CN105945253A - Roll gap control method after bleed-out of slab caster - Google Patents

Roll gap control method after bleed-out of slab caster Download PDF

Info

Publication number
CN105945253A
CN105945253A CN201610560529.8A CN201610560529A CN105945253A CN 105945253 A CN105945253 A CN 105945253A CN 201610560529 A CN201610560529 A CN 201610560529A CN 105945253 A CN105945253 A CN 105945253A
Authority
CN
China
Prior art keywords
roll gap
bleed
gap
fan
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610560529.8A
Other languages
Chinese (zh)
Other versions
CN105945253B (en
Inventor
孔意文
韩志伟
刘强
邓比涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CISDI Engineering Co Ltd
Original Assignee
CISDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CISDI Engineering Co Ltd filed Critical CISDI Engineering Co Ltd
Priority to CN201610560529.8A priority Critical patent/CN105945253B/en
Publication of CN105945253A publication Critical patent/CN105945253A/en
Application granted granted Critical
Publication of CN105945253B publication Critical patent/CN105945253B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/20Controlling or regulating processes or operations for removing cast stock
    • B22D11/201Controlling or regulating processes or operations for removing cast stock responsive to molten metal level or slag level
    • B22D11/202Controlling or regulating processes or operations for removing cast stock responsive to molten metal level or slag level by measuring temperature

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

The invention discloses a roll gap control method after bleed-out of a slab caster. The roll gap control method comprises the following steps: S1, monitoring a three-dimensional temperature field (Tfield) of a continuous casting billet online in real time; S2, obtaining the volume Vsafe of molten steel with liquidity characteristics between a meniscus of a crystallizer and a safety line position of the slab caster at the current moment, and obtaining the volume Vsegment of the molten steel with the liquidity characteristics in a fan-shaped segment with the capability of remotely adjusting the roll gap at the current moment; S3, assuming that the Vsegment is increased to Vsegment1, calculating a variable quantity delta Gapbreakout between a fan-shaped segment roll gap value corresponding to the Vsegment1 and a fan-shaped segment roll gap value corresponding to the Vsegment; and S4, if the bleed-out occurs, immediately increasing the variable quantity delta Gapbreakout of the fan-shaped segment roll gap value to the fan-shaped segment roll gap value corresponding to the Vsegment1, and otherwise, returning to the S1. According to the roll gap control method disclosed by the invention, the risk that a large amount of molten steel leaks from a bleed-out part during the bleed-out is avoided, the damage degree of mechanical equipment is reduced, and the handling difficulty after the bleed-out is reduced; and meanwhile, by reasonably controlling the fan-shaped segment roll gap, the defect that center bursts are generated on casting billets can be avoided.

Description

A kind of gap preset method after slab caster generation bleed-out
Technical field
The invention belongs to continuous casting technology field, relate to a kind of gap preset method after slab caster generation bleed-out.
Background technology
In all kinds of accidents that continuous casting produces, infringement the most seriously bleed-out accident.Bleed-out refers to that in casting process, solidified shell goes out knot After brilliant device, green shell keeps out incessantly ferrostatic pressure and the effect of throwing power, occurs fracture to make molten steel flow out at weakness.Bleed-out is not Only can affect continuous casting to produce, make plant equipment suffer damage, increase maintenance capacity and maintenance cost, and entail dangers to personal safety.
Along with the development of technology, although the incidence rate of current bleed-out accident is greatly reduced, but due to a variety of causes, meeting can not The generation avoided.When there is bleed-out, currently mainly relying on experience to process, closing submersed nozzle, the roller of fan-shaped section Seam is opened to maximum.
Said method processes not prompt enough, and molten steel flows out at bleed-out in a large number, makes plant equipment suffer damage, has increased the weight of plant equipment The extent of damage, adds the intractability after there is bleed-out, and can cause strand centre burst defect.
Summary of the invention
In view of this, it is an object of the invention to provide a kind of gap preset method after slab caster generation bleed-out, the method based on Real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field, after there is bleed-out, adjusts in real time and has mobility spy The segment roll gap value that the molten steel levied is corresponding.When avoiding generation bleed-out, the risk that molten steel flows out at bleed-out in a large number, alleviate machine The tool equipment extent of damage, is reduced the intractability after there is bleed-out, is controlled by rational segment roll gap simultaneously, can avoid casting Base produces centre burst defect.
It is an object of the invention to be achieved through the following technical solutions, the gap preset side after a kind of slab caster generation bleed-out Method, comprises the steps:
S1. real time and on line monitoring continuous casting billet three-dimensional temperature field Tfield
S2. according to the most real-time continuous casting billet three-dimensional temperature field, calculate and obtain current time crystallizer meniscus to conticaster safety line Position has the molten steel volume V of mobility featuresafe, calculate in obtaining current time conticaster and there is remote adjustment gap values between rollers ability There is in fan-shaped section the molten steel volume V of mobility featuresegment
S3. V is supposedsegmentIncrease to Vsegment1, calculate current time Vsegment1Corresponding segment roll gap value and Vsegment The corresponding variable quantity △ Gap between segment roll gap valuebreakout, wherein Vsegment1=(Vsegment+Vsafe);
S4. if it occur that bleed-out/crystallizer overflows, steel/mold liquid level declines suddenly, the most at once by the variable quantity of segment roll gap value △GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, until accident treatment completes;Otherwise go to step S1.
Further, in described step S1, by real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field.
Further, the molten steel with mobility feature is relevant with the coefficient of fluidity δ of casting steel grade.
Further, conticaster safety line position is relevant with the structure of conticaster.
Further, the variable quantity of segment roll gap value is regulated by multiple fan-shaped section, by the variable quantity △ Gap of segment roll gap valuebreakout Increase to Vsegment1Corresponding segment roll gap value, multiple fan-shaped section are to synchronize to perform.
Further, step S1~S4 controlled the cycle less than 10 seconds.
Owing to have employed technique scheme, present invention have the advantage that:
When present invention, avoiding generation bleed-out, the risk that molten steel flows out at bleed-out in a large number, alleviate the plant equipment extent of damage, fall Low there is the intractability after bleed-out, control by rational segment roll gap simultaneously, strand generation centre burst defect can be avoided.
Accompanying drawing explanation
In order to make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing, the present invention is made the most in detail Thin description, wherein:
Fig. 1 is conticaster schematic diagram;
Fig. 2 is real-time on-line simulation casting stream temperature field schematic diagram;
Fig. 3 is temperature field, real-time on-line simulation cross section schematic diagram.
Detailed description of the invention
Below with reference to accompanying drawing, the preferred embodiments of the present invention are described in detail;Should be appreciated that preferred embodiment only for The present invention is described rather than in order to limit the scope of the invention.
Wherein zero section is vertical curve section, and 1~6 section is segmental arc, and 7~8 sections is straightening section, and 9~14 sections is horizontal segment, and 1~14 all For long-range gap preset fan-shaped section.
A kind of gap preset method after slab caster generation bleed-out, comprises the steps:
S1. by real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field Tfield
S2. according to the most real-time continuous casting billet three-dimensional temperature field, calculate and obtain current time crystallizer meniscus to conticaster safety line Position has the molten steel volume V of mobility featuresafe, calculate in obtaining current time conticaster and there is remote adjustment gap values between rollers ability There is in fan-shaped section the molten steel volume V of mobility featuresegment;There is the molten steel of mobility feature and the mobility system of casting steel grade δ is relevant for number, and the safety line position of conticaster is relevant with the structure of conticaster.
S3. V is supposedsegmentIncrease to Vsegment1, calculate current time Vsegment1Corresponding segment roll gap value and Vsegment The corresponding variable quantity △ Gap between segment roll gap valuebreakout, wherein Vsegment1=(Vsegment+Vsafe);
S4. if it occur that bleed-out/crystallizer overflows, steel/mold liquid level declines suddenly, the most at once by the variable quantity of segment roll gap value △GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, until accident treatment completes;Otherwise go to step S1.
In the present invention, the variable quantity of segment roll gap value is regulated by multiple fan-shaped section, by the variable quantity of segment roll gap value △GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, multiple fan-shaped section are to synchronize to perform.
Described step S1~S4 control the cycle should be less than 10 seconds.
The present invention is not only suitable for the gap preset after bleed-out, is also adapted to crystallizer and overflows steel and mold liquid level declines suddenly.
Embodiment 1
It is 250mm × 1870mm strand that certain steel mill uses straight circular-arc type continuous casting machine to produce section, and production steel grade is X, and pulling rate is 0.95m/min, cast temperature is 1539 DEG C, and wherein zero section is vertical curve section, and 1~6 section is segmental arc, and 7~8 sections is straightening section, 9~14 sections is horizontal segment, and 1~14 is all long-range gap preset fan-shaped section.
Specifically comprise the following steps that
1) in casting machine production process, by Three-Dimensional Simulation of Temperature Fields model real-time tracking casting machine three-dimensional temperature field;
2) in this example, this conticaster safety line position takes 0.94 (i.e. away from crystallizer meniscus 1.1m, the coefficient of fluidity δ of casting steel grade Meet TStrand>=δ TliqFor having the molten steel of mobility feature, wherein TStrandFor the temperature of strand position, TliqFor casting steel grade Liquidus temperature).According to the most real-time three-dimensional temperature field, calculate and obtain current time crystallizer meniscus to conticaster safety Line position has the molten steel volume V of mobility featuresafe=0.41939304m3, calculate to obtain in current time conticaster and have remotely There is in the fan-shaped section of regulation gap values between rollers ability the molten steel volume V of mobility featuresegment=1.468335193m3
3) V is supposedsegmentIncrease to (Vsegment+Vsafe) time, calculate current time VsegmentCorresponding segment roll gap The variable quantity △ Gap of valuebreakout: △ SegmentIn01=0.481, △ SegmentOut01=0.362;
△ SegmentIn02=0.343, △ SegmentOut02=0.244;△ SegmentIn03=0.229,
Δ SegmentOut03=0.143;Δ SegmentIn04=0.130, Δ SegmentOut04=0.055;
Δ SegmentIn05=0.044, Δ SegmentOut05=0.009, Segment06~Segment14 roll gap variable quantity is zero.
4) if it occur that bleed-out, the most at once by step 3) in variation delta Gap of current time segment roll gap value that calculatesbreakout Increase to (Vsegment+VsafeUntil accident treatment completes in segment roll gap value corresponding to);Otherwise go to step 1).
In production process, contrast does not use the method to process scene and the slab quality that bleed-out accident occurs, and finds to have employed the party After method, molten steel is the most a small amount of at bleed-out to flow out, and alleviates greatly the plant equipment extent of damage, after reducing generation bleed-out Intractability, by sampling and carry out strand low power analysis, contrast does not has the casting blank sample of the method used, finds have employed The strand centre burst defect of the method disappears.
The present invention steel grade to being produced, without particular/special requirement, may be used for the various steel grades that current each factory produces.
The present invention to conticaster pulling rate without particular/special requirement, it is adaptable to various pulling rates.
The present invention is applicable to all slab caster types in addition to horizontal type continuous casting machine.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, it is clear that those skilled in the art is permissible The present invention is carried out various change and modification without departing from the spirit and scope of the present invention.So, if the present invention these amendment and Modification belongs within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these changes and modification exists In.

Claims (6)

1. the gap preset method after a slab caster generation bleed-out, it is characterised in that: comprise the steps:
S1. real time and on line monitoring continuous casting billet three-dimensional temperature field Tfield
S2. according to the most real-time continuous casting billet three-dimensional temperature field, calculate and obtain current time crystallizer meniscus to conticaster safety line Position has the molten steel volume V of mobility featuresafe, calculate in obtaining current time conticaster and there is remote adjustment gap values between rollers energy There is in the fan-shaped section of power the molten steel volume V of mobility featuresegment
S3. V is supposedsegmentIncrease to Vsegment1, calculate current time Vsegment1Corresponding segment roll gap value and Vsegment The corresponding variable quantity △ Gap between segment roll gap valuebreakout, wherein Vsegment1=(Vsegment+Vsafe);
S4. if it occur that bleed-out/crystallizer overflows, steel/mold liquid level declines suddenly, the most at once by the variable quantity of segment roll gap value △GapbreakoutIncrease to Vsegment1Corresponding segment roll gap value, until accident treatment completes;Otherwise go to step S1.
Gap preset method after a kind of slab caster generation bleed-out the most according to claim 1, it is characterised in that: described step In rapid S1, by real-time on-line simulation three-dimensional temperature field Model Monitoring continuous casting billet three-dimensional temperature field.
Gap preset method after a kind of slab caster generation bleed-out the most according to claim 1, it is characterised in that: there is stream The molten steel of dynamic property feature is relevant with the coefficient of fluidity δ of casting steel grade.
Gap preset method after a kind of slab caster generation bleed-out the most according to claim 1, it is characterised in that: conticaster Safety line position is relevant with the structure of conticaster.
Gap preset method after a kind of slab caster generation bleed-out the most according to claim 1, it is characterised in that: fan-shaped section The variable quantity of gap values between rollers is regulated by multiple fan-shaped section, by the variable quantity △ Gap of segment roll gap valuebreakoutIncrease to Vsegment1Institute is right The segment roll gap value answered, multiple fan-shaped section are to synchronize to perform.
Gap preset method after a kind of slab caster generation bleed-out the most according to claim 1, it is characterised in that: step S1~S4 controlled the cycle less than 10 seconds.
CN201610560529.8A 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster Active CN105945253B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610560529.8A CN105945253B (en) 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610560529.8A CN105945253B (en) 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster

Publications (2)

Publication Number Publication Date
CN105945253A true CN105945253A (en) 2016-09-21
CN105945253B CN105945253B (en) 2017-11-10

Family

ID=56900062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610560529.8A Active CN105945253B (en) 2016-07-15 2016-07-15 Gap preset method after bleed-out occurs for a kind of slab caster

Country Status (1)

Country Link
CN (1) CN105945253B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107008877A (en) * 2017-04-25 2017-08-04 中冶赛迪工程技术股份有限公司 A kind of control method for improving continuous casting machine roll-gap precision
CN107008874A (en) * 2017-03-29 2017-08-04 东北大学 A kind of continuous casting billet solidifying end pressing control method during unsteady statecalculation
CN114951578A (en) * 2022-05-31 2022-08-30 北京高创智信冶金科技有限公司 Soft reduction roll gap control method suitable for continuous casting square billet

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09122845A (en) * 1995-11-07 1997-05-13 Sumitomo Metal Ind Ltd Method for completing casting in continuous casting
CN101130205A (en) * 2006-08-23 2008-02-27 宝山钢铁股份有限公司 On-line prognostication of thin strap continuous casting crackle and solidification organization, and control method thereof
CN101362196A (en) * 2008-09-12 2009-02-11 攀钢集团研究院有限公司 Control method of natural roll-gap thermal-contraction technique based on bloom
US20100296960A1 (en) * 2007-11-19 2010-11-25 Chang Hee Yim Continuous cast slab and method for manufacturing the same
CN101934353A (en) * 2009-06-30 2011-01-05 上海宝信软件股份有限公司 Device and method for breakout prediction during slab continuous casting
CN105057625A (en) * 2015-08-12 2015-11-18 河北钢铁股份有限公司邯郸分公司 Adjusting method of slab caster roll gap under unsteady state pouring condition

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09122845A (en) * 1995-11-07 1997-05-13 Sumitomo Metal Ind Ltd Method for completing casting in continuous casting
CN101130205A (en) * 2006-08-23 2008-02-27 宝山钢铁股份有限公司 On-line prognostication of thin strap continuous casting crackle and solidification organization, and control method thereof
US20100296960A1 (en) * 2007-11-19 2010-11-25 Chang Hee Yim Continuous cast slab and method for manufacturing the same
CN101362196A (en) * 2008-09-12 2009-02-11 攀钢集团研究院有限公司 Control method of natural roll-gap thermal-contraction technique based on bloom
CN101934353A (en) * 2009-06-30 2011-01-05 上海宝信软件股份有限公司 Device and method for breakout prediction during slab continuous casting
CN105057625A (en) * 2015-08-12 2015-11-18 河北钢铁股份有限公司邯郸分公司 Adjusting method of slab caster roll gap under unsteady state pouring condition

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107008874A (en) * 2017-03-29 2017-08-04 东北大学 A kind of continuous casting billet solidifying end pressing control method during unsteady statecalculation
CN107008874B (en) * 2017-03-29 2018-11-27 东北大学 A kind of continuous casting billet solidifying end pressing control method during unsteady statecalculation
CN107008877A (en) * 2017-04-25 2017-08-04 中冶赛迪工程技术股份有限公司 A kind of control method for improving continuous casting machine roll-gap precision
CN107008877B (en) * 2017-04-25 2019-03-26 中冶赛迪工程技术股份有限公司 A kind of control method improving continuous casting machine roll-gap precision
CN114951578A (en) * 2022-05-31 2022-08-30 北京高创智信冶金科技有限公司 Soft reduction roll gap control method suitable for continuous casting square billet

Also Published As

Publication number Publication date
CN105945253B (en) 2017-11-10

Similar Documents

Publication Publication Date Title
CN105108096B (en) A kind of Properties of Heavy Rail Steel bloom continuous casting dynamic soft-reduction method for determination of amount
CN106513617A (en) Device and method for improving casting blank quality of continuous casting production
CN105215310A (en) A kind of method that big cross section Properties of Heavy Rail Steel strand center porosity controls
CN109261922B (en) Casting blank production process of solidification tail end large-reduction continuous casting machine
CN102941323A (en) Method for quickly replacing tundish at low liquid level of medium thin plate blank continuous casting machine crystallizer
CN105215309A (en) A kind of method that big cross section Properties of Heavy Rail Steel center segregation of casting blank controls
CN104162638A (en) Crystallizer cooling water control device and method
CN105945253A (en) Roll gap control method after bleed-out of slab caster
CN105057625A (en) Adjusting method of slab caster roll gap under unsteady state pouring condition
CN105364042A (en) Method for controlling crystalline structure uniformity of large-section heavy rail steel cast blank
JP2012011459A (en) Soft reduction method of cast slab in continuous casting
CN110062672B (en) Method and device for regulating a continuous casting installation
CN104889358B (en) Method for controlling surface crack of continuous cast slab
CN109420747B (en) High-yield automatic capping process for slab caster
CN107303601B (en) Cooling monitoring system and method for casting blank
CN113770318A (en) Method and device for controlling casting force and roll gap of casting roll in thin strip continuous casting
CN113953479B (en) Method for improving flanging of thin strip steel coil
US8863819B2 (en) Continuous casting device and relative method
JP2008525200A (en) Robust control method of molten metal level in twin roll type thin plate casting process.
TWI462790B (en) Mold surface control system for metal casting process and its control method
CN107321942A (en) A kind of vertical casting-rolling technology of aluminium alloy and device
CN102266920A (en) Method for changing conical degree at moment of obstructing process of on-line width reduction of continuous casting crystallizer
CN114269492B (en) Melt supply for a strip casting plant
KR20120110584A (en) Device for controlling cooling of mold for thin slab and method therefor
CN110548847A (en) Method for automatically hiding joint mark slabs in sector section during quick change of tundish of continuous casting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant