CN105649197A - Post-pouring belt construction method conducted under green-landscape-first condition - Google Patents

Post-pouring belt construction method conducted under green-landscape-first condition Download PDF

Info

Publication number
CN105649197A
CN105649197A CN201610066009.1A CN201610066009A CN105649197A CN 105649197 A CN105649197 A CN 105649197A CN 201610066009 A CN201610066009 A CN 201610066009A CN 105649197 A CN105649197 A CN 105649197A
Authority
CN
China
Prior art keywords
post
cast strip
top board
concrete
corrugated tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610066009.1A
Other languages
Chinese (zh)
Other versions
CN105649197B (en
Inventor
郭护
邹厚存
焦其贵
倪亚星
徐斌
王林国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YANGJIAN GROUP CO Ltd
Original Assignee
JIANGSU YANGJIAN GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU YANGJIAN GROUP CO Ltd filed Critical JIANGSU YANGJIAN GROUP CO Ltd
Priority to CN201610066009.1A priority Critical patent/CN105649197B/en
Publication of CN105649197A publication Critical patent/CN105649197A/en
Application granted granted Critical
Publication of CN105649197B publication Critical patent/CN105649197B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a post-pouring belt construction method conducted under the green-landscape-first condition. The post-pouring belt construction method includes the steps that in order to meet the requirements that the upper portions of roofs of basements between constructed-community high-rise buildings are backfilled with soil in advance and landscape greening is firstly constructed, shape steel supports are adopted on the two sides of post-pouring belts of the roofs of the basements in advance for system reinforcing, and the reinforced-concrete-cover-plate cast-in-place method and the corrugated pipe embedding method are adopted above the non-sealed post-pouring belts of the roofs to first temporarily seal the post-pouring belts of the roofs; after landscape greening is completed and a body structure is sealed, corrugated pipes reserved at the upper portions of the post-pouring belts of the roofs are used as concrete-pouring discharging guide pipes and used for vibrating, and the post-pouring belts of the roofs are subjected to later-period concrete pouring and sealing. According to the post-pouring belt construction method, the requirements that the roofs of the basements are backfilled with soil in advance and landscape greening is firstly constructed are guaranteed with low cost, the ideas that outdoor overall construction is completed in advance and follow-up construction of high-rise buildings is smooth are achieved, and the post-pouring belt construction method becomes a new highlight of high-rise building construction.

Description

Afforestation Landscape rear pouring tape construction method under antecedent condition
Technical field
The present invention relates to a kind of Afforestation Landscape rear pouring tape construction method under antecedent condition, belong to technical field of building construction.
Background technology
In today that urban construction develops rapidly, construction unit is usually in order to build construction area environment in advance, the sale of building is promoted with this, in skyscraper main structure construction process, before the closure of high-rise periphery post-cast strip is built, backfill soil is carried out in advance on basement roof, the construction of Afforestation Landscape, its construction and open hour in advance build the time in post-cast strip designing requirement far away, therefore in order to ensure the pouring quality of Afforestation Landscape basement roof structural safety under leading condition of construction and later stage post-cast strip, it it is a technical barrier in the realm of building construction.
Summary of the invention
The purpose of patent of the present invention is for an above-mentioned practical construction technology difficult problem, provides a kind of and high-rise periphery post-cast strip adopts interim closing, later stage in advance build the concrete Afforestation Landscape in post-cast strip rear pouring tape construction method under antecedent condition.
It is an object of the invention to be achieved through the following technical solutions: a kind of Afforestation Landscape rear pouring tape construction method under antecedent condition, it is characterized in that, comprise the following steps:
Step 1, after basement roof template framed bent is set up, at the bottom plate rear pouring tape both sides arranged type bracing members of the top board post-cast strip of basement and basement; Basement roof is carried out concreting, and after basement roof concreting, when intensity reaches template framed bent detachable condition, room roof plate template framed bent, only conservative bracing members are descended in disposable dismounting fully;
Before step 2, Afforestation Landscape region basement roof do waterproof and backfill soil, retaining wall is built by laying bricks or stones in the both sides, top board post-cast strip not blocked, top, top board post-cast strip arranges cast-in-place concrete cover plate, vertical pre-buried corrugated tube on cast-in-place concrete cover plate, and by closing suitable for reading for pre-buried corrugated tube;
Step 3, set up the template bent frame system at position, top board post-cast strip;
After step 4, Afforestation Landscape complete, open suitable for reading for the pre-buried corrugated tube of closure, by the corrugated tube that top, top board post-cast strip is reserved, as the use of top board post-cast strip (11) casting concrete blanking conduit and the mouth that vibrates, top board post-cast strip casting concrete is closed;
Step 5, bottom plate rear pouring tape is carried out casting concrete;
Step 6, wait that building complete top board post-cast strip concrete strength reaches 100%, the template bent frame system of top board post-cast strip is removed, and the type steel support that top board post-cast strip, bottom plate rear pouring tape both sides are arranged in advance is cut off, it is finally completed Afforestation Landscape post-cast strip after-construction method under antecedent condition.
In described step 1, before basement bottom board armored concrete is built or before initial set, shifting to an earlier date pre-buried pre-embedded steel slab on the basement bottom board surface of both sides, post-cast strip, it is simple to be welded and fixed with pre-embedded steel slab on the downside of type steel support, pre-embedded steel slab is arranged at distance bottom plate rear pouring tape dual-side 200mm place;
Shifting to an earlier date pre-buried termination steel plate on basement roof roof plate template reserved opening, termination steel plate is arranged at distance dual-side 200mm place, top board post-cast strip; Before concrete roof is built, it is connected fixing with the pre-buried termination Plate Welding of basement roof on the upside of type steel support;
Pre-buried termination steel plate part at basement roof is elongated arranges dark beam, together builds with basement roof, processes as to the roof reinforcement of both sides, post-cast strip.
In described step 2, the height of retaining wall is between 100��200mm, closely knit to guarantee later stage top board post-cast strip casting and compacting of concrete;
When concrete cover template construction, the top of top board post-cast strip (11) structural beams position be must be provided with installing the reserving hole of corrugated tube, and strictly control corrugated tube position and the reserving hole location pre-set and consistent size; To corrugated tube lower nozzle card groove location, cover plate reinforcing bar is adopted to carry out the fixing after-pouring cover plate concrete of colligation;
In backfilling of earthwork process, on-the-spot earth and foreign material are forbidden to fall in corrugated tube and top board post-cast strip, the employing tying suitable for reading closure of corrugated tube.
In described step 4, after Afforestation Landscape has been constructed, by the time requirement of design code, top board post-cast strip concrete is built, specifically includes following steps:
1) set up at the bottom template framed bent of top board post-cast strip, downside, top board post-cast strip has been carried out secondary dabbing cleaning, and with after giant flushing, carries out bed die closure;
2) open corrugated tube upper seal, corrugated tube inwall is rinsed moistening again;
3) utilizing corrugated tube as casting concrete blanking conduit and the mouth that vibrates, top board post-cast strip is carried out casting concrete, it builds thickness must be suitable for reading only to corrugated tube.
In described step 6, when top board post-cast strip intensity reaches 100%, first remove top board post-cast strip formwork bracing system, after type steel support is cut off.
The inventive method advanced person's science, pass through the present invention, adopt type steel support hardened system, post-cast strip structure on two sides top board being reinforced in advance, and uses " cast-in-situ steel reinforced concrete cover plate+pre-buried corrugated tube " construction method on top, top board post-cast strip, the employing tying suitable for reading of pre-buried corrugated tube seals, top board post-cast strip is closed temporarily in advance, after Afforestation Landscape main body completes, make casting concrete blanking conduit by reserved corrugated tube, top board post-cast strip is carried out pouring construction.
It is an advantage of the current invention that:
1) type steel support system is set separately in both sides, post-cast strip, when basement roof support reaches collapsible die condition, disposable form removal bent frame system, only conservative steel supporting system, roof support with reinforced concrete deadweight is born by type steel support system, and the every load after top Afforestation Landscape backfill soil, both save construction cost, in turn ensure that the leading construction of backfill soil, Afforestation Landscape.
2) type steel support both ensure that the safety of xoncrete structure, the later stage cut off and after can be recycled.
3) retaining wall had both played and had blocked the backfill earthwork, serves again and supports the effect shelving interim cast-in-place concrete cover plate.
4) cast-in-situ steel reinforced concrete cover plate, had both met the needs that backfilling of earthwork and landscape planting are constructed in advance in advance, has stopped again not close post-cast strip and the hidden danger of seepage occurs.
5) pre-buried vertical corrugated tube is build the concrete blanking in post-cast strip the later stage to provide convenience with vibrating, it is ensured that the degree of compaction of post-cast strip concreting and construction quality.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
In figure, 1 type steel support, 2 pre-embedded steel slabs, 3 termination steel plates, 4 corrugated tubes, 5 cast-in-place concrete cover plates, 6 retaining walls, 7 cover plate reinforcing bars, 8 basement roofs, 9 basement bottom boards, 10 bottom plate rear pouring tapes, 11 top board post-cast strips, 12 reserving holes.
Detailed description of the invention
Afforestation Landscape rear pouring tape construction method under antecedent condition, mainly comprises the steps that
Step 1, after basement roof template framed bent is set up, at both sides, basement roof post-cast strip 11 and basement bottom plate rear pouring tape 10 both sides arranged type bracing members 1, basement roof 8 is carried out concreting, after concreting, when intensity reaches collapsible die condition, room roof plate template framed bent is descended in disposable dismounting fully, only conservative bracing members 1;
Before step 2, Afforestation Landscape region basement roof 8 do waterproof and backfill soil, retaining wall 6 is built by laying bricks or stones in the both sides, top board post-cast strip 11 not blocked, top arranges cast-in-place concrete cover plate 5, and vertical pre-buried corrugated tube 4, by pre-buried corrugated tube 4 closure suitable for reading, the impurity being prevented effectively from the external world falls in top board post-cast strip 11 by pre-buried corrugated tube 4, it is achieved top board post-cast strip 11 carries out interim closing in advance;
Step 3, set up the template bent frame system at position, top board post-cast strip 11;
After step 4, Afforestation Landscape have been constructed, by top board post-cast strip 11 off-period of designing requirement, by reserved corrugated tube 4, as casting concrete blanking conduit and the use vibrated, to top board post-cast strip 11 casting concrete, it is achieved post-cast strip top board 11 concreting is closed;
Step 5, bottom plate rear pouring tape 10 is carried out casting concrete;
Step 6, wait to build complete top board post-cast strip 11, concrete strength reaches 100%, the template bent frame system of top board post-cast strip 11 is removed, and the type steel support 1 that top board post-cast strip 11, bottom plate rear pouring tape 10 both sides are arranged in advance is cut off, it is finally completed Afforestation Landscape post-cast strip after-construction method under antecedent condition.
Further, the present invention is specifically refined as:
1, the construction of type steel support system.
Before basement roof 8 is built, basement roof template framed bent is when setting up, in both sides, the top board post-cast strip 11 lower disposed type steel support 1 of basement roof 8.
1), the selection of type steel support 1 calculate according to load and determine, distance bottom plate rear pouring tape 10 dual-side 200mm;
2), on the downside of type steel support 1 with the connection of basement bottom board 9: before basement bottom board 9 armored concrete is built or before initial set, pre-buried pre-embedded steel slab 2 in advance, pre-embedded steel slab 2 is by welding anchoring Bar Anchorage in basement bottom board 9, and type steel support 1 and pre-embedded steel slab 2 are welded to connect;
3), on the upside of type steel support 1 with the connection of basement roof 8: adopting termination steel plate 3 and type steel support 1 to be welded to connect, termination steel plate 3 is by welding anchoring Bar Anchorage in basement roof 8;
4) making of type steel support: the making cutting length according to the strict control type bracing members 1 of the actual clear height of basement structure, the cutting length of type steel support 1 cannot be less than the actual clear spacing between type steel support about 1 embedded part, that is, the cutting length of type steel support 1 cannot be less than the actual clear spacing between pre-embedded steel slab 2, termination steel plate 3; The length of every root type bracing members (1), it is necessary to be accurate to a little.
5) installation of type steel support 1:
In a, roof plate template installation process, reserved support termination, top steel plate openings position is determined in the position according to base plate pre-embedded steel slab 2 location, and guarantees center, hole and bottom embedded part (pre-embedded steel slab 2) center vertical line up and down.
B, type steel support 1 is lifted, is welded and fixed, installation process guarantees type steel support 1 perpendicularity, it is to avoid after concrete roof is built, form type steel support 1 eccentric compression;
6) consolidation process of the basement roof of both sides, top board post-cast strip 11:
After type steel support 1 installation, in the basement roof 8 at type steel support 1 top, elongated along the position of the type steel support 1 on limit, top board post-cast strip 11 dark beam is set, together builds with basement roof 8;
2, cast-in-place cover plate and vertical corrugated tube Embedment Construction on the upside of top board post-cast strip 11.
1) after basement roof 8 concreting completes, the height according to landscape construction backfilling of earthwork, it is determined that the height of the thickness of cast-in-place cast-in-place concrete cover plate 5 and corrugated tube 4 on the upside of top board post-cast strip 11;
2) before waterproof construction, build retaining wall 6 by laying bricks or stones along both sides, top board post-cast strip 11, be highly between 100��200mm, to guarantee that later stage top board post-cast strip 11 pours dense. Both sides, top board post-cast strip 11 are conscientiously cleared up before building by laying bricks or stones by retaining wall 6, dabbing work, and by owner, supervisor combine examination.
3) cast-in-place concrete cover plate 5 shutterings-supported construction: on the upside of retaining wall 6, arrange 50 �� 100 along direction, top board post-cast strip 11, the wooden a tree, used in making timber for boats of spacing 300 as support, wood a tree, used in making timber for boats top completely spreads 18mm template along direction, top board post-cast strip 11;
4), during cast-in-place concrete cover plate 5 system template construction, it is consistent with reserving hole 12 location dimension offered in advance strictly to control corrugated tube 4 position, and top, structural beams position must be provided with reserving hole 12.
5) corrugated tube 4 is fixing: in the process of binding of cast-in-place concrete cover plate 5 cover plate reinforcing bar 7, adopts cover plate reinforcing bar 7 to carry out colligation corrugated tube 4 lower nozzle card groove location and fixes.
6) process of corrugated tube 4 mouth of pipe: view returns soil construction, for preventing on-the-spot earth and foreign material in backfilling of earthwork process from falling in top board post-cast strip 11 by corrugated tube 4, and it is easy to the inspection before later stage top board post-cast strip 11 is built and cleaning, the height of corrugated tube 4 is not less than backfilling of earthwork finished surface 20cm, before backfilling of earthwork, plastic sheeting tying is adopted to block corrugated tube 4 mouthfuls.
3, the concrete closure construction in post-cast strip.
After landscape construction completes, build top board post-cast strip 11 concrete by the time requirement of design code.
1) set up at top board post-cast strip 11 template framed bent, bed die closure before, rely on template framed bent operating platform is set, downside, top board post-cast strip 11 is carried out secondary dabbing cleaning, and is rinsed with giant. Bed die closure must carry out after top board post-cast strip 11 dabbing and flushing.
2) before the concreting of post-cast strip, open corrugated tube 4 upper seal, corrugated tube 4 inwall is rinsed moistening again.
3) utilizing corrugated tube (4) as casting concrete blanking conduit and the mouth that vibrates, top board post-cast strip 11 is carried out casting concrete, it builds thickness must be suitable for reading only to corrugated tube 4, and guarantees that casting and compacting of concrete is closely knit.
4, the cutting off of type steel support system.
When top board post-cast strip 11 intensity reaches 100%, first remove top board post-cast strip 11 formwork bracing system, after type steel support 1 is cut off. It is finally completed the closed pouring after settlement after-construction method under view antecedent condition.

Claims (5)

1. an Afforestation Landscape rear pouring tape construction method under antecedent condition, is characterized in that, comprises the following steps:
Step 1, set up basement roof template framed bent at basement roof (8), after setting up, in bottom plate rear pouring tape (10) both sides arranged type bracing members (1) of (11) both sides, top board post-cast strip of basement and basement; Basement roof (8) is carried out concreting, and after basement roof (8) concreting, when intensity reaches template framed bent detachable condition, room roof plate template framed bent is descended in disposable dismounting fully, only conservative bracing members (1);
Before step 2, Afforestation Landscape region basement roof (8) do waterproof and backfill soil, retaining wall (6) is built by laying bricks or stones in top board post-cast strip (11) both sides not blocked, top board post-cast strip (11) top arranges cast-in-place concrete cover plate (5), the upper vertical pre-buried corrugated tube (4) of cast-in-place concrete cover plate (5), and by pre-buried corrugated tube (4) closing suitable for reading;
Step 3, set up the template bent frame system at top board post-cast strip (11) position;
Step 4, the pre-buried corrugated tube (4) of closure suitable for reading is opened, by the corrugated tube (4) that top board post-cast strip (11) top is reserved, as the use of top board post-cast strip (11) casting concrete blanking conduit and the mouth that vibrates, top board post-cast strip (11) casting concrete is closed;
Step 5, bottom plate rear pouring tape (10) is carried out casting concrete;
Step 6, wait that building complete top board post-cast strip (11) concrete strength reaches 100%, the template bent frame system of top board post-cast strip (11) is removed, and the type steel support (1) that top board post-cast strip (11), bottom plate rear pouring tape (10) both sides are arranged in advance is cut off, it is finally completed Afforestation Landscape post-cast strip after-construction method under antecedent condition.
2. the Afforestation Landscape according to claim 1 rear pouring tape construction method under antecedent condition, it is characterized in that, in described step 1, before basement bottom board (9) armored concrete builds front or initial set, pre-buried pre-embedded steel slab (2) is shifted to an earlier date on basement bottom board (9) surface of both sides, post-cast strip, being easy to type steel support (1) downside be welded and fixed with pre-embedded steel slab (2), pre-embedded steel slab (2) is arranged at distance bottom plate rear pouring tape (10) dual-side 200mm place;
Shifting to an earlier date pre-buried termination steel plate (3) on basement roof (8) roof plate template reserved opening, termination steel plate (3) is arranged at distance top board post-cast strip (11) dual-side 200mm place; Before concrete roof is built, type steel support (1) upside is welded and fixed with pre-buried termination steel plate (3) of basement roof (8) and is connected;
Dark beam is set steel plate (3) position, pre-buried termination of basement roof (8) is elongated, together builds with basement roof (8), process as to the roof reinforcement of both sides, post-cast strip.
3. the Afforestation Landscape according to claim 1 rear pouring tape construction method under antecedent condition, it is characterized in that, in described step 2, the height of retaining wall (6) is between 100��200mm, closely knit to guarantee later stage concrete roof post-cast strip (11) casting and compacting of concrete;
When concrete cover template construction, the top of top board post-cast strip (11) structural beams position be must be provided with installing the reserving hole (12) of corrugated tube, and strictly control corrugated tube (4) position and reserving hole (12) location pre-set and consistent size;To corrugated tube (4) lower nozzle card groove location, cover plate reinforcing bar (7) is adopted to carry out the fixing after-pouring cover plate concrete of colligation;
In backfilling of earthwork process, on-the-spot earth and foreign material are forbidden to fall in corrugated tube (4) and top board post-cast strip (11), the employing tying suitable for reading closure of corrugated tube (4).
4. the Afforestation Landscape according to claim 1 rear pouring tape construction method under antecedent condition, it is characterized in that, in described step 4, after Afforestation Landscape has been constructed, by the time requirement of design code, top board post-cast strip (11) concrete is built, specifically includes following steps:
1) set up at the bottom template framed bent of top board post-cast strip (11), top board post-cast strip (11) downside has been carried out secondary dabbing cleaning, and with after giant flushing, carries out bed die closure;
2) open corrugated tube (4) upper seal, corrugated tube (4) inwall is rinsed moistening again;
3) utilizing corrugated tube (4) as casting concrete blanking conduit and the mouth that vibrates, top board post-cast strip (11) are carried out casting concrete, it builds thickness must be suitable for reading only to corrugated tube (4).
5. the Afforestation Landscape according to claim 1 rear pouring tape construction method under antecedent condition, it is characterized in that, in described step 6, when top board post-cast strip (11) intensity reaches 100%, first remove top board post-cast strip (11) formwork bracing system, after type steel support (1) is cut off.
CN201610066009.1A 2016-01-31 2016-01-31 Rear pouring tape construction method of Afforestation Landscape under the conditions of in advance Active CN105649197B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610066009.1A CN105649197B (en) 2016-01-31 2016-01-31 Rear pouring tape construction method of Afforestation Landscape under the conditions of in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610066009.1A CN105649197B (en) 2016-01-31 2016-01-31 Rear pouring tape construction method of Afforestation Landscape under the conditions of in advance

Publications (2)

Publication Number Publication Date
CN105649197A true CN105649197A (en) 2016-06-08
CN105649197B CN105649197B (en) 2018-07-13

Family

ID=56488216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610066009.1A Active CN105649197B (en) 2016-01-31 2016-01-31 Rear pouring tape construction method of Afforestation Landscape under the conditions of in advance

Country Status (1)

Country Link
CN (1) CN105649197B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385981A (en) * 2018-03-26 2018-08-10 中建八局第三建设有限公司 A kind of outdoor basement roof post-cast strip anti-seepage construction method
CN110258651A (en) * 2019-07-16 2019-09-20 中城投集团第六工程局有限公司 Basement roof post-cast strip shifts to an earlier date enclosed construction and construction method
CN111379438A (en) * 2020-03-10 2020-07-07 中国铁路设计集团有限公司 Vertical temporary supporting system for underground structure and using method
CN111926927A (en) * 2020-07-09 2020-11-13 福建建工集团有限责任公司 Underground chamber roof post-cast strip plugging structure and construction method thereof
CN112049411A (en) * 2020-08-31 2020-12-08 上海家树建筑工程有限公司 Roof post-cast strip reinforcing method and roof bracing structure thereof
CN112343091A (en) * 2020-12-21 2021-02-09 中国建筑第四工程局有限公司 Subside post-cast strip structure sealed in advance
CN114016552A (en) * 2021-11-18 2022-02-08 中铁十二局集团建筑安装工程有限公司 Pre-sealing construction method for basement roof settlement post-cast strip
CN114961338A (en) * 2022-03-16 2022-08-30 中国二十冶集团有限公司 Temporary support method for top plate of PC (polycarbonate) assembly type engineering basement
CN115324330A (en) * 2022-09-07 2022-11-11 江苏省华建建设股份有限公司 Post-cast strip upper-suspension lower-fixation independent supporting structure and construction method thereof
CN115387392A (en) * 2022-08-23 2022-11-25 中国五冶集团有限公司 Basement post-cast strip construction structure and method
CN115450420A (en) * 2022-10-20 2022-12-09 上海建工一建集团有限公司 Floor post-cast strip disassembly-free template system and construction method thereof
CN115506404A (en) * 2022-10-18 2022-12-23 中国二十二冶集团有限公司 Post-construction method for underground structure top plate construction hole
CN115506593A (en) * 2022-10-12 2022-12-23 中国二十二冶集团有限公司 Garage top wall column construction method
CN116856707A (en) * 2023-06-13 2023-10-10 中国十七冶集团有限公司 Construction method for novel advanced sealing one-step forming of post-pouring strip of basement roof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203080705U (en) * 2013-01-10 2013-07-24 浙江建设职业技术学院 Concrete post-cast strip supporting top
JP5458375B2 (en) * 2009-08-03 2014-04-02 清水建設株式会社 Base isolation structure
CN104805870A (en) * 2015-04-16 2015-07-29 中国二十二冶集团有限公司 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5458375B2 (en) * 2009-08-03 2014-04-02 清水建設株式会社 Base isolation structure
CN203080705U (en) * 2013-01-10 2013-07-24 浙江建设职业技术学院 Concrete post-cast strip supporting top
CN104805870A (en) * 2015-04-16 2015-07-29 中国二十二冶集团有限公司 Construction method for first soil filling and then casting at settlement post-cast strip of top plate of basement

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
崔荣强,等: "梁板后浇带模板断开早拆施工技术", 《建筑技术》 *
田金成,等: "地下室顶板沉降后浇带提前封闭施工技术", 《施工技术》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385981A (en) * 2018-03-26 2018-08-10 中建八局第三建设有限公司 A kind of outdoor basement roof post-cast strip anti-seepage construction method
CN110258651A (en) * 2019-07-16 2019-09-20 中城投集团第六工程局有限公司 Basement roof post-cast strip shifts to an earlier date enclosed construction and construction method
CN111379438A (en) * 2020-03-10 2020-07-07 中国铁路设计集团有限公司 Vertical temporary supporting system for underground structure and using method
CN111926927A (en) * 2020-07-09 2020-11-13 福建建工集团有限责任公司 Underground chamber roof post-cast strip plugging structure and construction method thereof
CN112049411A (en) * 2020-08-31 2020-12-08 上海家树建筑工程有限公司 Roof post-cast strip reinforcing method and roof bracing structure thereof
CN112343091A (en) * 2020-12-21 2021-02-09 中国建筑第四工程局有限公司 Subside post-cast strip structure sealed in advance
CN114016552A (en) * 2021-11-18 2022-02-08 中铁十二局集团建筑安装工程有限公司 Pre-sealing construction method for basement roof settlement post-cast strip
CN114961338A (en) * 2022-03-16 2022-08-30 中国二十冶集团有限公司 Temporary support method for top plate of PC (polycarbonate) assembly type engineering basement
CN115387392A (en) * 2022-08-23 2022-11-25 中国五冶集团有限公司 Basement post-cast strip construction structure and method
CN115387392B (en) * 2022-08-23 2023-12-15 中国五冶集团有限公司 Basement post-pouring strip construction structure and method
CN115324330A (en) * 2022-09-07 2022-11-11 江苏省华建建设股份有限公司 Post-cast strip upper-suspension lower-fixation independent supporting structure and construction method thereof
CN115506593A (en) * 2022-10-12 2022-12-23 中国二十二冶集团有限公司 Garage top wall column construction method
CN115506404A (en) * 2022-10-18 2022-12-23 中国二十二冶集团有限公司 Post-construction method for underground structure top plate construction hole
CN115450420A (en) * 2022-10-20 2022-12-09 上海建工一建集团有限公司 Floor post-cast strip disassembly-free template system and construction method thereof
CN116856707A (en) * 2023-06-13 2023-10-10 中国十七冶集团有限公司 Construction method for novel advanced sealing one-step forming of post-pouring strip of basement roof

Also Published As

Publication number Publication date
CN105649197B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN105649197A (en) Post-pouring belt construction method conducted under green-landscape-first condition
CN108397200B (en) Back-fabricated construction method for tunnel connection section structure of subway station
CN110258651A (en) Basement roof post-cast strip shifts to an earlier date enclosed construction and construction method
CN203924116U (en) Portable side wall formwork jumbo
JP2543667B2 (en) Rainwater storage tank
CN105756377B (en) A kind of swimming pool and its construction method
CN210421182U (en) Basement roof post-cast strip seals structure in advance
CN109680722B (en) Construction method for directly reserving external building access port on basement outer wall
CN109610516B (en) Basement exterior wall post-cast strip retaining wall construction method
CN112112292A (en) Construction method for preventing concrete from permeating into two sides of post-cast strip of bottom plate of garage
CN111945740A (en) Foundation pit water-resistant plate structure and construction method
CN114934544B (en) Construction method for covering and digging top-down side wall
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN213625699U (en) Basement outer wall waterproof construction structure for reverse construction
CN215594957U (en) Post-cast strip closes construction system in advance
CN205637707U (en) Swimming pool
CN211690389U (en) Inter-pile retaining plate structure for adjacent anti-slide piles
CN213979911U (en) Basement outer wall post-cast strip template structure
CN108104112A (en) A kind of underground wall body construction method based on the slurrying of original soil original position
JPH0657768A (en) Retaining wall structure and working method thereof
CN216157147U (en) Construction structure convenient for demoulding of ground beam and floor
CN210395449U (en) Protective structure convenient for backfilling post-cast strip in advance
CN214301864U (en) Sump pit and post-cast strip collision node
CN108914969A (en) A kind of large deep foundation pit cheats the secondary pouring construction engineering method of sole plate in hole
CN107653905B (en) Full-package waterproof structure for reverse construction method building and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Linguo

Inventor after: Xu Bin

Inventor after: Guo Hu

Inventor after: Zou Houcun

Inventor after: Ni Yaxing

Inventor after: Jiao Qigui

Inventor before: Guo Hu

Inventor before: Zou Houcun

Inventor before: Jiao Qigui

Inventor before: Ni Yaxing

Inventor before: Xu Bin

Inventor before: Wang Linguo

CB03 Change of inventor or designer information