CN105908636B - A kind of multi-functional rear support leg system of single girder bridge erecting machine - Google Patents

A kind of multi-functional rear support leg system of single girder bridge erecting machine Download PDF

Info

Publication number
CN105908636B
CN105908636B CN201610384935.3A CN201610384935A CN105908636B CN 105908636 B CN105908636 B CN 105908636B CN 201610384935 A CN201610384935 A CN 201610384935A CN 105908636 B CN105908636 B CN 105908636B
Authority
CN
China
Prior art keywords
rear support
support leg
girder
transverse
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610384935.3A
Other languages
Chinese (zh)
Other versions
CN105908636A (en
Inventor
张耀辉
陈晓明
徐光兴
陈士通
赵存宝
孙志星
王海林
刘嘉武
彭兴山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
Original Assignee
Shijiazhuang Tiedao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University filed Critical Shijiazhuang Tiedao University
Priority to CN201610384935.3A priority Critical patent/CN105908636B/en
Publication of CN105908636A publication Critical patent/CN105908636A/en
Application granted granted Critical
Publication of CN105908636B publication Critical patent/CN105908636B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/143Way of locomotion or support on a side-track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of multi-functional rear support leg system of single girder bridge erecting machine, it is made up of transverse-moving mechanism, rear support leg structure and longitudinal running mechanism.Transverse-moving mechanism mainly includes:Crane's major girder transverse-moving mechanism and rear support leg whole lateral moving mechanism composition on rear support leg entablature;Rear support leg structure mainly includes:Rear support leg entablature, rear support leg telescopic column, rear support leg spill sill bottom girder composition;Longitudinal running mechanism mainly includes wheel-track type running mechanism and rubber-tyred running mechanism is constituted.The present invention solves the problem of the traversing of the rear support leg of single girder bridge erecting machine, lifting and the rear support leg traveling for adapting to different work operating mode.

Description

A kind of multi-functional rear support leg system of single girder bridge erecting machine
Technical field
The present invention relates to Bridge Erector technical field, and in particular to a kind of multi-functional rear support leg system of single girder bridge erecting machine.
Background technology
Functional requirement of the erection of common railway T beams to single girder bridge erecting machine is very high, and the present invention relates to a kind of novel many Function rear support leg system, for railway T-beam set up single girder bridge erecting machine rear support leg, may be such that crane's major girder it is traversing, The lifting of complete machine and longitudinal traveling more convenient and quicker of rear support leg system, adaptability are stronger.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of multi-functional rear support leg system of single girder bridge erecting machine.
To solve the above problems, the technical solution used in the present invention is:
A kind of multi-functional rear support leg system of single girder bridge erecting machine, it includes rear support leg main body, is arranged on the rear support leg The rear support leg transverse-moving mechanism of bottom part body and longitudinal running mechanism, the rear support leg main body includes horizontal on the rear support leg at top Beam, the rear support leg telescopic column positioned at the left and right sides and the rear support leg bottom girder positioned at bottom, the rear support leg entablature, after two Landing leg stretching column and rear support leg bottom girder constitute frame-shaped construction;
The rear support leg entablature is connected through the reserving hole channel and crane's major girder on crane's major girder in right-angled intersection;
The rear support leg transverse-moving mechanism includes the transverse-moving trolley for being arranged on the rear support leg bottom girder two ends, longitudinal traveling Cross moving track beam is provided with mechanism, the transverse-moving trolley is arranged on the cross moving track beam.
Further, crane's major girder transverse-moving mechanism, institute are provided between the rear support leg entablature and crane's major girder Stating crane's major girder transverse-moving mechanism includes traversing hydraulic cylinder and chute system, and described traversing hydraulic cylinder one end connects with rear support leg main body Connect, the other end is connected with crane's major girder.
Further, the chute system include alignment pin, chute and slide plate, the upper surface of the rear support leg entablature and Slide plate and chute, the chute are provided between the top surface and bottom surface of lower surface and the reserving hole channel on the crane's major girder Positioned at middle part, the slide plate, which is located on the both sides of chute, the top surface of the reserving hole channel and bottom surface, is provided with alignment pin, described The end of alignment pin is embedded in corresponding chute.
Further, the rear support leg telescopic column includes the upper pillar stand and lower pillar stand that are slidably connected, the upper pillar stand and Lifting hydraulic cylinder is provided between lower pillar stand.
Further, longitudinal running mechanism is wheel-track type walking mechanism or rubber-tyred walking mechanism.
Further, the rear support leg bottom girder is spill bottom girder.
It is using the beneficial effect produced by above-mentioned technical proposal:
The present invention is applied to traversing, complete machine the lifting of the rear support leg of single girder bridge erecting machine and adapts to different work operating mode The problem of rear support leg traveling.
When setting up the railroad bridge with curve, Bridge Erector walks curve, it is necessary to can expire between crane's major girder and rear support leg The certain angular turn function of foot.Crane's major girder transverse-moving mechanism on rear support leg entablature can realize crane's major girder phase Transverse shifting is carried out for rear support leg entablature, and its chute system can ensure traversing smooth, resistance very little, and can ensure traversing During longitudinally opposed position between crane's major girder and rear support leg entablature it is constant and horizontal on crane's major girder and rear support leg Rotatable certain angle between beam.Rear support leg whole lateral moving mechanism can realize rear support leg whole lateral moving, so as to realize Bridge Erector Whole lateral moving.
When running into the operating mode only set a roof beam in place without the laying section of track, using rubber-tyred running mechanism;Should frame when running into When beam will also lay section of track operating mode, using wheel-track type running mechanism.
During using rubber-tyred running mechanism, tire is walked directly on bridge floor, it is not necessary to track, and such a mode is suitable for only Set a roof beam in place and do not require the engineering construction operating mode of laid rail row;During using wheel-track type running mechanism, travelling wheel is along the rail on bridge floor Road is walked, and such a mode is suitable for set a roof beam in place and requiring the engineering construction operating mode for laying the section of track.Both running mechanisms are adopted With modularized design, with can easily exchange the function for the link position for being installed to cross moving track beam, so as to be propped up after adding The engineering adaptability of leg running mechanism so that the operation of Bridge Erector is simpler and more direct efficiently.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the main structure diagram of the embodiment of the present invention 1.
Fig. 2 is Fig. 1 partial structural diagram.
Fig. 3 is the side structure schematic view of the embodiment of the present invention 1.
Fig. 4 is Fig. 2 partial structural diagram.
Fig. 5 is the main structure diagram of the embodiment of the present invention 2.
Fig. 6 is the side structure schematic view of the embodiment of the present invention 2.
1 traversing hydraulic cylinder, 2 alignment pins, 3 chutes, 4 slide plates, 5 transverse-moving trolleys, 6 cross moving track beams, 7 rear support leg entablatures, 8 Rear support leg telescopic column, 9 rear support leg bottom girders, 10 wheel-track type walking mechanisms, 11 rubber-tyred walking mechanisms, 12 crane's major girders, 13 The section of track, 14 lifting hydraulic cylinders, 15 reserving hole channels.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with the accompanying drawings with specific embodiment to hair It is bright to carry out clear, complete description.
A kind of multi-functional rear support leg system of single girder bridge erecting machine as shown in figures 1 to 6, it includes rear support leg main body, setting The rear support leg transverse-moving mechanism of leg body bottom and longitudinal running mechanism in the rear.The rear support leg transverse-moving mechanism is propped up after realizing Leg whole lateral moving, so as to realize the whole lateral moving of Bridge Erector, longitudinal running mechanism drives rear support leg generally longitudinally to move, from And realize generally longitudinally moving for Bridge Erector.
The rear support leg main body includes rear support leg entablature 7, the rear support leg telescopic vertical positioned at the left and right sides positioned at top Post 8 and the rear support leg bottom girder 9 positioned at bottom, the rear support leg entablature 7, two rear support leg telescopic columns 8 and rear support leg bottom girder 9 Constitute the frame-shaped construction of closure;The rear support leg bottom girder 9 is spill bottom girder, and the middle part of supporting leg bottom girder 9 is provided with depressed part, i.e., in Between low, two ends it is high.Supporting leg bottom girder 9 is set into concavity, by increasing capacitance it is possible to increase when setting a roof beam in place, T beams are needed by space.The rear support leg Telescopic column 8 includes the upper pillar stand and lower pillar stand being slidably connected, and lower pillar stand is sleeved in upper pillar stand, and lower pillar stand and upper pillar stand are slided Coordinate, lifting hydraulic cylinder 14 is provided between the upper pillar stand and lower pillar stand.The inner-outer sleeve relative telescopic of rear support leg telescopic column 8 can Realized by the vertical hydraulic cylinder on the outside of column, so as to reach the purpose of complete machine lifting.
As depicted in figs. 1 and 2, the rear support leg entablature 7 is through the reserving hole channel 15 on crane's major girder 12 and builds bridge Main beam 12 is connected in right-angled intersection;Crane's major girder is provided between the rear support leg entablature 7 and crane's major girder 12 horizontal Telephone-moving structure, the crane's major girder transverse-moving mechanism include traversing hydraulic cylinder 1 and chute system, described traversing one end of hydraulic cylinder 1 with Rear support leg main body is connected, and the other end is connected with crane's major girder 12.The chute system is arranged on reserving hole channel 15 and Bridge Erector The infall of girder 12.The chute system includes alignment pin 2, chute 3 and slide plate 4, the upper surface of the rear support leg entablature 7 Slide plate 4 and chute 3 are provided between the top surface of the reserving hole channel 15 on lower surface and the crane's major girder 12 and bottom surface, The chute 3 is located at middle part, and the slide plate 4, which is located on the both sides of chute 3, the top surface of the reserving hole channel 15 and bottom surface, to be respectively provided with There is alignment pin 2, the end of the alignment pin 2 is embedded in corresponding chute 3.
Such as Fig. 3 and Fig. 4, the rear support leg bottom girder 9 is provided at both ends with transverse-moving trolley 5, longitudinal running mechanism and set There is cross moving track beam 6, the transverse-moving trolley 5 is arranged on the cross moving track beam 6.Longitudinal running mechanism is played positioned at bottommost Cross moving track beam 6 is provided with supporting role, longitudinal running mechanism, transverse-moving trolley 5 is supported by cross moving track beam 6.The horizontal stroke It is two sections to move track 6, and one section is supported by longitudinal running mechanism, and another section stretches out, and forms extension, and its lower surface is set There is buttress, set up single-track railway T beams(It is made up of two panels T beams)When only need to one section of cross moving track 6;Set up double track railway T During beam (being made up of four T beams), extension need to be connected by another section, buttress below plays a supportive role.
As shown in Fig. 1,3,5,6, longitudinal running mechanism is wheel-track type walking mechanism 10 or rubber-tyred walking mechanism 11. When running into the operating mode only set a roof beam in place without the laying section of track 13, using rubber-tyred running mechanism 11;It should be set a roof beam in place also when running into When laying 13 operating mode of the section of track, using wheel-track type running mechanism 10.
During using rubber-tyred running mechanism, tire is walked directly on bridge floor, it is not necessary to track, and such a mode is suitable for only Set a roof beam in place and do not require the engineering construction operating mode of laid rail row;During using wheel-track type running mechanism, travelling wheel is along the rail on bridge floor Road is walked, and such a mode is suitable for set a roof beam in place and requiring the engineering construction operating mode for laying the section of track.Both running mechanisms are adopted With modularized design, with can easily exchange the function for the link position for being installed to cross moving track beam, so as to be propped up after adding The engineering adaptability of leg running mechanism so that the operation of Bridge Erector is simpler and more direct efficiently.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in previous embodiment, or equivalent substitution is carried out to which part technical characteristic;And These modifications are replaced, and the essence of appropriate technical solution is departed from the spirit and model of technical scheme of the embodiment of the present invention Enclose.

Claims (4)

1. a kind of multi-functional rear support leg system of single girder bridge erecting machine, it is characterised in that:It includes rear support leg main body, is arranged on institute The rear support leg transverse-moving mechanism and longitudinal running mechanism of rear support leg bottom part body are stated, the rear support leg main body includes being located at behind top Supporting leg entablature(7), rear support leg telescopic column positioned at the left and right sides(8)With the rear support leg bottom girder positioned at bottom(9), it is described after Supporting leg entablature(7), two rear support leg telescopic columns(8)With rear support leg bottom girder(9)Constitute frame-shaped construction;It is horizontal on the rear support leg Beam(7)Through crane's major girder(12)On reserving hole channel(15)And crane's major girder(12)Connected in right-angled intersection;After described Supporting leg transverse-moving mechanism includes being arranged on the rear support leg bottom girder(9)The transverse-moving trolley at two ends(5), set on longitudinal running mechanism It is equipped with cross moving track beam(6), the transverse-moving trolley(5)It is arranged at the cross moving track beam(6)On;
The rear support leg entablature(7)And crane's major girder(12)Between be provided with crane's major girder transverse-moving mechanism, the bridge formation Main beam transverse-moving mechanism includes traversing hydraulic cylinder(1)And chute system, the traversing hydraulic cylinder(1)One end connects with rear support leg main body Connect, the other end and crane's major girder(12)Connection;
The chute system includes alignment pin(2), chute(3)And slide plate(4), the rear support leg entablature(7)Upper surface and Lower surface and the crane's major girder(12)On reserving hole channel(15)Top surface and bottom surface between be provided with slide plate(4)And cunning Groove(3), the chute(3)Positioned at middle part, the slide plate(4)Positioned at chute(3)Both sides, the reserving hole channel(15)Top surface With alignment pin is provided with bottom surface(2), the alignment pin(2)End be embedded in corresponding chute(3)It is interior.
2. a kind of multi-functional rear support leg system of single girder bridge erecting machine according to claim 1, it is characterised in that:After described Landing leg stretching column(8)Including the upper pillar stand and lower pillar stand being slidably connected, lifting is provided between the upper pillar stand and lower pillar stand Hydraulic cylinder(14).
3. a kind of multi-functional rear support leg system of single girder bridge erecting machine according to claim 1, it is characterised in that:It is described vertical It is wheel-track type walking mechanism to running mechanism(10)Or rubber-tyred walking mechanism(11).
4. a kind of multi-functional rear support leg system of single girder bridge erecting machine according to claim 1, it is characterised in that:After described Supporting leg bottom girder(9)For spill bottom girder.
CN201610384935.3A 2016-06-02 2016-06-02 A kind of multi-functional rear support leg system of single girder bridge erecting machine Expired - Fee Related CN105908636B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610384935.3A CN105908636B (en) 2016-06-02 2016-06-02 A kind of multi-functional rear support leg system of single girder bridge erecting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610384935.3A CN105908636B (en) 2016-06-02 2016-06-02 A kind of multi-functional rear support leg system of single girder bridge erecting machine

Publications (2)

Publication Number Publication Date
CN105908636A CN105908636A (en) 2016-08-31
CN105908636B true CN105908636B (en) 2017-07-28

Family

ID=56743047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610384935.3A Expired - Fee Related CN105908636B (en) 2016-06-02 2016-06-02 A kind of multi-functional rear support leg system of single girder bridge erecting machine

Country Status (1)

Country Link
CN (1) CN105908636B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112974A (en) * 2018-10-24 2019-01-01 中铁工程机械研究设计院有限公司 Bridge Erector and its process of setting a roof beam in place
CN110748163A (en) * 2019-11-15 2020-02-04 河南省中冶起重机有限公司 Novel bridge girder erection machine
CN111945580B (en) * 2020-08-18 2021-11-23 上海振华港机重工有限公司 Bridge deck erection method for large-radian curve type steel box girder
CN113756212A (en) * 2021-09-13 2021-12-07 中铁第五勘察设计院集团有限公司 Portal structure

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2585888Y (en) * 2001-06-07 2003-11-12 中铁三局集团邯郸工程机械制造有限公司 Walking and telescopic single nose girder bridging machinery
CN201485790U (en) * 2009-07-29 2010-05-26 秦皇岛天业通联重工股份有限公司 Balanced single-nose bridge girder erection machine
KR100989892B1 (en) * 2010-06-30 2010-10-26 (주) 모스펙 Crane for constructing girder and constructing method using the same
CN102080358A (en) * 2010-12-20 2011-06-01 江西蓝天学院 Single beam girder erecting machine
CN102296535A (en) * 2011-05-30 2011-12-28 无锡澳玛高铁科技有限公司 Transverse movement structure of rear outriggers of bridge erecting machine
CN202099743U (en) * 2011-05-30 2012-01-04 无锡澳玛高铁科技有限公司 Transverse moving structure of rear supporting leg of bridge erecting machine
CN202500093U (en) * 2012-02-16 2012-10-24 徐州徐工铁路装备有限公司 Sidesway mechanism of single nose girder bridging machine
CN202969281U (en) * 2012-12-21 2013-06-05 中铁十一局集团有限公司 Dual-purpose bridge girder erection machine central leg capable of transversely shifting box girder of 450 tons or 900 tons
CN203007851U (en) * 2012-12-28 2013-06-19 中铁十一局集团有限公司 Middle support leg capable of transversely moving in modularized way for bridge erecting machine
CN205839604U (en) * 2016-06-02 2016-12-28 石家庄铁道大学 A kind of multi-functional rear support leg system of single girder bridge erecting machine

Also Published As

Publication number Publication date
CN105908636A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN105908636B (en) A kind of multi-functional rear support leg system of single girder bridge erecting machine
CN106968179B (en) A kind of constructing device that Cast-in-situ Beam is carried out using self-propelled entirety falsework method
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN102296971A (en) Lining method for tunnel emergency turnout strips and tunnel-lining trolley
CN205839604U (en) A kind of multi-functional rear support leg system of single girder bridge erecting machine
CN106638312A (en) Construction method of movable gantry in construction of big cantilever bent cap
CN110273375B (en) Bridge erecting machine
CN108756934A (en) Run disease tunnel assembled treatment structures construction operation trolley
CN101942807B (en) Flow type bridge erecting machine
CN110541347A (en) large-span full-hydraulic tire walking type tunnel inverted arch trestle and construction method
CN104343084A (en) Trackless lower chord inspection vehicle for steel truss bridges
CN107311047B (en) The steel box-girder lift structure and method for improving of large span bondbeam
CN110205948A (en) A kind of expanded letter Bridge Erector and its erection method
CN203821184U (en) Spreader used for separating and paving roadbed slabs
CN101949133A (en) Straddle type bridge girder erection machine
CN204662270U (en) A kind of case girder transferring system
CN107604828A (en) The Bridge Erector of double-T shaped beam bridge
CN201883383U (en) Movable bridge erecting machine
CN207919265U (en) Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge
CN107604825A (en) The bridging method of T-shaped beam bridge
CN208330395U (en) Run disease tunnel assembled treatment structures construction operation trolley
CN106758577A (en) The moveable entirety transfering type straddle-type monorail PC track beam forms of bed die
CN104929045B (en) Box girder transfer platform and girder feeding and fetching method
CN104929056B (en) The hydraulic drive of a kind of sphere track and control Bridge Erector, bridge formation system and bridging method
CN106087763B (en) It is a kind of to cross the double girder rubber-tyred railway T-girder bridge girder erections of tunnel type and bridging method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728