing truck crane assembly moulding bed;
Chord member of truss is lifted on moulding bed by the 2nd step, employing truck crane;
3rd step, draw to set up defences and protect tarpaulin;
In the range of 4th step, the driving using truck crane that truss web is deposited in moulding bed side lift, then use the assembled truss web of driving;
5th step, complete truss welding;
6th step, remove protection tarpaulin, use truck crane to be hung out by truss, next truss structure assembled.
Further it is provided in:
The assembled moulding bed of step 1, jig structure is as follows: include moulding bed cross bar, two moulding bed vertical rods are arranged on moulding bed cross bar in opposition, the side of moulding bed vertical rod being provided with moulding bed support bar, the inner side of moulding bed vertical rod is provided with moulding bed bracket, crane beam is arranged at the upper end of moulding bed vertical rod, driving is installed on crane beam, and can move back and forth along crane beam, it being arranged above tarpaulin hanger in moulding bed vertical rod, tarpaulin is loaded on tarpaulin hanger.
Described moulding bed support bar is arranged at the outside of moulding bed vertical rod.
Described moulding bed cross bar, moulding bed vertical rod, moulding bed bracket all use H steel to make, and moulding bed support bar uses angle steel to make, and crane beam uses H steel to make, and tarpaulin hanger uses scaffold tubes to make.
Described driving is the driving of planer-type small-sized movable.
The drawing to set up defences of step 3 protects tarpaulin, opens or closes tarpaulin according to on-the-spot weather condition.
Compared with prior art, there is following advantages in the present invention:
1, substantial amounts of truss web assembly uses driving to carry out, it is not necessary to use other loop wheel machines, saves machinery expense;
2, using driving assembly, trussmember is without putting into moulding bed from upper air installing so that assembled moulding bed top can be closed, it is achieved that round-the-clock consolidation service, can accelerate progress, it is to avoid personnel's work holdup;
3, by protecting the setting of tarpaulin, can effectively carry out rainproof, sun-proof, improve working environment, assembly, welding, coating quality can be greatly improved.
Describe the present invention below in conjunction with Figure of description and specific embodiment.
Accompanying drawing illustrates:
Fig. 1 is the structural representation of assembled moulding bed of the present invention;
Fig. 2 is the operating diagram that truss of the present invention is assembled.
Detailed description of the invention:
As Figure 1-Figure 2, a kind of round-the-clock truss assembly moulding bed, including: moulding bed cross bar 1, moulding bed vertical rod 2, moulding bed support bar 3, moulding bed bracket 4, crane beam 5, driving 6, tarpaulin hanger 7, tarpaulin 8 forms, wherein: two moulding bed vertical rods 2 are arranged on moulding bed cross bar 1 in opposition, the side of moulding bed vertical rod 2 is provided with moulding bed support bar 3, it is supported fixing to moulding bed vertical rod 2, preferably, described moulding bed support bar 3 is arranged at the outside of moulding bed vertical rod 2, the inner side of moulding bed vertical rod 2 is provided with moulding bed bracket 4, crane beam 5 is arranged at the upper end of moulding bed vertical rod 2, driving 6 is installed on crane beam 5, and can move back and forth along crane beam 5.
Being also equipped with tarpaulin hanger 7 above moulding bed vertical rod 2, tarpaulin 8 is set on tarpaulin hanger 7, can effectively carry out sun-proof, rainproof etc., it is to avoid the impact that vile weather brings, be effectively improved working environment.
Described moulding bed cross bar 1, moulding bed vertical rod 2, moulding bed bracket 4 all use H steel to make, moulding bed support bar 3 uses angle steel to make, crane beam 5 uses H steel to make, tarpaulin hanger 7 uses scaffold tubes to make, crane beam 5 and tarpaulin hanger 7, simultaneously as the plane outer support of moulding bed vertical rod, are effectively improved the stability of structure.
Fig. 1 shows a kind of embodiment of assembly English truss of the present invention.
A kind of method using above-mentioned assembled moulding bed to carry out assembled truss, comprises the following steps:
1st step, employing truck crane assembly moulding bed;
Chord member of truss is lifted on moulding bed by the 2nd step, employing truck crane;
3rd step, draw to set up defences and protect tarpaulin;
4th step, truss web is deposited in the driving lifting of moulding bed side in the range of, then use the assembled truss web of driving;
5th step, complete truss welding, paint;
6th step, remove protection tarpaulin, use truck crane to be hung out by truss, next truss structure assembled.
The present invention can adjust consolidation service mode and progress according to weather condition: if weather condition is good, can not draw and arrange tarpaulin, uses truck crane to carry out consolidation service together with driving, accelerates assembled speed;
During work, use truck crane by within the range of operation of bundled truss web transhipment driving, then use the assembled truss web of driving;
Fig. 1 shows a kind of embodiment of assembly English truss of the present invention, but the invention is not limited in assembled English truss, it is only necessary to is adjusted the position of moulding bed bracket, is equally applicable to the assembly of the various truss such as plane girder, space truss.

Claims (6)

1. a round-the-clock truss assembling method, it is characterised in that comprise the following steps:
1st step, employing truck crane assembly moulding bed;
Chord member of truss is lifted on moulding bed by the 2nd step, employing truck crane;
3rd step, draw to set up defences and protect tarpaulin;
In the range of 4th step, the driving using truck crane that truss web is deposited in moulding bed side lift, then use the assembled truss web of driving;
5th step, complete truss welding;
6th step, remove protection tarpaulin, use truck crane to be hung out by truss, next truss structure assembled.
One the most according to claim 1 round-the-clock truss assembling method, it is characterised in that: the drawing to set up defences of step 3 protects tarpaulin, opens or closes tarpaulin according to on-the-spot weather condition.
One the most according to claim 1 round-the-clock truss assembling method, it is characterized in that: the assembled moulding bed of step 1, jig structure is as follows: include moulding bed cross bar, two moulding bed vertical rods are arranged on moulding bed cross bar in opposition, the side of moulding bed vertical rod is provided with moulding bed support bar, the inner side of moulding bed vertical rod is provided with moulding bed bracket, crane beam is arranged at the upper end of moulding bed vertical rod, driving is installed on crane beam, and can move back and forth along crane beam, being arranged above tarpaulin hanger in moulding bed vertical rod, tarpaulin is loaded on tarpaulin hanger.
One the most according to claim 3 round-the-clock truss assembling method, it is characterised in that: described moulding bed support bar is arranged at the outside of moulding bed vertical rod.
One the most according to claim 3 round-the-clock truss assembling method, it is characterized in that: described moulding bed cross bar, moulding bed vertical rod, moulding bed bracket all use H steel to make, moulding bed support bar uses angle steel to make, and crane beam uses H steel to make, and tarpaulin hanger uses scaffold tubes to make.
One the most according to claim 3 round-the-clock truss assembling method, it is characterised in that: described driving is the driving of planer-type small-sized movable.
CN201610295295.9A 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method Active CN105952162B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610295295.9A CN105952162B (en) 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610295295.9A CN105952162B (en) 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method

Publications (2)

Publication Number Publication Date
CN105952162A true CN105952162A (en) 2016-09-21
CN105952162B CN105952162B (en) 2018-02-06

Family

ID=56914185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610295295.9A Active CN105952162B (en) 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method

Country Status (1)

Country Link
CN (1) CN105952162B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202280A (en) * 2021-04-21 2021-08-03 中交第四公路工程局有限公司 Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
CN114412196A (en) * 2022-02-25 2022-04-29 中建八局新型建造工程有限公司 High-altitude safe assembling jig frame device for pipe truss and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06330635A (en) * 1993-05-25 1994-11-29 Marufuji Shiitopairu Kk Unloading device for temporarily pitch tent
CN101725255A (en) * 2009-11-13 2010-06-09 高申甫 Segmental slipping and assembling process of overhead large-span steel structure
CN202925957U (en) * 2012-12-17 2013-05-08 南通市达欣工程股份有限公司 Instrumentalized extension-type safety protection shed
CN103821372A (en) * 2014-02-26 2014-05-28 中天建设集团有限公司 Method for installing trusses with different heights
CN103899093A (en) * 2014-04-28 2014-07-02 江苏南通六建建设集团有限公司 Step-by-step hoisting construction method of mega-frame steel truss beam
CN205152802U (en) * 2015-11-22 2016-04-13 中铁十八局集团有限公司 Improve structure of arched bridge strength nature skeleton building -site preparation precision

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06330635A (en) * 1993-05-25 1994-11-29 Marufuji Shiitopairu Kk Unloading device for temporarily pitch tent
CN101725255A (en) * 2009-11-13 2010-06-09 高申甫 Segmental slipping and assembling process of overhead large-span steel structure
CN202925957U (en) * 2012-12-17 2013-05-08 南通市达欣工程股份有限公司 Instrumentalized extension-type safety protection shed
CN103821372A (en) * 2014-02-26 2014-05-28 中天建设集团有限公司 Method for installing trusses with different heights
CN103899093A (en) * 2014-04-28 2014-07-02 江苏南通六建建设集团有限公司 Step-by-step hoisting construction method of mega-frame steel truss beam
CN205152802U (en) * 2015-11-22 2016-04-13 中铁十八局集团有限公司 Improve structure of arched bridge strength nature skeleton building -site preparation precision

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202280A (en) * 2021-04-21 2021-08-03 中交第四公路工程局有限公司 Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
CN114412196A (en) * 2022-02-25 2022-04-29 中建八局新型建造工程有限公司 High-altitude safe assembling jig frame device for pipe truss and construction method thereof

Also Published As

Publication number Publication date
CN105952162B (en) 2018-02-06

Similar Documents

Publication Publication Date Title
CN202358849U (en) Small-size suspension crane
JP2011220102A (en) Construction method of hybrid-type tower for wind generator
CN105926959A (en) All-weather truss splicing bed-jig
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN107060349A (en) A kind of large-span steel girder upper air installing system in place and its construction
CN105952162A (en) All-weather truss splicing method
CN105781210B (en) A kind of conical tower and its tool section assist punching construction method for lifting whole
CN103437563A (en) Mounting method for steel skeleton of large steel structure factory building
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN105986684A (en) Mobile type multifunctional component machining workshop
IT202100028058A1 (en) MOBILE SYSTEM TO ASSEMBLE SUPPORT FRAMES FOR ARRAYS OF PHOTOVOLTAIC PANELS AND TO INSTALL SAID SUPPORT FRAMES ON A RECEPTION STRUCTURE
CN201250058Y (en) Improved lifting trolley
CN106185677A (en) A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN105752854A (en) Special rope shake preventing gantry crane for port
CN206051351U (en) Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form
CN204625094U (en) A kind of manual transport trolley
JP5977224B2 (en) Dismantling method for large tower structure
CN105417397A (en) Moving type jacking and lifting transporting equipment and method
CN104652829B (en) Positioning action system construction method is folded from being lifted
CN205257845U (en) Small -size hoisting machine utensil
KR101317384B1 (en) The hoisting and installing method and apparatus of wind turbines by using the self tower
CN110761485A (en) Method for installing C-shaped closed stock ground portal steel frame structure
JP5881381B2 (en) Simple crane for assembling rooftop and method for carrying in or carrying out suspended load using this crane
CN206917297U (en) A kind of large-span steel girder upper air installing system in place
CN213265248U (en) Modularization steel construction well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant