CN105861786B - The method that iron filings make bearing material - Google Patents

The method that iron filings make bearing material Download PDF

Info

Publication number
CN105861786B
CN105861786B CN201610384289.0A CN201610384289A CN105861786B CN 105861786 B CN105861786 B CN 105861786B CN 201610384289 A CN201610384289 A CN 201610384289A CN 105861786 B CN105861786 B CN 105861786B
Authority
CN
China
Prior art keywords
seamless steel
steel pipe
iron filings
heat
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610384289.0A
Other languages
Chinese (zh)
Other versions
CN105861786A (en
Inventor
高原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610384289.0A priority Critical patent/CN105861786B/en
Publication of CN105861786A publication Critical patent/CN105861786A/en
Application granted granted Critical
Publication of CN105861786B publication Critical patent/CN105861786B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/006Continuous casting of metals, i.e. casting in indefinite lengths of tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal
    • B22D11/116Refining the metal
    • B22D11/119Refining the metal by filtering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/1206Accessories for subsequent treating or working cast stock in situ for plastic shaping of strands
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The invention discloses a kind of method that iron filings make bearing material, comprise the following steps, Step 1: iron filings collection and preheating, Step 2: melting, Step 3: casting crystallization trombone slide, Step 4: seamless steel pipe is incubated, Step 5: seamless steel pipe is cut, seamless steel pipe is removed after heat-preservation cylinder, and into Length-fixing cutting process, bearing material is made after cutting.The relatively former technique of present device investment is substantially reduced, enterprise is conducive to save production cost, this method major ingredient is using leftover bits and pieces such as the waste iron filings produced in machining, turn waste into wealth, the problem of not only solving these waste entrainment environment, these waste materials can be made full use of again simultaneously, the recycling of scrap iron material resource is may advantageously facilitate.

Description

The method that iron filings make bearing material
Technical field
The present invention relates to technical field of bearing processing, the method that specifically a kind of iron filings make bearing material.
Background technology
The application of present bearing is more and more extensive, and market yield is incrementally increased, and traditional processing technology is:Strand → roll compacting → perforation → Continuous Seamless Tube Mill → essence is pulled out → subtracts the processes such as sizing, and it is that this method is very crucial that the perforation of solid billet rod is made into hollow ingot Process.Because perforation process spends huge fund, it is necessary to build heating furnace, upper punch and buy other corollary equipments, this is not only The investment of equipment is added, but also has elongated technological process, production cost is further increased.In order to improve traditional production Technique, people have done many researchs and exploration, such as centrifugal casting, arc centreless continuous metal cast process, cover die strand method, but these sides Method all generally existings different degrees of defect.
Centrifugal casting, i.e., cast in molten steel in centrifuge, is rotated and cooled down by centrifuge, obtains hollow tube, Though the method can obtain the preferable hollow tube of quality, its technique interruption, productivity ratio is relatively low, it is impossible to carry out volume production, and Tube surfaces are relatively difficult to cleaning, are not suitable for extensive use,
For another example glass tube down-drawing, in order to obtain longer tubing, the equipment of hot-mold continuous cast method will take bigger space, and Expect that hollow tube will add a stationary core rod in a crystallizer, this method is very high to the performance requirement of plug, plug Must there are heat resistance, wearability, long lifespan and certain rigidity requirement, therefore add the difficulty of processing, and molten steel crystal It can be firmly attached to during solidification on plug, increase the resistance of pipe motion, be easily caused pipe and be pulled off, plug needs water flowing Cooling, manufacture and maintenance to equipment bring very big trouble, and the pipe uneven thickness produced, the inner side of pipe Wall is also rougher, causes to deal with cumbersome, the quality of influence product.
The content of the invention
It is an object of the present invention to provide a kind of method that iron filings make bearing material, comprises the following steps:
Step 1: iron filings collection and preheating
By the iron filings produced in production give up part, end to end etc. iron filings material collect, the heat smoke produced using electric furnace is directly and iron Crumble is contacted, and iron filings material is preheated, constantly iron filings material is stirred in warm, enters environmental protection equipment using complete heat smoke Do dust removal process;
Step 2: melting
Melting processing is carried out to the iron filings material after preheating using VD refining furnaces, filter is placed during cast, and extend horizontal pour Road tip length, with Normal practice, the molten iron slag after melting and sulphur phosphorus harmful element is removed, and drop the oxygen content of molten iron To 10 × below 10-6;
Step 3: casting crystallization trombone slide
Molten iron after melting, pours into insulation ladle, external U-type groove, into crystallizer, and crystallizer joint is craned one head, with same Variable-frequency motor pull-up is walked, stops frequent short steps method using stopping -- drawing -- and is pulled up, crystallizer water inlet and delivery port are by heat band Walk, condense molten iron;Cast tube uses vertical strain method, seamless steel pipe is made using double track alternating drawing, hot pipe insulating delays to swash It is cold, it is to avoid during the generation of seamless pipe thermal stress cracking, seamless steel pipe drawing, layering condensation is carried out, middle part is noted all the time Enter molten iron and carry out feeding, tapping hole seamless pipe temperature is installed above 990-1010 DEG C, crystallizer and two sets are installed on brandreth, brandreth Handle system, handle system snatch seamless steel pipe after reaching a certain height, is transported to from left to right centered on crystallizer and managed, alternately Seamless steel pipe is delivered into subsequent processing processing;
Step 4: seamless steel pipe is incubated
Heat-insulation system is processed using the material of 1000 DEG C of heatproof, and temperature-resistant material is processed into tubular is made heat-preservation cylinder, Heat-preservation cylinder is two, and two heat-preservation cylinders can be moved with seamless steel pipe, and seamless steel is sent into heat-preservation cylinder, seamless steel pipe blank Soaking time is that every millimeter of wall thickness is incubated 2~3 minutes;
Step 5: seamless steel pipe is cut
Seamless steel pipe is removed after heat-preservation cylinder, and into Length-fixing cutting process, bearing material is made after cutting;
Preferably, the molten iron in the step 3 after melting is not less than 1450 DEG C.
Preferably, in the step 3, tapping hole seamless pipe temperature is 1000 DEG C.
Beneficial effects of the present invention:
1st, the relatively former technique of equipment investment is substantially reduced(Former technique needs three related factories workshops, more than ten procedures), And this method step is simply easily operated, substantial amounts of man power and material is saved, suitable coal, electric energy can be also saved, according to survey Calculate, per ton to save more than 300 kilograms of coal, such as widely used above-mentioned technique can produce more than 1,000,000,000 yuan of benefit every year.
2nd, this method major ingredient is turned waste into wealth using leftover bits and pieces such as the waste iron filings produced in machining, is not only solved this The problem of a little waste entrainment environment, while these waste materials can be made full use of again, it may advantageously facilitate the recycling of scrap iron material resource.
3rd, this method because cooling velocity it is fast, therefore during crystal grain refinement, seamless steel pipe drawing, carry out layering condensation, it is middle Position injects molten iron and carries out feeding all the time, can so prevent seamless steel pipe from occurring the defects such as shrinkage porosite, deviation, micropore, fully ensure that The quality of product.
Embodiment
Embodiment 1
A kind of method that iron filings make bearing material, comprises the following steps:
Step 1: iron filings collection and preheating
By the iron filings produced in production give up part, end to end etc. iron filings material collect, the heat smoke produced using electric furnace is directly and iron Crumble is contacted, and iron filings material is preheated, constantly iron filings material is stirred in warm, enters environmental protection equipment using complete heat smoke Do dust removal process;
Step 2: melting
Melting processing is carried out to the iron filings material after preheating using VD refining furnaces, filter is placed during cast, and extend horizontal pour Road tip length, with Normal practice, the molten iron slag after melting and sulphur phosphorus harmful element is removed, and drop the oxygen content of molten iron To 10 × below 10-6;
Step 3: casting crystallization trombone slide
Molten iron after melting, pours into insulation ladle, external U-type groove, into crystallizer, and crystallizer joint is craned one head, with same Variable-frequency motor pull-up is walked, stops frequent short steps method using stopping -- drawing -- and is pulled up, crystallizer water inlet and delivery port are by heat band Walk, condense molten iron;Cast tube uses vertical strain method, seamless steel pipe is made using double track alternating drawing, hot pipe insulating delays to swash It is cold, it is to avoid during the generation of seamless pipe thermal stress cracking, seamless steel pipe drawing, layering condensation is carried out, middle part is noted all the time Enter molten iron and carry out feeding, tapping hole seamless pipe temperature is installed above 990 DEG C, crystallizer installs two sets of liftings on brandreth, brandreth System, handle system snatch seamless steel pipe after reaching a certain height, is transported to from left to right centered on crystallizer and managed, alternately by nothing Stitch steel pipe and deliver subsequent processing processing;
Step 4: seamless steel pipe is incubated
Heat-insulation system is processed using the material of 1000 DEG C of heatproof, and temperature-resistant material is processed into tubular is made heat-preservation cylinder, Heat-preservation cylinder is two, and two heat-preservation cylinders can be moved with seamless steel pipe, and seamless steel is sent into heat-preservation cylinder, seamless steel pipe blank Soaking time is that every millimeter of wall thickness is incubated 2~3 minutes;
Step 5: seamless steel pipe is cut
Seamless steel pipe is removed after heat-preservation cylinder, and into Length-fixing cutting process, bearing material is made after cutting;
Molten iron in the step 3 after melting is not less than 1450 DEG C.
Embodiment 2
Step 1: iron filings collection and preheating
By the iron filings produced in production give up part, end to end etc. iron filings material collect, the heat smoke produced using electric furnace is directly and iron Crumble is contacted, and iron filings material is preheated, constantly iron filings material is stirred in warm, enters environmental protection equipment using complete heat smoke Do dust removal process;
Step 2: melting
Melting processing is carried out to the iron filings material after preheating using VD refining furnaces, filter is placed during cast, and extend horizontal pour Road tip length, with Normal practice, the molten iron slag after melting and sulphur phosphorus harmful element is removed, and drop the oxygen content of molten iron To 10 × below 10-6;
Step 3: casting crystallization trombone slide
Molten iron after melting, pours into insulation ladle, external U-type groove, into crystallizer, and crystallizer joint is craned one head, with same Variable-frequency motor pull-up is walked, stops frequent short steps method using stopping -- drawing -- and is pulled up, crystallizer water inlet and delivery port are by heat band Walk, condense molten iron;Cast tube uses vertical strain method, seamless steel pipe is made using double track alternating drawing, hot pipe insulating delays to swash It is cold, it is to avoid during the generation of seamless pipe thermal stress cracking, seamless steel pipe drawing, layering condensation is carried out, middle part is noted all the time Enter molten iron and carry out feeding, tapping hole seamless pipe temperature is installed above 1000 DEG C, crystallizer installs two sets of liftings on brandreth, brandreth System, handle system snatch seamless steel pipe after reaching a certain height, is transported to from left to right centered on crystallizer and managed, alternately by nothing Stitch steel pipe and deliver subsequent processing processing;
Step 4: seamless steel pipe is incubated
Heat-insulation system is processed using the material of 1000 DEG C of heatproof, and temperature-resistant material is processed into tubular is made heat-preservation cylinder, Heat-preservation cylinder is two, and two heat-preservation cylinders can be moved with seamless steel pipe, and seamless steel is sent into heat-preservation cylinder, seamless steel pipe blank Soaking time is that every millimeter of wall thickness is incubated 2~3 minutes;
Step 5: seamless steel pipe is cut
Seamless steel pipe is removed after heat-preservation cylinder, and into Length-fixing cutting process, bearing material is made after cutting;
Molten iron in the step 3 after melting is not less than 1450 DEG C.
Embodiment 3
Step 1: iron filings collection and preheating
By the iron filings produced in production give up part, end to end etc. iron filings material collect, the heat smoke produced using electric furnace is directly and iron Crumble is contacted, and iron filings material is preheated, constantly iron filings material is stirred in warm, enters environmental protection equipment using complete heat smoke Do dust removal process;
Step 2: melting
Melting processing is carried out to the iron filings material after preheating using VD refining furnaces, filter is placed during cast, and extend horizontal pour Road tip length, with Normal practice, the molten iron slag after melting and sulphur phosphorus harmful element is removed, and drop the oxygen content of molten iron To 10 × below 10-6;
Step 3: casting crystallization trombone slide
Molten iron after melting, pours into insulation ladle, external U-type groove, into crystallizer, and crystallizer joint is craned one head, with same Variable-frequency motor pull-up is walked, stops frequent short steps method using stopping -- drawing -- and is pulled up, crystallizer water inlet and delivery port are by heat band Walk, condense molten iron;Cast tube uses vertical strain method, seamless steel pipe is made using double track alternating drawing, hot pipe insulating delays to swash It is cold, it is to avoid during the generation of seamless pipe thermal stress cracking, seamless steel pipe drawing, layering condensation is carried out, middle part is noted all the time Enter molten iron and carry out feeding, tapping hole seamless pipe temperature is installed above 990-1010 DEG C, crystallizer and two sets are installed on brandreth, brandreth Handle system, handle system snatch seamless steel pipe after reaching a certain height, is transported to from left to right centered on crystallizer and managed, alternately Seamless steel pipe is delivered into subsequent processing processing;
Step 4: seamless steel pipe is incubated
Heat-insulation system is processed using the material of 1000 DEG C of heatproof, and temperature-resistant material is processed into tubular is made heat-preservation cylinder, Heat-preservation cylinder is two, and two heat-preservation cylinders can be moved with seamless steel pipe, and seamless steel is sent into heat-preservation cylinder, seamless steel pipe blank Soaking time is that every millimeter of wall thickness is incubated 2~3 minutes;
Step 5: seamless steel pipe is cut
Seamless steel pipe is removed after heat-preservation cylinder, and into Length-fixing cutting process, bearing material is made after cutting;
Preferably, the molten iron in the step 3 after melting is not less than 1450 DEG C.
Schematical embodiment of the invention is the foregoing is only, the scope of the present invention is not limited to.It is any Those skilled in the art, made equivalent variations and modification on the premise of the design of the present invention and principle is not departed from, The scope of protection of the invention should be belonged to.

Claims (3)

1. the method that iron filings make bearing material, it is characterised in that comprise the following steps:
Step 1: iron filings collection and preheating
By the useless part of the iron filings produced in production, crumble is collected end to end, and the heat smoke produced using electric furnace is directly contacted with iron filings material, Iron filings material is preheated, constantly iron filings material is stirred in warm, is done using complete heat smoke into environmental protection equipment at dedusting Reason;
Step 2: melting
Melting processing is carried out to the iron filings material after preheating using VD refining furnaces, filter is placed during cast, and extend cross gate end Length is held, the molten iron slag after melting and sulphur phosphorus harmful element are removed, and the oxygen content of molten iron is down to 10 × 10-6Below;
Step 3: casting crystallization trombone slide
Molten iron after melting, pours into insulation ladle, external U-type groove, into crystallizer, and crystallizer joint is craned one head, is become with synchronous Frequency motor is pulled up, and is stopped frequent short steps method using stopping -- drawing -- and is pulled up, crystallizer water inlet and delivery port take away heat, make Molten iron condenses;Cast tube uses vertical strain method, seamless steel pipe is made using double track alternating drawing, hot pipe insulating delays Quench, keeps away Exempt from during the generation of seamless pipe thermal stress cracking, seamless steel pipe drawing, carry out layering condensation, molten iron is injected in middle part all the time Feeding is carried out, tapping hole seamless pipe temperature is installed above 990-1010 DEG C, crystallizer installs two sets of lifting systems on brandreth, brandreth System, handle system snatch seamless steel pipe after reaching a certain height, is transported to from left to right centered on crystallizer and managed, alternating will be seamless Steel pipe delivers subsequent processing processing;
Step 4: seamless steel pipe is incubated
Heat-insulation system is processed using the material of 1000 DEG C of heatproof, and temperature-resistant material is processed into tubular is made heat-preservation cylinder, insulation Cylinder is two, and two heat-preservation cylinders can be moved with seamless steel pipe, seamless steel be sent into heat-preservation cylinder, the insulation of seamless steel pipe blank Time is that every millimeter of wall thickness is incubated 2~3 minutes;
Step 5: seamless steel pipe is cut
Seamless steel pipe is removed after heat-preservation cylinder, and into Length-fixing cutting process, bearing material is made after cutting.
2. the method that iron filings as claimed in claim 1 make bearing material, it is characterised in that:In the step 3 after melting Molten iron is not less than 1450 DEG C.
3. the method that iron filings as claimed in claim 1 make bearing material, it is characterised in that:In the step 3, tapping hole Seamless pipe temperature is 1000 DEG C.
CN201610384289.0A 2016-06-02 2016-06-02 The method that iron filings make bearing material Expired - Fee Related CN105861786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610384289.0A CN105861786B (en) 2016-06-02 2016-06-02 The method that iron filings make bearing material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610384289.0A CN105861786B (en) 2016-06-02 2016-06-02 The method that iron filings make bearing material

Publications (2)

Publication Number Publication Date
CN105861786A CN105861786A (en) 2016-08-17
CN105861786B true CN105861786B (en) 2017-09-12

Family

ID=56676752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610384289.0A Expired - Fee Related CN105861786B (en) 2016-06-02 2016-06-02 The method that iron filings make bearing material

Country Status (1)

Country Link
CN (1) CN105861786B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114178492A (en) * 2021-12-13 2022-03-15 昆明理工大学 Method for recycling waste materials in continuous casting tundish

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087952A (en) * 1993-12-02 1994-06-15 吴君旺 Directly pouring casting technique using melted waste iron filings
CN101660098A (en) * 2009-09-16 2010-03-03 天津钢管集团股份有限公司 Hot-rolling seamless steel pipe applicable to high temperature of 580-620 DEG C and high pressure of 24-30MPa and production method thereof
CN102925818A (en) * 2012-11-23 2013-02-13 中天钢铁集团有限公司 Corrosion-resistant and high-temperature resistant bearing steel and production process thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087952A (en) * 1993-12-02 1994-06-15 吴君旺 Directly pouring casting technique using melted waste iron filings
CN101660098A (en) * 2009-09-16 2010-03-03 天津钢管集团股份有限公司 Hot-rolling seamless steel pipe applicable to high temperature of 580-620 DEG C and high pressure of 24-30MPa and production method thereof
CN102925818A (en) * 2012-11-23 2013-02-13 中天钢铁集团有限公司 Corrosion-resistant and high-temperature resistant bearing steel and production process thereof

Also Published As

Publication number Publication date
CN105861786A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104164574B (en) A kind of electroslag remelting prepares the method for high-rating generator retaining ring hollow steel ingot
CN102886501B (en) Tooling for efficiently manufacturing wide thick plate blank for wide thick plate rolling machine and manufacture method thereof
CN1864878A (en) Compact medium-width strip steel production process
CN104070145A (en) Manufacturing tooling and efficient production method of large height-diameter ratio circular casting billet
CN105014020B (en) A kind of apparatus and method for preparing major diameter semi-solid alloy blank
CN101091984A (en) Method for manufacturing stainless steel pipe
CN101804564B (en) High-efficiency short-flow production line of composite material of high-alloy steel and high-alloy steel
CN103056624B (en) Method for producing high-quality forged material by using large-scale vertical type continuous casting round billet, product and application thereof
CN107552750A (en) The multiple-strand caster and production method of large section Hot Metal in Beam Blank or slab can be produced
CN101224490A (en) Continuous rheological extending forming method for preparing Al alloy tube
CN103357836A (en) Production method of alloy plate
CN105861786B (en) The method that iron filings make bearing material
CN101966562B (en) Non-electroslag remelting type clean metal ingot mould
CN104959503B (en) The preparation technology of modern railway low-floor motor-car large-scale solid forging axle bridge
CN102019379B (en) Environment servo type clean metal mould
CN100999014A (en) Metal material surface slag fast uniform heating and compounding device
CN102161080A (en) Manufacturing tool of high-compact wide and thick plate blank for wide and thick plate rolling mill and method
CN202762983U (en) Efficient production tool of wide and thick slabs for wide and thick plate rolling mill
CN105033212A (en) Crystallizer for continuous casting of titanium alloy pipes
CN102310078A (en) Continuous-casting continuous-rolling method for producing sectional materials and bar-wire materials by using residual heat of molten steel
CN201799581U (en) Non-electroslag remelting type clean metal ingot mould
CN103231032A (en) Vacuum continuous casting device and method for alloy billets
CN203356551U (en) Vacuum continuous casting device for alloy billets
CN103071802B (en) Method and device for producing ferroalloy by mechanical crushing
CN207702991U (en) A kind of electric magnesite-smelting furnace Heat Flux device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170912

Termination date: 20210602