CN105599125A - 一种管桩防漏布料装置及其布料方法 - Google Patents

一种管桩防漏布料装置及其布料方法 Download PDF

Info

Publication number
CN105599125A
CN105599125A CN201610117827.XA CN201610117827A CN105599125A CN 105599125 A CN105599125 A CN 105599125A CN 201610117827 A CN201610117827 A CN 201610117827A CN 105599125 A CN105599125 A CN 105599125A
Authority
CN
China
Prior art keywords
distribution device
pile tube
leakproof
cell body
lower mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610117827.XA
Other languages
English (en)
Inventor
黄海燕
周勇军
彭端雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Is Pile Tube Co Ltd Energetically
Original Assignee
Fujian Is Pile Tube Co Ltd Energetically
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Is Pile Tube Co Ltd Energetically filed Critical Fujian Is Pile Tube Co Ltd Energetically
Priority to CN201610117827.XA priority Critical patent/CN105599125A/zh
Publication of CN105599125A publication Critical patent/CN105599125A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

一种管桩防漏布料装置及其布料方法,该布料装置整体呈长形槽体,该槽体上、下均开口;所述槽体上部为横截面为倒梯形的进料口,所述槽体下部为横截面为正梯形的出料口;所述出料口的高度与管模半径相当;所述槽体的前后端均设有端口板将两个侧部相连接;所述槽体的两侧部的外壁设有加强筋;所述槽体的长度不小于管模的长度。本发明由于有了防漏布料装置的协助,使得混凝土不会洒落在合模口和机架上,从而保证了合模的密封性和提高了管桩的生产效率。

Description

一种管桩防漏布料装置及其布料方法
【技术领域】
本发明涉及一种管桩防漏布料装置及其布料方法,属于混凝土管桩生产技术领域。
【背景技术】
随着我国基础建设的飞速发展,铁路、公路、桥梁建筑等都需要管桩来奠定基础,管桩需求量大大增加。
现有的管桩布料工艺是将钢筋骨架安装在下模体后,将预拌好的混凝土经布料机垂直布入下模体中,然后合上上模体经张拉、离型成型,最后制成管桩。此过程中混凝土的布料常有以下不足:a、布料不均匀、不可避免地有混凝土料洒落在合模口和机架(布料平台)上;b、洒落在合模口和机架(布料平台)上的混凝土料需用人工清理到下模体内能才合模,影响生产效率;c、由于清理不到位或在合上上模体时将混凝土料碰在合模口,致使合模后的密封性能差、管模易变形,影响成品质量;d、工人劳动强度大。
有鉴于此,本发明人针对现有技术的缺陷深入研究,遂有本案产生。
【发明内容】
本发明所要解决的技术问题在于提供一种管桩防漏布料装置及其布料方法。
本发明是这样实现的:
一种管桩防漏布料装置,该布料装置整体呈长形槽体,该槽体上、下均开口;所述槽体上部为横截面为倒梯形的进料口,所述槽体下部为横截面为正梯形的出料口;所述出料口的高度与管模半径相当;所述槽体的前后端均设有端口板将两个侧部相连接;所述槽体的两侧部的外壁设有加强筋;所述槽体的长度不小于管模的长度。
所述槽体的底部设有楔子。
所述槽体中部间隔地设置有多个横梁,连接所述槽体的两个侧部。
采用上述的一种管桩防漏布料装置的布料方法,包括如下步骤:
将钢筋骨架装配到下模体内;
将装配好钢筋骨架的下模体吊装至布料平台;
将所述管桩防漏布料装置装配到所述下模体上方;
布料机通过所述管桩防漏布料装置进行布料;
布料完毕,将所述管桩防漏布料装置撤出;
然后将上模体装配至下模体上方,经张拉、离型成型,最后制成管桩。
进一步地,所述管桩防漏布料装置的底部设有楔子,所述管桩防漏布料装置通过其楔子的导引装配到所述下模体上方。
本发明的优点在于:本发明由于有了防漏布料装置的协助,使得混凝土不会洒落在合模口和机架(布料平台)上,从而保证了合模的密封性和提高了管桩的生产效率。本发明可使年产120万米的生产线上减少用工10人,并大大降低工人的劳动强度;每根管桩的布料时间减少2分钟,生产效率明显提高。年减少固体垃圾750吨/年。
【附图说明】
下面参照附图结合实施例对本发明作进一步的描述。
图1是本发明中管桩防漏布料装置结构示意图。
图2是本发明中管桩防漏布料装置后视图。
图3是本发明中管桩防漏布料装置装配到下模体后的状态示意图。
图4是图3的剖视图。
【具体实施方式】
请参阅图1至图4所示,一种管桩防漏布料装置100,该布料装置100整体呈长形槽体,该槽体上、下均开口;所述槽体上部为横截面为倒梯形的进料口101,所述槽体下部为横截面为正梯形的出料口102;出料口102的高度与管模半径相当;所述槽体的两端均设有端口板103将两个侧部104相连接;所述槽体的两侧部104的外壁设有加强筋105。所述槽体的底部设有楔子106。所述槽体的长度不小于管模的长度。
所述槽体中部间隔地设置有多个横梁107,连接所述槽体的两个侧部104。
采用上述的一种管桩防漏布料装置的布料方法,包括如下步骤:
将钢筋骨架装配到下模体内;
将装配好钢筋骨架的下模体吊装至布料平台;
将所述管桩防漏布料装置100通过其楔子106的导引装配到所述下模体200上方,出料口102形成混凝土限位体,从而防漏,如图3所示;
布料机通过所述管桩防漏布料装置100进行布料;
布料完毕,将所述管桩防漏布料装置100撤出;
然后将上模体装配至下模体上方,经张拉、离型成型,最后制成管桩。
本发明由于有了防漏布料装置的协助,使得混凝土不会洒落在合模口和机架(布料平台)上,从而保证了合模的密封性和提高了管桩的生产效率。本发明可使年产120万米的生产线上减少用工10人,并大大降低工人的劳动强度;每根管桩的布料时间减少2分钟,生产效率明显提高。年减少固体垃圾750吨/年。
以上所述仅为本发明的较佳实施用例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换以及改进等,均应包含在本发明的保护范围之内。

Claims (5)

1.一种管桩防漏布料装置,其特征在于:该布料装置整体呈长形槽体,该槽体上、下均开口;所述槽体上部为横截面为倒梯形的进料口,所述槽体下部为横截面为正梯形的出料口;所述出料口的高度与管模半径相当;所述槽体的前后端均设有端口板将两个侧部相连接;所述槽体的两侧部的外壁设有加强筋;所述槽体的长度不小于管模的长度。
2.如权利要求1所述的一种管桩防漏布料装置,其特征在于:所述槽体的底部设有楔子。
3.如权利要求1所述的一种管桩防漏布料装置,其特征在于:所述槽体中部间隔地设置有多个横梁,连接所述槽体的两个侧部。
4.采用如权利要求1所述的一种管桩防漏布料装置的布料方法,其特征在于:包括如下步骤:
将钢筋骨架装配到下模体内;
将装配好钢筋骨架的下模体吊装至布料平台;
将所述管桩防漏布料装置装配到所述下模体上方;
布料机通过所述管桩防漏布料装置进行布料;
布料完毕,将所述管桩防漏布料装置撤出;
然后将上模体装配至下模体上方,经张拉、离型成型,最后制成管桩。
5.采用如权利要求4所述的一种管桩防漏布料装置的布料方法,其特征在于:所述管桩防漏布料装置的底部设有楔子,所述管桩防漏布料装置通过其楔子的导引装配到所述下模体上方。
CN201610117827.XA 2016-03-03 2016-03-03 一种管桩防漏布料装置及其布料方法 Pending CN105599125A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610117827.XA CN105599125A (zh) 2016-03-03 2016-03-03 一种管桩防漏布料装置及其布料方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610117827.XA CN105599125A (zh) 2016-03-03 2016-03-03 一种管桩防漏布料装置及其布料方法

Publications (1)

Publication Number Publication Date
CN105599125A true CN105599125A (zh) 2016-05-25

Family

ID=55979719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610117827.XA Pending CN105599125A (zh) 2016-03-03 2016-03-03 一种管桩防漏布料装置及其布料方法

Country Status (1)

Country Link
CN (1) CN105599125A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105856408A (zh) * 2016-06-02 2016-08-17 江门市新会区天海有限公司 一种用于水泥杆生产的混凝土喂料工具及其使用方法
CN111015931A (zh) * 2019-12-28 2020-04-17 天津宝丰建材有限公司 一种离心无浆桩杆生产工艺及配套引料模具和振动布料车
CN112428408A (zh) * 2020-11-23 2021-03-02 富强科技股份有限公司 一种管桩混凝土浇筑用行走装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275221A (zh) * 2011-08-20 2011-12-14 周兆弟 混凝土管桩成型模及混凝土管桩成型方法
KR20130087227A (ko) * 2012-01-27 2013-08-06 (주)파일테크 상하 분할 강관의 용접을 이용한 콘크리트 보강 강관말뚝의 제작방법
CN203418636U (zh) * 2013-05-01 2014-02-05 吴广明 均布槽和挡料板为一体的均体积快速布料***
CN204566356U (zh) * 2015-03-30 2015-08-19 江苏扬泰中天管桩有限公司 一种管桩混凝土自动布料机
CN205466695U (zh) * 2016-03-03 2016-08-17 福建大力新型建材科技有限公司 一种管桩防漏布料装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275221A (zh) * 2011-08-20 2011-12-14 周兆弟 混凝土管桩成型模及混凝土管桩成型方法
KR20130087227A (ko) * 2012-01-27 2013-08-06 (주)파일테크 상하 분할 강관의 용접을 이용한 콘크리트 보강 강관말뚝의 제작방법
CN203418636U (zh) * 2013-05-01 2014-02-05 吴广明 均布槽和挡料板为一体的均体积快速布料***
CN204566356U (zh) * 2015-03-30 2015-08-19 江苏扬泰中天管桩有限公司 一种管桩混凝土自动布料机
CN205466695U (zh) * 2016-03-03 2016-08-17 福建大力新型建材科技有限公司 一种管桩防漏布料装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105856408A (zh) * 2016-06-02 2016-08-17 江门市新会区天海有限公司 一种用于水泥杆生产的混凝土喂料工具及其使用方法
CN111015931A (zh) * 2019-12-28 2020-04-17 天津宝丰建材有限公司 一种离心无浆桩杆生产工艺及配套引料模具和振动布料车
CN112428408A (zh) * 2020-11-23 2021-03-02 富强科技股份有限公司 一种管桩混凝土浇筑用行走装置

Similar Documents

Publication Publication Date Title
CN105599125A (zh) 一种管桩防漏布料装置及其布料方法
CN104563573B (zh) 一种模块式拼装池
CN207141980U (zh) 一种带有脚梯件的液罐车防波板
CN205466695U (zh) 一种管桩防漏布料装置
CN208529402U (zh) 一种一次性浇注多用途钢筋混凝土池生产模具
CN201645746U (zh) 土工格栅多工位注编机
CN209453841U (zh) 一种管桩布料盖模
CN209665723U (zh) 一种简易的pc叠合楼板生产模具
CN201495767U (zh) 带肋双曲线筒壁的模板体系
CN103669894B (zh) 一种钢筋砼筒仓内壁的加固方法及结构
CN214725774U (zh) 一种立式多孔成型模具
CN210450354U (zh) 新能源电池包吊耳型材挤压模具
CN101486226B (zh) 模壳制造方法
CN205954533U (zh) 新型组合式隔离墩
CN201834040U (zh) 超市购物手推车
CN207616865U (zh) 一种管桩布料模具
DE102020120859A1 (de) Gehäuseunterteil eines Energiespeichergehäuses sowie Energiespeichergehäuse
CN217211879U (zh) 一种专用路面混凝土立方体抗压试模
CN207310186U (zh) 一种水渠渠槽侧通预制件模具
CN202271442U (zh) 搅拌车出料溜槽
CN211993923U (zh) 一种线材和端子焊接后注塑机
CN202688831U (zh) 路面排水沟成型模具
CN206663481U (zh) 可以防止余浆沾附的电杆模具
CN101446132A (zh) 可调节宽度式圆弧形大钢模
CN211549719U (zh) 一种隧道水沟电缆槽台车用水沟槽模具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 350200 Fuzhou City, Changle City, the town of Ocean Street, Lantau Island Village (Xin Tong pier)

Applicant after: Fujian Dali New Building Materials Technology Co., Ltd.

Address before: 350200 Fuzhou City, Changle City, the town of Ocean Street, Lantau Island Village (Xin Tong pier)

Applicant before: Fujian is pile tube Co., Ltd energetically

COR Change of bibliographic data
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160525