CN105945253B - Gap preset method after bleed-out occurs for a kind of slab caster - Google Patents

Gap preset method after bleed-out occurs for a kind of slab caster Download PDF

Info

Publication number
CN105945253B
CN105945253B CN201610560529.8A CN201610560529A CN105945253B CN 105945253 B CN105945253 B CN 105945253B CN 201610560529 A CN201610560529 A CN 201610560529A CN 105945253 B CN105945253 B CN 105945253B
Authority
CN
China
Prior art keywords
bleed
segment
gap
roll gap
segment1
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610560529.8A
Other languages
Chinese (zh)
Other versions
CN105945253A (en
Inventor
孔意文
韩志伟
刘强
邓比涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CISDI Engineering Co Ltd
Original Assignee
CISDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CISDI Engineering Co Ltd filed Critical CISDI Engineering Co Ltd
Priority to CN201610560529.8A priority Critical patent/CN105945253B/en
Publication of CN105945253A publication Critical patent/CN105945253A/en
Application granted granted Critical
Publication of CN105945253B publication Critical patent/CN105945253B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/20Controlling or regulating processes or operations for removing cast stock
    • B22D11/201Controlling or regulating processes or operations for removing cast stock responsive to molten metal level or slag level
    • B22D11/202Controlling or regulating processes or operations for removing cast stock responsive to molten metal level or slag level by measuring temperature

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

The gap preset method after bleed-out occurs the invention discloses a kind of slab caster, including:S1 monitors continuous casting billet three-dimensional temperature field;S2, which obtains current time crystallizer meniscus, has the molten steel volume of mobility feature to the safe line position of conticaster, obtains the molten steel volume V in current time fan-shaped section with mobility featuresegment;S3 assumes VsegmentIncrease to Vsegment1, calculate Vsegment1Corresponding segment roll gap value and VsegmentVariable quantity between corresponding segment roll gap value;The variable quantity of segment roll gap value is then increased to V by S4 at once in the event of bleed-outsegment1Corresponding segment roll gap value;Otherwise S1 is turned.Present invention, avoiding the risk that during generation bleed-out, molten steel largely flows out at bleed-out, the plant equipment extent of damage is alleviated, reduces the intractability after bleed-out occurs.

Description

Gap preset method after bleed-out occurs for a kind of slab caster
Technical field
The invention belongs to continuous casting technology field, is related to a kind of slab caster and the gap preset method after bleed-out occurs.
Background technology
In all kinds of accidents of continuous casting, damage that the most serious is bleed-out accident.Bleed-out refers to solidify in casting process After green shell goes out crystallizer, green shell keeps out the effect of incessantly ferrostatic pressure and throwing power, and fracture occurs in weakness and makes molten steel Outflow.Bleed-out can not only influence continuous casting, plant equipment is suffered damage, and increase maintenance capacity and maintenance cost, and can endanger And personal safety.
With the development of technology, at present although the incidence of bleed-out accident is greatly reduced, but due to a variety of causes, still Can inevitably it occur.When bleed-out occurs, experience is relied primarily at present to be handled, and closes submersed nozzle, fan The roll gap of shape section is opened to maximum.
Above method processing is not prompt enough, and molten steel largely flows out at bleed-out, plant equipment is suffered damage, and has aggravated machine The tool equipment extent of damage, the intractability after bleed-out occurs is added, and strand centre burst defect can be caused.
The content of the invention
In view of this, the gap preset method after bleed-out occurs it is an object of the invention to provide a kind of slab caster, should Method is based on real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field, after bleed-out occurs, adjustment in real time Segment roll gap value corresponding to molten steel with mobility feature.When avoiding generation bleed-out, molten steel largely flows out at bleed-out Risk, alleviate the plant equipment extent of damage, reduce the intractability after bleed-out occurs, while pass through rational fan-shaped section Gap preset, strand can be avoided to produce centre burst defect.
The purpose of the present invention is achieved through the following technical solutions, and the roll gap after bleed-out occurs for a kind of slab caster Control method, comprise the following steps:
S1. real time and on line monitoring continuous casting billet three-dimensional temperature field Tfield
S2. according to current continuous casting billet three-dimensional temperature field in real time, calculate and obtain current time crystallizer meniscus to continuous casting The safe line position of machine has the molten steel volume V of mobility featuresafe, calculating to obtain in current time conticaster has remote adjustment There is the molten steel volume V of mobility feature in the fan-shaped section of gap values between rollers abilitysegment
S3. V is assumedsegmentIncrease to Vsegment1, calculate current time Vsegment1Corresponding segment roll gap value with VsegmentVariable quantity △ Gap between corresponding segment roll gap valuebreakout, wherein Vsegment1=(Vsegment+Vsafe);
S4. decline suddenly in the event of the excessive steel/mold liquid level of bleed-out/crystallizer, then at once by segment roll gap value Variable quantity △ GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, until accident treatment is completed;Otherwise go to step S1。
Further, in the step S1, real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three dimensional temperature is passed through .
Further, the molten steel with mobility feature is relevant with the coefficient of fluidity δ for steel grade of casting.
Further, the safe line position of conticaster is relevant with the structure of conticaster.
Further, the variable quantity of segment roll gap value is adjusted by multiple fan-shaped sections, by the variable quantity △ of segment roll gap value GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, multiple fan-shaped sections synchronously perform.
Further, step S1~S4 controlling cycles are less than 10 seconds.
By adopting the above-described technical solution, the present invention has the advantage that:
Present invention, avoiding the risk that during generation bleed-out, molten steel largely flows out at bleed-out, alleviate plant equipment and be damaged Degree, the intractability after bleed-out occurs is reduced, while controlled by rational segment roll gap, can avoided in strand generation Heart crack defect.
Brief description of the drawings
In order that the object, technical solutions and advantages of the present invention are clearer, the present invention is made below in conjunction with accompanying drawing into The detailed description of one step, wherein:
Fig. 1 is conticaster schematic diagram;
Fig. 2 is real-time on-line simulation casting stream temperature field schematic diagram;
Fig. 3 is real-time on-line simulation cross section temperature field schematic diagram.
Embodiment
Below with reference to accompanying drawing, the preferred embodiments of the present invention are described in detail;It should be appreciated that preferred embodiment Only for the explanation present invention, the protection domain being not intended to be limiting of the invention.
Wherein zero section is vertical curve section, and 1~6 section is segmental arc, and 7~8 sections are straightening section, and 9~14 sections are horizontal segment, 1 ~14 be all long-range gap preset fan-shaped section.
Gap preset method after bleed-out occurs for a kind of slab caster, comprises the following steps:
S1. real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field T is passed throughfield
S2. according to current continuous casting billet three-dimensional temperature field in real time, calculate and obtain current time crystallizer meniscus to continuous casting The safe line position of machine has the molten steel volume V of mobility featuresafe, calculating to obtain in current time conticaster has remote adjustment There is the molten steel volume V of mobility feature in the fan-shaped section of gap values between rollers abilitysegment;Molten steel and casting with mobility feature The coefficient of fluidity δ of steel grade is relevant, and the safe line position of conticaster is relevant with the structure of conticaster.
S3. V is assumedsegmentIncrease to Vsegment1, calculate current time Vsegment1Corresponding segment roll gap value with VsegmentVariable quantity △ Gap between corresponding segment roll gap valuebreakout, wherein Vsegment1=(Vsegment+Vsafe);
S4. decline suddenly in the event of the excessive steel/mold liquid level of bleed-out/crystallizer, then at once by segment roll gap value Variable quantity △ GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, until accident treatment is completed;Otherwise go to step S1。
In the present invention, the variable quantity of segment roll gap value is adjusted by multiple fan-shaped sections, by the change of segment roll gap value Measure △ GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, multiple fan-shaped sections synchronously perform.
Step S1~S4 controlling cycles should be less than 10 seconds.
The present invention is not only suitable for the gap preset after bleed-out, be also adapted to crystallizer overflow steel and mold liquid level it is unexpected under Drop.
Embodiment 1
Certain steel mill uses straight circular-arc type continuous casting machine to produce section as 250mm × 1870mm strands, and production steel grade is X, and pulling rate is 0.95m/min, cast temperature are 1539 DEG C, wherein zero section is vertical curve section, 1~6 section is segmental arc, and 7~8 sections are aligning Section, 9~14 sections are horizontal segment, and 1~14 is all long-range gap preset fan-shaped section.
Comprise the following steps that:
1) in casting machine production process, Three-Dimensional Simulation of Temperature Fields model real-time tracking casting machine three-dimensional temperature field is passed through;
2) away from crystallizer meniscus 1.1m, the coefficient of fluidity δ for steel grade of casting takes the safe line position of the conticaster in this example 0.94 (meets TStrand>=δ TliqFor the molten steel with mobility feature, wherein TStrandFor the temperature of strand position, TliqFor The liquidus temperature of casting steel grade).According to current real-time three-dimensional temperature field, calculate and obtain current time crystallizer meniscus extremely The safe line position of conticaster has the molten steel volume V of mobility featuresafe=0.41939304m3, calculate obtain current time connect Molten steel volume V with mobility feature in fan-shaped section with remote adjustment gap values between rollers ability in casting machinesegment= 1.468335193m3
3) V is assumedsegmentIncrease to (Vsegment+Vsafe) when, calculate current time VsegmentCorresponding fan-shaped section roll The variable quantity △ Gap of seam valuebreakout:△ SegmentIn01=0.481, △ SegmentOut01=0.362;
△ SegmentIn02=0.343, △ SegmentOut02=0.244;△ SegmentIn03=0.229,
Δ SegmentOut03=0.143;Δ SegmentIn04=0.130, Δ SegmentOut04=0.055;
Δ SegmentIn05=0.044, Δ SegmentOut05=0.009, Segment06~Segment14 roll gap become Change amount is zero.
4) in the event of bleed-out, then at once by the variation delta of the current time segment roll gap value calculated in step 3) GapbreakoutIncrease to (Vsegment+Vsafe) corresponding to segment roll gap value on until accident treatment complete;Otherwise go to step 1)。
In production process, contrast does not have the scene and slab quality using this method processing bleed-out accident, finds to adopt After this method, molten steel only a small amount of outflow at bleed-out, greatly alleviate to the plant equipment extent of damage, reduce hair Intractability after raw bleed-out, low power analysis is carried out by sampling and to strand, the strand contrasted without this method used tries Sample, the strand centre burst defect for finding to employ this method disappear.
The present invention, without particular/special requirement, can be used for the various steel grades of each factory's production at present to the steel grade produced.
The present invention to conticaster pulling rate without particular/special requirement, suitable for various pulling rates.
The present invention is applied to all slab caster types in addition to horizontal type continuous casting machine.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, it is clear that those skilled in the art Member can carry out various changes and modification without departing from the spirit and scope of the present invention to the present invention.So, if the present invention These modifications and variations belong within the scope of the claims in the present invention and its equivalent technologies, then the present invention is also intended to include these Including change and modification.

Claims (6)

1. the gap preset method after bleed-out occurs for a kind of slab caster, it is characterised in that:Comprise the following steps:
S1. real time and on line monitoring continuous casting billet three-dimensional temperature field Tfield
S2. according to current continuous casting billet three-dimensional temperature field in real time, calculate acquisition current time crystallizer meniscus to conticaster and pacify Full line position has the molten steel volume V of mobility featuresafe, calculating to obtain in current time conticaster has remote adjustment roll gap There is the molten steel volume V of mobility feature in the fan-shaped section of value abilitysegment
S3. V is assumedsegmentIncrease to Vsegment1, calculate current time Vsegment1Corresponding segment roll gap value with VsegmentVariable quantity △ Gap between corresponding segment roll gap valuebreakout, wherein Vsegment1=(Vsegment+Vsafe);
S4. decline suddenly in the event of the excessive steel/mold liquid level of bleed-out/crystallizer, then at once by the change of segment roll gap value Measure △ GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, until accident treatment is completed;Otherwise S1 is gone to step.
2. the gap preset method after bleed-out occurs for a kind of slab caster according to claim 1, it is characterised in that:Institute State in step S1, pass through real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field.
3. the gap preset method after bleed-out occurs for a kind of slab caster according to claim 1, it is characterised in that:Tool There is the molten steel of mobility feature relevant with the coefficient of fluidity δ for steel grade of casting.
4. the gap preset method after bleed-out occurs for a kind of slab caster according to claim 1, it is characterised in that:Even The safe line position of casting machine is relevant with the structure of conticaster.
5. the gap preset method after bleed-out occurs for a kind of slab caster according to claim 1, it is characterised in that:Fan The variable quantity of shape section gap values between rollers is adjusted by multiple fan-shaped sections, by the variable quantity △ Gap of segment roll gap valuebreakoutIncrease to Vsegment1Corresponding segment roll gap value, multiple fan-shaped sections synchronously perform.
6. the gap preset method after bleed-out occurs for a kind of slab caster according to claim 1, it is characterised in that:Step Rapid S1~S4 controlling cycles are less than 10 seconds.
CN201610560529.8A 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster Active CN105945253B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610560529.8A CN105945253B (en) 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610560529.8A CN105945253B (en) 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster

Publications (2)

Publication Number Publication Date
CN105945253A CN105945253A (en) 2016-09-21
CN105945253B true CN105945253B (en) 2017-11-10

Family

ID=56900062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610560529.8A Active CN105945253B (en) 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster

Country Status (1)

Country Link
CN (1) CN105945253B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107008874B (en) * 2017-03-29 2018-11-27 东北大学 A kind of continuous casting billet solidifying end pressing control method during unsteady statecalculation
CN107008877B (en) * 2017-04-25 2019-03-26 中冶赛迪工程技术股份有限公司 A kind of control method improving continuous casting machine roll-gap precision
CN114951578B (en) * 2022-05-31 2023-07-14 北京高创智信冶金科技有限公司 Light-pressing roll gap control method suitable for continuous casting square billets

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09122845A (en) * 1995-11-07 1997-05-13 Sumitomo Metal Ind Ltd Method for completing casting in continuous casting
CN101130205A (en) * 2006-08-23 2008-02-27 宝山钢铁股份有限公司 On-line prognostication of thin strap continuous casting crackle and solidification organization, and control method thereof
CN101362196A (en) * 2008-09-12 2009-02-11 攀钢集团研究院有限公司 Control method of natural roll-gap thermal-contraction technique based on bloom
CN101934353A (en) * 2009-06-30 2011-01-05 上海宝信软件股份有限公司 Device and method for breakout prediction during slab continuous casting
CN105057625A (en) * 2015-08-12 2015-11-18 河北钢铁股份有限公司邯郸分公司 Adjusting method of slab caster roll gap under unsteady state pouring condition

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0818962B1 (en) * 2007-11-19 2017-07-04 Posco CONTINUOUS INJECTION PLATE AND METHOD FOR MANUFACTURING THE SAME

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09122845A (en) * 1995-11-07 1997-05-13 Sumitomo Metal Ind Ltd Method for completing casting in continuous casting
CN101130205A (en) * 2006-08-23 2008-02-27 宝山钢铁股份有限公司 On-line prognostication of thin strap continuous casting crackle and solidification organization, and control method thereof
CN101362196A (en) * 2008-09-12 2009-02-11 攀钢集团研究院有限公司 Control method of natural roll-gap thermal-contraction technique based on bloom
CN101934353A (en) * 2009-06-30 2011-01-05 上海宝信软件股份有限公司 Device and method for breakout prediction during slab continuous casting
CN105057625A (en) * 2015-08-12 2015-11-18 河北钢铁股份有限公司邯郸分公司 Adjusting method of slab caster roll gap under unsteady state pouring condition

Also Published As

Publication number Publication date
CN105945253A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN105108096B (en) A kind of Properties of Heavy Rail Steel bloom continuous casting dynamic soft-reduction method for determination of amount
CN106513617B (en) A kind of device and method improving continuous casting slab quality
CN105945253B (en) Gap preset method after bleed-out occurs for a kind of slab caster
CN104874758B (en) Continuous casting weight pressing control method
KR101781805B1 (en) Method for the continuous casting of metal strand
CN105057625A (en) Adjusting method of slab caster roll gap under unsteady state pouring condition
JP2012011459A (en) Soft reduction method of cast slab in continuous casting
CN104999043B (en) Online measuring device and method for opening degree of sliding nozzle of continuous casting ladle
CN109261922A (en) A kind of control method and production technology of the big pressure conticaster of solidification end
CN101554650B (en) Method for controlling online calibration of pulling-straightening roller gap under light pressure of bloom caster
CN109420747B (en) High-yield automatic capping process for slab caster
CN113770318B (en) Method and device for controlling casting force and roll gap of casting roll in thin strip continuous casting
CN104550801B (en) Control method and control device for continuous bloom casting soft reduction
CN104001892B (en) A kind of adjusting method of tundish argon flow amount
CN107321942A (en) A kind of vertical casting-rolling technology of aluminium alloy and device
KR102474770B1 (en) Belt casting path control
CN107570674A (en) Billet continuous casting sizing automatic casting control method
JP2012011460A (en) Soft reduction method of cast slab in continuous casting
CN113953479A (en) Method for improving flanging of thin strip steel coil
CN104174659B (en) A kind of big pressure rolling temperature control method of wick-containing
CN206519555U (en) It is a kind of to improve the device of continuous casting slab quality
CN103273032B (en) A kind of wide thickness plate continuous casting machine slighter compress fan-shaped section opening degree on-line testing method
CN110548847B (en) Method for automatically hiding joint mark slabs in sector section during quick change of tundish of continuous casting machine
CN110385412A (en) Control the continuous cast method of Ti microalloyed steel liquation TiN
JP5707850B2 (en) Control method of light reduction of slab in continuous casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant