CN105888677A - Underground pipe gallery construction device, combination and construction method - Google Patents

Underground pipe gallery construction device, combination and construction method Download PDF

Info

Publication number
CN105888677A
CN105888677A CN201610302175.7A CN201610302175A CN105888677A CN 105888677 A CN105888677 A CN 105888677A CN 201610302175 A CN201610302175 A CN 201610302175A CN 105888677 A CN105888677 A CN 105888677A
Authority
CN
China
Prior art keywords
piping lane
stirring
head
pipe gallery
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610302175.7A
Other languages
Chinese (zh)
Inventor
卫海
吴刚
卫龙武
张力
徐维平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hongji Energy Saving New Technology Co Ltd
Original Assignee
Jiangsu Hongji Energy Saving New Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hongji Energy Saving New Technology Co Ltd filed Critical Jiangsu Hongji Energy Saving New Technology Co Ltd
Priority to CN201610302175.7A priority Critical patent/CN105888677A/en
Publication of CN105888677A publication Critical patent/CN105888677A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses an underground pipe gallery construction device, a combination and a method. The device comprises a stirring head thruster arranged at one end of a prefabricated pipe gallery, multiple stirring heads fixedly mounted at the front end of the stirring head thruster, a pipe gallery jacking component arranged at the other end of the prefabricated pipe gallery and a jack connected with the pipe gallery jacking component, wherein the stirring head thruster and the stirring heads are arranged along the cross section of the prefabricated pipe gallery; and a separation anti-interference cover formed by steel plates is arranged around the outer side of the front end of the stirring head. The device has the advantages of cost reduction, fast construction and reliable quality.

Description

A kind of underground pipe gallery constructing device, assembly and construction method
Technical field
The invention belongs to civil construction project field, relate to a kind of piping lane constructing device, assembly and method.
Background technology
At present in the construction of underground pipe gallery, two kinds of methods of general employing, the first is open cut construction, and the second is shield construction construction.The first cut and cover method not only needs to carry out pattern foundation pit supporting structure, but also needs to destroy road surface, suspend traffic, and the traffic for old town brings a lot of difficulty;The second shield method is commonly used in the deeper subway engineering in ground, for shallower away from ground, sectional area is relatively big, section form be square pipe gallery be not the suitableeest.
Summary of the invention
Technical problem:The present invention provides a kind of and reduces cost, speed of application soon, and the underground pipe gallery constructing device of reliable in quality provides a kind of underground pipe gallery construction assembly and construction method simultaneously.
Technical scheme:A kind of underground pipe gallery constructing device of the present invention, including being arranged on the stirring-head thruster of prefabricated piping lane one end, being fixedly mounted on multiple stirring-heads of described stirring-head thruster front end, be arranged on the piping lane top power parts of the prefabricated piping lane other end and be connected the jacking jack installed with described piping lane top power parts, described stirring-head thruster and stirring-head are arranged along the transverse section of prefabricated piping lane, and the outside surrounding of stirring-head front end is provided with the separation anti-interference cover surrounded with steel plate.
Further, in apparatus of the present invention, described stirring-head includes support, arranges power set on the bracket, thrust wheel, the chain that driven by described power set, stirrer gear head it is provided with outside described chain, inner side is connected installation with thrust wheel, described stirring-head propeller is the level jack being arranged on prefabricated piping lane end, and its front end is connected with stirring-head.
Further, in apparatus of the present invention, the top of described separation anti-interference cover is provided with detector, and described detector is changing sensor, pressure transducer or dip angle device.
Further, in apparatus of the present invention, the relaying servomotor of adjacent two prefabricated piping lanes before and after also including connecting, described relaying servomotor is constituted with horizontally disposed jack for main body, it is arranged on the top of follow-up prefabricated piping lane, and is connected with the tail end of above prefabricated piping lane.
Further, prefabricated piping lane cross section corresponding to apparatus of the present invention is square, circular or polygon, multiple stirring-heads are arranged by the section configuration of prefabricated piping lane front end, and are fixed on the angle of rake front end of stirring-head, and the angle of rake rear end of stirring-head is connected with prefabricated piping lane.
The underground pipe gallery construction assembly of the present invention, including prefabricated piping lane and above-mentioned underground pipe gallery constructing device, the two installation is combined into one.
The underground pipe gallery construction method of the present invention, comprises the following steps:
1) stirring-head propeller, stirring-head, separation anti-interference cover, detector are installed location, piping lane top power parts and prefabricated piping lane other end abutting joint along the transverse section of prefabricated piping lane jacking end;
2) start stirring-head and jacking jack, start jacking construction;
3) constantly new prefabricated piping lane is placed in construction station, and by jacking construction by its jacking to soil layer, until completing the jacking of an all component of station;
4) soil body in prefabricated piping lane is taken out, dismounting detector, separation anti-interference cover, stirring-head, stirring-head thruster and piping lane top power parts, complete piping lane construction.
Further, in the inventive method, described step 2) and 3) in, when the prefabricated piping lane of jacking, supplied water at stirring-head by water injection pipe so that the stirring soil body of member exterior and water mix and blend become mud or clay coating, when being provided with relaying servomotor, step 4) also includes dismounting relaying servomotor, and closes the room after teeming relaying servomotor is removed.
Further, in the inventive method, use two set piping lane constructing devices, at same active well jacking construction in the opposite direction, two overlap the back-to-back setting of jacking jack in piping lane constructing devices, or two set piping lane constructing devices share one group of jacking jack, thus counteract jacking counter-force.
The inventive method belongs to non-excavating construction category, it is as shield construction, without destroying road surface in the construction of piping lane, directly at underground construction piping lane, but it is different from again the construction of shield, the construction method of shield is: during piping lane is pushed ahead, assembled again or jacking piping lane after the soil body before piping lane is all excavated, and the method for the present invention is: during piping lane is pushed ahead, discharge after only soil body water filling stirring anterior in the range of piping lane section being become mud, jacking piping lane simultaneously, after piping lane jacking puts in place, excavate the soil body in the middle of piping lane again.
Beneficial effect:Compared with prior art, the invention have the advantages that
1, the present invention is non-excavating construction, thus without destroying road surface, affects traffic, and the road tool for old town, heavy traffic has an enormous advantage;
2, the present invention is prefabricated components, and compared with excavation cast-in-place method, prefabricated components quality is relatively reliable, and faster, owing to need not destroy road surface and recover road surface, therefore cost is lower, and investment more saves for speed of application;
3, having one to separate anti-interference cover and detector due to the present invention, in addition during construction, the soil body within piping lane does not takes out, and therefore goes for the construction of the piping lane shallower away from ground, and degree of safety is higher.
4, the stirring-head quantity that the present invention is anterior is that the size and shape according to piping lane section is assembled by multiple stirring-heads, has the biggest motility, goes for various compound section, and the construction of relatively big cross section piping lane.
Accompanying drawing explanation
Fig. 1 is that the underground pipe gallery constructing device of the present invention arranges schematic diagram.
Fig. 2 is the two set piping lane constructing devices of the present invention, at the schematic diagram of same active well jacking construction round about.
Fig. 3 is the stirring-head of the present invention and separates the schematic perspective view that anti-interference cover fits together.
Fig. 4 is the elevational schematic view that multiple stirring-heads of the present invention are assembled on the front end face of piping lane.
Fig. 5 is the 1-1 generalized section of Fig. 4.
Fig. 6 is the single stirring-head elevational schematic view of the present invention.
Figure has: stirring-head 1, stirring-head propeller 2, separation anti-interference cover 3, detector 4, relaying propeller 5, water injection pipe 6, support 11, power set 12, thrust wheel 13, chain 14, stirrer gear head 15.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment to the present invention technical scheme be described in further details.
The underground pipe gallery constructing device of the present invention, corresponding piping lane cross section is square, circular or polygon, multiple stirring-heads 1 are arranged by the section configuration of prefabricated piping lane front end, and are fixed on the front end of stirring-head propeller 2, and the rear end of stirring-head propeller 2 is connected with prefabricated piping lane.A kind of embodiment of constructing device of the present invention includes: the stirring-head thruster 2 being arranged on prefabricated piping lane one end, the multiple stirring-heads 1 being fixedly mounted on described stirring-head thruster 2 front end, is arranged on the piping lane top power parts of the prefabricated piping lane other end and is connected the jacking jack installed with described piping lane top power parts, described stirring-head thruster 2 and stirring-head 1 are arranged along the transverse section of prefabricated piping lane, and the outside surrounding of stirring-head 1 front end is provided with the separation anti-interference cover 3 surrounded with steel plate.Stirring-head 1 includes support 11, the power set 12 being arranged on described support 11, thrust wheel 13, the chain 14 that driven by described power set 12, it is provided with stirrer gear head 15 outside described chain 14, inner side is connected installation with thrust wheel 13, described stirring-head propeller 2 is the level jack being arranged on prefabricated piping lane end, and its front end is connected with stirring-head 1.Stirring-head thruster 2 is as the structure of relaying servomotor 5, all include: stress connecting plate, the outer breast boards being connected with rear stress connecting plate and interior breast boards after jack, jack, stress connecting plate before jack, the outer breast boards being connected with front stress connecting plate and interior breast boards.The embodiment of the present invention is provided with detector 4 on the top separating anti-interference cover 3, and described detector 4 is changing sensor, pressure transducer or dip angle device.
In the preferred embodiment of apparatus of the present invention, the relaying servomotor 5 of adjacent two prefabricated piping lanes before and after also including connecting, described relaying servomotor 5 is constituted with horizontally disposed jack for main body, is arranged on the top of follow-up prefabricated piping lane, and is connected with the tail end of above prefabricated piping lane.
The piping lane construction assembly of the present invention, including prefabricated piping lane and above-mentioned underground pipe gallery constructing device, the two installation is combined into one.
The piping lane construction method of the present invention, comprises the following steps:
1) stirring-head propeller 2, stirring-head 1, separation anti-interference cover 3, detector 4 are installed location, piping lane piping lane top power parts and prefabricated piping lane other end abutting joint along the transverse section of prefabricated piping lane jacking end;
2) start stirring-head 1 and jacking jack, start jacking construction;
3) constantly new prefabricated piping lane is placed in construction station, and by jacking construction by its jacking to soil layer, until completing the jacking of an all component of station;
4) soil body in prefabricated piping lane is taken out by the rod member by auger bar or with folding scraper plate, and dismounting stirring-head 1 and piping lane top power parts complete piping lane construction.The soil body in prefabricated piping lane, can take out when each prefabricated piping lane jacking puts in place, it is also possible to disposably take out after all prefabricated piping lane jackings put in place.
The step 2 of work progress) and 3) in, when the prefabricated piping lane of jacking, supplied water at stirring-head 1 by water injection pipe 6, the stirring soil body making member exterior becomes mud with water mix and blend, when being provided with relaying servomotor 5, step 4) also includes dismounting relaying servomotor 5, and closes the room after teeming relaying servomotor 5 is removed.
In the preferred embodiment of construction method of the present invention, use two set piping lane constructing devices, at same active well jacking construction in the opposite direction, the back-to-back setting of jacking jack in two set piping lane constructing devices, or two set piping lane constructing devices share one group of jacking jack, thus counteract jacking counter-force.
Above-described embodiment is only the preferred embodiment of the present invention; it is noted that, for those skilled in the art; under the premise without departing from the principles of the invention; some improvement and equivalent can also be made; the claims in the present invention are improved and technical scheme after equivalent by these, each fall within protection scope of the present invention.

Claims (9)

1. a underground pipe gallery constructing device, it is characterized in that, this device includes being arranged on the stirring-head thruster (2) of prefabricated piping lane one end, the multiple stirring-heads (1) being fixedly mounted on described stirring-head thruster (2) front end, the piping lane top power parts that are arranged on the prefabricated piping lane other end are connected the jacking jack installed with described piping lane top power parts, described stirring-head thruster (2) and stirring-head (1) are arranged along the transverse section of prefabricated piping lane, and the outside surrounding of stirring-head (1) front end is provided with separation anti-interference cover (3) surrounded with steel plate.
Underground pipe gallery constructing device the most according to claim 1, it is characterized in that, described stirring-head (1) includes support (11), be arranged on described support (11) power set (12), thrust wheel (13), the chain (14) that driven by described power set (12), described chain (14) outside is provided with stirrer gear head (15), inner side is connected installation with thrust wheel (13), described stirring-head propeller (2) is the level jack being arranged on prefabricated piping lane end, and its front end is connected with stirring-head (1).
Underground pipe gallery constructing device the most according to claim 1, it is characterised in that the top of described separation anti-interference cover (3) is provided with detector (4), described detector (4) is changing sensor, pressure transducer or dip angle device.
4. according to the underground pipe gallery constructing device described in claim 1,2 or 3, it is characterized in that, this device also include connecting before and after the relaying servomotor (5) of adjacent two prefabricated piping lanes, described relaying servomotor (5) is constituted with horizontally disposed jack for main body, it is arranged on the top of follow-up prefabricated piping lane, and is connected with the tail end of above prefabricated piping lane.
5. according to the underground pipe gallery constructing device described in claim 1,2 or 3, it is characterized in that, the prefabricated piping lane cross section that this device is corresponding is square, circular or polygon, multiple stirring-heads (1) are arranged by the section configuration of prefabricated piping lane front end, and it being fixed on the front end of stirring-head propeller (2), the rear end of stirring-head propeller (2) is connected with prefabricated piping lane.
6. underground pipe gallery construction assembly, it is characterised in that this assembly include prefabricated piping lane and as described in claim 1,2,3,4 or 5 underground pipe gallery constructing device, the two installation is combined into one.
7. a underground pipe gallery construction method, it is characterised in that the method comprises the following steps:
1) stirring-head propeller (2), stirring-head (1), separation anti-interference cover (3), detector (4) are installed location, piping lane top power parts and prefabricated piping lane other end abutting joint along the transverse section of prefabricated piping lane jacking end;
2) start stirring-head (1) and jacking jack, start jacking construction;
3) constantly new prefabricated piping lane is placed in construction station, and by jacking construction by its jacking to soil layer, until completing the jacking of an all component of station;
4) soil body within prefabricated piping lane is taken out, dismounting detector (4), separation anti-interference cover (3), stirring-head (1), stirring-head thruster (2) and piping lane top power parts, complete piping lane construction.
Underground pipe gallery construction method the most according to claim 7, it is characterized in that, described step 2) and 3) in, when the prefabricated piping lane of jacking, supplied water to stirring-head (1) place by water injection pipe (6) so that the stirring soil body of member exterior and water mix and blend become mud or clay coating, when being provided with relaying servomotor (5), step 4) also includes dismounting relaying servomotor (5), and closes the room after teeming relaying servomotor (5) is removed.
9. according to the underground pipe gallery construction method described in claim 7 or 8, it is characterized in that, the method uses two set piping lane constructing devices, at same active well jacking construction in the opposite direction, the back-to-back setting of jacking jack in two set piping lane constructing devices, or two set piping lane constructing devices share one group of jacking jack, thus counteract jacking counter-force.
CN201610302175.7A 2016-05-09 2016-05-09 Underground pipe gallery construction device, combination and construction method Pending CN105888677A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610302175.7A CN105888677A (en) 2016-05-09 2016-05-09 Underground pipe gallery construction device, combination and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610302175.7A CN105888677A (en) 2016-05-09 2016-05-09 Underground pipe gallery construction device, combination and construction method

Publications (1)

Publication Number Publication Date
CN105888677A true CN105888677A (en) 2016-08-24

Family

ID=56703524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610302175.7A Pending CN105888677A (en) 2016-05-09 2016-05-09 Underground pipe gallery construction device, combination and construction method

Country Status (1)

Country Link
CN (1) CN105888677A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522266A (en) * 2016-11-11 2017-03-22 山东省呈祥电工电气有限公司 Light high-strength anti-seepage anti-seismic pipe gallery and construction method
CN106593460A (en) * 2017-01-18 2017-04-26 王燏斌 Roof excavation driving device for underground building and construction method thereof
CN106640103A (en) * 2017-01-18 2017-05-10 王燏斌 Tunnel boring machine and construction method thereof
CN106761791A (en) * 2017-01-18 2017-05-31 王燏斌 A kind of rock tunnel(ling) machine and its construction method
CN107269288A (en) * 2017-08-11 2017-10-20 曹丽召 The non-explosion water mill of hard stone section push pipe bores two-way drilling construction method
CN107313781A (en) * 2017-06-23 2017-11-03 山河智能装备股份有限公司 A kind of superficial stratum piping lane one-shot forming development machine and driving method
CN107503759A (en) * 2017-01-18 2017-12-22 王燏斌 A kind of mole and its construction method for push bench process
CN108755750A (en) * 2018-04-09 2018-11-06 成都利拓重工机械有限公司 A kind of drag reduction method for the mobile supporting shield built for city pipe capsule
CN109610503A (en) * 2018-06-14 2019-04-12 中煤建工集团有限公司 A kind of prefabricated piping lane installation method
CN111395391A (en) * 2020-04-13 2020-07-10 中国建筑一局(集团)有限公司 Porous rectangular jacking pipe and light and shade cut connecting pipe gallery joint and construction method thereof
CN111810712A (en) * 2020-07-17 2020-10-23 中铁十二局集团有限公司 Push pipe starting construction method for bent pipeline
CN111963767A (en) * 2020-08-24 2020-11-20 中国电建集团港航建设有限公司 Pipe jacking construction method for complex geological conditions
CN114735971A (en) * 2022-02-28 2022-07-12 中铁隧道局集团有限公司 Composite paste and preparation and application thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2995843A (en) * 1957-10-04 1961-08-15 William V Hutchison Ditch digger
SU924271A1 (en) * 1979-12-17 1982-04-30 Ky Vnii Str Dorozhnogo Mash Working implement of earth digger
DE4114459C1 (en) * 1991-05-03 1992-07-02 Langerbein-Scharf Gmbh & Co Kg, 4700 Hamm, De Mine roadway floor lowering machine - has loosening tool with several blades rotating about vertical axis
JP2000204885A (en) * 1999-01-14 2000-07-25 Ishikawajima Harima Heavy Ind Co Ltd Trimming cutter
CN1800513A (en) * 2005-12-13 2006-07-12 上海市第二市政工程有限公司 Steel pipe roof jacking construction method
CN101608547A (en) * 2008-06-18 2009-12-23 上海奇谋能源技术开发有限公司 A kind of tunnel method for digging and device of caving in of can preventing
CN202082490U (en) * 2011-06-01 2011-12-21 浙江九峰建设有限公司 Reverse push bench
CN103899321A (en) * 2014-04-23 2014-07-02 上海隧道工程股份有限公司 Jacking pulling combined rectangular jacking pipe tunnel construction method
CN104695971A (en) * 2015-01-07 2015-06-10 同济大学 Annular pipe-jacking construction method
CN104712339A (en) * 2015-01-07 2015-06-17 同济大学 Annular pipe jacking machine
CN104912101A (en) * 2015-06-15 2015-09-16 上海市政工程设计研究总院(集团)有限公司 Tunneling and assembling structure and construction method of comprehensive pipe gallery
CN205743914U (en) * 2016-05-09 2016-11-30 江苏鸿基节能新技术股份有限公司 Underground pipe gallery constructing device and assembly

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2995843A (en) * 1957-10-04 1961-08-15 William V Hutchison Ditch digger
SU924271A1 (en) * 1979-12-17 1982-04-30 Ky Vnii Str Dorozhnogo Mash Working implement of earth digger
DE4114459C1 (en) * 1991-05-03 1992-07-02 Langerbein-Scharf Gmbh & Co Kg, 4700 Hamm, De Mine roadway floor lowering machine - has loosening tool with several blades rotating about vertical axis
JP2000204885A (en) * 1999-01-14 2000-07-25 Ishikawajima Harima Heavy Ind Co Ltd Trimming cutter
CN1800513A (en) * 2005-12-13 2006-07-12 上海市第二市政工程有限公司 Steel pipe roof jacking construction method
CN101608547A (en) * 2008-06-18 2009-12-23 上海奇谋能源技术开发有限公司 A kind of tunnel method for digging and device of caving in of can preventing
CN202082490U (en) * 2011-06-01 2011-12-21 浙江九峰建设有限公司 Reverse push bench
CN103899321A (en) * 2014-04-23 2014-07-02 上海隧道工程股份有限公司 Jacking pulling combined rectangular jacking pipe tunnel construction method
CN104695971A (en) * 2015-01-07 2015-06-10 同济大学 Annular pipe-jacking construction method
CN104712339A (en) * 2015-01-07 2015-06-17 同济大学 Annular pipe jacking machine
CN104912101A (en) * 2015-06-15 2015-09-16 上海市政工程设计研究总院(集团)有限公司 Tunneling and assembling structure and construction method of comprehensive pipe gallery
CN205743914U (en) * 2016-05-09 2016-11-30 江苏鸿基节能新技术股份有限公司 Underground pipe gallery constructing device and assembly

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522266A (en) * 2016-11-11 2017-03-22 山东省呈祥电工电气有限公司 Light high-strength anti-seepage anti-seismic pipe gallery and construction method
CN106761791B (en) * 2017-01-18 2020-05-08 王燏斌 Tunnel boring machine and construction method thereof
CN106593460A (en) * 2017-01-18 2017-04-26 王燏斌 Roof excavation driving device for underground building and construction method thereof
CN106640103A (en) * 2017-01-18 2017-05-10 王燏斌 Tunnel boring machine and construction method thereof
CN106761791A (en) * 2017-01-18 2017-05-31 王燏斌 A kind of rock tunnel(ling) machine and its construction method
CN107503759A (en) * 2017-01-18 2017-12-22 王燏斌 A kind of mole and its construction method for push bench process
CN107313781A (en) * 2017-06-23 2017-11-03 山河智能装备股份有限公司 A kind of superficial stratum piping lane one-shot forming development machine and driving method
CN107269288A (en) * 2017-08-11 2017-10-20 曹丽召 The non-explosion water mill of hard stone section push pipe bores two-way drilling construction method
CN108755750A (en) * 2018-04-09 2018-11-06 成都利拓重工机械有限公司 A kind of drag reduction method for the mobile supporting shield built for city pipe capsule
CN108755750B (en) * 2018-04-09 2020-03-10 成都利拓重工机械有限公司 Drag reduction method for movable support shield for building urban pipe gallery
CN109610503A (en) * 2018-06-14 2019-04-12 中煤建工集团有限公司 A kind of prefabricated piping lane installation method
CN111395391A (en) * 2020-04-13 2020-07-10 中国建筑一局(集团)有限公司 Porous rectangular jacking pipe and light and shade cut connecting pipe gallery joint and construction method thereof
CN111395391B (en) * 2020-04-13 2021-11-09 中国建筑一局(集团)有限公司 Construction method for multi-hole rectangular jacking pipe and light and dark excavation joint pipe gallery joint
CN111810712A (en) * 2020-07-17 2020-10-23 中铁十二局集团有限公司 Push pipe starting construction method for bent pipeline
CN111963767A (en) * 2020-08-24 2020-11-20 中国电建集团港航建设有限公司 Pipe jacking construction method for complex geological conditions
CN114735971A (en) * 2022-02-28 2022-07-12 中铁隧道局集团有限公司 Composite paste and preparation and application thereof

Similar Documents

Publication Publication Date Title
CN105888677A (en) Underground pipe gallery construction device, combination and construction method
CN103590833B (en) Screw conveyor push pipe pipe curtain construction method
CN203034467U (en) Combined steel pile cofferdam with water-proof fore shafts
CN111425207B (en) Inclined shaft construction method and equipment
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
US11346218B1 (en) Guiding type miniature pipe-jacking construction method
CN101696578A (en) Construction method for pouring foundations of main pylon piers of bridge on deep water inclined runway
JP4317843B2 (en) Construction method for underground structures
CN101845955B (en) Underground tunnel formation infrastructure establishment method
CN205743914U (en) Underground pipe gallery constructing device and assembly
CN109026035A (en) Tunnel circumferential direction variable cross-section digs method
CN106759262A (en) The continuous sawing grooving of ground-connecting-wall synchronously irrigates wall-forming device and construction method
KR20040097967A (en) Construction method of three arch excavation tunnel
CN109026034A (en) Circumferential direction digs shield mechanism and circumferential direction digs method
CN106089218B (en) Precast assembly underground gallery bimodulus development machine
CN114108666B (en) Construction method of cemented pebble geological cofferdam and cofferdam structure
CN108708284A (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN203270642U (en) Slot milling machine digging-cutting stirring mechanism
CN105064379A (en) H-shaped steel foundation pit supporting device and method
CN111075457A (en) In-hole repairing method for shield deformation of tail shield of shield tunneling machine under complex geological condition
CN205936623U (en) Shield constructs quick -witted advancing mechanism
CN109235507B (en) Stratum reinforcing system and method for reinforcing existing tunnel
CN110566217A (en) shallow-earth-covered shield construction method
CN113622930B (en) Slurry balance shield tunnel entering and exiting construction method
CN205975551U (en) A construction platform for construction of aquatic steel sheet pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160824

RJ01 Rejection of invention patent application after publication