JPH0657768A - Retaining wall structure and working method thereof - Google Patents

Retaining wall structure and working method thereof

Info

Publication number
JPH0657768A
JPH0657768A JP13931092A JP13931092A JPH0657768A JP H0657768 A JPH0657768 A JP H0657768A JP 13931092 A JP13931092 A JP 13931092A JP 13931092 A JP13931092 A JP 13931092A JP H0657768 A JPH0657768 A JP H0657768A
Authority
JP
Japan
Prior art keywords
retaining wall
pile
wall
concrete
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13931092A
Other languages
Japanese (ja)
Other versions
JP3026131B2 (en
Inventor
Shoji Fukushi
昭治 福士
Yoshitaka Matsunaga
吉隆 松永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP4139310A priority Critical patent/JP3026131B2/en
Publication of JPH0657768A publication Critical patent/JPH0657768A/en
Application granted granted Critical
Publication of JP3026131B2 publication Critical patent/JP3026131B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

PURPOSE:To reduce the construction period of a retaining wall. CONSTITUTION:A precast concrete wall slab 11 is unified together with a base slab 12 projecting to both sides of the lower part of the wall slab 11. Pierced holes 15 in which a pile 16 driven in the ground is inserted into the base slab 12. The pierced holes 15 provided with a taper face 17 gradually widened along the axis of piles 16. Concrete 18 is placed between these pierced holes 15 and piles 16. Accordingly, since the wall slab 11 is formed as a unit with the base slab 12, the wall slab 11 is constructed in a factory or the like, it is not necessary to install molding frames, remove the frames, and arrange reinforcing rods in site and the working processes required for the construction of the retaining wall can be decreased, and hence, the construction period of retaining wall and the cost for same can be reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、宅地造成、土留め工事
等に用いて好適な擁壁構造とその施工方法に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a retaining wall structure suitable for residential land development, earth retaining work, etc. and a construction method thereof.

【0002】[0002]

【従来の技術】従来、宅地造成や道路造成などの本設用
あるいは仮説用擁壁の一つとして、図3に示すようなL
型擁壁が提供されている。このL型擁壁1は、地山2の
前方において地山2の下面に埋設された底版部4と、こ
の底版部4から上方に向かって立設された壁体部5とか
ら構成されている。
2. Description of the Related Art Conventionally, as shown in FIG. 3, as one of the retaining walls for main construction or hypothesis such as residential land construction and road construction.
Mold retaining walls are provided. This L-shaped retaining wall 1 is composed of a bottom slab 4 which is buried in the lower surface of the ground 2 in front of the ground 2, and a wall body 5 which is erected upward from the bottom slab 4. There is.

【0003】このようなL型擁壁1の施工方法では、壁
高が3m以上の擁壁は宅地造成においてはすべて施工現
場における場所打ち工法により施工されているのが現状
である。すなわち、現場に型枠を設置し、この型枠内に
鉄筋を配筋し、これら鉄筋周囲にコンクリートを打設す
る。そして、前記型枠を脱型して、L型擁壁1を施工す
る。
In the construction method of the L-shaped retaining wall 1 as described above, all the retaining walls having a wall height of 3 m or more are currently constructed by the cast-in-place method at the construction site in the construction of the residential land. That is, a formwork is installed on the site, reinforcing bars are arranged in the formwork, and concrete is placed around these reinforcing bars. Then, the mold is demolded and the L-shaped retaining wall 1 is constructed.

【0004】[0004]

【発明が解決しようとする課題】しかし、前記L型擁壁
1の施工では、型枠設置作業、配筋作業、コンクリート
打設作業、型枠脱型作業が必要になるため、多数の作業
工程を必要とし、L型擁壁1の施工に長期間を要すると
ともに、L型擁壁1の施工作業が煩雑であり、L型擁壁
1の施工に多大な費用を要していた。そして、近年の型
枠工等の熟練を有する作業者の労働力不足から現場での
施工が難しくなっている。また、前記L型擁壁1は場所
打ち工法で施工されるために、かかるL型擁壁1に品質
のバラツキを有する場合があり、L型擁壁1の安全上問
題があった。
However, the construction of the L-shaped retaining wall 1 requires a lot of work steps because it requires formwork installation work, bar arrangement work, concrete placement work, and formwork demolding work. The construction of the L-shaped retaining wall 1 requires a long period of time, the construction work of the L-shaped retaining wall 1 is complicated, and the construction of the L-shaped retaining wall 1 requires great cost. Further, due to the labor shortage of workers who have skills such as formwork in recent years, it is difficult to carry out the construction on site. Further, since the L-shaped retaining wall 1 is constructed by the cast-in-place construction method, the L-shaped retaining wall 1 may have quality variations, which is a safety problem of the L-shaped retaining wall 1.

【0005】本発明は前記課題を有効に解決するもの
で、擁壁の施工期間を短くするとともに、擁壁の施工作
業性を向上させた擁壁構造とその施工方法を提供するこ
とを目的とする。
The present invention effectively solves the above problems, and an object thereof is to provide a retaining wall structure which shortens the period of construction of the retaining wall and improves workability of the retaining wall, and a construction method thereof. To do.

【0006】[0006]

【課題を解決するための手段】請求項1記載の擁壁構造
は、プレキャストコンクリート製壁版部と、該壁版部の
下部に当該壁版部の両側方へ突出する基版部とが一体に
形成され、該基版部に地盤に打ち込まれた杭の上端部を
挿入する貫通孔が設けられ、該貫通孔には杭の軸に沿っ
て漸次拡径したテーパ面が形成され、これら貫通孔と杭
との間に場所打ちコンクリートが打設されてなることを
特徴とするものである。
A retaining wall structure according to claim 1, wherein a precast concrete wall slab portion and a base plate portion projecting to both sides of the wall slab portion are integrally formed at a lower portion of the wall slab portion. And a through hole for inserting the upper end of the pile driven into the ground is formed in the base plate portion, and a taper surface gradually increasing in diameter along the axis of the pile is formed in the through hole. It is characterized in that cast-in-place concrete is cast between the hole and the pile.

【0007】請求項2記載の擁壁構造は、請求項1記載
の擁壁構造であって、前記杭の上端部から鉄筋が突出さ
れ、該鉄筋は、前記杭から貫通孔上側に配されるととも
に、前記コンクリートで覆われていることを特徴とする
ものである。
The retaining wall structure according to a second aspect is the retaining wall structure according to the first aspect, in which a reinforcing bar is projected from an upper end portion of the pile, and the reinforcing bar is arranged above the through hole from the pile. In addition, it is characterized by being covered with the concrete.

【0008】請求項3記載の擁壁の施工方法は、請求項
1記載の擁壁の施工方法であって、あらかじめ前記プレ
キャストコンクリート製壁版部と、該壁版部の下部に当
該壁版部の両側方へ突出する基版部とが一体に形成する
とともに該基版部に貫通孔を形成し、前記杭を地盤に打
ち込み、該杭の上端部を前記貫通孔に挿入し、これら貫
通孔と杭との間に場所打ちコンクリートを打設すること
を特徴とするものである。
A method of constructing a retaining wall according to claim 3 is the method of constructing a retaining wall according to claim 1, wherein the precast concrete wall slab and the wall slab below the wall slab are prepared in advance. Of the base plate portion projecting to both sides of the base plate and a through hole is formed in the base plate portion, the pile is driven into the ground, the upper end of the pile is inserted into the through hole, and the through holes are formed. It is characterized by casting cast-in-place concrete between the pile and the pile.

【0009】[0009]

【作用】請求項1記載の擁壁構造では、プレキャストコ
ンクリート製壁版部と、該壁版部の下部に当該壁版部の
両側方へ突出する基版部とが一体に形成されているた
め、前記壁版部は工場等で施工され、前記壁版部が現場
に搬入される。そして、前記基版部に貫通孔が設けら
れ、この貫通孔に杭の上端部が挿入される。前記貫通孔
には杭の軸に沿って漸次拡径したテーパ面が形成されて
いるため、前記杭の上端部が貫通孔に容易に挿入され
る。これら貫通孔と杭との間に場所打ちコンクリートが
打設されているため、前記テーパ面でコンクリートを押
圧し、このコンクリートで杭を押圧し、前記基版部と杭
とが接合される。
In the retaining wall structure according to claim 1, the precast concrete wall slab part and the base plate part projecting to both sides of the wall slab part are integrally formed in the lower part of the wall slab part. The wall slab is constructed in a factory or the like, and the wall slab is brought to the site. Then, a through hole is provided in the base plate portion, and the upper end portion of the pile is inserted into the through hole. Since the through hole is formed with a taper surface whose diameter gradually increases along the axis of the pile, the upper end of the pile can be easily inserted into the through hole. Since cast-in-place concrete is placed between these through holes and the piles, the taper surface presses the concrete, and the concrete presses the piles to join the base plate portion and the piles.

【0010】請求項2記載の擁壁構造では、請求項1記
載の作用を有するとともに、前記杭の上端部から鉄筋が
突出され、該鉄筋は、前記杭から貫通孔上側に配される
とともに、前記コンクリートで覆われているため、前記
貫通孔の上側がコンクリートで覆われている。
According to a second aspect of the present invention, the retaining wall structure has the function of the first aspect, a reinforcing bar is projected from the upper end of the pile, and the reinforcing bar is arranged above the through hole from the pile. Since it is covered with the concrete, the upper side of the through hole is covered with the concrete.

【0011】請求項3記載の擁壁の施工方法では、あら
かじめ前記プレキャストコンクリート製壁版部と、該壁
版部の下部に当該壁版部の両側方へ突出する基版部とが
一体に形成するとともに該基版部に貫通孔を形成し、前
記杭を地盤に打ち込み、該杭の上端部を前記貫通孔に挿
入し、これら貫通孔と杭との間に場所打ちコンクリート
を打設するため、型枠の設置・脱型作業、配筋作業がな
くされる。
In the method for constructing a retaining wall according to a third aspect of the present invention, the precast concrete wall slab portion and a base plate portion projecting to both sides of the wall slab portion are integrally formed in advance at a lower portion of the wall slab portion. In order to form a through hole in the base plate portion, drive the pile into the ground, insert the upper end portion of the pile into the through hole, and cast a cast-in-place concrete between the through hole and the pile. Eliminates the work of installing / demolding the formwork and arranging the bars.

【0012】[0012]

【実施例】以下、本発明の擁壁構造とその施工方法の一
実施例について、図1を参照しながら説明する。図1に
示すように、符号10は擁壁構造であり、この擁壁構造
10は、地盤に打ち込まれた杭16と、この杭16に接
合される擁壁部材9とから概略構成されている。この擁
壁部材9は、地盤に立設され、プレキャストコンクリー
ト製外観矩形壁版部11と、この壁版部11の下部に一
体形成され、当該壁版部11の立設方向に直交する両側
方へ突出する基版部12とから構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the retaining wall structure and its construction method of the present invention will be described below with reference to FIG. As shown in FIG. 1, reference numeral 10 is a retaining wall structure, and this retaining wall structure 10 is roughly composed of a pile 16 driven into the ground and a retaining wall member 9 joined to the pile 16. . The retaining wall member 9 is erected on the ground, is integrally formed with a precast concrete exterior rectangular wall slab 11 and a lower portion of the wall slab 11, and is on both sides orthogonal to the standing direction of the wall slab 11. It is composed of a base plate portion 12 that protrudes inward.

【0013】前記壁版部11は、側壁と地山Gとの間に
裏込め砂利13を介在させ、地山Gを支持するととも
に、その立設方向に沿って通水孔14を複数平行に設け
ている。この壁版部11は、地山Gの斜面に沿って複数
列設状態に配置されている。
The wall slab 11 supports back ground gravel 13 between the side wall and the ground G to support the ground G, and a plurality of water passage holes 14 are arranged in parallel along the standing direction. It is provided. The wall slabs 11 are arranged in a plurality of rows along the slope of the natural ground G.

【0014】前記基版部12は、壁版部11の立設方向
に直交して当該壁版部11の両側に設けられ、複数の貫
通孔15を設けている。これら貫通孔15には、前記杭
15の上端部がそれぞれ挿入され、この杭16の軸に沿
って漸次拡径したテーパ面17が形成され、これら貫通
孔15と杭16との間に場所打ちコンクリート18が打
設されている。前記基版部12の下側面には、この基版
部12の位置を決める捨コンクリート19が設けられ、
この捨コンクリート19の下側に砂利20が敷かれてい
る。
The base plate portion 12 is provided on both sides of the wall plate portion 11 at right angles to the standing direction of the wall plate portion 11 and has a plurality of through holes 15. The upper end of the pile 15 is inserted into each of the through holes 15, and a tapered surface 17 having a diameter gradually increased along the axis of the pile 16 is formed. Concrete 18 is placed. On the lower surface of the base plate portion 12, a waste concrete 19 for determining the position of the base plate portion 12 is provided.
Gravel 20 is laid under the waste concrete 19.

【0015】このような擁壁構造10の施工方法につい
て説明する。まず、あらかじめ前記壁版部11と基版部
12と貫通孔15とを一体形成する。これらは、工場等
に備えた型枠に鉄筋を配筋し、当該型枠にコンクリート
を打設する。こうして、プレキャストコンクリートから
なる擁壁部材9を構築する。
A method of constructing such a retaining wall structure 10 will be described. First, the wall slab 11, the base 12 and the through hole 15 are integrally formed in advance. In these, reinforcing bars are laid in the formwork provided in factories, and concrete is placed in the formwork. Thus, the retaining wall member 9 made of precast concrete is constructed.

【0016】この擁壁部材9の立設対象の地盤を掘削
し、この掘削された地盤に杭16を打ち込み、この杭1
6の上端部を露出状態にし、前記擁壁部材9を搬入す
る。そして、前記杭16が打ち込まれた地盤の表面に砂
利20を敷く。この砂利20の上に捨コンクリート19
を打設する。ここで、捨コンクリート19を水平面に表
面出しする。この捨コンクリート19の上に前記擁壁部
材9の基版部12を載置する。このときに、基版部12
の貫通孔15に前記杭16の上端部を挿入する。これら
貫通孔15と杭16との間にコンクリート18を打設す
る。
The ground on which the retaining wall member 9 is to be erected is excavated, and the pile 16 is driven into the excavated ground to form the pile 1
The retaining wall member 9 is carried in with the upper end of 6 exposed. Then, gravel 20 is laid on the surface of the ground on which the piles 16 have been driven. On this gravel 20, discard concrete 19
To place. Here, the waste concrete 19 is exposed on the horizontal surface. The base plate portion 12 of the retaining wall member 9 is placed on the waste concrete 19. At this time, the base plate section 12
The upper end of the pile 16 is inserted into the through hole 15. Concrete 18 is placed between the through holes 15 and the piles 16.

【0017】こうして地盤に固定された基版部12に土
砂を載せ、擁壁部材9の基版部12を埋設するととも
に、壁版部14の側壁と地山Gとの間に裏込め砂利13
を介在させて地山Gを支持させる。
In this way, earth and sand are placed on the base plate portion 12 fixed to the ground, the base plate portion 12 of the retaining wall member 9 is buried, and the backfill gravel 13 is provided between the side wall of the wall plate portion 14 and the ground G.
To support the natural ground G.

【0018】このような擁壁構造10によれば、プレキ
ャストコンクリート製壁版部11と基版部12とが一体
形成されているため、前記壁版部11を工場等で施工で
きる。このため、現場で型枠設置作業、配筋作業、型枠
脱型作業を不要にでき、擁壁部材9の施工に要する作業
工程を少なくできるから、擁壁部材9の施工期間を短く
でき、擁壁部材9の施工に要する費用を低減できる。そ
して、前記擁壁部材9が工場等で施工できることから、
擁壁部材9の品質を向上でき、擁壁部材9の安全性を向
上できる。
According to such a retaining wall structure 10, since the precast concrete wall slab 11 and the base plate 12 are integrally formed, the wall slab 11 can be constructed in a factory or the like. Therefore, on-site formwork installation work, bar arrangement work, and formwork demolding work can be eliminated, and the work process required for construction of the retaining wall member 9 can be reduced, so that the construction period of the retaining wall member 9 can be shortened. The cost required for constructing the retaining wall member 9 can be reduced. And since the retaining wall member 9 can be constructed in a factory or the like,
The quality of the retaining wall member 9 can be improved, and the safety of the retaining wall member 9 can be improved.

【0019】また、壁版部11の両側方へ基版部12が
形成され、この基版部12が地盤に打ち込まれた杭16
に接続されているため、壁版部11が地山Gで押圧され
た場合にあっても、壁版部11が転倒するおそれをなく
し、壁版部11の安全性を向上できる。
A stencil portion 12 is formed on both sides of the wall slab portion 11, and the stencil 16 is driven into the ground.
Therefore, even if the wall slab 11 is pressed by the ground G, the wall slab 11 can be prevented from tipping over and the safety of the wall slab 11 can be improved.

【0020】前記基版部12の貫通孔15には、杭16
の軸に沿って漸次拡径したテーパ面17が形成されてい
るため、前記杭16の上端部が貫通孔15に容易に挿入
され、擁壁部材9と杭16との接続作業性を向上でき
る。前記貫通孔15と杭16との間にコンクリート18
が打設されて、前記基版部12と杭16とが接合される
ため、擁壁部材9の施工作業性を向上できる。したがっ
て、近年の作業者の労働力不足にあっても、擁壁を容易
に施工できる。そして、前記テーパ面17でコンクリー
ト18を押圧し、このコンクリート18で杭16を押圧
するため、この杭16を押圧する力が伝達される。
A pile 16 is provided in the through hole 15 of the base plate portion 12.
Since the tapered surface 17 having a diameter gradually increasing along the axis of is formed, the upper end of the pile 16 can be easily inserted into the through hole 15 and the workability of connecting the retaining wall member 9 and the pile 16 can be improved. . Concrete 18 is provided between the through hole 15 and the pile 16.
Since the base plate portion 12 and the pile 16 are joined by being cast, the workability of the retaining wall member 9 can be improved. Therefore, the retaining wall can be easily constructed even if the labor force of workers in recent years is insufficient. Then, since the taper surface 17 presses the concrete 18 and the concrete 18 presses the pile 16, the force for pressing the pile 16 is transmitted.

【0021】このような擁壁の施工方法では、あらかじ
め前記プレキャストコンクリートからなる擁壁部材9を
形成し、前記杭16を地盤に打ち込み、前記杭16の上
端部を前記貫通孔15に挿入し、これら貫通孔15と杭
16との間にコンクリート18を打設する。このため、
型枠の設置・脱型作業、配筋作業がなくされ、擁壁の施
工期間を短くでき、擁壁の施工作業性を向上させること
ができる。
In such a retaining wall construction method, the retaining wall member 9 made of the precast concrete is formed in advance, the pile 16 is driven into the ground, and the upper end of the pile 16 is inserted into the through hole 15, Concrete 18 is placed between the through holes 15 and the piles 16. For this reason,
Eliminating the work of installing / demolding the formwork and arranging the work, the construction period of the retaining wall can be shortened and the construction workability of the retaining wall can be improved.

【0022】〈他の実施例〉本発明の擁壁構造とその施
工方法の他の実施例について、図2を参照しながら説明
する。ここで、前記実施例と同様のものについては同一
符号を用いて説明を簡略化する。当該擁壁構造は、プレ
キャストコンクリート製壁版部11と基版部12とから
なる擁壁部材9と、地盤に打ち込まれた杭16とから概
略構成されている。前記壁版部11は、側壁と地山Gと
の間に裏込め砂利13を介在させ、通水孔14を複数平
行に設けている。
<Other Embodiments> Another embodiment of the retaining wall structure and its construction method of the present invention will be described with reference to FIG. Here, the same components as those in the above-described embodiment are designated by the same reference numerals to simplify the description. The retaining wall structure is roughly composed of a retaining wall member 9 including a precast concrete wall slab portion 11 and a base plate portion 12, and a pile 16 driven into the ground. The wall slab 11 has a backfill gravel 13 between the side wall and the ground G, and a plurality of water passage holes 14 provided in parallel.

【0023】前記基版部12は、壁版部11の両側に設
けられ、複数の貫通孔15を設け、下側面に捨コンクリ
ート19、砂利20を敷いている。前記貫通孔15に
は、前記杭15の上端部が挿入され、漸次拡径したテー
パ面17が形成されている。
The base plate portion 12 is provided on both sides of the wall plate portion 11, is provided with a plurality of through holes 15, and is provided with waste concrete 19 and gravel 20 on the lower side surface. An upper end portion of the pile 15 is inserted into the through hole 15, and a tapered surface 17 having a gradually increasing diameter is formed.

【0024】これら貫通孔15と杭16との間には、図
2に示すように、コンクリート24が打設されている。
このコンクリート24は、前記杭16の上端部から突出
する複数の鉄筋25全体を覆っている。この鉄筋25
は、前記杭16の軸方向に延在され、この杭16の上端
部から貫通孔15の上側に配されている。
Between the through holes 15 and the piles 16, concrete 24 is placed as shown in FIG.
The concrete 24 entirely covers a plurality of reinforcing bars 25 protruding from the upper end of the pile 16. This rebar 25
Extend in the axial direction of the pile 16 and are arranged above the through hole 15 from the upper end of the pile 16.

【0025】このような擁壁構造10の施工方法につい
て説明する。まず、あらかじめ工場等でプレキャストコ
ンクリートからなる擁壁部材9を構築する。この擁壁部
材9の立設対象の地盤を掘削し、この地盤に杭16を打
ち込み、前記擁壁部材9を搬入する。前記掘削された地
盤に砂利20を敷き、この砂利20の上に捨コンクリー
ト19を打設する。この捨コンクリート19に前記擁壁
部材9の基版部12を載置する。
A method of constructing such a retaining wall structure 10 will be described. First, the retaining wall member 9 made of precast concrete is constructed in advance in a factory or the like. The ground to be erected by the retaining wall member 9 is excavated, the pile 16 is driven into the ground, and the retaining wall member 9 is carried in. Gravel 20 is laid on the excavated ground, and waste concrete 19 is placed on the gravel 20. The base plate portion 12 of the retaining wall member 9 is placed on the waste concrete 19.

【0026】この基版部12の貫通孔15では、前記杭
16の鉄筋25を貫通させ、杭16の上端部を挿入す
る。これら貫通孔15と杭16との間にコンクリート2
4を打設するとともに、このコンクリート24を基版部
12の上側に配された鉄筋25周囲に打設する。この
後、地盤に擁壁部材9の基版部12を埋設するととも
に、壁版部14と地山Gとの間に裏込め砂利13を介在
させ、擁壁を施工する。
In the through hole 15 of the base plate portion 12, the reinforcing bar 25 of the pile 16 is penetrated and the upper end portion of the pile 16 is inserted. Between the through hole 15 and the pile 16, concrete 2
4 is cast, and this concrete 24 is cast around the reinforcing bars 25 arranged on the upper side of the base plate portion 12. Thereafter, the base plate portion 12 of the retaining wall member 9 is embedded in the ground, and the backfill gravel 13 is interposed between the wall plate portion 14 and the ground G to construct the retaining wall.

【0027】このような擁壁構造によれば、前記杭16
から突出された鉄筋25は、前記貫通孔15から基版部
12上側に配されるとともに、前記貫通孔15と杭16
との間にコンクリート24が充填され、このコンクリー
ト24で基版部12の上側が覆われる。このため、基版
部12と杭16とを強固に接合でき、壁版部11が転倒
するのを防止でき、擁壁部材9の安全性を向上させるこ
とができる。
According to such a retaining wall structure, the pile 16
The reinforcing bars 25 projected from the through holes 15 and the piles 16 are arranged on the base plate portion 12 above the through holes 15.
Concrete 24 is filled in the space between and, and the upper side of the base plate portion 12 is covered with the concrete 24. Therefore, the base plate portion 12 and the pile 16 can be firmly joined, the wall slab portion 11 can be prevented from falling, and the safety of the retaining wall member 9 can be improved.

【0028】[0028]

【発明の効果】以上説明したように、本発明の擁壁構造
とその施工方法によれば、以下の効果を奏することがで
きる。請求項1記載の擁壁構造によれば、プレキャスト
コンクリート製壁版部と基版部とが一体形成されている
ため、前記壁版部を工場等で施工できる。このため、現
場で型枠設置・脱型作業、配筋作業を不要にでき、擁壁
の施工に要する作業工程を少なくできるから、擁壁の施
工期間を短くでき、擁壁の施工に要する費用を低減でき
る。そして、前記壁版部と基版部とが工場等で施工でき
ることから、擁壁の品質を向上でき、擁壁の安全性を向
上できる。
As described above, according to the retaining wall structure and its construction method of the present invention, the following effects can be obtained. According to the retaining wall structure of the first aspect, since the precast concrete wall slab and the base plate are integrally formed, the wall slab can be constructed in a factory or the like. For this reason, it is possible to eliminate the need for formwork installation / demolding work and bar arrangement work on site, and the work steps required for construction of the retaining wall can be reduced, so the construction period of the retaining wall can be shortened and the cost required for constructing the retaining wall Can be reduced. Since the wall slab portion and the base plate portion can be constructed in a factory or the like, the quality of the retaining wall can be improved and the safety of the retaining wall can be improved.

【0029】また、壁版部の両側方へ基版部が形成さ
れ、この基版部が地盤に打ち込まれた杭に接続されてい
るため、壁版部が地山等で押圧された場合にあっても、
壁版部が転倒するおそれをなくし、壁版部の安全性を向
上できる。
Further, since the base plate portion is formed on both sides of the wall plate portion and the base plate portion is connected to the pile driven into the ground, when the wall plate portion is pressed by the ground etc. Even so,
It is possible to prevent the wall slab from falling and improve the safety of the wall slab.

【0030】前記基版部の貫通孔には、杭の軸に沿って
漸次拡径したテーパ面が形成されているため、前記杭の
上端部が貫通孔に容易に挿入され、基版部と杭との接続
作業性を向上できる。前記貫通孔と杭との間にコンクリ
ートが打設されて、前記基版部と杭とが接合されるた
め、擁壁の施工作業性を向上できる。したがって、近年
の作業者の労働力不足にあっても、擁壁を容易に施工で
きる。そして、前記テーパ面でコンクリートを押圧し、
このコンクリートで杭を押圧するため、この杭を押圧す
る力が伝達される。
Since the through hole of the base plate portion is formed with a taper surface whose diameter is gradually expanded along the axis of the pile, the upper end portion of the pile is easily inserted into the through hole to form the base plate portion. The workability of connecting to the pile can be improved. Since concrete is cast between the through hole and the pile and the base plate portion and the pile are joined, the workability of the retaining wall can be improved. Therefore, the retaining wall can be easily constructed even if the labor force of workers in recent years is insufficient. And press the concrete with the tapered surface,
Since the concrete presses the pile, the force for pressing the pile is transmitted.

【0031】請求項2記載の擁壁構造によれば、請求項
1記載の効果を奏することができるとともに、前記杭か
ら突出された鉄筋は、前記貫通孔から基版部上側に配さ
れるとともに、この基版部の上側がコンクリートで覆わ
れる。このため、基版部と杭とを強固に接合でき、壁版
部が転倒するのを防止でき、擁壁の安全性を向上させる
ことができる。
According to the retaining wall structure of claim 2, the effect of claim 1 can be obtained, and the reinforcing bars protruding from the piles are arranged from the through holes to the upper side of the base plate portion. , The upper side of the base plate is covered with concrete. Therefore, the base plate portion and the pile can be firmly joined, the wall plate portion can be prevented from falling, and the safety of the retaining wall can be improved.

【0032】請求項3記載の擁壁の施工方法によれば、
あらかじめ前記プレキャストコンクリートからなる壁版
部と基版部とを一体形成し、前記杭を地盤に打ち込み、
前記杭の上端部を前記貫通孔に挿入し、これら貫通孔と
杭との間にコンクリートを打設し、擁壁を施工する。こ
のため、型枠の設置・脱型作業、配筋作業がなくされ、
擁壁の施工期間を短くでき、擁壁の施工作業性を向上さ
せることができる。
According to the retaining wall construction method of claim 3,
A wall slab part and a base plate part made of the precast concrete are integrally formed in advance, and the pile is driven into the ground,
The upper end of the pile is inserted into the through hole, concrete is placed between the through hole and the pile, and a retaining wall is constructed. For this reason, the work of setting / demolding the formwork and the work of arranging are eliminated.
The retaining wall construction period can be shortened and the retaining wall construction workability can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の擁壁構造の一実施例を示す断面図であ
る。
FIG. 1 is a sectional view showing an embodiment of a retaining wall structure of the present invention.

【図2】図1の他の実施例を示す一部断面図である。FIG. 2 is a partial cross-sectional view showing another embodiment of FIG.

【図3】従来の擁壁構造を示す断面図である。FIG. 3 is a cross-sectional view showing a conventional retaining wall structure.

【符号の説明】[Explanation of symbols]

10 擁壁構造 11 壁版部 12 基版部 14 通水孔 15 貫通孔 17 テーパ面 18・24 コンクリート 25 鉄筋 10 Retaining wall structure 11 Wall plate part 12 Base plate part 14 Water passage hole 15 Through hole 17 Tapered surface 18/24 Concrete 25 Reinforcing bar

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 プレキャストコンクリート製壁版部と、
該壁版部の下部に当該壁版部の両側方へ突出する基版部
とが一体に形成され、該基版部に地盤に打ち込まれた杭
の上端部を挿入する貫通孔が設けられ、該貫通孔には杭
の軸に沿って漸次拡径したテーパ面が形成され、これら
貫通孔と杭との間に場所打ちコンクリートが打設されて
なることを特徴とする擁壁構造。
1. A wall part made of precast concrete,
A base plate portion projecting to both sides of the wall plate portion is integrally formed at a lower portion of the wall plate portion, and a through hole for inserting an upper end portion of a pile driven into the ground is provided in the base plate portion, A retaining wall structure characterized in that a tapered surface whose diameter gradually increases along the axis of the pile is formed in the through hole, and cast-in-place concrete is placed between the through hole and the pile.
【請求項2】 請求項1記載の擁壁構造であって、前記
杭の上端部から鉄筋が突出され、該鉄筋は、前記杭から
貫通孔上側に配されるとともに、前記コンクリートで覆
われていることを特徴とする擁壁構造。
2. The retaining wall structure according to claim 1, wherein a reinforcing bar is projected from an upper end portion of the pile, and the reinforcing bar is arranged above the through hole from the pile and is covered with the concrete. Retaining wall structure characterized by being present.
【請求項3】 請求項1記載の擁壁の施工方法であっ
て、あらかじめ前記プレキャストコンクリート製壁版部
と、該壁版部の下部に当該壁版部の両側方へ突出する基
版部とが一体に形成するとともに該基版部に貫通孔を形
成し、前記杭を地盤に打ち込み、該杭の上端部を前記貫
通孔に挿入し、これら貫通孔と杭との間に場所打ちコン
クリートを打設することを特徴とする擁壁の施工方法。
3. The retaining wall construction method according to claim 1, wherein the precast concrete wall slab part and a base plate part projecting to both sides of the wall slab part at a lower part of the wall slab part in advance. Form a through hole in the base plate portion with integrally formed, drive the pile into the ground, insert the upper end of the pile into the through hole, place cast concrete between these through holes and the pile. A method of constructing a retaining wall characterized by being cast.
JP4139310A 1992-05-29 1992-05-29 Retaining wall structure and its construction method Expired - Lifetime JP3026131B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4139310A JP3026131B2 (en) 1992-05-29 1992-05-29 Retaining wall structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4139310A JP3026131B2 (en) 1992-05-29 1992-05-29 Retaining wall structure and its construction method

Publications (2)

Publication Number Publication Date
JPH0657768A true JPH0657768A (en) 1994-03-01
JP3026131B2 JP3026131B2 (en) 2000-03-27

Family

ID=15242326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4139310A Expired - Lifetime JP3026131B2 (en) 1992-05-29 1992-05-29 Retaining wall structure and its construction method

Country Status (1)

Country Link
JP (1) JP3026131B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100382053B1 (en) * 1999-09-22 2003-04-26 김우기 Method for constructing breast wall using micro-file in direct-foundation
KR100387998B1 (en) * 2000-06-29 2003-06-18 주식회사 팸택 Block for Containing Wall and Method of Consolidating Base for Containing Wall
JP2005036641A (en) * 2003-06-23 2005-02-10 Fuji Autetsuku:Kk Construction method for retaining wall
KR100774020B1 (en) * 2006-09-30 2007-11-08 김근수 Open concrete wall
JP2014145228A (en) * 2013-01-30 2014-08-14 Geostr Corp Precast block serving as foundation part of tide embankment
CN109610407A (en) * 2018-05-10 2019-04-12 浙江华东工程建设管理有限公司 It is a kind of based on dead-weight balanced landslide-proofing Ecological Retaining Wall

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100382053B1 (en) * 1999-09-22 2003-04-26 김우기 Method for constructing breast wall using micro-file in direct-foundation
KR100387998B1 (en) * 2000-06-29 2003-06-18 주식회사 팸택 Block for Containing Wall and Method of Consolidating Base for Containing Wall
JP2005036641A (en) * 2003-06-23 2005-02-10 Fuji Autetsuku:Kk Construction method for retaining wall
KR100774020B1 (en) * 2006-09-30 2007-11-08 김근수 Open concrete wall
JP2014145228A (en) * 2013-01-30 2014-08-14 Geostr Corp Precast block serving as foundation part of tide embankment
CN109610407A (en) * 2018-05-10 2019-04-12 浙江华东工程建设管理有限公司 It is a kind of based on dead-weight balanced landslide-proofing Ecological Retaining Wall
CN109610407B (en) * 2018-05-10 2020-09-22 浙江华东工程建设管理有限公司 Ecological barricade of landslide prevention based on dead weight is balanced

Also Published As

Publication number Publication date
JP3026131B2 (en) 2000-03-27

Similar Documents

Publication Publication Date Title
JPH0657767A (en) Construction of precast gravity type retaining wall
KR20080077721A (en) The method of constructing bloclk for wall
JP2004232328A (en) Structure of half precast type arch culvert and its construction method
JPH0657768A (en) Retaining wall structure and working method thereof
KR100562686B1 (en) The underground structure and it&#39;s construction method is using sheet pile and cast in a place concrete
JP2020197015A (en) Construction method of foundation
JPH0892981A (en) Earth retaining wall
JP2000144769A (en) Method of landslide protection work for preparing housing lot
JPH10299003A (en) Foundation work using precast concrete member
JPH09111776A (en) Basement and construction method thereof
JPH0517956A (en) Concrete form and building foundation execution method using this concrete form
KR0165582B1 (en) Construction of the precast concrete wall
JP2824374B2 (en) Concrete block for foundation, manufacturing method thereof, and foundation construction method using the same
JPH04347214A (en) Pc pile anchoring precast concrete base and pile foundation method
JP2001064985A (en) Retaining wall work method and retaining wall structure for preparation or building site of the like
JPH0336967B2 (en)
JPH0748848A (en) Construction method for underground skeleton by inverted construction method
JPH11241349A (en) Mat foundation for dwelling house, and construction method thereof
JP2002061278A (en) Septic tank foundation and method for setting septic tank
JPH0716764Y2 (en) Retaining wall block
JPH05112949A (en) Execution method of foundation
JP2506978Y2 (en) Synthetic retaining wall
JPH06330529A (en) Mounting method of cast-in-place concrete strip footing and precast concrete wall slab
JPH02248527A (en) Constructing foundation structure
JPH05112948A (en) Permanent form and foundation execution method using it

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19991130