CN105862653A - Dynamic calculation method based on mathematical statistics model and applied to flood control benefit of reservoir - Google Patents
Dynamic calculation method based on mathematical statistics model and applied to flood control benefit of reservoir Download PDFInfo
- Publication number
- CN105862653A CN105862653A CN201610220300.XA CN201610220300A CN105862653A CN 105862653 A CN105862653 A CN 105862653A CN 201610220300 A CN201610220300 A CN 201610220300A CN 105862653 A CN105862653 A CN 105862653A
- Authority
- CN
- China
- Prior art keywords
- flood
- benefit
- year
- preventation
- flood control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
- E02B1/02—Hydraulic models
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Time | Crest discharge | Magnanimity on the five | Investigation year Benefit of Flood Preventation value | Conversion coefficient | Based on standard year Benefit of Flood Preventation value |
2012 | 2930 | 6.05 | 26.76 | 1.268 | 21.1 |
2010 | 2640 | 5.45 | 20.14 | 1.219 | 16.52 |
2005 | 2358 | 4.87 | 16.71 | 1.104 | 15.14 |
2006 | 2086 | 4.31 | 14.73 | 1.126 | 13.08 |
2013 | 1704 | 3.52 | 8.98 | 1.294 | 6.94 |
2009 | 1403 | 2.9 | 6.16 | 1.195 | 5.15 |
2007 | 1094 | 2.26 | 2.56 | 1.149 | 2.23 |
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610220300.XA CN105862653B (en) | 2016-04-08 | 2016-04-08 | A kind of flood control by reservoir regulation benefit Dynamic calculation method based on mathematical statistical model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610220300.XA CN105862653B (en) | 2016-04-08 | 2016-04-08 | A kind of flood control by reservoir regulation benefit Dynamic calculation method based on mathematical statistical model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105862653A true CN105862653A (en) | 2016-08-17 |
CN105862653B CN105862653B (en) | 2017-12-22 |
Family
ID=56636550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610220300.XA Active CN105862653B (en) | 2016-04-08 | 2016-04-08 | A kind of flood control by reservoir regulation benefit Dynamic calculation method based on mathematical statistical model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105862653B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107016185A (en) * | 2017-03-31 | 2017-08-04 | 中国地质科学院探矿工艺研究所 | Calculation method for prediction of peak flow of collapse flood of tillite lake |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2754784A (en) * | 1983-05-02 | 1984-11-08 | Pester, B.S. | Irrigation gate |
CN102296562A (en) * | 2010-06-25 | 2011-12-28 | 华东电网有限公司 | Step reservoir joint flood scheduling optimization method coupling flood protection with power generation |
-
2016
- 2016-04-08 CN CN201610220300.XA patent/CN105862653B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2754784A (en) * | 1983-05-02 | 1984-11-08 | Pester, B.S. | Irrigation gate |
CN102296562A (en) * | 2010-06-25 | 2011-12-28 | 华东电网有限公司 | Step reservoir joint flood scheduling optimization method coupling flood protection with power generation |
Non-Patent Citations (1)
Title |
---|
方国华等: ""防洪效益计算方法述评"", 《水利水电科技进展》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107016185A (en) * | 2017-03-31 | 2017-08-04 | 中国地质科学院探矿工艺研究所 | Calculation method for prediction of peak flow of collapse flood of tillite lake |
Also Published As
Publication number | Publication date |
---|---|
CN105862653B (en) | 2017-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104794580B (en) | It is a kind of by unit balance of electric power and ener computational methods month by month | |
CN107294081B (en) | Method for determining correlation of line loss rate influence factors | |
Wu et al. | A mixed-objective integer DEA model | |
CN109165809B (en) | Power grid planning project investment sequencing assessment method under new electricity-to-electricity environment | |
CN105184493A (en) | Electrical network enterprise energy performance appraisal method | |
CN108197805A (en) | A kind of electric energy and natural gas competitiveness integrated evaluating method that planning guidance is substituted available for electric energy | |
CN115907536B (en) | Reservoir characteristic curve correction method based on interval spurious rate | |
CN103942609A (en) | Product service supply chain optimization designing method | |
Marszk | Economic integration and foreign direct investment: Review of main theoretical concepts | |
CN103955872A (en) | Method for partitioning pipe network pressure through combination of ant colony algorithm and pressure similarity analysis | |
CN104158188B (en) | A kind of Congestion removing method under interruptible load participation | |
CN105862653A (en) | Dynamic calculation method based on mathematical statistics model and applied to flood control benefit of reservoir | |
CN105447640A (en) | Big power grid construction economical type assessment method | |
CN109902382A (en) | A kind of statistical calculation method of large and medium-sized Francis turbine specific speed | |
CN104392384B (en) | Substation project two-stage quantities synchronously calculates system and method | |
CN105226644B (en) | Belt restraining equivalence method based on active volume uniformity | |
Cui et al. | How policy preferences affect the carbon shadow price in the OECD | |
CN103752621B (en) | A kind of hot rolling line promptly changes the method that specification material exchanges conversion automatically | |
Muftiadi | Analysis of production cost efficiency of local government-owned drinking water supply companies (PDAMs) in West Java | |
CN103413021A (en) | Method for evaluating repair reserve capacity in electric power system planning | |
CN113675854A (en) | Distribution network cable transformer verification method and device considering transformer area voltage loss | |
CN102609392B (en) | High-end marine engineering equipment designs the quick calculation method in man-hour | |
Ocampo et al. | On a generic framework for sustainable product design: An application to a food product | |
Muftiadi et al. | Analysis on sources of inefficiency in the construction sector: high cost of infrastructure development in Indonesia | |
CN105373848A (en) | Priority ordering method of load-grid-supply interactive coordination control scheme based on rough set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Yang Ming Inventor after: Yang Mingshan Inventor after: Liu Xingju Inventor after: Wang Yongguo Inventor after: Wang Lei Inventor after: Gu Wenyu Inventor after: Wang Jing Inventor after: Cao Wei Inventor after: He Yong Inventor after: Xu Jinying Inventor after: Wang Lijie Inventor before: Gu Wenyu Inventor before: Wang Jing Inventor before: Cao Wei Inventor before: He Yong Inventor before: Xu Jinying Inventor before: Wang Lijie Inventor before: Guo Tuanting Inventor before: Yang Mingshan |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170316 Address after: Qianxi County, Guizhou province 551501 five in Bijie township of Hongjiadu power plant Applicant after: Guizhou Wujiang Hydropower Development Co. Ltd. of Hongjiadu power plant Applicant after: China Huadian Electric Research Institute Address before: Hangzhou City, Zhejiang Province, 310030 Xihu District science and Technology Park of West Lake Park Road, No. 10 Applicant before: China Huadian Electric Research Institute |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |