CN105781019B - 装配式建筑钢筋连接用全灌浆套筒及灌浆方法 - Google Patents
装配式建筑钢筋连接用全灌浆套筒及灌浆方法 Download PDFInfo
- Publication number
- CN105781019B CN105781019B CN201610166102.XA CN201610166102A CN105781019B CN 105781019 B CN105781019 B CN 105781019B CN 201610166102 A CN201610166102 A CN 201610166102A CN 105781019 B CN105781019 B CN 105781019B
- Authority
- CN
- China
- Prior art keywords
- grout sleeve
- frustum
- sleeve
- eccentric
- grout
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610166102.XA CN105781019B (zh) | 2016-03-22 | 2016-03-22 | 装配式建筑钢筋连接用全灌浆套筒及灌浆方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610166102.XA CN105781019B (zh) | 2016-03-22 | 2016-03-22 | 装配式建筑钢筋连接用全灌浆套筒及灌浆方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105781019A CN105781019A (zh) | 2016-07-20 |
CN105781019B true CN105781019B (zh) | 2018-03-23 |
Family
ID=56390644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610166102.XA Active CN105781019B (zh) | 2016-03-22 | 2016-03-22 | 装配式建筑钢筋连接用全灌浆套筒及灌浆方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105781019B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816671A (zh) * | 2017-12-06 | 2018-03-20 | 江苏铁锚玻璃股份有限公司 | 具有多段灯条的窗户结构 |
CN109184084A (zh) * | 2018-11-13 | 2019-01-11 | 黑龙江建筑职业技术学院 | 一种组合式灌浆套筒 |
CN112282217A (zh) * | 2019-07-25 | 2021-01-29 | 沈阳建筑大学 | 一种钢筋连接用异形灌浆套筒及其制备方法 |
CN111894144A (zh) * | 2020-07-30 | 2020-11-06 | 福州鼓楼纹英建筑工程有限责任公司 | 预制钢筋砼构件间偏心增注钢筋联结结构 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100240099B1 (ko) * | 1997-07-28 | 2000-06-01 | 정경옥 | 철근 연결 구조 |
AU5366100A (en) * | 1999-12-08 | 2001-06-14 | Suntisuk Dr Plooksawasdi | Self coupling steel bar connections |
KR100984243B1 (ko) * | 2010-06-15 | 2010-10-04 | 김용근 | 타원형 회전 쐐기를 적용한 철근 연결구 |
CN103216044B (zh) * | 2012-01-20 | 2016-01-20 | 中冶建筑研究总院有限公司 | 预制混凝土构件的水泥灌浆钢筋连接构造 |
CN203701433U (zh) * | 2014-01-23 | 2014-07-09 | 河北联合大学 | 装配式墙体竖向钢筋钢套管侧焊搭接连接结构 |
CN103866921B (zh) * | 2014-03-26 | 2016-07-13 | 王睿敏 | 预制钢筋混凝土构件之间的钢筋连接件、制作方法及施工方法 |
CN105201147A (zh) * | 2015-10-14 | 2015-12-30 | 沈阳建筑大学 | 一种钢筋偏心连接全灌浆套筒及其使用方法 |
-
2016
- 2016-03-22 CN CN201610166102.XA patent/CN105781019B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105781019A (zh) | 2016-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105781019B (zh) | 装配式建筑钢筋连接用全灌浆套筒及灌浆方法 | |
CN103452246B (zh) | 一种钢筋浆锚对接连接的灌浆变形钢管套筒 | |
CN103104040B (zh) | 一种采用竖向连接的装配式框架梁柱节点及施工方法 | |
CN104533021B (zh) | 一种钢筋连接用全灌浆套筒 | |
WO2018196151A1 (zh) | 一种预制空腔式开竖缝混凝土剪力墙 | |
CN206337641U (zh) | 一种预制板墙层间横缝连接节点 | |
CN102691365B (zh) | 装配式混凝土剪力墙边缘构件连接构造 | |
CN207700443U (zh) | 一种装配式剪力墙建筑楼层处外墙板水平有筋灌浆接缝结构 | |
CN105064619A (zh) | 预制装配式混凝土构件用钢筋套筒灌浆连接件及连接方法 | |
CN108240037A (zh) | 一种预制板墙层间横缝连接节点 | |
CN102021908A (zh) | 一种用于预制方桩接桩的机械连接结构及施工方法 | |
CN107059911A (zh) | 一种预制装配式基础及其组装方法 | |
CN205955067U (zh) | 一种带外装饰线条的预制叠合墙板 | |
CN204456669U (zh) | 一种钢筋连接用全灌浆套筒 | |
CN106320537A (zh) | 一种装配式方钢管混凝土柱与钢梁连接节点 | |
CN204826423U (zh) | 一种预制装配式混凝土构件用钢筋套筒灌浆连接件 | |
CN105756289B (zh) | 装配式建筑钢筋连接用全灌浆套筒 | |
JP4901900B2 (ja) | プレキャストパイルキャップ構造とその接合構造の接合方法 | |
CN107461003A (zh) | 万向钢筋机械连接组件 | |
CN106182361B (zh) | 一种销栓式交叉榫齿预制混凝土构件及其制备方法 | |
CN210067238U (zh) | 一种半灌浆套筒 | |
CN102852167B (zh) | 单桩竖向静载试验桩头钢筋连接节点及其施工方法 | |
CN206667492U (zh) | 一种预制叠合墙板和预制楼梯侧向连接结构 | |
CN206189456U (zh) | 一种三舱管廊 | |
CN202881986U (zh) | 单桩竖向静载试验桩头钢筋连接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Dongen Inventor after: Zhong Xiaohui Inventor after: Liao Yi Inventor after: Chen Hongqiang Inventor after: Zheng Huanqi Inventor before: Chen Huafeng |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180213 Address after: Lily road Guangzhou city Guangdong province 511440 Panyu District lotus town Applicant after: Guangdong Jian Yuan building assembly industry Co., Ltd. Address before: 250014 Shandong City, Ji'nan province Lixia District, Lin Road, No. 9, Fu Fu Garden, building 4, unit 39, 602 Applicant before: JINAN LUFANGZHIHE INFORMATION TECHNOLOGY CO., LTD. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |