CN105824982A - Three-dimensional electrical distance checking method for approach span of very high voltage transmission line - Google Patents

Three-dimensional electrical distance checking method for approach span of very high voltage transmission line Download PDF

Info

Publication number
CN105824982A
CN105824982A CN201510507414.8A CN201510507414A CN105824982A CN 105824982 A CN105824982 A CN 105824982A CN 201510507414 A CN201510507414 A CN 201510507414A CN 105824982 A CN105824982 A CN 105824982A
Authority
CN
China
Prior art keywords
line
design
tower
high voltage
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510507414.8A
Other languages
Chinese (zh)
Inventor
李帅波
李艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Electric Power Design Institute Co Ltd
Priority to CN201510507414.8A priority Critical patent/CN105824982A/en
Publication of CN105824982A publication Critical patent/CN105824982A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a three-dimensional electrical distance checking method for an approach span of a very high voltage transmission line. The method comprises the following steps: S1, adding corresponding line sections, tower footings and outgoing line frame pile positions in corresponding positions according to design requirements; S2, newly constructing tower poles and portal structures required in the very high voltage line, and newly constructing insulator strings and conductor structures required; S3, newly constructing meteorological conditions in the current line engineering situation; S4, selecting required conductor and ground wire models and selecting tower models and corresponding insulator strings under a voltage class; S5, selecting corresponding conductor and ground wire models, parameters, meteorological conditions, tower poles, portals and corresponding insulator strings, and then erecting a tower and performing line stringing in a pile position; S6, performing line distance measurement checking and design adjustment after modeling is successful. The method can realize accurate three-dimensional electrical distance check of the access gear, can adjust line design, and is convenient and efficient, good in flexible and high in reliability.

Description

UHV transmission line enters the station shelves three-dimensional electrical distance method of calibration
Technical field
The present invention relates to power transmission technology field, particularly relate to a kind of UHV transmission line and enter the station shelves three-dimensional electrical distance method of calibration.
Background technology
Grade crossing elimination leap distance that enters the station and wire pitch need to judge whether to meet the safety net distance of Regulations requirement by SPATIAL CALCULATION, detailed three-dimensional computations to take considerable time, calculating typically by means of simplifying in engineering design, incorporation engineering experience judges.And Three-dimensional Design Software, the intersection in this antarafacial space intuitively can be represented, and carry out tight three-dimensional electrically check, measure space length and the lead wire and earth wire vertical dimension over the ground of any two object, the convenient phase spacing checking grade circuit that enters the station and other space lengths.Therefore Three-dimensional Design Software compare conventional two-dimensional mode more accurately, image, directly perceived, be greatly improved sight, there is certain superiority.
Utilize common three-dimensional drawing Software on Drawing 3-D graphic complex, the most more, and the characteristic such as sag of conductor and ground wire curve is wayward, " road henry SLW3D aerial power transmission line three-dimensional design system " software has accurate three-dimensional modeling ability, but only there is the engineering such as 110kV~500kV electric pressure universal design storehouse and corresponding circuit design, function singleness, design inconvenience.
Summary of the invention
Because the drawbacks described above of prior art, the present invention provides a kind of UHV transmission line to enter the station shelves three-dimensional electrical distance method of calibration, this method utilizes " road henry SLW3D aerial power transmission line three-dimensional design system " software 3-D view and the function of three-dimensional range finding for 1000kV UHVAC transmission line, carry out three-dimensional modeling, it is achieved the shelves three-dimensional electrical distance that enters the station accurately measures verification.The modeling software of the present invention utilizes file of surveying the topography to model more accuracy on actual landform, if and phase spacing is undesirable in actual design process, circuit can be adjusted by forms such as the wire transposition of the shelves that enter the station, adjusting lever tower height degree, displacements to design, convenient and swift.
For achieving the above object, the invention provides a kind of UHV transmission line and enter the station shelves three-dimensional electrical distance method of calibration, comprise the following steps:
Step S1, open the terrain file measuring gained, electric pressure modeling in arbitrarily selected software, add respective lines section, column foot and outlet structure stake position in relevant position according to design requirement;
Shaft tower used and portal-framed structure, newly-built insulator chain, conductor structure used in newly-built extra high voltage line in step S2, electric pressure corresponding selected in " editorial project data base ";
Step S3, in " editor storehouse, meteorologic district ", again build the meteorological condition under current line project situation;
Tower under step S4, the lead wire and earth wire model used needed for " preparing in storehouse " is selected and selected electric pressure and corresponding insulator string;
Step S5, in " Design wizard ", on stake position, carry out Li Ta stringing after selected corresponding lead wire and earth wire model and parameter, meteorological condition, shaft tower, door frame and corresponding insulator chain;
Step S6, model successfully, carry out wire spacing and measure verification and design adjusts, to determine distance whether compliant and design requirement.
Further, in described step S2, shaft tower used and portal-framed structure should ensure that corresponding physical dimension and extra high voltage line are actually used consistent.
Further, in described step S5, in " Design wizard ", the parameter type of selected corresponding lead wire and earth wire model and parameter includes division number, new linear system number, safety coefficient, year flat coefficient.
Further, intuitively show that extra high voltage line enters the station the situation of shelves by 3-D view after described step S6 modeling successfully.
Beneficial effects of the present invention:
1, this method utilizes " road henry SLW3D aerial power transmission line three-dimensional design system " software 3-D view and the function of three-dimensional range finding for 1000kV UHVAC transmission line, carries out three-dimensional modeling, it is achieved the shelves three-dimensional electrical distance that enters the station accurately measures verification;
2, the modeling software of the present invention utilizes file of surveying the topography to model more accuracy on actual landform, if and phase spacing is undesirable in actual design process, circuit can be adjusted by forms such as the wire transposition of the shelves that enter the station, adjusting lever tower height degree, displacements to design, convenient and swift.
Below with reference to accompanying drawing, the technique effect of design, concrete structure and the generation of the present invention is described further, to be fully understood from the purpose of the present invention, feature and effect.
Accompanying drawing explanation
Fig. 1 is the method flow diagram of the present invention;
Fig. 2 is that the extra high voltage line of the present invention enters the station mark structure schematic diagram.
Detailed description of the invention
As shown in Figure 1, 2, a kind of UHV transmission line enters the station shelves three-dimensional electrical distance method of calibration, it is characterised in that comprise the following steps:
Step S1, open the terrain file measuring gained, electric pressure modeling in arbitrarily selected software, add respective lines section, column foot and outlet structure stake position in relevant position according to design requirement;
Shaft tower used and portal-framed structure, newly-built insulator chain, conductor structure used in newly-built extra high voltage line in step S2, electric pressure corresponding selected in " editorial project data base ";
Step S3, in " editor storehouse, meteorologic district ", again build the meteorological condition under current line project situation;
Tower under step S4, the lead wire and earth wire model used needed for " preparing in storehouse " is selected and selected electric pressure and corresponding insulator string;
Step S5, in " Design wizard ", on stake position, carry out Li Ta stringing after selected corresponding lead wire and earth wire model and parameter, meteorological condition, shaft tower, door frame and corresponding insulator chain;
Step S6, model successfully, carry out wire spacing and measure verification and design adjusts, to determine distance whether compliant and design requirement.
Further, using and measure gained terrain file in described step S1, result is the most accurate.Method can also substitute below: in most cases progress shelves landform is relatively flat, the landform in software example therefore can be used in the case of not having actual surveying the topography to be modeled calculating verification.This has some superiority in the case of the preliminary stages such as engineering feasibility study do not have measurement data.
Further, in described step S2, shaft tower used and portal-framed structure should ensure that corresponding physical dimension and extra high voltage line are actually used consistent.Newly-built tower input parameter mainly include arrangements of conductors pattern, horizontal spacing, lead ground level away from, earth wire support lower wire high, upper away from, middle lower wire away from, lead flat projection, lead projection of hanging down.General UHV Long Insulator String structure is complex, for shelves three-dimensional electrical distance verification of entering the station, it is possible to use the insulator chain that structure is relatively easy, length is identical replaces.
Further, in described step S3, meteorological condition used mainly inputs meteorological condition under the operating modes such as low temperature, strong wind, Nian Ping, icing, high temperature, installation, thunder and lightning, operation.
Further, in described step S5, in " Design wizard ", the parameter type of selected corresponding lead wire and earth wire model and parameter includes division number, new linear system number, safety coefficient, year flat coefficient.Isolated shelves calculate the drawing length of crossing of lead wire and earth wire in parameter and are disposed as 0.15m, and cooling numerical value is according to actually used lead wire and earth wire model.
Further, by 3-D view intuitively showing extra high voltage line enter the station the situation of shelves after modeling successfully in described step S6, including alternate minimum range numerical value and position, minimum perpendicular distance etc., in this example, alternate minimum range is 10.19m.
The modeling following structural parameters of employing of the present embodiment:
Frame size:
Project Arrange size (m)
Framework width 51
Framework hanging point height 41
Framework conducting wire hanging point distance mutually 11.3
Framework conducting wire hanging point phase spacing 14.2
Terminal tower uses the 10GB3-SDJ1 tower in " State Grid Corporation of China's project of transmitting and converting electricity universal design 1000kV transmission line of electricity fascicle ", wire: 8 × JL/G1A-630/45;Ground wire: JLB20A-240, uses the design meteorology combination of corresponding 10GB3 module.
In sum, this method utilizes " road henry SLW3D aerial power transmission line three-dimensional design system " software 3-D view and the function of three-dimensional range finding for 1000kV UHVAC transmission line, carries out three-dimensional modeling, it is achieved the shelves three-dimensional electrical distance that enters the station accurately measures verification.The modeling software of the present invention utilizes file of surveying the topography to model more accuracy on actual landform, if and phase spacing is undesirable in actual design process, circuit can be adjusted by forms such as the wire transposition of the shelves that enter the station, adjusting lever tower height degree, displacements to design, convenient and swift.
The preferred embodiment of the present invention described in detail above.Should be appreciated that those of ordinary skill in the art just can make many modifications and variations according to the design of the present invention without creative work.Therefore, all technical staff in the art, all should be in the protection domain being defined in the patent claims the most on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (3)

1. UHV transmission line enters the station a shelves three-dimensional electrical distance method of calibration, comprises the following steps:
Step S1, open the terrain file measuring gained, electric pressure modeling in arbitrarily selected software, add respective lines section, column foot and outlet structure stake position in relevant position according to design requirement;
Shaft tower used and portal-framed structure, newly-built insulator chain, conductor structure used in newly-built extra high voltage line in step S2, electric pressure corresponding selected in " editorial project data base ";
Step S3, in " editor storehouse, meteorologic district ", again build the meteorological condition under current line project situation;
Tower under step S4, the lead wire and earth wire model used needed for " preparing in storehouse " is selected and selected electric pressure and corresponding insulator string;
Step S5, in " Design wizard ", on stake position, carry out Li Ta stringing after selected corresponding lead wire and earth wire model and parameter, meteorological condition, shaft tower, door frame and corresponding insulator chain;In described step S5, in " Design wizard ", the parameter type of selected corresponding lead wire and earth wire model and parameter includes division number, new linear system number, safety coefficient, year flat coefficient;
Step S6, model successfully, carry out wire spacing and measure verification and design adjusts, to determine distance whether compliant and design requirement.
UHV transmission line the most according to claim 1 enters the station shelves three-dimensional electrical distance method of calibration, it is characterised in that in described step S2, shaft tower used and portal-framed structure should ensure that corresponding physical dimension and extra high voltage line are actually used consistent.
UHV transmission line the most according to claim 1 enters the station shelves three-dimensional electrical distance method of calibration, it is characterised in that intuitively show that extra high voltage line enters the station the situation of shelves by 3-D view after modeling successfully in described step S6.
CN201510507414.8A 2015-08-18 2015-08-18 Three-dimensional electrical distance checking method for approach span of very high voltage transmission line Pending CN105824982A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510507414.8A CN105824982A (en) 2015-08-18 2015-08-18 Three-dimensional electrical distance checking method for approach span of very high voltage transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510507414.8A CN105824982A (en) 2015-08-18 2015-08-18 Three-dimensional electrical distance checking method for approach span of very high voltage transmission line

Publications (1)

Publication Number Publication Date
CN105824982A true CN105824982A (en) 2016-08-03

Family

ID=56514628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510507414.8A Pending CN105824982A (en) 2015-08-18 2015-08-18 Three-dimensional electrical distance checking method for approach span of very high voltage transmission line

Country Status (1)

Country Link
CN (1) CN105824982A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110889542A (en) * 2019-11-19 2020-03-17 国网电力科学研究院武汉南瑞有限责任公司 Dynamic prediction method for electrical safety distance of crossing of conducting wires and ground wires of power transmission line
CN111737307A (en) * 2020-04-10 2020-10-02 中国电力工程顾问集团中南电力设计院有限公司 Automatic checking method based on distribution network dictionary setting boundary condition full elements

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102103650A (en) * 2011-03-25 2011-06-22 江苏南大先腾信息产业有限公司 Three-dimensional simulation arrangement-along construction method for power transmission line
CN103680239A (en) * 2013-12-04 2014-03-26 国家电网公司 Three-dimensional simulation system of 500kV transformer substation
CN103779808A (en) * 2013-12-30 2014-05-07 国家电网公司 Power transmission line intelligent inspection system based on LiDAR

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102103650A (en) * 2011-03-25 2011-06-22 江苏南大先腾信息产业有限公司 Three-dimensional simulation arrangement-along construction method for power transmission line
CN103680239A (en) * 2013-12-04 2014-03-26 国家电网公司 Three-dimensional simulation system of 500kV transformer substation
CN103779808A (en) * 2013-12-30 2014-05-07 国家电网公司 Power transmission line intelligent inspection system based on LiDAR

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
HF437117273: "《SLCAD架空送电线路说明书》", 《HTTPS://WENKU.BAIDU.COM/VIEW/D453924EE45C3B3567EC8B45.HTML?FROM=SEARCH》 *
刘建: "《特高压长距离交流输电线路分布参数计算及线路模型的建立》", 《电力学报》 *
刘旭等: "《基于OpenGL的架空输电线路电气距离三维校验***的实现》", 《电力建设》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110889542A (en) * 2019-11-19 2020-03-17 国网电力科学研究院武汉南瑞有限责任公司 Dynamic prediction method for electrical safety distance of crossing of conducting wires and ground wires of power transmission line
CN111737307A (en) * 2020-04-10 2020-10-02 中国电力工程顾问集团中南电力设计院有限公司 Automatic checking method based on distribution network dictionary setting boundary condition full elements
CN111737307B (en) * 2020-04-10 2024-04-09 中国电力工程顾问集团中南电力设计院有限公司 Automatic checking method based on full elements of typical boundary conditions of power distribution network

Similar Documents

Publication Publication Date Title
CN107909222B (en) Wind power plant current collection line three-dimensional path planning method and system based on intelligent fan grouping
CN102118021B (en) Transmission line three-dimensional panoramic model-based fault processing method and system
WO2020158527A1 (en) Stray current estimation system, stray current estimation method, and stray current estimation program
CN101900779B (en) Method for measuring lightning shielding failure trip-out rate of high-voltage power transmission line by combining topography
CN108052731B (en) Method and system for planning current collection line path of wind power plant
CN103673960A (en) Method and device for predicating icing state of power transmission line
CN105953762B (en) A kind of transmission line of electricity modeling method measured for clearance and range unit
CN103954842B (en) Method for determining grounding resistance value of large-scale grounding system
CN105095589A (en) Drawing method of power network wind zone distribution map in mountainous area
CN105278004B (en) A kind of weather condition analysis method of grid power transmission circuit section
CN103401183B (en) A kind of assembly type overhead method
Gentle Concurrent wind cooling in power transmission lines
CN107084676A (en) A kind of method of phase spacing at the position for the anti-dancing device for obtaining transmission line of electricity
CN109670205A (en) A kind of lightning protection evaluation system for wind power plant
CN103268379B (en) Overhead power transmission conducting wire optional position aerial cross sectional phase spacing Method for Accurate Calculation
CN105824982A (en) Three-dimensional electrical distance checking method for approach span of very high voltage transmission line
CN105823929B (en) Long range transmission line with four-circuit on single tower Zero sequence parameter accurate measurement method based on both-end asynchronous data
CN103529304A (en) Optimization method of on-site ground resistance testing technology of ground grid of electric power equipment
CN110865268B (en) Method for testing lightning trip-out rate of transmission tower in low-soil resistivity region
CN104123671B (en) Meteorological reference station partition method
CN102565554A (en) Method for generating three-dimensional lightning positioned place flash point distribution map
CN110865267B (en) Evaluation method for shielding failure trip-out rate of 110kV power transmission line
CN104217010A (en) Conducting wire trip-out rate calculating and evaluating method based on segmented topography
CN110749777A (en) Soil resistivity measuring method
CN109766648A (en) Traction substation conducting wire prefabricated construction method based on BIM technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160803

WD01 Invention patent application deemed withdrawn after publication