CN105907987A - Smelting furnace and copper matte preparation method using same - Google Patents

Smelting furnace and copper matte preparation method using same Download PDF

Info

Publication number
CN105907987A
CN105907987A CN201610264237.XA CN201610264237A CN105907987A CN 105907987 A CN105907987 A CN 105907987A CN 201610264237 A CN201610264237 A CN 201610264237A CN 105907987 A CN105907987 A CN 105907987A
Authority
CN
China
Prior art keywords
district
blowing
smelting
slag
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610264237.XA
Other languages
Chinese (zh)
Other versions
CN105907987B (en
Inventor
袁剑平
彭天照
陈森
黄文华
唐斌
徐冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ruim engineering technology Limited by Share Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN201610264237.XA priority Critical patent/CN105907987B/en
Publication of CN105907987A publication Critical patent/CN105907987A/en
Application granted granted Critical
Publication of CN105907987B publication Critical patent/CN105907987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B15/00Obtaining copper
    • C22B15/0026Pyrometallurgy
    • C22B15/0028Smelting or converting

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a smelting furnace and a copper matte preparation method using the smelting furnace. The smelting furnace comprises a smelting furnace bottom, a smelting flue and a blow flue, wherein the smelting furnace bottom is provided with a material inlet, a first air inlet, a second air inlet, a third air inlet, a flux inlet, a smelting slag outlet, a blow slag outlet and a melt outlet; a slag basin zone, a smelting zone, a blow zone and a settling zone are formed inside the smelting furnace bottom in the horizontal direction; a smelting reaction zone and a smelting basin zone are formed in the smelting zone from top to bottom; a blow reaction zone and a blow basin zone are formed in the blow zone from top to bottom; the smelting basin zone communicates with the slag basin zone and the blow basin zone; the blow basin zone communicates with the settling zone; the smelting flue communicates with the top end of the smelting zone; and the blow flue communicates with the top end of the blow zone. The smelting furnace is compact in structure, small in occupied area, and particularly suitable for continuous treatment of copper ore concentrates. Obtained copper matte has a high grade and copper content in furnace slag is relatively low.

Description

Smelting furnace and use the method that this smelting furnace prepares copper matte regulus
Technical field
The invention belongs to metallurgical technology field, specifically, the present invention relates to a kind of smelting furnace and use this smelting furnace to prepare The method of copper matte regulus.
Background technology
Current process copper concentrate obtains the high-grade copper matte regulus of more than 75% and typically uses flash smelting or the method for bottom-blown smelting or molten Refining and the separate method that blows (being i.e. respectively adopted smelting furnace and converting furnace), but in flash smelting or bottom-blown smelting method: dodge Fast thawing refining investment height, is suitable for large-scale production, and while the high-grade copper matte regulus of output to more than 75%, smelting slag cupric is typically wanted To about 3%;Although and bottom-blown smelting is invested lower slightly, but equally existing the problem that Copper in Slag is high, typically will be to 3~5%.Should Although method can obtain high-grade copper matte regulus in a metallurgical furnace, but owing to slag cupric is high, reduces metal straight yield, Add production cost.And in melting and the separate method of blowing, the first more low-grade matte of output in smelting furnace, Then in converting furnace, continue blowing output high-grade copper matte regulus.The method Copper in Slag is relatively low, but due to two kinds of metallurgical furnaces of needs, Increase is all had for equipment investment and construction investment;And to there is the transshipment problem of melt in converting process in melting, adds The probability of flue gas loss, in particular by when bessemerizing, in melt transport process, environment is caused greatly by the flue gas of loss Impact.
Therefore, the equipment that existing process copper concentrate obtains high-grade copper matte regulus is further improved.
Summary of the invention
It is contemplated that one of technical problem solved the most to a certain extent in correlation technique.To this end, the one of the present invention Purpose is a kind of method proposing smelting furnace and using this smelting furnace to prepare copper matte regulus, this smelting furnace compact conformation, takes up an area face Long-pending little, such that it is able to significantly reduce cost of investment, and this smelting furnace is particularly suited for continuous processing copper concentrate, obtained copper Sulfonium has higher grade, and in slag, copper content is relatively low.
In one aspect of the invention, the present invention proposes a kind of smelting furnace.According to embodiments of the invention, described smelting furnace Including:
At the bottom of smelting furnace, at the bottom of described smelting furnace in limit reaction compartment, described reaction compartment sequentially forms in the horizontal direction Slag bath district, smelting zone, blowing district and settling section, described smelting zone sequentially forms melting reaction district and melting molten bath from top to bottom District, described blowing district sequentially forms blowing reaction zone and blowing molten bath district from top to bottom, and described smelting zone leads to described slag bath district Cross the first partition wall spaced apart, and described melting molten bath district is connected with described slag bath district, described smelting zone and described blowing district Spaced apart by the second partition wall, and described melting molten bath district is connected with described blowing molten bath district, and described blowing district is with described Settling section is spaced apart by the 3rd partition wall, and described blowing molten bath district is connected with described settling section, wherein, and described first Partition wall is more than described second partition wall distance to the bottom at the bottom of described smelting furnace to the distance of the bottom at the bottom of described smelting furnace;
Melting flue, described melting flue is connected with the top of described smelting zone;
Blowing flue, described blowing flue is connected with the top in described blowing district;
Material inlet, described material inlet is located at the top of described smelting zone;
First air port, described first air port is located on the sidewall in described melting reaction district;
Second air port, described second air port is located on the sidewall in described melting reaction district, and in the vertical direction, and described Two air ports are positioned at the top in described first air port;
3rd air port, described 3rd air port is located on the sidewall of described blowing reaction zone;
Flux entrance, described flux entrance is located at the top in described blowing district;
Smelting slag exports, and the outlet of described smelting slag is located on the sidewall in described slag bath district;
Blowing slag outlet, the outlet of described blowing slag is located on the sidewall of described settling section;And
Melt outlet, described melt outlet is located on the sidewall of described settling section.
Thus, smelting furnace compact conformation according to embodiments of the present invention, floor space is little, invests into such that it is able to significantly reduce Originally, and this smelting furnace is particularly suited for continuous processing copper concentrate, and obtained copper matte regulus has higher grade, and in slag Copper content is relatively low.
It addition, smelting furnace according to the above embodiment of the present invention can also have a following additional technical characteristic:
In some embodiments of the invention, described smelting furnace includes multiple material inlet, and the plurality of material inlet is along level Interval, direction is located at the top of described smelting zone.Thus, it is possible to significantly improve equipment disposal ability.
In some embodiments of the invention, described smelting furnace includes multiple first air port, and the plurality of first air port is along level Interval, direction is located on the sidewall in described melting reaction district.Thus, it is possible to significantly improve smelting efficiency.
In some embodiments of the invention, described smelting furnace includes multiple second air port, and the plurality of second air port is along level Interval, direction is located on the sidewall in described melting reaction district.Thus, it is possible to unreacted elemental sulfur and combustion after the decomposition of after-flame concentrate Unreacted carbon in material.
In some embodiments of the invention, described smelting furnace includes multiple 3rd air port, and the plurality of 3rd air port is along level Interval, direction is located on the sidewall of described blowing reaction zone.Thus, it is possible to significantly improve blowing efficiency.
In some embodiments of the invention, described smelting furnace farther includes: fuel nozzle, and described fuel nozzle is located at institute State on the sidewall in slag bath district.Thus, it is possible to ensure equipment safe and stable operation.
In another aspect of the invention, the present invention proposes a kind of method utilizing above-mentioned smelting furnace to prepare copper matte regulus.According to this Inventive embodiment, the method includes:
(1) by the mixed material containing copper concentrate, flux and solid fuel through described material inlet supply extremely described smelting zone, And supply the first air through described first air port to described melting reaction district, through described second air port to described melting reaction district Middle supply the second air, in order to described mixed material is reacted in described melting reaction district, obtain melting flue gas and Containing smelting slag and the mix products of blister copper sulfonium melt, and described melting flue gas is discharged through described melting flue;
(2) the described mix products containing smelting slag and blister copper sulfonium melt is carried out natural subsidence in described melting molten bath district;
(3) smelting slag of step (2) isolated is supplied to described slag bath district;
(4) the blister copper sulfonium melt of step (2) isolated is supplied to described blowing district, simultaneously by described 3rd air To described blowing reaction zone supply the 3rd air, by flux entrance to described blowing district supply flux, in order to make described slightly Copper matte regulus melt reacts, and obtains blow flue gas and the mix products containing copper matte regulus melt with blowing slag, and by described blowing Flue gas is discharged through described blowing flue;And
(5) the described mix products containing copper matte regulus melt and blowing slag is carried out natural subsidence in blowing molten bath district;
(6) the mix products supply after natural subsidence step (5) obtained carries out clarifying treatment to described settling section, with Just respectively obtain copper matte regulus melt and blowing slag, and described copper matte regulus melt is discharged through described melt outlet, by described blowing slag warp The outlet of described blowing slag is discharged.
Thus, the method preparing copper matte regulus according to embodiments of the present invention can prepare high-grade copper matte regulus, and obtained Slag in copper content relatively low.
It addition, the method preparing copper matte regulus according to the above embodiment of the present invention can also have a following additional technical characteristic:
In some embodiments of the invention, the described method preparing copper matte regulus farther includes: by described fuel nozzle to institute State slag bath district supply fuel, in order to keep the temperature in described slag bath district.Thus, it is possible to ensure equipment safe and stable operation.
In some embodiments of the invention, in step (1), in described first air, oxygen concentration is not less than 70 volume %. Thus, it is possible to significantly improve smelting efficiency.
In some embodiments of the invention, in step (4), in described 3rd air, oxygen concentration is 25~35 volume %. Thus, it is possible to significantly improve blowing efficiency.
The additional aspect of the present invention and advantage will part be given in the following description, and part will become bright from the following description Aobvious, or recognized by the practice of the present invention.
Accompanying drawing explanation
Above-mentioned and/or the additional aspect of the present invention and advantage will be apparent from from combining the accompanying drawings below description to embodiment With easy to understand, wherein:
Fig. 1 is the structural representation of smelting furnace according to an embodiment of the invention;
Fig. 2 is the structural representation of the smelting furnace according to further embodiment of the present invention;
Fig. 3 is the method flow schematic diagram preparing copper matte regulus according to an embodiment of the invention;
Fig. 4 is the method flow schematic diagram preparing copper matte regulus according to further embodiment of the present invention.
Detailed description of the invention
Embodiments of the invention are described below in detail, and the example of described embodiment is shown in the drawings, the most identical Or similar label represents same or similar element or has the element of same or like function.Retouch below with reference to accompanying drawing The embodiment stated is exemplary, it is intended to is used for explaining the present invention, and is not considered as limiting the invention.
In describing the invention, it is to be understood that term " " center ", " longitudinally ", " laterally ", " length ", " width ", " thickness ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", " outward ", Orientation or the position relationship of the instruction such as " clockwise ", " counterclockwise ", " axially ", " radially ", " circumferential " are based on shown in the drawings Orientation or position relationship, be for only for ease of describe the present invention and simplify describe rather than instruction or hint indication device or Element must have specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.
Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance or Person implies the quantity indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Implicitly include at least one this feature.In describing the invention, " multiple " are meant that at least two, such as two, Three etc., unless otherwise expressly limited specifically.
In the present invention, unless otherwise clearly defined and limited, term " install ", " being connected ", " connection ", the art such as " fixing " Language should be interpreted broadly, and connects for example, it may be fixing, it is also possible to be to removably connect, or integral;Can be machinery Connect, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two units Connection within part or the interaction relationship of two elements, unless otherwise clear and definite restriction.Ordinary skill for this area For personnel, above-mentioned term concrete meaning in the present invention can be understood as the case may be.
In the present invention, unless otherwise clearly defined and limited, fisrt feature second feature " on " or D score can be One directly contacts with second feature, or the first and second features are by intermediary mediate contact.And, fisrt feature is Two features " on ", " top " and " above " but fisrt feature directly over second feature or oblique upper, or be merely representative of first Characteristic level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be fisrt feature Immediately below second feature or obliquely downward, or it is merely representative of fisrt feature level height less than second feature.
In one aspect of the invention, the present invention proposes a kind of smelting furnace.According to embodiments of the invention, as it is shown in figure 1, This smelting furnace includes: 100, melting flue 200 and blowing flue 300 at the bottom of smelting furnace.
According to one embodiment of present invention, limiting reaction compartment 10 in 100 at the bottom of smelting furnace, reaction compartment 10 is along water Square to sequentially forming slag bath district 11, smelting zone 12, blowing district 13 and settling section 14, smelting zone 12 is the most successively Forming melting reaction district 15 and melting molten bath district 16, blowing district 13 sequentially forms blowing reaction zone 17 and blowing from top to bottom Molten bath district 18.
According to one embodiment of present invention, smelting zone 12 is spaced apart by the first partition wall 19 with slag bath district 11, i.e. smelting zone It is provided with the first partition wall 19 between 12 and slag bath district 11, and melting molten bath district 16 is connected with slag bath district 11.Concrete, Appropriately distance is there is, such that it is able to realize melting molten bath district in the lower end of the first partition wall 19 to the bottom at the bottom of smelting furnace 100 16 are connected with slag bath district 11.It should be noted that those skilled in the art can be according to actual needs to the first partition wall Particular type selects, such as, can be water jacket partition wall.
According to still a further embodiment, smelting zone 12 and blowing district 13 are spaced apart by the second partition wall 20, i.e. melting It is provided with the second partition wall between district 12 and blowing district 13, and melting molten bath district 16 is connected with blowing molten bath district 18.Tool Body, there is appropriately distance in the bottom in the lower end of the second partition wall 20 at the bottom of smelting furnace 100, such that it is able to realize melting Molten bath district 16 is connected with blowing molten bath district 18.It should be noted that those skilled in the art can be the most right The particular type of the second partition wall selects, such as, can be water jacket partition wall.
According to another specific embodiment of the present invention, the distance of the first partition wall to the bottom at the bottom of smelting furnace is more than the second partition wall Distance to the bottom at the bottom of smelting furnace.Thus, after there is difference of specific gravity and realize natural layering in smelting slag and melting melt, Smelting slag floats over above melting melt owing to proportion is less, smelting slag space bottom at the bottom of the first partition wall and smelting furnace and Enter into slag bath district, and owing to distance from bottom at the bottom of the second partition wall and smelting furnace is relatively near, block smelting slag and enter into blowing instead Qu Zhong, melting melt therein then can enter in blowing molten bath district.Concrete, can be according to smelting slag in fusion process First partition wall and the second partition wall it is set to the distance bottom at the bottom of smelting furnace, as long as can expire with the delamination of melting melt The separation of foot smelting slag.
According to another specific embodiment of the present invention, blowing district 13 is spaced apart, i.e. by the 3rd partition wall 21 with settling section 14 It is provided with the 3rd partition wall 21 between blowing district 13 and settling section 14, and the molten bath district 18 that blows is connected with settling section 14. Concrete, there is appropriately distance in the bottom in the lower end of the 3rd partition wall 21 at the bottom of smelting furnace 100, such that it is able to realize blowing Refining molten bath district 18 is connected with settling section 14.It should be noted that those skilled in the art can be according to actual needs to The particular type of three partition walls selects, such as, can be water jacket partition wall.
According to embodiments of the invention, at the bottom of smelting furnace, 100 are provided with the 102, second air port, material inlet the 101, first air port 103, the 3rd air port 104, flux entrance 105, smelting slag outlet 106, blowing slag outlet 107 and melt outlet 108.
A specific embodiment according to the present invention, material inlet 101 can be located at the top of smelting zone 12, and be suitable to mixed Compound material supplies to smelting zone.According to the concrete example of the present invention, material inlet can be multiple, and multiple material enters Mouth horizontally spaced can be located at the top of smelting zone.
According to still a further embodiment, the first air port 102 can be located on the sidewall in melting reaction district 15, and is suitable to Oxygen-enriched air is supplied, in order to mixed material is reacted under excess oxygen and obtains containing smelting slag in melting reaction district Mix products with melting melt.According to the concrete example of the present invention, the first air port can be multiple, and multiple first wind Mouth can be located on the sidewall in melting reaction district along horizontal direction interval.
According to still another embodiment of the invention, the second air port 103 can be located on the sidewall in melting reaction district 15, and On vertical direction, the second air port 103 may be located at the top in the first air port 102, and it is normal to be suitable to supply in melting reaction district Oxygen air, makes the elemental sulfur and the oxygen that produce in fusion process react generation sulfur dioxide, also can make not fill in coal simultaneously Divided combustion and the carbon monoxide that produces and normal oxygen air react generation carbon dioxide, thus eliminate elemental sulfur and carbon monoxide The harmful effect that follow-up antacid operation is caused.According to the concrete example of the present invention, the second air port can be multiple and many Individual second air port can be located on the sidewall in melting reaction district along horizontal direction interval.
According to still another embodiment of the invention, the 3rd air port 104 can be located on the sidewall of blowing reaction zone 17, and is suitable to Oxygen-enriched air is supplied, in order to make melting melt occur to continue reaction under excess oxygen in blowing reaction zone, such that it is able to Obtain high-grade melt.According to the concrete example of the present invention, the 3rd air port can be multiple, and multiple 3rd air port can To be located on the sidewall of blowing reaction zone along horizontal direction interval.
According to another specific embodiment of the present invention, flux entrance 105 can be located at blowing district 13 top, and be suitable to Blowing supplies flux in district, in order to flux is reacted with melting melt mixed.
According to another specific embodiment of the present invention, smelting slag outlet 106 can be located on the sidewall in slag bath district 11, and suitable In the smelting slag discharged in slag bath district.Concrete, it is molten higher than in slag bath district that smelting slag outlet can be located on slag bath district sidewall The position of refining melt.
According to another specific embodiment of the present invention, blowing slag outlet 107 can be located on the sidewall of settling section 14, and be suitable to Discharge the blowing slag in settling section.Concrete, that blowing slag outlet can be located on settling section sidewall molten higher than in settling section The position of body, and this blowing slag outlet can be connected with material inlet, in order to by smelting slag supply proceed to smelting zone Melting processes.
According to another specific embodiment of the present invention, melt outlet 108 can be located on the sidewall of settling section 14, and be suitable to Discharge the high-grade melt in settling section.Concrete, the position of the close bottom that melt outlet can be located on settling section sidewall.
According to embodiments of the invention, melting flue 200 can be connected with the top of smelting zone 12, and be suitable to melting anti- Answer the melting flue gas produced in district to discharge smelting zone, and the supply of this melting flue gas is continued with to subsequent handling.
According to embodiments of the invention, blowing flue 300 is connected with the top in blowing district 13, and is suitable to reaction zone of blowing The blowing flue gas of middle generation discharges blowing district, and the supply of this blowing flue gas is continued with to subsequent handling.
Inventor finds, by arranging partition wall inside at the bottom of smelting furnace, reaction compartment is divided into different reaction zones, and leads to Cross and air port is set on different reaction zone sidewalls so that the melt produced in melting reaction district continues in blowing reaction zone Carry out melting process, thus in separate unit smelting furnace, just can prepare high-grade melt, and due to overwhelming majority stove Slag produces in smelting zone, and the discard slag with copper of smelting zone is relatively low, and the copper amount that smelting slag is carried secretly is few;Although simultaneously in blowing district Discard slag with copper is high, but the quantity of slag is few, and the copper amount that blowing slag is carried secretly is the most less, controls the copper in slag the most on the whole Amount, thus significantly reduce valuable metal content in slag, secondly because whole reaction is all carried out inside at the bottom of a smelting furnace, Hence in so that this smelting furnace compact conformation, floor space is little, such that it is able to significantly reduce cost of investment, and this smelting furnace is outstanding It is suitable to continuous processing copper concentrate, and obtained copper matte regulus has a higher grade (higher than 75wt%), and copper in slag Content is relatively low, and more existing process copper concentrate equipment is compared, and the smelting furnace of the present invention can solve in prior art as realizing Obtain the relatively low slag of copper content while output high-grade copper matte regulus and have to use the problem of two metallurgical furnaces, and this melting Stove is particularly suitable for the 300000 tons i.e. ore deposit copper smelting plant of following scale.
With reference to Fig. 2, smelting furnace according to embodiments of the present invention farther includes: fuel nozzle 109:
According to embodiments of the invention, fuel nozzle 109 can be located on the sidewall in slag bath district.Thus, it is possible to as required Fuel is supplied, in order to keep the temperature stabilization in slag bath district, thereby may be ensured that equipment safe and stable operation in slag bath district.
Understand for convenience, be described in detail with the process using the smelting furnace of the embodiment of the present invention to process copper concentrate below.
First, by copper concentrate (water content is not higher than 12wt%, and granularity is not higher than 50mm), flux (quartz sand) and solid Fluid fuel (coal) through computer system automatically carry out proportioning complete after dispensing, obtain mixed material, then by this mixed material warp Adhesive tape delivery system supplies to smelting zone through material inlet after delivering to smelting furnace furnace roof, simultaneously anti-to melting by the first air port Answer and district supplies oxygen-enriched air (oxygen concentration is not less than 70 volume %), supplied in melting reaction district often by the second air port Oxygen air so that mixed material produces under oxygen-enriched atmosphere in melting reaction district occurs vigorous reaction, and melting reaction district Elemental sulfur and/or the normal oxygen air that blasts with the second air port in uphill process of carbon monoxide continue to react, such that it is able to Obtaining melting flue gas and containing smelting slag and the mix products of blister copper sulfonium melt, the smelting flue of melting flue gas obtained is discharged After enter into Mist heat recovering in waste heat boiler, gather dust and acid making system subsequently into follow-up, and obtain containing melting The mix products of slag and blister copper sulfonium melt carries out natural subsidence in melting molten bath district, due to smelting slag and blister copper sulfonium melt difference in specific gravity Different and realize smelting slag and the layering of blister copper sulfonium melt, smelting slag is relatively low and be positioned at the top of blister copper sulfonium melt due to proportion, molten Refining slag enters into slag bath district through the first partition wall, and sprays into fuel (coal dust) in slag bath district as desired by fuel nozzle It is incubated in slag bath district, and smelting slag (copper content is less than 1.2wt%) the smelting slag outlet obtained is drained into cinder ladle In, then deliver to slow cooling operation with cinder ladle handlebar smelting slag and process, and thick melting melt (grade is not higher than 60wt%) Entering into blowing district through the second partition wall, supply oxygen-enriched air by the 3rd air port in blowing district (oxygen concentration is 25~35 simultaneously Volume %), supply quartz sand by colvent inlet so that blister copper sulfonium melt proceeds reaction in blowing reaction zone, is blown Refining flue gas and the mix products containing copper matte regulus melt with blowing slag, the blowing flue gas obtained enters into after blowing flue is discharged Mist heat recovering in waste heat boiler, gathers dust and acid making system subsequently into follow-up, and obtain containing copper matte regulus melt and blowing The mix products of refining slag carries out natural subsidence in blowing molten bath district, and blowing slag is more frivolous above copper matte regulus melt, and settles After the mix products containing copper matte regulus melt and blowing slag enter into through the 3rd partition wall settling section carry out clarified separation, obtain Copper matte regulus melt (grade be higher than 78wt%) is discharged into next process through melt outlet, and the slag that blows (copper content is 2.8wt%) Discharge through blowing slag outlet and proceed melting through material inlet Returning smelting district after slow cooling is broken and process.
In another aspect of the present invention, the present invention proposes a kind of method preparing copper matte regulus.According to embodiments of the invention, This method preparing copper matte regulus is by using above-mentioned smelting furnace to carry out.With reference to Fig. 3, the embodiment of the present invention prepare copper matte regulus Method include:
S100: by the mixed material containing copper concentrate, flux and solid fuel through the supply of described material inlet to described smelting zone, And supply the first air through described first air port to described melting reaction district, through described second air port to described melting reaction district Middle supply the second air, in order to described mixed material is reacted in described melting reaction district, obtain melting flue gas and Containing smelting slag and the mix products of blister copper sulfonium melt, and described melting flue gas is discharged through described melting flue;
S200: the described mix products containing smelting slag and blister copper sulfonium melt is carried out natural subsidence in described melting molten bath district;
S300: the smelting slag of step S200 isolated is supplied to described slag bath district;
S400: the blister copper sulfonium melt of step S200 isolated is supplied to described blowing district, simultaneously by described 3rd air To described blowing reaction zone supply the 3rd air, by flux entrance to described blowing district supply flux, in order to make described slightly Copper matte regulus melt reacts, and obtains blow flue gas and the mix products containing copper matte regulus melt with blowing slag, and by described blowing Flue gas is discharged through described blowing flue;
S500: the described mix products containing copper matte regulus melt and blowing slag is carried out natural subsidence in blowing molten bath district;And
S600: the mix products supply after natural subsidence step S500 obtained carries out clarifying treatment to described settling section, with Just respectively obtain copper matte regulus melt and blowing slag, and described copper matte regulus melt is discharged through described melt outlet, by described blowing slag warp The outlet of described blowing slag is discharged.
According to embodiments of the invention, in the step s 100, in described first air, oxygen concentration is not less than 70 volume %. Thus, it is possible to significantly improve smelting efficiency.
According to embodiments of the invention, in step S400, in described 3rd air, oxygen concentration is 25~35 volume %.By This, can significantly improve blowing efficiency.
Thus, the method preparing copper matte regulus according to embodiments of the present invention, by using above-mentioned smelting furnace to process, can be prepared Obtain high-grade copper matte regulus (grade 78wt%), and in obtained slag, copper content is relatively low.
With reference to Fig. 4, the method preparing copper matte regulus of the embodiment of the present invention farther includes:
S700: by described fuel nozzle to described slag bath district supply fuel, in order to keep the temperature in described slag bath district.
It is equally applicable to this method preparing copper matte regulus for the feature and advantage described by smelting furnace it should be noted that above-mentioned, Here is omitted.
In the description of this specification, reference term " embodiment ", " some embodiments ", " example ", " concrete example ", Or specific features, structure, material or the feature bag that the description of " some examples " etc. means to combine this embodiment or example describes It is contained at least one embodiment or the example of the present invention.In this manual, to the schematic representation of above-mentioned term necessarily It is directed to identical embodiment or example.And, the specific features of description, structure, material or feature can be arbitrary Individual or multiple embodiment or example combine in an appropriate manner.Additionally, in the case of the most conflicting, the skill of this area The feature of the different embodiments described in this specification or example and different embodiment or example can be combined by art personnel And combination.
Although above it has been shown and described that embodiments of the invention, it is to be understood that above-described embodiment is exemplary, Being not considered as limiting the invention, those of ordinary skill in the art within the scope of the invention can be to above-described embodiment It is changed, revises, replaces and modification.

Claims (10)

1. a smelting furnace, it is characterised in that including:
At the bottom of smelting furnace, at the bottom of described smelting furnace in limit reaction compartment, described reaction compartment sequentially forms in the horizontal direction Slag bath district, smelting zone, blowing district and settling section, described smelting zone sequentially forms melting reaction district and melting molten bath from top to bottom District, described blowing district sequentially forms blowing reaction zone and blowing molten bath district from top to bottom, and described smelting zone leads to described slag bath district Cross the first partition wall spaced apart, and described melting molten bath district is connected with described slag bath district, described smelting zone and described blowing district Spaced apart by the second partition wall, and described melting molten bath district is connected with described blowing molten bath district, and described blowing district is with described Settling section is spaced apart by the 3rd partition wall, and described blowing molten bath district is connected with described settling section, wherein, and described first Partition wall is more than described second partition wall distance to the bottom at the bottom of described smelting furnace to the distance of the bottom at the bottom of described smelting furnace;
Melting flue, described melting flue is connected with the top of described smelting zone;
Blowing flue, described blowing flue is connected with the top in described blowing district;
Material inlet, described material inlet is located at the top of described smelting zone;
First air port, described first air port is located on the sidewall in described melting reaction district;
Second air port, described second air port is located on the sidewall in described melting reaction district, and in the vertical direction, and described Two air ports are positioned at the top in described first air port;
3rd air port, described 3rd air port is located on the sidewall of described blowing reaction zone;
Flux entrance, described flux entrance is located at the top in described blowing district;
Smelting slag exports, and the outlet of described smelting slag is located on the sidewall in described slag bath district;
Blowing slag outlet, the outlet of described blowing slag is located on the sidewall of described settling section;And
Melt outlet, described melt outlet is located on the sidewall of described settling section.
Smelting furnace the most according to claim 1, it is characterised in that include that multiple material inlet, the plurality of material enter The horizontally spaced top being located at described smelting zone of mouth.
Smelting furnace the most according to claim 1 and 2, it is characterised in that include multiple first air port, the plurality of On the horizontally spaced sidewall being located at described melting reaction district in one air port.
Smelting furnace the most according to claim 3, it is characterised in that include multiple second air port, the plurality of second wind On the horizontally spaced sidewall being located at described melting reaction district of mouth.
Smelting furnace the most according to claim 1, it is characterised in that include multiple 3rd air port, the plurality of 3rd wind On the horizontally spaced sidewall being located at described blowing reaction zone of mouth.
6. according to the smelting furnace described in any one of claim 1-5, it is characterised in that farther include: fuel nozzle, institute State fuel nozzle to be located on the sidewall in described slag bath district.
7. the method that copper matte regulus prepared by the smelting furnace used described in any one of claim 1-6, it is characterised in that including:
(1) by the mixed material containing copper concentrate, flux and solid fuel through described material inlet supply extremely described smelting zone, And supply the first air through described first air port to described melting reaction district, through described second air port to described melting reaction district Middle supply the second air, in order to described mixed material is reacted in described melting reaction district, obtain melting flue gas and Containing smelting slag and the mix products of blister copper sulfonium melt, and described melting flue gas is discharged through described melting flue;
(2) the described mix products containing smelting slag and blister copper sulfonium melt is carried out natural subsidence in described melting molten bath district;
(3) smelting slag of step (2) isolated is supplied to described slag bath district;
(4) the blister copper sulfonium melt of step (2) isolated is supplied to described blowing district, simultaneously by described 3rd air To described blowing reaction zone supply the 3rd air, by flux entrance to described blowing district supply flux, in order to make described slightly Copper matte regulus melt reacts, and obtains blow flue gas and the mix products containing copper matte regulus melt with blowing slag, and by described blowing Flue gas is discharged through described blowing flue;And
(5) the described mix products containing copper matte regulus melt and blowing slag is carried out natural subsidence in blowing molten bath district;
(6) the mix products supply after natural subsidence step (5) obtained carries out clarifying treatment to described settling section, with Just respectively obtain copper matte regulus melt and blowing slag, and described copper matte regulus melt is discharged through described melt outlet, by described blowing slag warp The outlet of described blowing slag is discharged.
Method the most according to claim 7, it is characterised in that farther include: by described fuel nozzle to described Slag bath district supply fuel, in order to keep the temperature in described slag bath district.
9. according to the method described in claim 7 or 8, it is characterised in that in step (1), in described first air Oxygen concentration is not less than 70 volume %.
Method the most according to claim 9, it is characterised in that in step (4), oxygen in described 3rd air Concentration is 25~35 volume %.
CN201610264237.XA 2016-04-26 2016-04-26 Smelting furnace and the method that copper matte regulus is prepared using the smelting furnace Active CN105907987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610264237.XA CN105907987B (en) 2016-04-26 2016-04-26 Smelting furnace and the method that copper matte regulus is prepared using the smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610264237.XA CN105907987B (en) 2016-04-26 2016-04-26 Smelting furnace and the method that copper matte regulus is prepared using the smelting furnace

Publications (2)

Publication Number Publication Date
CN105907987A true CN105907987A (en) 2016-08-31
CN105907987B CN105907987B (en) 2017-10-27

Family

ID=56751973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610264237.XA Active CN105907987B (en) 2016-04-26 2016-04-26 Smelting furnace and the method that copper matte regulus is prepared using the smelting furnace

Country Status (1)

Country Link
CN (1) CN105907987B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007193A (en) * 2017-11-09 2018-05-08 中国恩菲工程技术有限公司 Smelting furnace and the method using smelting furnace processing metal waste
CN109764679A (en) * 2017-11-09 2019-05-17 中国瑞林工程技术股份有限公司 Smelting device and smelting process
CN110629036A (en) * 2019-08-16 2019-12-31 中国瑞林工程技术股份有限公司 Continuous copper smelting equipment and copper smelting method
CN113046571A (en) * 2021-03-08 2021-06-29 易门铜业有限公司 Smelting system and method for reducing generation of magnetic iron in copper ore smelting process
CN116425121A (en) * 2023-05-22 2023-07-14 南风化工(运城)集团有限公司 Sodium sulfide production method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4645186A (en) * 1984-07-18 1987-02-24 Outokumpu Oy Apparatus for processing sulphide concentrates and sulphide ores into raw material
JPH09263849A (en) * 1996-03-28 1997-10-07 Nikko Kinzoku Kk Method for continuously smelting copper and apparatus therefor
CN101144123A (en) * 2007-09-29 2008-03-19 南昌有色冶金设计研究院 Floating smelting and immersed air refining integrated continuous copper smelting method and device
CN201867056U (en) * 2010-11-26 2011-06-15 长沙有色冶金设计研究院 Combined furnace for nonferrous metallurgy
CN201901695U (en) * 2010-11-21 2011-07-20 中国恩菲工程技术有限公司 Continuous lead smelting device
CN102978405A (en) * 2012-12-06 2013-03-20 中国瑞林工程技术有限公司 Side-blown continuous smelting process and device for electronic scrap
CN104073653A (en) * 2014-06-25 2014-10-01 中国恩菲工程技术有限公司 Continuous lateral blowing tin smelting device
CN203890418U (en) * 2014-04-18 2014-10-22 东营鲁方金属材料有限公司 One-step copper smelting device
CN104928492A (en) * 2015-06-15 2015-09-23 中国瑞林工程技术有限公司 Flash side-blowing smelting device and flash side-blowing smelting method
CN105087956A (en) * 2015-09-02 2015-11-25 云南锡业股份有限公司铜业分公司 Smelting furnace for continuously smelting blister copper through copper sulfide concentrate and smelting method of smelting furnace
CN205603657U (en) * 2016-04-26 2016-09-28 中国瑞林工程技术有限公司 Smelting furnace

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4645186A (en) * 1984-07-18 1987-02-24 Outokumpu Oy Apparatus for processing sulphide concentrates and sulphide ores into raw material
JPH09263849A (en) * 1996-03-28 1997-10-07 Nikko Kinzoku Kk Method for continuously smelting copper and apparatus therefor
CN101144123A (en) * 2007-09-29 2008-03-19 南昌有色冶金设计研究院 Floating smelting and immersed air refining integrated continuous copper smelting method and device
CN201901695U (en) * 2010-11-21 2011-07-20 中国恩菲工程技术有限公司 Continuous lead smelting device
CN201867056U (en) * 2010-11-26 2011-06-15 长沙有色冶金设计研究院 Combined furnace for nonferrous metallurgy
CN102978405A (en) * 2012-12-06 2013-03-20 中国瑞林工程技术有限公司 Side-blown continuous smelting process and device for electronic scrap
CN203890418U (en) * 2014-04-18 2014-10-22 东营鲁方金属材料有限公司 One-step copper smelting device
CN104073653A (en) * 2014-06-25 2014-10-01 中国恩菲工程技术有限公司 Continuous lateral blowing tin smelting device
CN104928492A (en) * 2015-06-15 2015-09-23 中国瑞林工程技术有限公司 Flash side-blowing smelting device and flash side-blowing smelting method
CN105087956A (en) * 2015-09-02 2015-11-25 云南锡业股份有限公司铜业分公司 Smelting furnace for continuously smelting blister copper through copper sulfide concentrate and smelting method of smelting furnace
CN205603657U (en) * 2016-04-26 2016-09-28 中国瑞林工程技术有限公司 Smelting furnace

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007193A (en) * 2017-11-09 2018-05-08 中国恩菲工程技术有限公司 Smelting furnace and the method using smelting furnace processing metal waste
CN109764679A (en) * 2017-11-09 2019-05-17 中国瑞林工程技术股份有限公司 Smelting device and smelting process
CN109764679B (en) * 2017-11-09 2024-04-23 中国瑞林工程技术股份有限公司 Smelting device and smelting method
CN110629036A (en) * 2019-08-16 2019-12-31 中国瑞林工程技术股份有限公司 Continuous copper smelting equipment and copper smelting method
CN113046571A (en) * 2021-03-08 2021-06-29 易门铜业有限公司 Smelting system and method for reducing generation of magnetic iron in copper ore smelting process
CN116425121A (en) * 2023-05-22 2023-07-14 南风化工(运城)集团有限公司 Sodium sulfide production method

Also Published As

Publication number Publication date
CN105907987B (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN102618729B (en) Smelting method and device for molten oxidized lead slag
CN101705367B (en) Copper nickel smelting process with oxygen-enriched side-blowing bath smelting method
CN102374781B (en) Direct lead-smelting comprehensive metallurgical device and smelting process
CN102978405B (en) Side-blown continuous smelting device for electronic scrap
CN105907987A (en) Smelting furnace and copper matte preparation method using same
CN104131170A (en) Smelting process of low-grade scrap copper
CN102735047A (en) Method and equipment for depleting furnace slag of electric melting furnace of side-blowing melting pool
CN102796875B (en) Zinc leaching residue treatment unit and treatment process
CN103993176A (en) Rich-oxygen top-blown smelting/liquid high-lead slag side-blown direct-reduction lead smelting process
CN104073655A (en) Tin smelting technique by continuous side blowing
CN102031393A (en) Continuous lead smelting clean production process
CN104946899B (en) Edge transmission top-blown converter and depleted sedimentation furnace combined lead dross treatment method
CN111424175A (en) System and method for smelting zinc concentrate and zinc-containing secondary material
CN111411234A (en) Jet smelting electrothermal reduction furnace and method for smelting zinc-containing material
CN103643051A (en) Process and device for treating copper-lead smelting mixed slag through bottom-blowing bath smelting technology
CN201785464U (en) Integrated metallurgical device for direct lead smelting
CN103993183A (en) Rich-oxygen top-blown smelting/liquid high-lead slag side-blown direct-reduction lead smelting equipment
CN111322869A (en) Smelting furnace for continuously smelting crude tin from tin concentrate and continuously fuming furnace slag and smelting method
CN201762422U (en) Double-chamber oxygen side-blown continual lead smelting furnace
CN104073653A (en) Continuous lateral blowing tin smelting device
CN203820871U (en) Lead smelting equipment adopting oxygen enrichment top-blown smelting and liquid high-lead slag side-blown direct reduction
CN205603657U (en) Smelting furnace
CN111411230A (en) Suspension smelting electrothermal reduction furnace and method for smelting zinc concentrate
CN110195165A (en) A kind of Copper making technique
CN104073652A (en) Side-blown tin smelting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Patentee after: China ruim engineering technology Limited by Share Ltd

Address before: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Patentee before: China Nerin Engineering Co., Ltd.

CP01 Change in the name or title of a patent holder