CN105756477A - Auxiliary frame construction installation method and matching fixed part - Google Patents

Auxiliary frame construction installation method and matching fixed part Download PDF

Info

Publication number
CN105756477A
CN105756477A CN201410771105.7A CN201410771105A CN105756477A CN 105756477 A CN105756477 A CN 105756477A CN 201410771105 A CN201410771105 A CN 201410771105A CN 105756477 A CN105756477 A CN 105756477A
Authority
CN
China
Prior art keywords
auxiliary frame
window
wall
installation
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410771105.7A
Other languages
Chinese (zh)
Other versions
CN105756477B (en
Inventor
张友忠
王广龙
袁茂玉
李志臣
曾长涛
张波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tianchang Environmental Protection Technology Co Ltd
Original Assignee
Shandong Tianchang Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tianchang Environmental Protection Technology Co Ltd filed Critical Shandong Tianchang Environmental Protection Technology Co Ltd
Priority to CN201410771105.7A priority Critical patent/CN105756477B/en
Publication of CN105756477A publication Critical patent/CN105756477A/en
Application granted granted Critical
Publication of CN105756477B publication Critical patent/CN105756477B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

An auxiliary frame construction installation method comprises steps of (A) checking a hole size and an auxiliary frame size before installation, (B) fixing the periphery of the auxiliary frame via expansion bolts in a temporary way, supplying waterproof mortar after wooden wedge crack stuffing, and (C) connecting the auxiliary frame and a hole wall body via expansion bolts, (D) maintaining even gaps for the periphery during the installation, pushing a window from indoor to outdoor, rotating clamping members in an order upon attachment between screws and the clamping members, firmly fixing the window, filling foaming agent in the gaps and injecting sealing glue. The auxiliary frame construction installation method is advantageous in that during the installation, the window is pushed from indoor to outdoor; when the spacing fixing members and the clamping members are attached, the clamping members are driven to rotate in a clockwise direction by a special wrench; then the clamping members are donwardly tensioned in a vertical way and transversely tensioned toward the right side, so the clamping members are locked; and the window can be firmly fixed. Polyurethane foaming agnet is filled into the gaps and internal and external wall sealing glue is injected, so window and door finished product installation can be achieved; less time and labor are required during the installation; and simple structure, low cost and convenient installation can be achieved.

Description

Auxiliary frame construction installation method and matching fixing part
Technical field
The present invention relates to a kind of auxiliary frame installation method, particularly relate to a kind of auxiliary frame construction installation method and matching fixing part.
Background technology
Building erection of doors and windows remains first box out mouth, installs outer window frame afterwards, carries out door and window peripheral joint filling again and whitewash, assemble the technological process of bar and complete in existing building industry.When receiving civil engineering due to hole reserved, the impact of all many factors of building template, cast, building block etc. is unable to disposable standard and puts in place, also need to smear could solve by artificial powder, time-consuming expense material of taking a lot of work, particularly labor wage sharp rises at present, causes cost to be significantly increased.And whitewashing and in joint filling work progress, through the cooperation of many work posts, unavoidably can cause and the door and window housing installed etc. is produced serious damage and pollution in door-window opening inside and outside surrounding, although through second protection after erection of doors and windows, also of no avail.And owing to door and window peripheral fills out the generation meeting leakiness to be easy to cause the problems such as seepage, also include building outer wall insulation with erection of doors and windows hole be connected waterproof problem.When prior art is installed, commonly used setscrew is fixed or connects in junction fixing glue, wastes time and energy during connection.
Summary of the invention
The invention aims to provide one to realize doors and windows finished product install, it is time saving and energy saving to install, simple in construction, cost economy, auxiliary frame construction installation method easy for installation and matching fixing part.
For achieving the above object, the technical solution adopted in the present invention is:
A kind of auxiliary frame construction installation method, comprises the following steps:
A: auxiliary frame should be checked dimension of opening and auxiliary frame size, have built-in fitting before installing, should first capturing position, confirm errorless after install again;
B: temporarily fixed on auxiliary frame four limit with timber wedge, adjusts auxiliary frame level, vertical and turnover position further according to control line, adjusts and adopt the fixing auxiliary frame of expansion bolt afterwards, and timber wedge further takes out after stuff up a crack processes, and mends plug waterproof mortar in time;
C: auxiliary frame should adopt expansion bolt to be connected with hole body of wall, expansion bolt can not cause auxiliary frame bending or deformation, installation process should check the vertical of auxiliary frame and flatness at any time, should add in expansion bolt position in the middle of auxiliary frame and wall if desired and fill out backing member and fasten, have the position of lightning protection requirement, should first prebored hole going between in auxiliary frame, after stuff up a crack terminates, should scrape rough levelling before again check perpendicularity and the flatness of auxiliary frame, indoor and outdoor plaster leveling and external decoration must not exceed auxiliary frame inner plane;
D: keep surrounding gap uniformity during installation, window is pushed to outdoor by indoor, when positioning limiting fixator and fastener are adjacent to, adopt special spanner successively according to clockwise by fastener half-twist, then vertically fastener is strained downwards, laterally strain to the right, locking fastener, by window fixation, then fills in polyurethane foams at gap place, and injecting inner-outer wall fluid sealant, injecting glue is full.
A kind of matching fixing part of auxiliary frame construction installation method, including: body of wall, it is characterized in that: be installed with auxiliary frame on body of wall, body of wall is connected by fixing bolt with auxiliary frame, the medial wall of auxiliary frame is provided with positioning limiting fixator, being connected to window frame in auxiliary frame, the lateral wall of window frame is provided with fastener, fastener is corresponding with positioning limiting fixator.
The invention have the advantage that maintenance surrounding gap uniformity when the present invention installs, window is pushed to outdoor by indoor, when positioning limiting fixator is adjacent to fastener, adopt special spanner successively according to clockwise by fastener half-twist, then vertically fastener is strained downwards, laterally strain to the right, lock fastener, by window fixation.Then fill in polyurethane foams at gap place, and inject inner-outer wall fluid sealant.Realizing doors and windows finished product to install, it is time saving and energy saving to install, simple in construction, cost economy, easy for installation.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is scheme of installation;
Fig. 3 is fastener and the structural representation of positioning limiting fixator connection.
In accompanying drawing:
1: window frame;2: fastener;3: positioning limiting fixator;4: auxiliary frame;5: body of wall;6: fixing bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described with specific embodiment:
A kind of auxiliary frame construction installation method, comprises the following steps:
A: auxiliary frame should be checked dimension of opening and auxiliary frame size, have built-in fitting before installing, should first capturing position, confirm errorless after install again;
B: temporarily fixed on auxiliary frame four limit with timber wedge, adjusts auxiliary frame level, vertical and turnover position further according to control line, adjusts and adopt the fixing auxiliary frame of expansion bolt afterwards, and timber wedge further takes out after stuff up a crack processes, and mends plug waterproof mortar in time;
C: auxiliary frame should adopt expansion bolt to be connected with hole body of wall, expansion bolt can not cause auxiliary frame bending or deformation, installation process should check the vertical of auxiliary frame and flatness at any time, should add in expansion bolt position in the middle of auxiliary frame and wall if desired and fill out backing member and fasten, have the position of lightning protection requirement, should first prebored hole going between in auxiliary frame, after stuff up a crack terminates, should scrape rough levelling before again check perpendicularity and the flatness of auxiliary frame, indoor and outdoor plaster leveling and external decoration must not exceed auxiliary frame inner plane;
D: keep surrounding gap uniformity during installation, window is pushed to outdoor by indoor, when positioning limiting fixator and fastener are adjacent to, adopt special spanner successively according to clockwise by fastener half-twist, then vertically fastener is strained downwards, laterally strain to the right, locking fastener, by window fixation, then fills in polyurethane foams at gap place, and injecting inner-outer wall fluid sealant, injecting glue is full.
A kind of matching fixing part of auxiliary frame construction installation method, as shown in Figure 1, Figure 2, Figure 3 shows, including: body of wall 5, body of wall 5 is installed with auxiliary frame 4, body of wall 5 is connected by fixing bolt 6 with auxiliary frame 4, the medial wall of auxiliary frame 4 is provided with positioning limiting fixator 3, is connected to window frame 1 in auxiliary frame 4, being provided with fastener 2 on the lateral wall of window frame 1, fastener 2 is corresponding with positioning limiting fixator 3.
The method have the benefit that maintenance surrounding gap uniformity when the present invention installs, window is pushed to outdoor by indoor, when positioning limiting fixator is adjacent to fastener, adopt special spanner successively according to clockwise by fastener half-twist, then vertically fastener is strained downwards, laterally strain to the right, lock fastener, by window fixation.Then fill in polyurethane foams at gap place, and inject inner-outer wall fluid sealant.Realizing doors and windows finished product to install, it is time saving and energy saving to install, simple in construction, cost economy, easy for installation.
Embodiment described above is only that the preferred embodiment of the present invention is described; not design and the protection domain of the present invention is defined; under the premise without departing from design concept of the present invention; various modification that in this area, technical scheme is made by ordinary skill technical staff and improvement, all should fall into protection scope of the present invention.

Claims (2)

1. an auxiliary frame construction installation method, comprises the following steps:
A: auxiliary frame should be checked dimension of opening and auxiliary frame size, have built-in fitting before installing, should first capturing position, confirm errorless after install again;
B: temporarily fixed on auxiliary frame four limit with timber wedge, adjusts auxiliary frame level, vertical and turnover position further according to control line, adjusts and adopt the fixing auxiliary frame of expansion bolt afterwards, and timber wedge further takes out after stuff up a crack processes, and mends plug waterproof mortar in time;
C: auxiliary frame should adopt expansion bolt to be connected with hole body of wall, expansion bolt can not cause auxiliary frame bending or deformation, installation process should check the vertical of auxiliary frame and flatness at any time, should add in expansion bolt position in the middle of auxiliary frame and wall if desired and fill out backing member and fasten, have the position of lightning protection requirement, should first prebored hole going between in auxiliary frame, after stuff up a crack terminates, should scrape rough levelling before again check perpendicularity and the flatness of auxiliary frame, indoor and outdoor plaster leveling and external decoration must not exceed auxiliary frame inner plane;
D: keep surrounding gap uniformity during installation, window is pushed to outdoor by indoor, when positioning limiting fixator and fastener are adjacent to, adopt special spanner successively according to clockwise by fastener half-twist, then vertically fastener is strained downwards, laterally strain to the right, locking fastener, by window fixation, then fills in polyurethane foams at gap place, and injecting inner-outer wall fluid sealant, injecting glue is full.
2. the matching fixing part of an auxiliary frame construction installation method, including: body of wall (5), it is characterized in that: body of wall (5) is installed with auxiliary frame (4), body of wall (5) is connected by fixing bolt (6) with auxiliary frame (4), the medial wall of auxiliary frame (4) is provided with positioning limiting fixator (3), being connected to window frame (1) in auxiliary frame (4), the lateral wall of window frame (1) is provided with fastener (2), fastener (2) is corresponding with positioning limiting fixator (3).
CN201410771105.7A 2014-12-15 2014-12-15 Auxiliary frame construction installation method and matching fixing part Expired - Fee Related CN105756477B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410771105.7A CN105756477B (en) 2014-12-15 2014-12-15 Auxiliary frame construction installation method and matching fixing part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410771105.7A CN105756477B (en) 2014-12-15 2014-12-15 Auxiliary frame construction installation method and matching fixing part

Publications (2)

Publication Number Publication Date
CN105756477A true CN105756477A (en) 2016-07-13
CN105756477B CN105756477B (en) 2018-02-06

Family

ID=56336358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410771105.7A Expired - Fee Related CN105756477B (en) 2014-12-15 2014-12-15 Auxiliary frame construction installation method and matching fixing part

Country Status (1)

Country Link
CN (1) CN105756477B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166890A (en) * 2018-02-06 2018-06-15 无锡日兆节能科技有限公司 A kind of door and window auxiliary frame and the mounting structure of door and window outline border
CN114293879A (en) * 2021-12-27 2022-04-08 中国建筑第二工程局有限公司 Rear plug door and window installation node and installation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2646336Y (en) * 2003-10-08 2004-10-06 靳国辉 Door window fixing device
CN101936111A (en) * 2010-08-06 2011-01-05 中国二十二冶集团有限公司 External window construction technology for assembling external window steel subframe by plastic-steel connection corner
CN102409926A (en) * 2011-11-21 2012-04-11 北京米兰之窗节能建材有限公司 Heat preservation doors and windows with conveniently-dismounted attached frames of doors and windows
SE1200291A1 (en) * 2012-05-11 2013-11-12 Joergen Kaerrman Building elements also suitable for industrial construction
CN203783348U (en) * 2014-04-22 2014-08-20 南京鹏迪幕墙工程有限公司 Clamping piece fordoor and window outer frame
CN204476179U (en) * 2014-12-15 2015-07-15 山东天畅环保工程有限公司 Auxiliary frame construction and installation fixture

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2646336Y (en) * 2003-10-08 2004-10-06 靳国辉 Door window fixing device
CN101936111A (en) * 2010-08-06 2011-01-05 中国二十二冶集团有限公司 External window construction technology for assembling external window steel subframe by plastic-steel connection corner
CN102409926A (en) * 2011-11-21 2012-04-11 北京米兰之窗节能建材有限公司 Heat preservation doors and windows with conveniently-dismounted attached frames of doors and windows
SE1200291A1 (en) * 2012-05-11 2013-11-12 Joergen Kaerrman Building elements also suitable for industrial construction
CN203783348U (en) * 2014-04-22 2014-08-20 南京鹏迪幕墙工程有限公司 Clamping piece fordoor and window outer frame
CN204476179U (en) * 2014-12-15 2015-07-15 山东天畅环保工程有限公司 Auxiliary frame construction and installation fixture

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166890A (en) * 2018-02-06 2018-06-15 无锡日兆节能科技有限公司 A kind of door and window auxiliary frame and the mounting structure of door and window outline border
CN108166890B (en) * 2018-02-06 2024-01-02 无锡日兆节能科技有限公司 Mounting structure of door and window auxiliary frame and door and window outer frame
CN114293879A (en) * 2021-12-27 2022-04-08 中国建筑第二工程局有限公司 Rear plug door and window installation node and installation method

Also Published As

Publication number Publication date
CN105756477B (en) 2018-02-06

Similar Documents

Publication Publication Date Title
CN104947944B (en) Channel-section steel is nuzzled in advance the built-in process of concrete component
CA2600050A1 (en) Curtain wall system and method
CN104153485A (en) Outer-wall tongue groove capable of preventing water seepage of window and construction method of outer-wall tongue groove
CN204511159U (en) A kind of integrated overall plastic door and window auxiliary frame
CN109826239B (en) Basement outer wall post-pouring strip structure and construction method thereof
CN107143250A (en) A kind of door and window fixed connection structure and its production installation method
CN103469905A (en) Heat-insulating wall
CN105756477A (en) Auxiliary frame construction installation method and matching fixed part
CN104632007B (en) A kind of erection of doors and windows method using energy-conservation auxiliary frame
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN207003673U (en) A kind of connecting node of beam and wallboard
CN204476179U (en) Auxiliary frame construction and installation fixture
CN202810503U (en) Connection structure of door window frame and wall body
CN205858042U (en) A kind of building window auxiliary frame
CN114439242B (en) Assembly type cantilever complex component optimization and hoisting reinforcement construction method
CN116220510A (en) Sub-frame type outer window seepage-proofing energy-saving installation method
CN105569328A (en) Concealed tie member for external scaffold of curtain wall engineering and construction technology of concealed tie member
CN105756478A (en) Door and window auxiliary frame construction installation method and matching fixing members
CN210396493U (en) Fixing device for aluminum alloy window
CN204476177U (en) Door and window auxiliary frame construction and installation matching fixing part
CN202689813U (en) Door/window structure capable of being mounted quickly and integrally
CN209891256U (en) Basement outer wall post-cast strip structure
CN204081126U (en) A kind of exterior wall tongue and groove preventing window from seeping water
CN207878734U (en) Cement fibrolite plate curtain wall panel supporting connecting system
CN101994454A (en) Installation structure for door and window mounted on wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20181215