CN105870841A - Automatic cable traction device - Google Patents

Automatic cable traction device Download PDF

Info

Publication number
CN105870841A
CN105870841A CN201610408772.8A CN201610408772A CN105870841A CN 105870841 A CN105870841 A CN 105870841A CN 201610408772 A CN201610408772 A CN 201610408772A CN 105870841 A CN105870841 A CN 105870841A
Authority
CN
China
Prior art keywords
cable
take
pulley
directive wheel
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610408772.8A
Other languages
Chinese (zh)
Other versions
CN105870841B (en
Inventor
陈兆强
赵斌
王佳科
王晓燕
轩正杰
李睿
刘欣
渠吉鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610408772.8A priority Critical patent/CN105870841B/en
Publication of CN105870841A publication Critical patent/CN105870841A/en
Application granted granted Critical
Publication of CN105870841B publication Critical patent/CN105870841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses an automatic cable traction device, comprising a traction machine, supports and a traction rope, wherein the traction machine is arranged at a terminal of a cable laying line, a plurality of supports are arranged on the cable laying line, the traction machine comprises a cable take-up wheel and a motor, a revolving shaft of the cable take-up wheel is in connection with a rotating shaft of the motor, the traction rope is winded on the cable take-up wheel, the length of the traction rope is larger than that of the cable laying line, each support comprises a bracket and a guide pulley, the guide pulley is mounted at the top of the bracket, one end of the traction rope is fixed on the cable take-up wheel, and the other end of the traction rope penetrates through respective guide pulleys in turn and is connected to a cable, and the cable is wound on a cable coil. The traction machine realizes cable laying by means of taking back the traction rope, and does not move along the cable laying line, so that the problem of damaging a cultivated land or crops is avoided; as the supports are arranged, the cable keeps away from the ground, the risk of cable wear on the ground is reduced greatly, and risks such as electric leakage, cable explosion and the like caused by a broken sheath of the cable in use are reduced.

Description

A kind of cable automatic traction device
Technical field
The present invention relates to power ampere dress equipment technical field, particularly relate to a kind of cable automatic traction device.
Background technology
When erecting power transmission lines, need cabling, it is necessary first to decontroled by the cable expanding of rolling.All being dependent on manpower in present work, it usually needs 7 to 8 people could complete: wherein, and 1 people is monitored by cable hank and controls, 6 people pass through manpower traction's cable, and 1 people assists at the other end.So wasting substantial amounts of manpower, and efficiency of construction is the highest, in addition it is also necessary in view of the time such as rest of people.Cable easily rubs with ground at distraction procedure mesocuticle, causes cable covering damaged, affects serviceability.
Existing cable drawing machine is mostly portable, and volume, weight are relatively big, provides power cable in tow to advance by machine, and the most simple instead of manpower traction, is easily limited to the impact of landform.Cable laying is generally carried out on mountain region or arable land, and existing cable traction machine there is also the defects such as obstacle detouring arable land difficult, easily damaged or crop.
Summary of the invention
The present invention is directed to cable laying labor intensive, inefficiency, existing cable traction machine, easily by the problem of the influence of topography, develops a kind of cable automatic traction device, and this cable automatic traction device is not affected by landform, arable land or crop will not be damaged, be effectively increased cable laying efficiency.
The present invention solves the technical scheme of technical problem: a kind of cable automatic traction device, including traction machine, bearing, pull rope, traction machine is arranged on the terminal of cable run, bearing arranges multiple on cable run, traction machine includes take-up pulley, motor, the rotary shaft of take-up pulley is connected with the rotating shaft of motor, and pull rope is wrapped on take-up pulley, and the length of pull rope is more than the length of cable run;Bearing includes support, directive wheel, and directive wheel is arranged on the top of support by rotating shaft, and one end of pull rope is fixed on take-up pulley, the other end is connected with cable after sequentially passing through each directive wheel, and cable is wrapped on cable hank.
As optimization, the rotary shaft of described take-up pulley is connected by pulley assembly with the rotating shaft of motor, and pulley assembly includes bull wheel, steamboat, belt, and the rotary shaft of take-up pulley connects the center of bull wheel, the rotating shaft of motor connects the center of steamboat, and belt connects bull wheel and steamboat.
As optimization, described directive wheel is revolving body, and rotating shaft is arranged in the horizontal direction, and rotating shaft runs through the both ends of the surface of directive wheel, directive wheel side be provided centrally with arc groove, pull rope falls into arc groove from directive wheel top.
As optimization, described support includes that vertical bar, bottom bar, connecting rod, vertical bar are vertically arranged parallel two piece, and bottom bar is horizontally set on the bottom of vertical bar, and connecting rod is arranged between two vertical bars, and connecting rod connects two vertical bars.
As optimization, described bottom bar two ends are provided with fixing nail, bottom bar two ends vertically arrange installing hole, fixing nail penetrates in installing hole, the side of installing hole vertically arranges strip hole, strip hole runs through bottom bar, and fixing nail is provided with the through hole corresponding with strip hole, and bolt passes strip hole, through hole.
As optimization, the height of described bearing is 2 ± 0.2 meters.
Beneficial effects of the present invention:
1. present configuration is simple, durable, by arranging pull rope, traction machine, traction machine realizes laying of cable by regaining pull rope, traction machine can be fixed on a bit, need not move along cable run, it is to avoid damage is ploughed or the problem of crop, by arranging bearing, make cable departing from ground, greatly reduce cable and mop floor the risk of abrasion, reduce during cable uses because crust ruptures electric leakage, the electric cable explosion equivalent risk caused.
2. by centrally disposed arc groove in directive wheel side, provide guiding and spacing for the motion of pull rope, cable, ensured that what cable laying worked is smoothed out.
3. by arranging fixing nail, fixing nail is treaded in ground, the fixing of bearing can be realized easily.
Accompanying drawing explanation
Fig. 1 is the working state figure of the present invention.
Fig. 2 is the left view of bearing.
Fig. 3 is the front view of bearing.
Fig. 4 is the top view of bearing.
Fig. 5 is the overall construction drawing of bearing.
Fig. 6 is the partial enlarged drawing of a-quadrant in Fig. 5.
Fig. 7 is the overall construction drawing of fixing nail.
Detailed description of the invention
In order to be more fully understood that the present invention, explain in detail embodiments of the present invention below in conjunction with the accompanying drawings.
Fig. 1 to Fig. 6 is a kind of embodiment of the present invention, as shown in the figure, a kind of cable automatic traction device, including traction machine 1, bearing 2, pull rope 3, traction machine 1 is arranged on the terminal of cable run, and bearing 2 arranges multiple on cable run, traction machine 1 includes take-up pulley 11, motor 12, the rotary shaft of take-up pulley 11 is connected with the rotating shaft of motor 12, and pull rope 3 is wrapped on take-up pulley 11, and the length of pull rope 3 is more than the length of cable run;Bearing 2 includes that support 21, directive wheel 22, directive wheel 22 are arranged on the top of support 21 by rotating shaft 23, and one end of pull rope 3 is fixed on take-up pulley 11, the other end is connected with cable 4 after sequentially passing through each directive wheel 22, and cable 4 is wrapped on cable hank 5.By arranging pull rope 3, traction machine 1, traction machine 1 realizes laying of cable 4 by regaining pull rope 3, traction machine 1 can be fixed on a bit, need not move along cable run, avoid damage to plough or the problem of crop, by arranging bearing 2, make cable 4 departing from ground, greatly reduce cable 4 to mop floor the risk of abrasion, reduce during cable 4 uses and rupture electric leakage, the electric cable explosion equivalent risk caused because of crust.The rotary shaft of described take-up pulley 11 is connected by pulley assembly with the rotating shaft of motor 12, pulley assembly includes bull wheel, steamboat, belt, the rotary shaft of take-up pulley 11 connects the center of bull wheel, and the rotating shaft of motor 12 connects the center of steamboat, and belt connects bull wheel and steamboat.
As shown in Figures 2 to 6, described directive wheel 22 is revolving body, and rotating shaft 23 is arranged in the horizontal direction, and rotating shaft 23 runs through the both ends of the surface of directive wheel 22, directive wheel 22 side be provided centrally with arc groove, pull rope 3 falls into arc groove from directive wheel 22 top.By the centrally disposed arc groove in directive wheel 22 side, provide guiding and spacing for the motion of pull rope 3, cable 4, ensured that what cable laying worked is smoothed out.Described support 21 includes vertical bar 211, bottom bar 212, connecting rod 213, vertically bar 211 is vertically arranged parallel two piece, bottom bar 212 is horizontally set on the bottom of vertical bar 211, and connecting rod 213 is arranged between two vertical bars 211, and connecting rod 213 connects two vertical bars 211.Described bottom bar 212 two ends are provided with fixing nail 214, bottom bar 212 two ends vertically arrange installing hole 2121, fixing nail 214 penetrates in installing hole 2121, the side of installing hole 2121 vertically arranges strip hole 2122, strip hole 2122 runs through bottom bar 212, fixing nail 214 is provided with the through hole 2141 corresponding with strip hole 2122, and bolt passes strip hole 2122, through hole 2141.By arranging fixing nail 214, fixing nail 214 is treaded in ground, the fixing of bearing 2 can be realized easily.The height of described bearing 2 is 1.8 meters or 2 meters or 2.2 meters, facilitates personnel to operate cable.
During use, first traction machine 1 being arranged in the terminal of cable run, arrange the most bearings 2 on cable run, the spacing of bearing 2 is adjusted according to the bottom surface gradient;Pull rope 3 on traction machine 1 is pulled, and sequentially passes through each directive wheel 22, finally connect the free end of cable 4 in cable hank 5;Starting traction machine 1, cable 4 is finally reached the terminal of cable run under the drive of pull rope 3 by directive wheel 22, removes pull rope 3, and cable laying is complete.This cable automatic traction device achieves the mechanization of cable pulling, greatly reduces the input of manpower, improves the efficiency of cable pulling.
Although the detailed description of the invention of invention is described by the above-mentioned accompanying drawing that combines; but not limiting the scope of the invention; on the basis of technical scheme, those skilled in the art need not to pay various amendments or deformation that creative work can make still within protection scope of the present invention.

Claims (6)

1. a cable automatic traction device, it is characterised in that: include traction machine (1), bearing (2), Pull rope (3), traction machine (1) is arranged on the terminal of cable run, and bearing (2) is in cable laying Arranging multiple on route, traction machine (1) includes take-up pulley (11), motor (12), take-up pulley (11) Rotary shaft be connected with the rotating shaft of motor (12), pull rope (3) is wrapped on take-up pulley (11), traction The length of rope (3) is more than the length of cable run;Bearing (2) includes support (21), directive wheel (22), directive wheel (22) is arranged on the top of support (21), pull rope (3) by rotating shaft (23) One end be fixed on that take-up pulley (11) is upper, the other end sequentially pass through each directive wheel (22) afterwards with cable (4) Connecting, cable (4) is wrapped on cable hank (5).
A kind of cable automatic traction device the most according to claim 1, is characterized in that, described take-up pulley (11) rotary shaft is connected by pulley assembly with the rotating shaft of motor (12), and pulley assembly includes greatly Wheel, steamboat, belt, the rotary shaft of take-up pulley (11) connects the center of bull wheel, the rotating shaft of motor (12) Connecting the center of steamboat, belt connects bull wheel and steamboat.
A kind of cable automatic traction device the most according to claim 1, is characterized in that, described directive wheel (22) being revolving body, rotating shaft (23) is arranged in the horizontal direction, and rotating shaft (23) runs through directive wheel (22) Both ends of the surface, directive wheel (22) side be provided centrally with arc groove, pull rope (3) is from directive wheel (22) Top falls in arc groove.
A kind of cable automatic traction device the most according to claim 1, is characterized in that, described support (21) Including vertical bar (211), bottom bar (212), connecting rod (213), vertical bar (211) is vertically arranged Parallel two, bottom bar (212) is horizontally set on the bottom of vertical bar (211), and connecting rod (213) sets Putting between two vertical bars (211), connecting rod (213) connects two vertical bars (211).
A kind of cable automatic traction device the most according to claim 4, is characterized in that, described bottom bar (212) two ends are provided with fixing nail (214), and bottom bar (212) two ends vertically arrange installing hole (2121), Fixing nail (214) penetrates in installing hole (2121), and the side of installing hole (2121) is vertically arranged Strip hole (2122), strip hole (2122) runs through bottom bar (212), fixing nail (214) be provided with The through hole (2141) that strip hole (2122) is corresponding, bolt passes strip hole (2122), through hole (2141).
A kind of cable automatic traction device the most according to claim 1, is characterized in that, described bearing (2) Height be 2 ± 0.2 meters.
CN201610408772.8A 2016-06-07 2016-06-07 A kind of cable automatic traction device Active CN105870841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610408772.8A CN105870841B (en) 2016-06-07 2016-06-07 A kind of cable automatic traction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610408772.8A CN105870841B (en) 2016-06-07 2016-06-07 A kind of cable automatic traction device

Publications (2)

Publication Number Publication Date
CN105870841A true CN105870841A (en) 2016-08-17
CN105870841B CN105870841B (en) 2018-02-06

Family

ID=56649293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610408772.8A Active CN105870841B (en) 2016-06-07 2016-06-07 A kind of cable automatic traction device

Country Status (1)

Country Link
CN (1) CN105870841B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106364493A (en) * 2016-09-20 2017-02-01 巨力索具股份有限公司 Cableway driving device
CN106451242A (en) * 2016-10-19 2017-02-22 国网冀北电力有限公司张家口供电公司 Pipe cable conveying device and method
CN109809237A (en) * 2019-03-25 2019-05-28 广东安恒铁塔钢构有限公司 Power cable unfolding winding unit
CN110980447A (en) * 2019-11-04 2020-04-10 中国电子科技集团公司第十四研究所 Cable is laid fast and is removed receipts device
CN111244831A (en) * 2020-03-20 2020-06-05 广东韶钢松山股份有限公司 Cable arrangement method
CN112018664A (en) * 2020-07-31 2020-12-01 国网山东省电力公司安丘市供电公司 Cable testing bridge laying device
CN112769087A (en) * 2020-12-29 2021-05-07 常州博成机械制造有限公司 Cantilever type heading machine body frame
CN114362056A (en) * 2021-12-16 2022-04-15 临海伟星新型建材有限公司 Plastic pipeline online cable laying device and technology

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101001007A (en) * 2006-12-25 2007-07-18 山东铝业工程有限公司 Mechanical laying method for overlength large section cable
CN201956622U (en) * 2010-12-10 2011-08-31 汝阳县电业局 Remote-distance overhead wire paying-off device
CN202084838U (en) * 2010-11-03 2011-12-21 中建三局第二建设工程有限责任公司 Small vehicle for placing wire
JP2015053845A (en) * 2013-08-07 2015-03-19 住友電気工業株式会社 Method of laying superconducting cable line
CN204361586U (en) * 2015-02-03 2015-05-27 中核检修有限公司 High-tension cable lays uses device
JP2015220898A (en) * 2014-05-20 2015-12-07 株式会社泰生工業 Cable laying device and cable laying method
CN204886016U (en) * 2015-09-02 2015-12-16 葛洲坝集团电力有限责任公司 Big high drop cable machinery of cross -section long distance exhibition system of putting
CN205029252U (en) * 2015-10-26 2016-02-10 国网山东桓台县供电公司 Cable laying device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101001007A (en) * 2006-12-25 2007-07-18 山东铝业工程有限公司 Mechanical laying method for overlength large section cable
CN202084838U (en) * 2010-11-03 2011-12-21 中建三局第二建设工程有限责任公司 Small vehicle for placing wire
CN201956622U (en) * 2010-12-10 2011-08-31 汝阳县电业局 Remote-distance overhead wire paying-off device
JP2015053845A (en) * 2013-08-07 2015-03-19 住友電気工業株式会社 Method of laying superconducting cable line
JP2015220898A (en) * 2014-05-20 2015-12-07 株式会社泰生工業 Cable laying device and cable laying method
CN204361586U (en) * 2015-02-03 2015-05-27 中核检修有限公司 High-tension cable lays uses device
CN204886016U (en) * 2015-09-02 2015-12-16 葛洲坝集团电力有限责任公司 Big high drop cable machinery of cross -section long distance exhibition system of putting
CN205029252U (en) * 2015-10-26 2016-02-10 国网山东桓台县供电公司 Cable laying device

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106364493A (en) * 2016-09-20 2017-02-01 巨力索具股份有限公司 Cableway driving device
CN106364493B (en) * 2016-09-20 2018-08-28 巨力索具股份有限公司 A kind of cableway driving device
CN106451242A (en) * 2016-10-19 2017-02-22 国网冀北电力有限公司张家口供电公司 Pipe cable conveying device and method
CN106451242B (en) * 2016-10-19 2018-08-07 国网冀北电力有限公司张家口供电公司 The carrying method of underground cable conveying device
CN109809237A (en) * 2019-03-25 2019-05-28 广东安恒铁塔钢构有限公司 Power cable unfolding winding unit
CN110980447A (en) * 2019-11-04 2020-04-10 中国电子科技集团公司第十四研究所 Cable is laid fast and is removed receipts device
CN111244831A (en) * 2020-03-20 2020-06-05 广东韶钢松山股份有限公司 Cable arrangement method
CN112018664A (en) * 2020-07-31 2020-12-01 国网山东省电力公司安丘市供电公司 Cable testing bridge laying device
CN112769087A (en) * 2020-12-29 2021-05-07 常州博成机械制造有限公司 Cantilever type heading machine body frame
CN114362056A (en) * 2021-12-16 2022-04-15 临海伟星新型建材有限公司 Plastic pipeline online cable laying device and technology
CN114362056B (en) * 2021-12-16 2023-12-12 临海伟星新型建材有限公司 Plastic pipeline on-line cable laying device and process

Also Published As

Publication number Publication date
CN105870841B (en) 2018-02-06

Similar Documents

Publication Publication Date Title
CN105870841A (en) Automatic cable traction device
CN205687285U (en) A kind of cable drawing machine
RU2461935C1 (en) High-voltage overhead power transmission line and method of erection of high-voltage overhead power transmission line
CN111600244A (en) Assembled cable pit cable laying device
CN203690811U (en) Multifunctional cable laying and paying-off apparatus for cable drum
CN108736377B (en) Live crossing system for paying-off construction crossing power line and application method thereof
CN104795765A (en) Cable laying and displacing frame
CN109346999A (en) Omnipotent bracing wire vehicle and cable-drawing construction method
CN103241586A (en) Opened cable conveyor, transformation method and novel cable laying construction method
CN107238907B (en) Aerial optical cable laying system and aerial optical cable laying method
CN113788369B (en) Cable laying winding and unwinding device and using method thereof
CN209896586U (en) Laying support for shore power cable
KR101443255B1 (en) A Wiring Apparatus of an Electric Wire
CN205471960U (en) Wire pay -off
CN205016914U (en) Wire releasing frame
CN111559671B (en) Cable core pulling equipment capable of being rapidly retracted and released for power maintenance and method
CN105502077A (en) Traction frame
CN210884606U (en) Pay-off device for electric power engineering installation
CN111039076A (en) Cable winding and unwinding device
CN205544156U (en) Integrated form cable pay -off and take -up system
KR102025155B1 (en) Cable traction device with traction assembly
CN218829035U (en) High-altitude wire towing frame, high-altitude wire towing station and electric operation system
CN110120649A (en) A kind of spool of embedded cable and the construction method of embedded cable
CN214610757U (en) Novel circle-shaped cable conductor placing frame
CN217920825U (en) Electric wire and cable pay-off rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant