CN105804758A - 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 - Google Patents
浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 Download PDFInfo
- Publication number
- CN105804758A CN105804758A CN201610258446.3A CN201610258446A CN105804758A CN 105804758 A CN105804758 A CN 105804758A CN 201610258446 A CN201610258446 A CN 201610258446A CN 105804758 A CN105804758 A CN 105804758A
- Authority
- CN
- China
- Prior art keywords
- push
- tunnel
- pipe
- tube coupling
- deformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 62
- 239000002689 soil Substances 0.000 claims abstract description 58
- 238000000034 method Methods 0.000 claims abstract description 53
- 238000005520 cutting process Methods 0.000 claims abstract description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 230000008878 coupling Effects 0.000 claims description 55
- 238000010168 coupling process Methods 0.000 claims description 55
- 238000005859 coupling reaction Methods 0.000 claims description 55
- 230000008569 process Effects 0.000 claims description 23
- 238000012544 monitoring process Methods 0.000 claims description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 17
- 239000010959 steel Substances 0.000 claims description 17
- 238000007789 sealing Methods 0.000 claims description 15
- 238000012937 correction Methods 0.000 claims description 11
- 229920002401 polyacrylamide Polymers 0.000 claims description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 8
- 230000000694 effects Effects 0.000 claims description 8
- 238000011049 filling Methods 0.000 claims description 8
- 238000005259 measurement Methods 0.000 claims description 8
- 239000002893 slag Substances 0.000 claims description 7
- 239000002002 slurry Substances 0.000 claims description 7
- 230000003068 static effect Effects 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 claims description 6
- 230000009977 dual effect Effects 0.000 claims description 6
- 239000004587 polysulfide sealant Substances 0.000 claims description 6
- 238000007569 slipcasting Methods 0.000 claims description 6
- 239000003516 soil conditioner Substances 0.000 claims description 6
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 4
- 229920002134 Carboxymethyl cellulose Polymers 0.000 claims description 3
- 239000004606 Fillers/Extenders Substances 0.000 claims description 3
- CDBYLPFSWZWCQE-UHFFFAOYSA-L Sodium Carbonate Chemical compound [Na+].[Na+].[O-]C([O-])=O CDBYLPFSWZWCQE-UHFFFAOYSA-L 0.000 claims description 3
- 238000005422 blasting Methods 0.000 claims description 3
- 230000003139 buffering effect Effects 0.000 claims description 3
- 235000010948 carboxy methyl cellulose Nutrition 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 3
- ONCZQWJXONKSMM-UHFFFAOYSA-N dialuminum;disodium;oxygen(2-);silicon(4+);hydrate Chemical compound O.[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[Na+].[Na+].[Al+3].[Al+3].[Si+4].[Si+4].[Si+4].[Si+4] ONCZQWJXONKSMM-UHFFFAOYSA-N 0.000 claims description 3
- 229920001971 elastomer Polymers 0.000 claims description 3
- 238000002156 mixing Methods 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000012188 paraffin wax Substances 0.000 claims description 3
- 229920002635 polyurethane Polymers 0.000 claims description 3
- 239000004814 polyurethane Substances 0.000 claims description 3
- 235000019353 potassium silicate Nutrition 0.000 claims description 3
- 239000012945 sealing adhesive Substances 0.000 claims description 3
- 238000004088 simulation Methods 0.000 claims description 3
- 229940080314 sodium bentonite Drugs 0.000 claims description 3
- 229910000280 sodium bentonite Inorganic materials 0.000 claims description 3
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 3
- 238000004162 soil erosion Methods 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 230000032258 transport Effects 0.000 claims description 3
- 238000012369 In process control Methods 0.000 claims description 2
- DPXJVFZANSGRMM-UHFFFAOYSA-N acetic acid;2,3,4,5,6-pentahydroxyhexanal;sodium Chemical compound [Na].CC(O)=O.OCC(O)C(O)C(O)C(O)C=O DPXJVFZANSGRMM-UHFFFAOYSA-N 0.000 claims description 2
- 239000001768 carboxy methyl cellulose Substances 0.000 claims description 2
- 238000010965 in-process control Methods 0.000 claims description 2
- 235000019812 sodium carboxymethyl cellulose Nutrition 0.000 claims description 2
- 229920001027 sodium carboxymethylcellulose Polymers 0.000 claims description 2
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 230000005641 tunneling Effects 0.000 abstract description 2
- 230000000149 penetrating effect Effects 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 238000012407 engineering method Methods 0.000 description 8
- 239000000243 solution Substances 0.000 description 7
- 238000007667 floating Methods 0.000 description 4
- 230000001276 controlling effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 238000011068 loading method Methods 0.000 description 3
- 238000004062 sedimentation Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 210000005239 tubule Anatomy 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610258446.3A CN105804758B (zh) | 2016-04-22 | 2016-04-22 | 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610258446.3A CN105804758B (zh) | 2016-04-22 | 2016-04-22 | 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105804758A true CN105804758A (zh) | 2016-07-27 |
CN105804758B CN105804758B (zh) | 2018-02-16 |
Family
ID=56458424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610258446.3A Active CN105804758B (zh) | 2016-04-22 | 2016-04-22 | 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804758B (zh) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106339544A (zh) * | 2016-08-26 | 2017-01-18 | 浙江大学城市学院 | 地面出入式盾构施工引起邻近地下管线附加荷载计算方法 |
CN107327302A (zh) * | 2017-07-20 | 2017-11-07 | 西南交通大学 | 高水压、高渗透砂性地层土压平衡盾构的渣土改良方法 |
CN107420104A (zh) * | 2017-06-09 | 2017-12-01 | 中铁建大桥工程局集团第五工程有限公司 | 浅埋隧道超大直径水平预钻孔静态***开挖施工方法 |
CN108170098A (zh) * | 2016-12-07 | 2018-06-15 | 复合材料技术和应用有限公司 | 一种检查头路径数据的方法 |
CN108204240A (zh) * | 2018-01-17 | 2018-06-26 | 中国铁路设计集团有限公司 | 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 |
CN108868808A (zh) * | 2018-08-08 | 2018-11-23 | 淮南中泰矿山装备制造有限公司 | 顶管掘进机防偏机构 |
CN108868784A (zh) * | 2018-06-08 | 2018-11-23 | 中交公局厦门工程有限公司 | 一种盾构区间端头洞门围护结构破除施工方法 |
CN109084082A (zh) * | 2018-08-20 | 2018-12-25 | 上海交通大学 | 一种顶管抗浮施工的管内轨道式可移动配重方法 |
CN109141716A (zh) * | 2018-08-16 | 2019-01-04 | 中铁二十局集团第工程有限公司 | 一种综合管廊大断面矩形顶管施工管土接触压力测试方法 |
CN109704654A (zh) * | 2018-12-28 | 2019-05-03 | 中铁隧道集团三处有限公司 | 一种用于隧道壁后填充的组合物、固结液及制备方法 |
CN109779651A (zh) * | 2019-01-22 | 2019-05-21 | 安徽建筑大学 | 一种砂姜黏土地层近距泥水平衡顶管施工方法 |
CN109854272A (zh) * | 2019-01-31 | 2019-06-07 | 中国矿业大学 | 一种岩体小断面通道的顶管管节 |
CN109948303A (zh) * | 2019-04-16 | 2019-06-28 | 广东华坤建设集团有限公司 | 淤泥浅水等滩涂地段节能环保管道铺设施工分析方法 |
CN110359540A (zh) * | 2019-08-02 | 2019-10-22 | 中铁建设集团北京工程有限公司 | 一种浅覆土大管径高水位穿既有道路人工顶管施工工法 |
CN112253142A (zh) * | 2020-11-27 | 2021-01-22 | 鲁东大学 | 一种深长隧道联络风道近净距上跨主洞施工方法 |
CN112610233A (zh) * | 2020-11-27 | 2021-04-06 | 中铁十五局集团有限公司 | 一种“金蝉脱壳”式矩形顶管接收施工方法 |
CN112983456A (zh) * | 2021-04-01 | 2021-06-18 | 中铁四局集团第四工程有限公司 | 一种富水砂层多排顶管地表变形控制方法 |
CN113190902A (zh) * | 2021-04-30 | 2021-07-30 | 中铁十一局集团有限公司 | 一种隧道施工引起地表位移的预测方法及*** |
CN114876471A (zh) * | 2022-07-05 | 2022-08-09 | 中铁四局集团有限公司北京分公司 | 用于无水砂层中的顶管施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102777313A (zh) * | 2011-05-10 | 2012-11-14 | 贺学术 | 海浪能量收集储存方法及其压力海水调度*** |
CN103628507A (zh) * | 2013-11-19 | 2014-03-12 | 厦门水务集团有限公司 | 顶管穿越海底浅覆土抗浮施工方法 |
CN104652279A (zh) * | 2013-11-25 | 2015-05-27 | 北京城建设计发展集团股份有限公司 | 一种新建框架桥上穿既有地铁结构箱涵顶进施工方法 |
CN204457798U (zh) * | 2014-12-26 | 2015-07-08 | 广东华隧建设股份有限公司 | 一种用于盾构浅覆土段的配重混凝土管片 |
CN104895122A (zh) * | 2015-06-03 | 2015-09-09 | 中铁第四勘察设计院集团有限公司 | 一种盾构隧道连续梁式抗浮结构 |
CN204690805U (zh) * | 2015-06-03 | 2015-10-07 | 中铁第四勘察设计院集团有限公司 | 一种盾构隧道连续梁式抗浮结构 |
-
2016
- 2016-04-22 CN CN201610258446.3A patent/CN105804758B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102777313A (zh) * | 2011-05-10 | 2012-11-14 | 贺学术 | 海浪能量收集储存方法及其压力海水调度*** |
CN103628507A (zh) * | 2013-11-19 | 2014-03-12 | 厦门水务集团有限公司 | 顶管穿越海底浅覆土抗浮施工方法 |
CN104652279A (zh) * | 2013-11-25 | 2015-05-27 | 北京城建设计发展集团股份有限公司 | 一种新建框架桥上穿既有地铁结构箱涵顶进施工方法 |
CN204457798U (zh) * | 2014-12-26 | 2015-07-08 | 广东华隧建设股份有限公司 | 一种用于盾构浅覆土段的配重混凝土管片 |
CN104895122A (zh) * | 2015-06-03 | 2015-09-09 | 中铁第四勘察设计院集团有限公司 | 一种盾构隧道连续梁式抗浮结构 |
CN204690805U (zh) * | 2015-06-03 | 2015-10-07 | 中铁第四勘察设计院集团有限公司 | 一种盾构隧道连续梁式抗浮结构 |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106339544B (zh) * | 2016-08-26 | 2019-08-06 | 浙江大学城市学院 | 地面出入式盾构施工引起邻近地下管线附加荷载计算方法 |
CN106339544A (zh) * | 2016-08-26 | 2017-01-18 | 浙江大学城市学院 | 地面出入式盾构施工引起邻近地下管线附加荷载计算方法 |
CN108170098A (zh) * | 2016-12-07 | 2018-06-15 | 复合材料技术和应用有限公司 | 一种检查头路径数据的方法 |
CN108170098B (zh) * | 2016-12-07 | 2021-10-01 | 劳斯莱斯股份有限公司 | 一种检查头路径数据的方法 |
CN107420104A (zh) * | 2017-06-09 | 2017-12-01 | 中铁建大桥工程局集团第五工程有限公司 | 浅埋隧道超大直径水平预钻孔静态***开挖施工方法 |
CN107327302A (zh) * | 2017-07-20 | 2017-11-07 | 西南交通大学 | 高水压、高渗透砂性地层土压平衡盾构的渣土改良方法 |
CN107327302B (zh) * | 2017-07-20 | 2019-10-18 | 西南交通大学 | 高水压、高渗透砂性地层土压平衡盾构的渣土改良方法 |
CN108204240A (zh) * | 2018-01-17 | 2018-06-26 | 中国铁路设计集团有限公司 | 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 |
CN108204240B (zh) * | 2018-01-17 | 2024-01-23 | 中国铁路设计集团有限公司 | 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 |
CN108868784A (zh) * | 2018-06-08 | 2018-11-23 | 中交公局厦门工程有限公司 | 一种盾构区间端头洞门围护结构破除施工方法 |
CN108868808A (zh) * | 2018-08-08 | 2018-11-23 | 淮南中泰矿山装备制造有限公司 | 顶管掘进机防偏机构 |
CN108868808B (zh) * | 2018-08-08 | 2023-11-17 | 淮南中泰矿山装备制造有限公司 | 顶管掘进机防偏机构 |
CN109141716B (zh) * | 2018-08-16 | 2020-11-03 | 中铁二十局集团第一工程有限公司 | 一种综合管廊大断面矩形顶管施工管土接触压力测试方法 |
CN109141716A (zh) * | 2018-08-16 | 2019-01-04 | 中铁二十局集团第工程有限公司 | 一种综合管廊大断面矩形顶管施工管土接触压力测试方法 |
CN109084082A (zh) * | 2018-08-20 | 2018-12-25 | 上海交通大学 | 一种顶管抗浮施工的管内轨道式可移动配重方法 |
CN109704654A (zh) * | 2018-12-28 | 2019-05-03 | 中铁隧道集团三处有限公司 | 一种用于隧道壁后填充的组合物、固结液及制备方法 |
CN109779651A (zh) * | 2019-01-22 | 2019-05-21 | 安徽建筑大学 | 一种砂姜黏土地层近距泥水平衡顶管施工方法 |
CN109779651B (zh) * | 2019-01-22 | 2021-07-06 | 安徽建筑大学 | 一种砂姜黏土地层近距泥水平衡顶管施工方法 |
CN109854272B (zh) * | 2019-01-31 | 2023-10-13 | 中国矿业大学 | 一种岩体小断面通道的顶管管节 |
CN109854272A (zh) * | 2019-01-31 | 2019-06-07 | 中国矿业大学 | 一种岩体小断面通道的顶管管节 |
CN109948303A (zh) * | 2019-04-16 | 2019-06-28 | 广东华坤建设集团有限公司 | 淤泥浅水等滩涂地段节能环保管道铺设施工分析方法 |
CN110359540A (zh) * | 2019-08-02 | 2019-10-22 | 中铁建设集团北京工程有限公司 | 一种浅覆土大管径高水位穿既有道路人工顶管施工工法 |
CN110359540B (zh) * | 2019-08-02 | 2024-04-19 | 中铁建设集团北京工程有限公司 | 一种浅覆土大管径高水位穿既有道路人工顶管施工工法 |
CN112610233A (zh) * | 2020-11-27 | 2021-04-06 | 中铁十五局集团有限公司 | 一种“金蝉脱壳”式矩形顶管接收施工方法 |
CN112610233B (zh) * | 2020-11-27 | 2023-06-13 | 中铁十五局集团有限公司 | 一种“金蝉脱壳”式矩形顶管接收施工方法 |
CN112253142B (zh) * | 2020-11-27 | 2022-05-24 | 鲁东大学 | 一种深长隧道联络风道近净距上跨主洞施工方法 |
CN112253142A (zh) * | 2020-11-27 | 2021-01-22 | 鲁东大学 | 一种深长隧道联络风道近净距上跨主洞施工方法 |
CN112983456B (zh) * | 2021-04-01 | 2023-01-06 | 中铁四局集团第四工程有限公司 | 一种富水砂层多排顶管地表变形控制方法 |
CN112983456A (zh) * | 2021-04-01 | 2021-06-18 | 中铁四局集团第四工程有限公司 | 一种富水砂层多排顶管地表变形控制方法 |
CN113190902B (zh) * | 2021-04-30 | 2023-10-17 | 中铁十一局集团有限公司 | 一种隧道施工引起地表位移的预测方法及*** |
CN113190902A (zh) * | 2021-04-30 | 2021-07-30 | 中铁十一局集团有限公司 | 一种隧道施工引起地表位移的预测方法及*** |
CN114876471A (zh) * | 2022-07-05 | 2022-08-09 | 中铁四局集团有限公司北京分公司 | 用于无水砂层中的顶管施工方法 |
CN114876471B (zh) * | 2022-07-05 | 2022-09-09 | 中铁四局集团有限公司北京分公司 | 用于无水砂层中的顶管施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105804758B (zh) | 2018-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804758B (zh) | 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 | |
CN111396063B (zh) | 一种富水砂层盾构近距离上跨既有线下穿污水顶管的施工方法 | |
CN100501124C (zh) | 地铁盾构区间隧道联络通道的施工方法 | |
CN109208637B (zh) | 在既有隧道基础上新增明挖车站的施工方法 | |
CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
CN100580221C (zh) | 盾构隧道下穿浅覆土河床施工方法 | |
CN111236957B (zh) | 机械顶管施工工艺 | |
CN110924961B (zh) | 一种盾构机下穿既有车站始发的施工方法 | |
CN111156009A (zh) | 一种隧道盾构下穿高架桥施工及监测方法 | |
CN109372532A (zh) | 复杂地址环境下顶管施工工法 | |
CN109594990B (zh) | 一种复杂地层大断面顶管施工方法 | |
CN101737060A (zh) | 土质下穿隧道超大直径管幕施工方法 | |
CN1215276C (zh) | 土压平衡矩形顶管施工工艺 | |
CN103670448B (zh) | 一种地下管线保护装置及应用该装置的支护方法 | |
CN109386293B (zh) | 超大断面矩形顶管密封式接收施工方法 | |
CN110185844A (zh) | 浅覆土大直径顶管施工方法 | |
CN111206944B (zh) | 下穿地铁车站变形缝差异沉降控制预支顶开挖构筑方法 | |
CN109458184A (zh) | 湖下浅埋段盾构施工方法 | |
CN113669073B (zh) | 一种控制临近建筑变形的富水砂性地层先隧后站施工方法 | |
CN112664221A (zh) | 一种用于复杂地质层的顶管施工方法 | |
CN103032075A (zh) | 地面出入式盾构法隧道建造施工方法 | |
CN110259467A (zh) | 泥水平衡盾构下穿江河施工方法 | |
CN104594379B (zh) | 铁路站场内线间保温涵管***及埋设施工方法 | |
CN111156005A (zh) | 一种隧道近距离下穿地铁车站的施工方法 | |
CN111677521B (zh) | 用于地铁区间隧道施工中高压燃气管沉降控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 100160 701, 7th floor, building 3, yard 10, Automobile Museum East Road, Fengtai District, Beijing Patentee after: China Power Construction Railway Construction Investment Group Co.,Ltd. Patentee after: SINOHYDRO ENGINEERING BUREAU 4 Co.,Ltd. Patentee after: ZHEJIANG University Address before: 100089 1001, 10th floor, building 2, yard 22, Chegongzhuang West Road, Haidian District, Beijing Patentee before: POWERCHINA RAILWAY CONSTRUCTION Co.,Ltd. Patentee before: SINOHYDRO ENGINEERING BUREAU 4 Co.,Ltd. Patentee before: ZHEJIANG University |
|
CP03 | Change of name, title or address |