CN105756038A - Construction method for composite foundations - Google Patents

Construction method for composite foundations Download PDF

Info

Publication number
CN105756038A
CN105756038A CN201610342850.9A CN201610342850A CN105756038A CN 105756038 A CN105756038 A CN 105756038A CN 201610342850 A CN201610342850 A CN 201610342850A CN 105756038 A CN105756038 A CN 105756038A
Authority
CN
China
Prior art keywords
minor
diameter
pile
steel pipe
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610342850.9A
Other languages
Chinese (zh)
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610342850.9A priority Critical patent/CN105756038A/en
Publication of CN105756038A publication Critical patent/CN105756038A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a construction method for composite foundations.The construction method comprises the steps that firstly, steel pipe sets composed of a plurality of minor-diameter steel pipes aim at pile positions to be sunk into a soil body to a set depth; secondly, the steel pipe sets are elevated while fine concrete is pumped into the minor-diameter steel pipes; thirdly, operation in the second step continues to be conducted until the steel pipe sets are elevated out of the ground, and a set of minor-diameter piles is formed in the foundations; fourthly, operation from the first step to the third step is repeatedly conducted until the foundations of a whole needed field are full of the minor-diameter piles; fifthly, a mattress layer is laid on the tops of the minor-diameter piles, and the composite foundations are formed.According to the construction method, the pile soil displacement area is increased by reducing the pile diameter and increasing the number of the piles, and hole forming, hole extruding and pressing filling are finished at a time; multiple piles can be constructed at a time, the structure is simple, continuity is high, and work efficiency is high.

Description

A kind of construction method of composite foundation
Technical field
The present invention relates to field of civil engineering, particularly relate to the construction method of a kind of composite foundation.
Background technology
In the stiffening basic ground of building, composite foundation be through frequently with construction method.Composite foundation stabilization processes the soil strength referring in ground and deforms the requirement that can not meet upper load, the method to soil reinforcement is taked in order to play the bearing capacity of soil, namely adding stake shared upper load in the soil body, composite foundation construction method conventional at present includes the construction methods such as broken stone pile, CFG stake, cement earth pile.In composite foundation, determining that the key parameter of its bearing capacity size is stake soil area replacement ratio, namely the surface area of the pile body in composite foundation quantity more big, stake is more many, pile spacing is more little, and replacement rate is more high, and the bearing capacity of composite foundation is also more high.But, in order to improve the bearing capacity of ground and the quantity increasing stake simply or add the diameter of timber pile, the adverse effects such as quantities strengthens, construction cost increases, the duration is longer all can be caused undoubtedly.
Summary of the invention
For solving the problems referred to above, the construction method of a kind of composite foundation of the present application, the steps include:
1) the steel pipe align piles position being made up of several minor-diameter steel-tubes, by the mode of one or more combinations in vibration, hammering, static pressure, sinks to steel pipe in the soil body, until set depth;
2) while pumping fine concrete in steel pipe medium-small diameter steel pipe, it is lifted up steel pipe;
3) continuation steps 2) operation, until steel pipe is proposed earth's surface, ground forms one group of Small Diameter Pile;
4) repeat the above steps 1) to the operation of step 3), until the ground in whole required place is covered with Small Diameter Pile;
5) mattress layer, form compound foundation are laid on Small Diameter Pile top.
In above-mentioned construction method, the above-mentioned steel pipe being made up of several minor-diameter steel-tubes, the quantity of this minor-diameter steel-tube is 2~9, diameter is 50~300mm, the bottom of minor-diameter steel-tube adopts flapper pile tip or precast pile tip closure, top is connected by feeding chamber and is fixed as one, and the inner chamber of feeding chamber and the inner space of minor-diameter steel-tube, feeding chamber is connected with high-pressure pump by conveying pipeline.
In above-mentioned construction method, above-mentioned fine concrete, is that one or several mix and stir and form by cement and water and sand, soil, flyash, fine grained rubble, concrete admixture.
In above-mentioned construction method, being covered with Small Diameter Pile in above-mentioned ground, whole pile spacings between Small Diameter Pile is equal.
Feature and the advantage of the construction method of the composite foundation of the application are in that: 1. the quantity of the diameter and increase stake by reducing stake improves stake soil replacement rate, when the amount of concrete identical with common CFG stake employing, its lateral area increases by 100~150%, and foundation bearing capacity improves 80~150%.Although it is higher that the quantity increase of 2. stake, the many Small Diameter Pile but employing steel pipe mode once can be constructed, and the pore-forming of Small Diameter Pile compare the work efficiency such as larger-diameter CFG stake with filling process.3. whole work progress does not all fetch earth, and adopts soil compaction method by compacted for the former stake holes place soil body, namely avoids the operation of clear soil outward transport, significantly improves again side friction and the inter-pile soil bearing capacity of pile body.4. disposable completing pore-forming, squeezed and guncreting multiple working procedure, simple in construction, seriality are strong, work efficiency is higher.
Accompanying drawing explanation
Fig. 1 is the process chart of an embodiment of the composite foundation construction method of the present invention;
Fig. 2 is transverse direction and the vertical cross section schematic diagram of multiple combination examples of the steel pipe adopted in the present invention;
Fig. 3 is the schematic diagram of the composite foundation after adopting the construction method of the present invention to process.
Detailed description of the invention
Fig. 1 is the process chart of an embodiment of the composite foundation construction method of the present invention, first, in Fig. 1 shown in a, the steel pipe 1 align piles position being made up of four minor-diameter steel-tubes, sink in the soil body, in steel pipe 1, the bottom of every minor-diameter steel-tube is flapper pile tip, and the top of steel pipe 1 is provided with feeding chamber 2 and connects with every minor-diameter steel-tube, and feeding chamber 2 connects with outside high-pressure pump;Then, in Fig. 1 shown in b, will be sunk in the soil body to by steel pipe 1 by the mode of static pressure, until set depth;Then, in Fig. 1 shown in c, pumping fine concrete 3 in feeding chamber 2, fine concrete 3 is poured into bottom stake holes by minor-diameter steel-tube inner chamber pressing bottom minor-diameter steel-tube, while being lifted up steel pipe 1;Then, in Fig. 1 shown in d, be performed continuously over step 2) pump concrete and lift up operation, until steel pipe 1 is proposed earth's surface, in ground formed four Small Diameter Pile 4;Then, in Fig. 1 shown in e, repeat the above steps 1) to the operation of step 3), until the ground in whole required place is covered with Small Diameter Pile;Finally, in Fig. 1 shown in f, lay mattress layer 5, form compound foundation on Small Diameter Pile top.
Fig. 2 is transverse direction and the vertical cross section schematic diagram of multiple combination examples of the steel pipe adopted in the present invention, as in figure 2 it is shown, 2-1 is three minor-diameter steel-tubes, 2-2 is four minor-diameter steel-tubes, 2-3 is five minor-diameter steel-tubes, and 2-4 is six roots of sensation minor-diameter steel-tube, and 2-5 is nine minor-diameter steel-tubes.
Fig. 3 is the schematic diagram of the composite foundation after adopting the construction method of the present invention to process, as it is shown on figure 3, be covered with Small Diameter Pile 4 in ground, whole pile spacings between Small Diameter Pile 4 is equal, and mattress layer 5 is all laid on the stake top of Small Diameter Pile 4.

Claims (4)

1. a construction method for composite foundation, the method comprises the steps:
1) the steel pipe align piles position being made up of several minor-diameter steel-tubes, by the mode of one or more combinations in vibration, hammering, static pressure, sinks to steel pipe in the soil body, until set depth;
2) while pumping fine concrete in the minor-diameter steel-tube in steel pipe, it is lifted up steel pipe;
3) continuation steps 2) operation, until steel pipe is proposed earth's surface, ground forms one group of Small Diameter Pile;
4) repeat the above steps 1) to the operation of step 3), until the ground in whole required place is covered with Small Diameter Pile;
5) mattress layer, form compound foundation are laid on Small Diameter Pile top.
2. construction method as claimed in claim 1, it is characterized in that, the steel pipe being made up of several minor-diameter steel-tubes described in step 1), the quantity of this minor-diameter steel-tube is 2~9, diameter is 50~300mm, and the bottom of minor-diameter steel-tube adopts flapper pile tip or precast pile tip closure, and top is fixed as one by feeding chamber connection, the inner chamber of feeding chamber and the inner space of minor-diameter steel-tube, feeding chamber is connected with high-pressure pump by conveying pipeline.
3. construction method according to claim 1, it is characterised in that step 2) described in fine concrete, be that one or several mix and stir and form by cement and water and sand, soil, flyash, fine grained rubble, concrete admixture.
4. construction method according to claim 1, it is characterised in that being covered with Small Diameter Pile in the ground described in step 4), whole pile spacings between Small Diameter Pile is equal.
CN201610342850.9A 2016-05-23 2016-05-23 Construction method for composite foundations Pending CN105756038A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610342850.9A CN105756038A (en) 2016-05-23 2016-05-23 Construction method for composite foundations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610342850.9A CN105756038A (en) 2016-05-23 2016-05-23 Construction method for composite foundations

Publications (1)

Publication Number Publication Date
CN105756038A true CN105756038A (en) 2016-07-13

Family

ID=56324347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610342850.9A Pending CN105756038A (en) 2016-05-23 2016-05-23 Construction method for composite foundations

Country Status (1)

Country Link
CN (1) CN105756038A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0543320A1 (en) * 1991-11-22 1993-05-26 Vibroflotation Ag Device for producing concrete piles in the ground
EP0474070B1 (en) * 1990-08-31 1994-11-30 Vibroflotation Ag Method and device for the insertion of a narrow partition or subterraneous curtain in the earth
PL182270B1 (en) * 1996-12-31 2001-12-31 Politechnika Swietokrzyska Method of in situ making a micropile directly in the ground
CN102182176A (en) * 2010-12-20 2011-09-14 陈健雄 Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof
CN102943466A (en) * 2012-11-14 2013-02-27 中铁十二局集团有限公司 Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN104480956A (en) * 2014-10-31 2015-04-01 上海市政工程设计研究总院(集团)有限公司 Small-diameter mold-bagged concrete pile composite foundation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0474070B1 (en) * 1990-08-31 1994-11-30 Vibroflotation Ag Method and device for the insertion of a narrow partition or subterraneous curtain in the earth
EP0543320A1 (en) * 1991-11-22 1993-05-26 Vibroflotation Ag Device for producing concrete piles in the ground
PL182270B1 (en) * 1996-12-31 2001-12-31 Politechnika Swietokrzyska Method of in situ making a micropile directly in the ground
CN102182176A (en) * 2010-12-20 2011-09-14 陈健雄 Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof
CN102943466A (en) * 2012-11-14 2013-02-27 中铁十二局集团有限公司 Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN104480956A (en) * 2014-10-31 2015-04-01 上海市政工程设计研究总院(集团)有限公司 Small-diameter mold-bagged concrete pile composite foundation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹宏军: "微型沉管灌注素砼桩复合地基设计及其优化的探讨", 《科技资讯》 *

Similar Documents

Publication Publication Date Title
CN102071693B (en) Construction method of variable section cement-soil gravity type retaining wall
JP5243669B1 (en) Method of tilting structure and improving ground
CN108547336B (en) Sedimentation, reinforcement, jacking and leveling method suitable for independent pile foundation of industrial plant
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN110965595B (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN102900079A (en) High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile
CN103741670A (en) Negative skin friction (NSF) removing foundation treatment method
CN104060601B (en) The construction method of utilizing precast construction stake pile foundation to carry out ground processing
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN101200888A (en) Construction method of composite foundation
CN105401571A (en) Precast post-grouting special-shaped root pile and construction method thereof
JP3126896B2 (en) Restoration method for uneven settlement structures
CN103195060A (en) Soft foundation pre-stressed anchor rod reinforced structure and use thereof
CN102251514A (en) Multi-section type variable cross-section dynamic compaction method
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN105804045A (en) Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method
CN105113492A (en) Construction method of composite pile applicable to cohesive soil, sandy soil and muddy soil foundations
CN105386462A (en) Integral construction type small and medium-sized basement and construction method thereof
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
CN111005359A (en) Anti-collapse hole foundation reinforcing structure for building engineering construction and reinforcing method thereof
CN105756038A (en) Construction method for composite foundations
CN214362633U (en) Structure for preventing car ramp from settling too much in soft soil foundation
CN104294817B (en) The construction method of concrete-pile
CN104153356B (en) The constructing device of concrete-pile and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160713

WD01 Invention patent application deemed withdrawn after publication