- CN105799056A CN105799056A CN201610219230.6A CN201610219230A CN105799056A CN 105799056 A CN105799056 A CN 105799056A CN 201610219230 A CN201610219230 A CN 201610219230A CN 105799056 A CN105799056 A CN 105799056A
- Authority
- CN
- China
- Prior art keywords
- template
- backrest
- vertical shift
- pedestal
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/04—Producing shaped prefabricated articles from the material by tamping or ramming
- B28B1/045—Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/26—Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
- B28B7/266—Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other for making oblong objects, e.g. girders
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种T梁工厂化预制支模体系及施工方法,支模体系包括台座、纵移平台、翼板模板、模板背架、纵向轨道、横移轨道、底模板、腹板侧模板、顶板模板。主要施工步骤包括:(1)浇筑台座;(2)轨道梁安装;(3)纵移平台安装;(4)模板背架拼装;(5)螺杆安装固定;(6)浇筑混凝土及养护;(7)拆模;本发明涉及的结构具有拆装方便,施工效率高,T梁模板固定在背架上,背架顶部设有滑轮可水平横向移动,整个支模体系放置在纵移平台上,解决了现有T梁预制模板的机械拆除、吊装、拼装的施工费时、费力、施工效率低等问题,具有较好的经济技术效益。
Description
技术领域
本发明涉及T梁工厂化预制支模体系,尤其涉及可整体横向和纵向移动的T梁工厂化预制支模体系的施工方法。
技术背景
桥梁是道路建设的关键工程,梁式桥在桥梁工程中占据着主导地位,其中预制T梁支模施工对施工效率和施工质量产生重要影响。
传统的T梁工厂化预制通常采用钢模板拼装而成,待T梁强度达到拆模强度后,进行模板拆除,分别吊装到下一台座位置重新进行钢模板拼装施工,该方法施工效率低,模板重复拼装精度难以保证。
鉴于此,目前亟需发明一种拆装方便,施工速度快,实现模板体系整体组装成型后可横向和纵向移动,不需要重复拆装和吊装的T梁工厂化预制支模体系及施工方法。
发明内容
本发明的目的在于提供一种施工方便,施工速度快,可横向和纵向移动需要,能重复实用的T梁工厂化预制支模体系及施工方法。
为实现上述目的,本发明采用了以下技术方案:
T梁工厂化预制支模体系,包括台座、纵移平台、翼板模板、模板背架、纵向轨道、横移轨道、底模板、腹板侧模板和顶板模板。台座沿T梁纵向均匀的设有预埋PVC管,台座顶部设置底模板;纵向轨道固定在地面上,纵移平台置于纵向轨道上;腹板侧模板、顶板模板和翼板模板固定在模板背架上,模板背架置于纵移平台上。
纵移平台由纵杆与横杆相互连接构成并设置斜拉杆;纵移平台底部设置行车轮组,顶部设置横移轨道。
模板背架底部设置滑轮,模板背架整体置于横移轨道上。
T梁两侧模板背架底部和顶部分别通过对拉螺杆B和对拉螺杆A固定。
顶板模板根据顶板横向主筋尺寸及间距均匀的开置凹槽。
T梁工厂化预制支模体系及施工方法,其特征在于包括以下步骤:
1)台座浇筑:施工前先将地面做硬化处理,根据设计要求在台座内预埋PVC管,底模板与台座钢筋骨架固定,支设模板后浇筑混凝土;
2)轨道梁安装:根据设计要求T梁每侧设置两行纵向轨道,纵移轨道固定在地面指定位置;
3)纵移平台安装:纵杆与横杆相互连接构成并设置斜拉杆;纵移平台底部设置行车轮组,顶部设置横移轨道,纵移平台整体放置在纵移轨道上;
4)模板背架拼装:利用角钢焊接模板背架,腹板模板、翼板模板、顶板模板为钢模板,通过焊接固定在模板背架上,模板背架立杆底部设置滑轮,待模板背架拼装完毕后整体吊装置纵移平台顶部的横移轨道上;
5)螺杆安装固定:T梁两侧模板背架就位后,预埋PVC内穿插对拉螺杆A,通过对拉螺杆A将两侧模板背架底部对拉固定在一起,模板背架顶部通过对拉螺杆B对拉固定在一起;
6)浇筑混凝土:自下而上水平分层纵向分段从一端向另一端推进,待距离另一端约5m左右时,浇注从另一端进行,中间合拢,翼板砼浇筑从梁肋向两翼,浇筑过程中配合振捣器进行振捣;
7)拆模:达到拆模要求后,先拆除对拉螺杆A和对拉螺杆B使模板与梁体分离,模板背架即可沿横移轨道横移到指定位置后,利用卷扬机将纵移平台沿纵移轨道移动到下一台座位置进行下一T梁施工。
本发明具有以下的特点和有益效果:
(1)前一T梁施工完毕后,无需进行重新拆装,只需拆除螺杆,沿着轨道移动到达下一T梁位置,再进行固定支模,施工效率高。
(2)模板背架整体放置在纵移平台上,沿横移轨道横移,不需要拆除翼板模板,不影响纵移平台的纵向移动,施工方便,工序大大减少。
(3)改变了传统的直接在预制梁台座上重复拼装支模体系的施工工艺,大大减少了模板拼装时间,施工周期明显缩短。
附图说明
图1是本发明T梁工厂化预制支模体系结构示意图;
图2是T梁工厂化预制支模体系结构侧面示意图;
图3是T梁支模体系纵向移动示意图;
图4是纵移平台详图;
图5是本发明施工工艺流程图;
图中:1.地面;2.台座;3.预埋PVC管;4.纵向轨道;5.纵移平台;51.横移轨道;52.纵杆;53.行车轮组;54.横杆;55.斜拉杆;6.翼板模板;7.滑轮;8.模板背架;9.背楞;10.对拉螺杆A;11.腹板侧模板;12.底模板;13.顶板模板;14.翼板;15.对拉螺杆B;16.T梁。
具体实施方式
本实施方式钢结构焊接工艺、螺栓连接施工工艺、混凝土浇筑施工工艺等本实施中就不在累述,重点阐述本发明涉及结构的实施方式。
图1是本发明T梁工厂化预制支模体系结构示意图。参照图1所示,本发明T梁工厂化预制支模体系主要包括:台座(2)、纵移平台(5)、翼板模板(6)、模板背架(8)、纵向轨道(4)、横移轨道(51)、底模板(12)、腹板侧模板(11)、顶板模板(13)。
参照图1所示,台座(2)沿T梁纵向均匀的预埋PVC管(3),台座(2)顶部设置底模板(12);纵向轨道(4)固定在地面(1)上,纵移平台(5)置于纵向轨道(4)上;腹板侧模板(11)、顶板模板(13)和翼板模板(6)固定在模板背架(8)上,模板背架(8)置于纵移平台(5)上。
模板背架(8)顶部设置滑轮(7),模板背架(8)整体置于横移轨道(51)上;T梁两侧模板背架(8)底部和顶部分别通过对拉螺杆B和对拉螺杆A固定。
参照图2,顶板模板(13)根据顶板横向主筋尺寸及间距均匀的开置凹槽(18)。
参照图3,先拆除对拉螺杆A(10)和对拉螺杆B(15)使模板与梁体分离,模板背架(8)即可沿横移轨道横移到指定位置后,利用卷扬机将纵移平台(5)沿纵移轨道(4)移动到下一台座(2)位置进行下一T梁施工。
参照图4,纵杆(52)与横杆(54)相互连接构成并设置斜拉杆(55);纵移平台(5)底部设置行车轮组,顶部设置横移轨道(51),纵移平台(5)整体放置在纵移轨道(4)上。本发明还提供了上述T梁工厂化预制支模体系的施工方法,主要包括以下步骤:
1)台座浇筑:施工前先将地面(1)做硬化处理,根据设计要求在台座(2)内预埋PVC管(3),底模板(12)与台座钢筋骨架固定,支设模板后浇筑混凝土;
2)轨道梁安装:根据设计要求T梁每侧设置两行纵向轨道(4),纵移轨道(4)固定在地面(1)指定位置;
3)纵移平台安装:纵杆(52)与横杆(54)相互连接构成并设置斜拉杆(55);纵移平台(5)底部设置行车轮组,顶部设置横移轨道(51),纵移平台(5)整体放置在纵移轨道(4)上;
4)模板背架拼装:利用角钢焊接模板背架(8),腹板模板(11)、翼板模板(6)、顶板模板(13)为钢模板,通过焊接固定在模板背架(8)上,模板背架(8)立杆底部设置滑轮(7),待模板背架(8)拼装完毕后整体吊装置纵移平台(5)顶部的横移轨道(51)上。
5)螺杆安装固定:T梁两侧模板背架就位后,预埋PVC(3)内穿插对拉螺杆A(10),通过对拉螺杆A(10)将两侧模板背架(8)底部对拉固定在一起,模板背架(8)顶部通过对拉螺杆B(15)对拉固定在一起。
6)浇筑混凝土:自下而上水平分层纵向分段从一端向另一端推进,待距离另一端约5m左右时,浇注从另一端进行,中间合拢,翼板(14)砼浇筑从梁肋向两翼,浇筑过程中配合振捣器进行振捣。
7)拆模:达到拆模要求后,先拆除对拉螺杆A(10)和对拉螺杆B(15)使模板与梁体分离,模板背架(8)即可沿横移轨道横移到指定位置后,利用卷扬机将纵移平台(5)沿纵移轨道(4)移动到下一台座(2)位置进行下一T梁施工。
Claims (6)
1.T梁工厂化预制支模体系,其特征在于:包括台座(2)、纵移平台(5)、翼板模板(6)、模板背架(8)、纵向轨道(4)、横移轨道(51)、底模板(12)、腹板侧模板(11)和顶板模板(13);台座(2)沿T梁纵向均匀的设有预埋PVC管(3),台座(2)顶部设置底模板(12);纵向轨道(4)固定在地面(1)上,纵移平台(5)置于纵向轨道(4)上;腹板侧模板(11)、顶板模板(13)和翼板模板(6)固定在模板背架(8)上,模板背架(8)置于纵移平台(5)上。
2.根据权利要求1所述的T梁工厂化预制支模体系,其特征在于:纵移平台(5)由纵杆(52)与横杆(54)相互连接构成并设置斜拉杆(55);纵移平台(5)底部设置行车轮组(53),顶部设置横移轨道(51)。
3.根据权利要求1所述的T梁工厂化预制支模体系,其特征在于:模板背架(8)底部设置滑轮(7),模板背架(8)整体置于横移轨道(51)上。
4.根据权利要求1所述的T梁工厂化预制支模体系,其特征在于:T梁两侧模板背架(8)底部和顶部分别通过对拉螺杆B(15)和对拉螺杆A(10)固定。
5.根据权利要求1所述的T梁工厂化预制支模体系,其特征在于:顶板模板(13)根据顶板横向主筋尺寸及间距均匀的开置凹槽(18)。
6.T梁工厂化预制支模体系及施工方法,其特征在于包括以下步骤:
1)台座浇筑:施工前先将地面(1)做硬化处理,根据设计要求在台座(2)内预埋PVC管(3),底模板(12)与台座钢筋骨架固定,支设模板后浇筑混凝土;
2)轨道梁安装:根据设计要求T梁每侧设置两行纵向轨道(4),纵移轨道(4)固定在地面(1)指定位置;
3)纵移平台安装:纵杆(52)与横杆(54)相互连接构成并设置斜拉杆(55);纵移平台(5)底部设置行车轮组,顶部设置横移轨道(51),纵移平台(5)整体放置在纵移轨道(4)上;
4)模板背架拼装:利用角钢焊接模板背架(8),腹板模板(11)、翼板模板(6)、顶板模板(13)为钢模板,通过焊接固定在模板背架(8)上,模板背架(8)立杆底部设置滑轮(7),待模板背架(8)拼装完毕后整体吊装置纵移平台(5)顶部的横移轨道(51)上;
5)螺杆安装固定:T梁两侧模板背架就位后,预埋PVC(3)内穿插对拉螺杆A(10),通过对拉螺杆A(10)将两侧模板背架(8)底部对拉固定在一起,模板背架(8)顶部通过对拉螺杆B(15)对拉固定在一起;
6)浇筑混凝土:自下而上水平分层纵向分段从一端向另一端推进,待距离另一端约5m左右时,浇注从另一端进行,中间合拢,翼板(14)砼浇筑从梁肋向两翼,浇筑过程中配合振捣器进行振捣;
7)拆模:达到拆模要求后,先拆除对拉螺杆A(10)和对拉螺杆B(15)使模板与梁体分离,模板背架(8)即可沿横移轨道横移到指定位置后,利用卷扬机将纵移平台(5)沿纵移轨道(4)移动到下一台座(2)位置进行下一T梁施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610219230.6A CN105799056B (zh) | 2016-04-08 | 2016-04-08 | T梁工厂化预制支模体系及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610219230.6A CN105799056B (zh) | 2016-04-08 | 2016-04-08 | T梁工厂化预制支模体系及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105799056A true CN105799056A (zh) | 2016-07-27 |
CN105799056B CN105799056B (zh) | 2018-09-21 |
Family
ID=56460765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610219230.6A Active CN105799056B (zh) | 2016-04-08 | 2016-04-08 | T梁工厂化预制支模体系及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105799056B (zh) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106906750A (zh) * | 2017-03-24 | 2017-06-30 | 中建三局基础设施工程有限公司 | 一种多功能跨铁路线平转桥梁合龙施工模架及其施工方法 |
CN108086329A (zh) * | 2017-11-30 | 2018-05-29 | 中国二十冶集团有限公司 | 代替冠梁受力钢筋和模板的钢模的制作方法 |
CN108284506A (zh) * | 2017-12-22 | 2018-07-17 | 安徽伟宏钢结构集团股份有限公司 | 一种t梁预制设备 |
CN108638298A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 一种跨座式单轨轨道梁的侧模***及使用方法 |
CN108638297A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 用于单轨轨道梁模板的纵移小车、调节组件及使用方法 |
CN108638296A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 一种跨座式单轨轨道梁的模板***及使用方法 |
CN108858723A (zh) * | 2018-07-27 | 2018-11-23 | 中电建路桥集团有限公司 | 公路预制箱梁新型集约化施工工艺 |
CN109129847A (zh) * | 2018-10-18 | 2019-01-04 | 江苏燕宁工程科技集团有限公司 | T梁整体模板 |
CN109267485A (zh) * | 2018-08-27 | 2019-01-25 | 宁波工程学院 | 一种箱梁钢筋骨架定位制作的液压驱动模架 |
CN109366695A (zh) * | 2017-08-10 | 2019-02-22 | 比亚迪股份有限公司 | 用于轨道梁生产的模板组件和轨道梁生产方法 |
CN109750564A (zh) * | 2019-01-07 | 2019-05-14 | 柳州市轨道交通工程有限责任公司 | 一种pc轨道梁的施工方法 |
CN109968499A (zh) * | 2019-04-26 | 2019-07-05 | 四川东泉机械设备制造有限公司 | 一种t型梁浇筑专用模具及其使用方法 |
CN110394886A (zh) * | 2019-08-19 | 2019-11-01 | 中交一公局第四工程有限公司 | 一种预制梁快拆型流水作业钢模板 |
CN110450271A (zh) * | 2019-08-20 | 2019-11-15 | 中冶建工集团有限公司 | 行走式定型钢模板及t梁模板安装方法 |
CN110883914A (zh) * | 2019-10-12 | 2020-03-17 | 安徽省路港工程有限责任公司 | 预制混凝土π型梁支模体系及其施工方法 |
CN111745789A (zh) * | 2019-03-26 | 2020-10-09 | 比亚迪股份有限公司 | 一种墩柱模具*** |
CN112025924A (zh) * | 2020-09-14 | 2020-12-04 | 台州学院 | 一种定向钢纤维增强混凝土预制构件制备装置及制备方法 |
CN113445731A (zh) * | 2021-07-20 | 2021-09-28 | 上海建工一建集团有限公司 | 单侧模板支模体系及其使用方法 |
CN112437715B (zh) * | 2018-06-27 | 2022-07-19 | 克莱建筑株式会社 | 预制土墙体的成型***及用此的土墙体筑造方法 |
CN115302614A (zh) * | 2022-10-12 | 2022-11-08 | 山东铁鹰建设工程有限公司 | 一种海洋工程建设用段梁预制模板设备 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03208603A (ja) * | 1990-01-12 | 1991-09-11 | P S Concrete Co Ltd | プレキャストコンクリートt形桁の製造装置 |
CN101597958A (zh) * | 2009-04-16 | 2009-12-09 | 中铁二十二局集团有限公司 | 可整体立、拆模的模板*** |
CN101748681A (zh) * | 2009-12-22 | 2010-06-23 | 浙江省大成建设集团有限公司 | 50m折线配筋混凝土T梁先张法施工工艺 |
CN104259447A (zh) * | 2014-10-11 | 2015-01-07 | 江苏圣乐机械有限公司 | T梁移模装置及其使用方法 |
CN105216101A (zh) * | 2015-10-10 | 2016-01-06 | 山东铁鹰建设工程有限公司 | 一种自行式液压t型梁预制模板装置及其脱模方法 |
CN205521918U (zh) * | 2016-04-08 | 2016-08-31 | 浙江大学城市学院 | T梁工厂化预制支模体系 |
-
2016
- 2016-04-08 CN CN201610219230.6A patent/CN105799056B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03208603A (ja) * | 1990-01-12 | 1991-09-11 | P S Concrete Co Ltd | プレキャストコンクリートt形桁の製造装置 |
CN101597958A (zh) * | 2009-04-16 | 2009-12-09 | 中铁二十二局集团有限公司 | 可整体立、拆模的模板*** |
CN101748681A (zh) * | 2009-12-22 | 2010-06-23 | 浙江省大成建设集团有限公司 | 50m折线配筋混凝土T梁先张法施工工艺 |
CN104259447A (zh) * | 2014-10-11 | 2015-01-07 | 江苏圣乐机械有限公司 | T梁移模装置及其使用方法 |
CN105216101A (zh) * | 2015-10-10 | 2016-01-06 | 山东铁鹰建设工程有限公司 | 一种自行式液压t型梁预制模板装置及其脱模方法 |
CN205521918U (zh) * | 2016-04-08 | 2016-08-31 | 浙江大学城市学院 | T梁工厂化预制支模体系 |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106906750A (zh) * | 2017-03-24 | 2017-06-30 | 中建三局基础设施工程有限公司 | 一种多功能跨铁路线平转桥梁合龙施工模架及其施工方法 |
CN106906750B (zh) * | 2017-03-24 | 2019-01-25 | 中建三局基础设施工程有限公司 | 一种多功能跨铁路线平转桥梁合龙施工模架及其施工方法 |
CN109366695A (zh) * | 2017-08-10 | 2019-02-22 | 比亚迪股份有限公司 | 用于轨道梁生产的模板组件和轨道梁生产方法 |
CN108086329A (zh) * | 2017-11-30 | 2018-05-29 | 中国二十冶集团有限公司 | 代替冠梁受力钢筋和模板的钢模的制作方法 |
CN108284506A (zh) * | 2017-12-22 | 2018-07-17 | 安徽伟宏钢结构集团股份有限公司 | 一种t梁预制设备 |
CN108638296A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 一种跨座式单轨轨道梁的模板***及使用方法 |
CN108638297A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 用于单轨轨道梁模板的纵移小车、调节组件及使用方法 |
CN108638298A (zh) * | 2018-05-09 | 2018-10-12 | 中国建筑第五工程局有限公司 | 一种跨座式单轨轨道梁的侧模***及使用方法 |
CN112437715B (zh) * | 2018-06-27 | 2022-07-19 | 克莱建筑株式会社 | 预制土墙体的成型***及用此的土墙体筑造方法 |
CN108858723A (zh) * | 2018-07-27 | 2018-11-23 | 中电建路桥集团有限公司 | 公路预制箱梁新型集约化施工工艺 |
CN109267485A (zh) * | 2018-08-27 | 2019-01-25 | 宁波工程学院 | 一种箱梁钢筋骨架定位制作的液压驱动模架 |
CN109129847A (zh) * | 2018-10-18 | 2019-01-04 | 江苏燕宁工程科技集团有限公司 | T梁整体模板 |
CN109750564A (zh) * | 2019-01-07 | 2019-05-14 | 柳州市轨道交通工程有限责任公司 | 一种pc轨道梁的施工方法 |
CN111745789A (zh) * | 2019-03-26 | 2020-10-09 | 比亚迪股份有限公司 | 一种墩柱模具*** |
CN109968499A (zh) * | 2019-04-26 | 2019-07-05 | 四川东泉机械设备制造有限公司 | 一种t型梁浇筑专用模具及其使用方法 |
CN109968499B (zh) * | 2019-04-26 | 2023-11-21 | 四川东泉机械设备制造有限公司 | 一种t型梁浇筑专用模具及其使用方法 |
CN110394886A (zh) * | 2019-08-19 | 2019-11-01 | 中交一公局第四工程有限公司 | 一种预制梁快拆型流水作业钢模板 |
CN110450271A (zh) * | 2019-08-20 | 2019-11-15 | 中冶建工集团有限公司 | 行走式定型钢模板及t梁模板安装方法 |
CN110883914A (zh) * | 2019-10-12 | 2020-03-17 | 安徽省路港工程有限责任公司 | 预制混凝土π型梁支模体系及其施工方法 |
CN112025924A (zh) * | 2020-09-14 | 2020-12-04 | 台州学院 | 一种定向钢纤维增强混凝土预制构件制备装置及制备方法 |
CN113445731A (zh) * | 2021-07-20 | 2021-09-28 | 上海建工一建集团有限公司 | 单侧模板支模体系及其使用方法 |
CN115302614A (zh) * | 2022-10-12 | 2022-11-08 | 山东铁鹰建设工程有限公司 | 一种海洋工程建设用段梁预制模板设备 |
CN115302614B (zh) * | 2022-10-12 | 2022-12-20 | 山东铁鹰建设工程有限公司 | 一种海洋工程建设用段梁预制模板设备 |
Also Published As
Publication number | Publication date |
---|---|
CN105799056B (zh) | 2018-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105799056A (zh) | T梁工厂化预制支模体系及施工方法 | |
CN106120563B (zh) | 基于复合式移动模架现浇箱梁的施工方法 | |
CN111365035A (zh) | 一种管廊横隔板快速联动施工台车及管廊横隔板施工方法 | |
CN102230383A (zh) | 全液压隧道仰拱栈桥式移动模架 | |
CN105804395B (zh) | 基于整体式定型模板的楼梯一次连续浇筑成型施工方法 | |
CN201666157U (zh) | 仰拱整体式移动模架 | |
CN208716348U (zh) | 双块式轨枕模具自动码垛*** | |
CN205521918U (zh) | T梁工厂化预制支模体系 | |
CN109555027B (zh) | 一种节段梁混凝土浇筑***及其施工方法 | |
CN105821768A (zh) | 箱梁底腹板钢筋整体成型模架及施工方法 | |
CN107460889A (zh) | 地下综合管廊施工中的整体移动式支架模板及其施工方法 | |
CN202132052U (zh) | 全液压隧道仰拱栈桥式移动模架 | |
CN201972715U (zh) | 一次成型水沟电缆槽模架 | |
CN211547804U (zh) | 悬臂式挡土墙快速施工装置 | |
CN203200664U (zh) | 变截面空心高墩滑模施工装置 | |
CN102322138A (zh) | 模块式滑模 | |
CN204002852U (zh) | 一种公路隧道整体移动式水沟电缆槽施工模板*** | |
CN108005684B (zh) | 分离式钢模台车及其施工方法 | |
CN102444406A (zh) | 针梁式仰拱衬砌滑行模架及其施工方法 | |
CN202073045U (zh) | 挂篮内模滑移装置 | |
CN205521875U (zh) | 箱梁底腹板钢筋整体成型模架 | |
CN110883920B (zh) | 一种预制t梁自行式液压模板装置及模板*** | |
CN202730709U (zh) | 驳岸墙施工移动模架 | |
CN112160339A (zh) | 用于砼挡土墙提模浇筑的施工方法 | |
CN209812667U (zh) | 一种预制楼梯pc模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |