CN105650603B CN201610156626.0A CN201610156626A CN105650603B CN 105650603 B CN105650603 B CN 105650603B CN 201610156626 A CN201610156626 A CN 201610156626A CN 105650603 B CN105650603 B CN 105650603B
Authority
CN
China
Prior art keywords
pedestal
conduit
upright bar
ground
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610156626.0A
Other languages
Chinese (zh)
Other versions
CN105650603A (en
Inventor
张福明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Langtelong Photoelectric Co Ltd
Original Assignee
Zhejiang Langtelong Photoelectric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Langtelong Photoelectric Co Ltd filed Critical Zhejiang Langtelong Photoelectric Co Ltd
Priority to CN201610156626.0A priority Critical patent/CN105650603B/en
Publication of CN105650603A publication Critical patent/CN105650603A/en
Priority to PCT/CN2017/076406 priority patent/WO2017157256A1/en
Application granted granted Critical
Publication of CN105650603B publication Critical patent/CN105650603B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V17/00Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages
    • F21V17/10Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V21/00Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
    • F21V21/10Pendants, arms, or standards; Fixing lighting devices to pendants, arms, or standards
    • F21V21/108Arms

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Supports For Pipes And Cables (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention relates to a kind of ground to install upright bar fixator, including pedestal, the above conduit there are three setting on pedestal, after pedestal is installed on ground, the angle on conduit and ground is acute angle, support rod passes through conduit and is inserted into underground, it is characterized in that, the pedestal is equipped with connecting plate and bindiny mechanism, connecting plate is fixed as one with upright bar, connecting plate is hinged with pedestal, and bindiny mechanism is used to connected with pedestal turning to above pedestal and be pressed in the connecting plate on pedestal.Connecting plate of the present invention is fixed as one with upright bar, connecting plate is hinged with pedestal, and when installation first fixes pedestal on the ground, then upright bar is lifted help it is straight, connecting plate and pedestal are linked together with bindiny mechanism again, upright bar is installed very quick and easy without positioning, entire upright bar without lifting, it only needs a people, can be completed in half an hour, installation effectiveness greatly improves, and saves a large amount of manpower and material resources, and the installation for being particularly suitable for long upright bar is fixed.

Description

Ground is installed by upright bar fixator
Technical field
The present invention relates to ground surface mount technology field, upright bar fixator is installed on especially a kind of ground.
Background technique
Ground is installed carries out installation fixation on the ground, and ground installation includes street lamp installation, flagpole setting, puts up a shed, is red Green light installation, guideboard installation, billboard installation etc..
With the development of solar photovoltaic technology and LED lighting technology, the installation of matched street lamp post is also therewith Upgrade into revolution, pursue material it is light while, mounting means must also be sought simpler, more on the basis of safety Economic change.In early stage, or even instantly, all it is the rectangular hole to dig nearly meter Shen, a 60x60cm or so, reinforcing bar is bundled into Keel are placed in hole, fill mixed mud later to ground level, are stayed and are completed lamp stand installation there are four stud and lamp stand method column are fixed, It installs front and back and needs at least 3-5 days time, and Master Cost few then fifty, more then to cross thousand, manpower financial capacity's formation very billow Take.Traffic lights installation, guideboard installation, billboard installation etc. there is also it is the same with street lamp installation time-consuming, take manually and material, Inconvenient problem.
Application No. is 201620067886.6 utility applications to propose a kind of ground installation bottom by the applicant Seat fixator, including retainer body, the upper end center of retainer body are equipped with mounting groove, and mounting groove is inserted into upright bar In, bindiny mechanism is fixed on upright bar in retainer body, and retainer body is equipped at least two shoulder protector conduits, shoulder protector conduit In the outside of the mounting groove, after on ground, mounting seat fixator is installed on ground, the angle on shoulder protector conduit and ground is Acute angle, support rod pass through shoulder protector conduit and are inserted into underground.The ground mounting seat fixator is led using support rod across shoulder protector It manages and gets off to fix on the ground with being inserted into, upright bar and retainer body split settings, when installation need upright bar first to place In the mounting groove of retainer body, then connected again by bindiny mechanism, it is especially long for the long upright bar of length Degree is long and the upright bar of weight weight, and when installation is not easy to place it in the mounting groove of retainer body, upright bar and fixator It is unreliable that difficult and connection is connected between ontology, is installed troublesome and time-consuming and laborious.
Summary of the invention
It is an object of the present invention to propose that one kind is suitable for installing long upright bar and the simple ground installation upright bar of installation is fixed Device.
To achieve the goals above, the present invention provides a kind of ground to install upright bar fixator, including pedestal, sets on pedestal There are three the above conduits, and after pedestal is installed on ground, the angle on conduit and ground is acute angle, and support rod passes through conduit and inserts Enter to underground, which is characterized in that the pedestal is equipped with connecting plate and bindiny mechanism, and connecting plate is fixed as one with upright bar, even Fishplate bar is hinged with pedestal, and bindiny mechanism is used to connect one with pedestal turning to above pedestal and be pressed in the connecting plate on pedestal It rises.
Upright bar fixator is installed on ground provided by the invention, and connecting plate is fixed as one with upright bar, and connecting plate and pedestal are cut with scissors Connect, when installation, first fixes pedestal on the ground, then upright bar is lifted help it is straight, then with bindiny mechanism connecting plate and pedestal company It is connected together, upright bar is not necessarily to positioning, and without lifting, installation is very quick and easy for entire upright bar, only needs a people, is in half an hour Achievable, installation effectiveness greatly improves, and saves a large amount of manpower and material resources, and the installation for being particularly suitable for long upright bar is fixed.
Further, the bindiny mechanism includes threaded rod, nut and connecting hole, and threaded rod is set on the base, nut With shaft, connecting hole is the through-hole being arranged on connecting plate, when connecting plate turns to above pedestal and is pressed on pedestal, Threaded rod passes through the connecting hole, and nut, which is screwed on threaded rod, links together connecting plate and pedestal compression.Bindiny mechanism's knot Structure is simple, and installing and dismounting is all easy to, and connects reliable.
Further, the conduit runs through pedestal in the chassis interior, tilts down and prolongs from pedestal to chassis outer side It stretches.When support rod passes through conduit and is inserted into underground pedestal is fixed on the ground, pedestal be subject to along landing ground direction Component is easy to obtain stress balance, the ground fixation of pedestal is more firm to chassis outer side.It is installed on ground in pedestal Afterwards, the conduit is identical as the angle on ground, the setting of multiple conduits with the equidistant position of the base center.It is the multiple to lead The positional relationship of pipe is that one of conduit is made point angles such as 360 degree of conduit quantity around the central axis of the pedestal and rotated It is overlapped afterwards with adjacent conduit.Stress, which is easier to obtain, after pedestal is fixed balances, is fixed more firm.
Detailed description of the invention
Fig. 1 is that ground installation upright bar fixator is in connecting plate and pedestal not yet connects the perspective view of state;
Fig. 2 is that ground installation upright bar fixator is in the perspective view that connecting plate has connected state together with pedestal;
The ground that Fig. 3 is Fig. 2 is installed by upright bar fixator top view.
The present invention is described in further detail below in conjunction with the accompanying drawings.
Specific embodiment
Referring to Fig. 1 to Fig. 3, it includes pedestal 1, connecting plate 2 and upright bar 3 that upright bar fixator is installed on ground.1 global approximation of pedestal Cubic column construction, bottom surface and top surface are smooth plane, are respectively provided with a conduit 11 at four angles, conduit 11 exists Run through pedestal 1 inside pedestal 1, extension is tilted down from pedestal 1 to chassis outer side, conduit 11 and the bottom surface of pedestal 1 and top surface are equal Acute angle is formed, the both ends of conduit 11 can be flushed with the bottom surface of pedestal 1 and top surface, can also stretch out the bottom surface and top of pedestal 1 respectively Face.When installation, pedestal 1 is placed on the ground, and bottom surface and ground face contact, support rod (not shown) pass through conduit 11 and inserts Enter to underground, the relatively hightension formed behind underground is inserted by support rod, pedestal 1 is securely seated between on ground.Conduit 11 It is mainly used to guide support rod and position, position has determined the position of support rod.The bottom surface and top surface of pedestal 1 can be with It is not plane, as long as the angle on conduit 11 and ground is that acute angle can make support rod obtain foot after pedestal 1 is installed on ground Enough strength carrys out firm banking.
Referring to Fig. 3, four conduits 11 be arranged in the equidistant position in the center of pedestal 1, form phase with the bottom surface of pedestal 1 Same angle, after pedestal 1 is installed on ground, four conduits 11 and ground angle are just as any one conduit 11 is the bottom of around The central axis of seat 1 is overlapped after making 90 degree of rotations with adjacent conduit 11.Support rod passes through conduit and is inserted into underground for pedestal Fixed, pedestal is equal in magnitude in the component that ground direction is subject to, and direction is easy to obtain stress balance two-by-two on the contrary, cancel out each other, It will not be rolled tiltedly to a certain, the ground fixation of pedestal is more firm.In Fig. 3, the conduit 11 in the lower left corner prolongs to the left side of pedestal 1 It stretches, the conduit 11 in the upper right corner extends to the right side of pedestal 1, and the conduit 11 in the upper left corner extends to the upside of pedestal 1, and the lower right corner is led Pipe 11 extends to the downside of pedestal 1, the conduit in the lower left corner and the conduit in the upper right corner be subject to along paper direction, (pedestal is installed to ground For along ground direction after on face) component be respectively that the left and to the right, direction equal in magnitude is completely on the contrary, cancel out each other;Upper left The component along paper direction that the conduit at angle and the conduit in the lower right corner are subject to is respectively up and down that direction equal in magnitude is also complete Complete on the contrary, cancelling out each other, such pedestal is easy to acquirement stress balance, and ground fixation is more firm.The angle of conduit and ground Preferably 25-30 °, it is bigger that support rod is inserted into the tension formed behind underground.
Conduit 11 is not limited to four, can be three or more, and the positional relationship of multiple conduits is that one of conduit is the bottom of around The central axis of seat is made to be overlapped after 360 degree of conduit quantity etc. divides angle to rotate with adjacent conduit.If conduit is three, one Conduit is overlapped after 120 degree of rotations of central axis work of pedestal with adjacent conduit;If conduit is five, a conduit is the bottom of around The central axis of seat is overlapped after making 72 degree of rotations with adjacent conduit;In the present embodiment, conduit is four, then a conduit around The central axis of pedestal is overlapped after making 90 degree of rotations with adjacent conduit.
Connecting plate 2 is the steel plate of square, and upright bar 3 is hollow circular steel pipe, connecting plate 2 and upright bar 3 by being welded and fixed It is integrated.Connecting plate 2 has shaft 21, and shaft 21 is rotatably installed on pedestal 1, and connecting plate 2 passes through shaft 21 and pedestal 1 Hingedly, it can be rotated relative to pedestal 1.Upright bar 3 is fixed on the center of connecting plate 2, the central axis of center axis thereof and connecting plate 2 Line is overlapped.Upright bar and connecting plate are also possible to integrally formed.
Pedestal 1 is equipped with bindiny mechanism, for the connecting plate 2 and pedestal for turning to 1 top of pedestal and being pressed on pedestal 1 1 connects.Bindiny mechanism includes threaded rod 41, connecting hole 42 and nut 43, and threaded rod 41 is arranged on the top surface of pedestal 1, Nut 43 and threaded rod 41 cooperate, and connecting hole 42 is the through-hole for the kidney-shaped being arranged on connecting plate 2, and connecting plate 2 turns to pedestal 1 Top and when being pressed on pedestal 1, threaded rod 41 passes through connecting hole 42, and nut 43 is screwed on threaded rod 41 connecting plate 2 and pedestal 1 Compression links together.Bindiny mechanism is four, and four threaded rods 41 of four bindiny mechanisms are evenly distributed on pedestal 1 in On the circumference of mandrel line, in the position than conduit 11 closer to 1 center of pedestal, connecting hole 42 is in the outside of upright bar 3, when connection machine After structure connects pedestal 1 and connecting plate 2 (as shown in Figures 2 and 3), the central axis of upright bar 3 and the central axis of pedestal 1 It is overlapped.After entire ground installation upright bar fixator fixes on the ground, whole stress is more balanced, it is not easy to generate skew, incline , fixation is more firm.
When installation, smooth processing is slightly done on ground, and first pedestal 1 is placed on the ground, and support rod passes through the conduit on pedestal 11, and be driven underground with tool, pedestal is fixed on the ground, by lamp installation in the upper end of upright bar, lift upright bar 3 make its with Shaft 21 on connecting plate is the rotation of axis fulcrum, and the threaded post 41 on pedestal imbeds in the connecting hole 42 of connecting plate 2, continues to lift Upright bar 3, until upright bar is turned to above pedestal and is pressed on pedestal, threaded post 41 stretches out connecting hole 42, and nut 43 is screwed in screw thread It locks, connecting plate 2 and the compression of pedestal 1 is linked together, state is as shown in Figures 2 and 3 on bar 41.This completes roads The installation of lamp, upright bar are not necessarily to positioning, and without lifting, installation is very quick and easy for entire upright bar, only needs a people, is in half an hour Achievable, installation effectiveness greatly improves, and saves a large amount of manpower and material resources, and the installation for being particularly suitable for long upright bar is fixed.This hair It is bright to be also adapted to installation traffic light, guideboard, flag etc..

Claims (7)

1. upright bar fixator is installed on ground, including pedestal, set that there are three the above conduits on pedestal, is installed on ground in pedestal Afterwards, conduit and the angle on ground are acute angle, and support rod passes through conduit and is inserted into underground, which is characterized in that sets on the pedestal There are connecting plate and bindiny mechanism, connecting plate is fixed as one with upright bar, and connecting plate is hinged with pedestal, and bindiny mechanism is used for rotation To above pedestal and being pressed in the connecting plate on pedestal and connecting with pedestal, the bindiny mechanism includes threaded rod, nut and company Hole is connect, threaded rod is set on the base, nut and shaft, and connecting hole is the through-hole being arranged on connecting plate, connecting plate When turning to above pedestal and being pressed on pedestal, threaded rod passes through the connecting hole, nut be screwed on threaded rod connecting plate with Pedestal compression links together, and the conduit runs through pedestal in the chassis interior, tilts down and prolongs from pedestal to chassis outer side Stretch, after pedestal is installed on ground, the conduit is identical as the angle on ground, conduit setting with the base center Equidistant position.
2. upright bar fixator is installed on ground according to claim 1, which is characterized in that the positional relationship of the conduit is, One of conduit around the central axis of the pedestal make 360 degree conduit quantity etc. divide after angle rotation with adjacent conduit weight It closes.
3. upright bar fixator is installed on ground according to claim 2, which is characterized in that the threaded rod is arranged than described Conduit is closer to the position of base center.
4. upright bar fixator is installed on ground according to claim 3, which is characterized in that the bindiny mechanism be it is multiple, it is more The threaded rod of a bindiny mechanism is evenly arranged on the pedestal on the circumference of central axis, and the connecting hole is in the outer of the upright bar Side.
5. upright bar fixator is installed on ground according to claim 4, which is characterized in that the conduit is four, wherein one A conduit is overlapped after 90 degree of rotations of central axis work of the pedestal with adjacent conduit.
6. upright bar fixator is installed on ground according to claim 5, which is characterized in that be installed on ground in the pedestal Afterwards, the conduit and the angle on ground are 25-30 °.
7. upright bar fixator is installed on ground according to claim 6, which is characterized in that when the bindiny mechanism is the bottom After seat and connecting plate connect, the central axis of the upright bar is overlapped with the central axis of the pedestal.
CN201610156626.0A 2016-03-18 2016-03-18 Ground is installed by upright bar fixator Expired - Fee Related CN105650603B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610156626.0A CN105650603B (en) 2016-03-18 2016-03-18 Ground is installed by upright bar fixator
PCT/CN2017/076406 WO2017157256A1 (en) 2016-03-18 2017-03-13 Ground-installed, vertical rod fixing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610156626.0A CN105650603B (en) 2016-03-18 2016-03-18 Ground is installed by upright bar fixator

Publications (2)

Publication Number Publication Date
CN105650603A CN105650603A (en) 2016-06-08
CN105650603B true CN105650603B (en) 2019-04-26

Family

ID=56494678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610156626.0A Expired - Fee Related CN105650603B (en) 2016-03-18 2016-03-18 Ground is installed by upright bar fixator

Country Status (2)

Country Link
CN (1) CN105650603B (en)
WO (1) WO2017157256A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105650603B (en) * 2016-03-18 2019-04-26 浙江朗特隆光电有限公司 Ground is installed by upright bar fixator
EP3936832A4 (en) 2019-03-20 2022-05-25 Autel Intelligent Technology Corp., Ltd. Calibration support
CN112856344B (en) * 2021-01-21 2022-10-21 浙江宸际照明科技有限公司 Installation method of intelligent street lamp
CN113063662B (en) * 2021-03-16 2023-07-14 沧州市建设工程质量服务中心 Steel pipe concrete creep testing device considering initial stress of steel pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4079555A (en) * 1977-01-31 1978-03-21 The Raymond Lee Organization, Inc. Automatic color guard flagpole
CN201003303Y (en) * 2007-01-19 2008-01-09 李新社 Safe flagpole
CN201460380U (en) * 2009-06-26 2010-05-12 华东师范大学附属杨行中学 Flagpole capable of being laid down
CN204328811U (en) * 2014-10-16 2015-05-13 吕柯南 A kind of intelligent energy-saving solar street light
CN205560638U (en) * 2016-03-18 2016-09-07 嘉兴市朗特隆光电有限公司 Ground installation pole setting fixer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004157491A (en) * 2002-11-06 2004-06-03 Kojiro Harima Housing type flag hoisting tool
WO2008046145A1 (en) * 2006-10-18 2008-04-24 Goodcart Pty Ltd Pole assembly and mounting thereof
CN105650603B (en) * 2016-03-18 2019-04-26 浙江朗特隆光电有限公司 Ground is installed by upright bar fixator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4079555A (en) * 1977-01-31 1978-03-21 The Raymond Lee Organization, Inc. Automatic color guard flagpole
CN201003303Y (en) * 2007-01-19 2008-01-09 李新社 Safe flagpole
CN201460380U (en) * 2009-06-26 2010-05-12 华东师范大学附属杨行中学 Flagpole capable of being laid down
CN204328811U (en) * 2014-10-16 2015-05-13 吕柯南 A kind of intelligent energy-saving solar street light
CN205560638U (en) * 2016-03-18 2016-09-07 嘉兴市朗特隆光电有限公司 Ground installation pole setting fixer

Also Published As

Publication number Publication date
WO2017157256A1 (en) 2017-09-21
CN105650603A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105650603B (en) Ground is installed by upright bar fixator
CN108397755A (en) A kind of municipal road lamp installation auxiliary device
CN106426541B (en) Precast beam reinforced bar binding tire film and precast beam reinforced bar construction technology
CN205560638U (en) Ground installation pole setting fixer
CN104459922B (en) Lower sheave autocollimation device and alignment method
CN204463728U (en) Spherical display screen
CN209412879U (en) Assembled ballast box for engineering pile foundation detection ballast platform
CN209636968U (en) A kind of full tensioning intersection Cable Truss Structure of no inner ring
CN106195840A (en) A kind of street lamp pole base station
CN107288918A (en) A kind of water pump mounting bracket
CN101261125A (en) Large-sized rotating curved face foundation surface calibration method and apparatus
CN218241206U (en) Safety warning sign for construction
KR101542013B1 (en) Easy installation security and street holding a folding structure rotation
CN206724023U (en) A kind of municipal road lamp for being easily installed billboard
Cook et al. Evaluation of dual cable signal support systems with pivotal hanger assemblies
CN205636587U (en) Articulated formula rail guard equipment of use easy to assemble
CN206093785U (en) Light pole basic station
CN205531609U (en) Ground installation base fixer
CN207714899U (en) A kind of foldable safe fence of aluminium profiles
CN103967232B (en) Suspension spiral ramp
CN208603584U (en) A kind of concrete duct handling apparatus
CN215482503U (en) Highway bridge construction foundation ditch protector
CN206319333U (en) The basic built-in fitting of combination assembled lamp stand
CN206220624U (en) The helicopter servicing unit of extra-high voltage wine glass tower tower head
CN207425284U (en) Catch-phrase stent

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 314100 Zhenxing Road 519, Jiaxing City, Zhejiang Province

Applicant after: ZHEJIANG RANTOON PHOTOELECTRIC CO.,LTD.

Address before: 314100 Zhenxing Road 519, Jiaxing City, Zhejiang Province

Applicant before: JIAXING RANTOON PHOTOELECTRIC Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190426

CF01 Termination of patent right due to non-payment of annual fee