China
Prior art keywords
guidance system
bridge
supporting
guidance
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610170773.3A
Other languages
Chinese (zh)
Other versions
CN105803951A (en
Inventor
王文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610170773.3A priority Critical patent/CN105803951B/en
Publication of CN105803951A publication Critical patent/CN105803951A/en
Application granted granted Critical
Publication of CN105803951B publication Critical patent/CN105803951B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of fixation or the mutual rail devices of supporting system able to turn on or off and guidance system, the guidance system set including being arranged in bridge deck, along bridge length direction, rail system is equipped on the guidance system along its length, guidance system is associated with supporting system by rail system, makes supporting system that can be moved with guidance system along the direction of rail system;The supporting system includes rotary power support arm, and the rotary power support arm is equipped with the dynamical system spread out;Bridge pier is equipped with the bearing of fixed bearing system or guidance system.In the present invention, for Hanging Basket without the setting walking track as the prior art as, cost is lower, easy to operate, labor intensity is low, and can overcome because being not provided with track of walking, and is easy to cause the danger that Hanging Basket overturns.Substantially reduce construction period.

Description

The mutual rail device of supporting system and guidance system fixed or able to turn on or off
Technical field
The present invention relates to a kind of a kind of mutual rail of Hanging Basket more particularly to fixation or supporting system able to turn on or off and guidance system dresses It puts.
Background technology
Bridge is generally using prestressed reinforced concrete construction or continuous beam, in the construction process, using one section of suspending technology One segment of section cantilever cast-in-place method implement, each segment is linked up by reinforcing bar and prestressing force steel hinge line.Cantilever pouring Concrete and prestress engineering carry out all on Hanging Basket.After the completion of one segment, Hanging Basket needs cantilever running to next position Continue to construct, so cycle carries out, until the last one segment.This just needs to set track on bridge, and cradle construction is completed After one section, using jack stand hanging basket device, moving track is moved to default position to next construction predeterminated position, then by Hanging Basket It puts.Thus cycle completes Roadway Construction operation.
The prior art is completed by the way of can only being poured on one section of bridge using multistage, and present one-time-concreting probably can only Pour the concrete of 2 meters or so length.Due to cradle structure complexity, in the process of walking, spare and accessory parts are more, mutual with bridge for Hanging Basket Association, centre also have interspersed.From demoulding walking is poured into, the technology gap of single hop is long, and the time of multistage combination waste is longer, makes Construction period into entire bridge is long.
Invention content
The purpose of the present invention is that providing one kind solves the above problems, and track, section are set without bridge the preceding paragraph section again Save duration, fixation simple in structure or the mutual rail device of supporting system able to turn on or off and guidance system.
To achieve these goals, the technical solution adopted by the present invention is such:A kind of fixation or bearing system able to turn on or off The mutual rail device of system and guidance system, the guidance system set including being arranged in bridge deck, along bridge length direction;
Rail system is equipped on the guidance system along its length, guidance system is associated with bearing system by rail system System, makes supporting system that can be moved with guidance system along the direction of rail system;
The supporting system includes rotary power support arm, and the rotary power support arm is equipped with the dynamical system spread out System;
Bridge pier is equipped with the bearing of fixed bearing system or guidance system;
Antidumping component is further included, supporting system or guidance system are fixed in bridge deck by the antidumping component;
This is fixed or the traveling method of the mutual rail device of supporting system able to turn on or off and guidance system is:
The first step:The rotary power support arm 5 of supporting system 4 is opened, supporting system 4, guiding system have been set in bridge deck System 2, and pass through both associations of rail system 3, the direction of rail system 3 is along 1 length direction of bridge, that is, the construction of bridge 1 Direction is set, and is fixed guidance system 2 by antidumping component 7;
Second step:It moves forward at supporting system 4 to 1 span 1/3rd of bridge, the antidumping group of supporting system 4 is installed Part 7 removes the antidumping component 7 of guidance system 2;
Third walks:2 front end of guidance system is moved to 8 top of bridge pier, then guidance system 2 is fixed on bridge by bearing On pier 8.
As preferred:The guidance system is girder steel or trussing.
Compared with prior art, the advantage of the invention is that:Under the action of rail system, guidance system and supporting system It can be moved along the direction of rail system, in this way, during bridge construction, guidance system, branch are first set on access bridge It holds system, and both is associated with by rail system, the Construction Party of the direction of rail system along bridge length direction, that is, bridge To setting, moving forward supporting system or guidance system, the system not moved need to be fixed by antidumping component, and what is first moved is After system is moved to precalculated position, fixed by antidumping component, then remove the antidumping component set in the system not moved, and It is moved forward into precalculated position along rail system.
Under normal circumstances, we set the system first moved and are moved forward at bridge span 1/3rd along track, after Mobile system is moved again at adjacent bridge pier.Repeat above-mentioned movement, it is possible to constantly by supporting system and guidance system It pushes ahead, so as to complete the construction of bridge.
Rail system can be a kind of rail set of peripheral hardware, can also be carried out on guidance system and supporting system certainly Body is associated with, and makes the structure at the two association with rail set.
Supporting system includes rotary power support arm, and the rotary power support arm is equipped with the dynamical system spread out, mesh Be make rotary power support arm get around barrier, supporting system is not hindered to travel forward.
In the present invention, Hanging Basket is without the setting walking track as the prior art, and cost is lower, easy to operate, labor intensity It is low, and can overcome because being not provided with walking track, and it is easy to cause the danger that Hanging Basket overturns.Substantially reduce construction period.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is run trace figure first step figure of the present invention;
Fig. 3 is run trace figure second step figure of the present invention;
Fig. 4 is run trace figure third of the present invention step figure.
In figure:1st, bridge;2nd, guidance system;3rd, rail system;4th, supporting system;5th, rotary power support arm;6th, dynamical system System;7th, antidumping component;8th, bridge pier.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings.
Embodiment 1:Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, a kind of fixation or the mutual rail of supporting system able to turn on or off and guidance system Device, the guidance system 2 set including being arranged in bridge deck, along 1 length direction of bridge,
Rail system 3 is equipped on the guidance system 2 along its length, guidance system 2 is associated with branch by rail system 3 System 4 is held, makes supporting system 4 that can be moved with guidance system 2 along the direction of rail system 3;
The supporting system 4 includes rotary power support arm 5, and the rotary power support arm 5 is equipped with the power spread out System 6;Bridge pier 8 is equipped with the bearing of fixed bearing system 4 or guidance system 2.
In the present embodiment, the guidance system 2 is girder steel, the invention also includes antidumping component 7, the antidumping component 7 are fixed on supporting system 4 or guidance system 2 in bridge deck.
Build a bridge 1 between the bridge pier 8 of bridge 1, for ease of description the principle of the invention, we allow supporting system 4 first to move It is dynamic.
The first step:The rotary power support arm 5 of supporting system 4 is opened, supporting system 4, guiding system have been set in bridge deck System 2, and pass through both associations of rail system 3, the direction of rail system 3 is along 1 length direction of bridge, that is, the construction of bridge 1 Direction is set, and is fixed guidance system 2 by antidumping component 7;
Second step:It moves forward at supporting system 4 to 1 span 1/3rd of bridge, the antidumping group of supporting system 4 is installed Part 7 removes the antidumping component 7 of guidance system 2;
Third walks:2 front end of guidance system is moved to 8 top of bridge pier, then guidance system 2 is fixed on bridge by bearing On pier 8.In this way, just complete the movement that bridge 1 arrives next bridge pier 8.
Similarly, the movement that a bridge pier 8 arrives next bridge pier 8 can be completed, it, will necessarily certainly since 8 size of bridge pier is big The movement of supporting system 4 is hindered, so we are equipped with the dynamical system spread out on the rotary power support arm 5 of supporting system 4 System 6, is the movement for not hindering supporting system 4 in order to demould and get around the barriers such as bridge pier 8.
Certainly, first mobile homing system 2, can also realize technical solution of the present invention.
In the present invention, Hanging Basket is without the setting walking track as the prior art, and cost is lower, easy to operate, labor intensity It is low, and can overcome because being not provided with walking track, and it is easy to cause the danger that Hanging Basket overturns.Substantially reduce construction period.
Embodiment 2:In the present embodiment, the guidance system 2 is trussing, remaining is same as Example 1.
Due to make guidance system 2 and supporting system 4 each other track, support each other, without setting the walking of Hanging Basket on the wall Track, the spare and accessory parts that encounter are more when overcoming setting walking track, each system mutually interspersed the defects of interfering.Build 300 meters of left sides Right bridge 1, the prior art needs the duration 18 months, and the present invention only needs 6 months or so, substantially reduces the duration.
Present invention can apply to such as:Corrugated web bridge, Cast-in-place concrete bridge, the molding of continuous Cast-in-place concrete beam and as prefabricated Erection of beam slab etc..

Claims (2)

1. a kind of fixation or the mutual rail device of supporting system able to turn on or off and guidance system, including being arranged in bridge deck, along bridge The guidance system of length direction setting;
It is characterized in that:Rail system is equipped on the guidance system along its length, guidance system is closed by rail system Join supporting system, make supporting system that can be moved with guidance system along the direction of rail system;
The supporting system includes rotary power support arm, and the rotary power support arm is equipped with the dynamical system spread out;
Bridge pier is equipped with the bearing of fixed bearing system or guidance system;
Antidumping component is further included, supporting system or guidance system are fixed in bridge deck by the antidumping component;
This is fixed or the traveling method of the mutual rail device of supporting system able to turn on or off and guidance system is:
The first step:The rotary power support arm 5 of supporting system 4 is opened, supporting system 4, guidance system 2 have been set in bridge deck, And passing through both associations of rail system 3, the direction of rail system 3 is along 1 length direction of bridge, that is, the constructive direction of bridge 1 Setting, is fixed guidance system 2 by antidumping component 7;
Second step:It moves forward at supporting system 4 to 1 span 1/3rd of bridge, the antidumping component 7 of supporting system 4 is installed, Remove the antidumping component 7 of guidance system 2;
Third walks:2 front end of guidance system is moved to 8 top of bridge pier, then guidance system 2 is fixed on bridge pier 8 by bearing On.
2. fixation according to claim 1 or the mutual rail device of supporting system able to turn on or off and guidance system, it is characterised in that: The guidance system is girder steel or trussing.
CN201610170773.3A 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off Active CN105803951B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610170773.3A CN105803951B (en) 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610170773.3A CN105803951B (en) 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off

Publications (2)

Publication Number Publication Date
CN105803951A CN105803951A (en) 2016-07-27
CN105803951B true CN105803951B (en) 2018-07-03

Family

ID=56453730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610170773.3A Active CN105803951B (en) 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off

Country Status (1)

Country Link
CN (1) CN105803951B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210419A (en) * 2007-12-21 2008-07-02 中铁大桥局股份有限公司 Inside and outside beam system bridge fabrication machine for small radius curve concrete box girder construction and construction method thereof
CN101672018B (en) * 2009-08-27 2011-11-09 孙广喜 Trackless hanging bracket with traveling truss
ES2396291B1 (en) * 2010-02-05 2013-12-19 Rubrica Ingeniería Y Arquitectura S.L. TROLLEY IN SUCCESSIVE ADVANCE VOLUME FOR BRIDGE CONSTRUCTION.
CN201809726U (en) * 2010-10-08 2011-04-27 石家庄铁道大学国防交通研究所 Straddle-type bridge girder erection machine
CN102094394A (en) * 2010-12-30 2011-06-15 徐州徐工铁路装备有限公司 Through-tunnel lower pilot girder type non-moving lifting bridge girder erection machine
CN202031037U (en) * 2011-04-28 2011-11-09 湖南中铁五新钢模有限责任公司 Running guide device of descending hanging basket
CN203807947U (en) * 2014-04-16 2014-09-03 河北工业大学 Fixed-point hoisting type bridge girder erection machine
CN205474873U (en) * 2016-03-24 2016-08-17 王文龙 Fixed mutual rail device that may open and close supporting system and guide system

Also Published As

Publication number Publication date
CN105803951A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN102121234B (en) Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN102182147B (en) Steel box girder erection method
CN103998690A (en) Self-launching movable scaffolding system
WO2014200443A1 (en) Self-launching movable scaffolding system
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN104328745B (en) Across the rotary body device of the little bridge beam of high ferro and construction method thereof on a kind of low-angle
CN102286935A (en) Brand-new construction method of cable-stayed bridge with hybrid composite beams
CN102433844B (en) Method for erecting prefabricated beam of bridge deck
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN103774558A (en) Automatic travelling type moveable formwork used in bridge construction
CN202369933U (en) Trestle bridge cantilever beam lifting system and bridge surface precast beam erecting construction system
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
JP2010031607A (en) Construction method for grade separation
CN105803951B (en) The mutual rail device of supporting system and guidance system fixed or able to turn on or off
CN205474873U (en) Fixed mutual rail device that may open and close supporting system and guide system
KR100928063B1 (en) Self-launching movable formwork
CN104179123A (en) Bridge fabrication machine capable of building and assembling two bridge segments
CN104831638B (en) A kind of mobile formwork straddle truck and construction method thereof
JP4880374B2 (en) How to build a bridge
CN109162737A (en) Self-lifting type steel bar binding trolley
CN206092017U (en) Diversion tunnel inclined shaft, complete general steel mould trolley of section of flat section
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN106013234A (en) Construction method for underground comprehensive pipe rack
CN113882286A (en) Bridge dismantling and building all-in-one machine and spanning method thereof, bridge dismantling method and new building method
CN204311360U (en) A kind of traversing carriage being applied to the simple supported box beam section assembling of bridge construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant