CN105584939A - Arm head special for wind power generator hoisting - Google Patents

Arm head special for wind power generator hoisting Download PDF

Info

Publication number
CN105584939A
CN105584939A CN201410569979.4A CN201410569979A CN105584939A CN 105584939 A CN105584939 A CN 105584939A CN 201410569979 A CN201410569979 A CN 201410569979A CN 105584939 A CN105584939 A CN 105584939A
Authority
CN
China
Prior art keywords
arm
arm head
wind
tie
electricity generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410569979.4A
Other languages
Chinese (zh)
Other versions
CN105584939B (en
Inventor
胡全义
凌永宏
张渊
徐建筑
崔光新
杨少楠
任卫涛
孙学红
左振双
刘光伟
白俊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yutong heavy equipment Co.,Ltd.
Original Assignee
Zhengzhou Yutong Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yutong Heavy Industry Co Ltd filed Critical Zhengzhou Yutong Heavy Industry Co Ltd
Priority to CN201410569979.4A priority Critical patent/CN105584939B/en
Publication of CN105584939A publication Critical patent/CN105584939A/en
Application granted granted Critical
Publication of CN105584939B publication Critical patent/CN105584939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wind Motors (AREA)
  • Jib Cranes (AREA)

Abstract

The invention provides an arm head special for wind power generator hoisting, comprising two parts, namely a connecting arm head and a wind power generator arm head, wherein the rear end of the connecting arm head is connected with a main arm transitional arm, the lower part of the front end of the connecting arm head is connected with the wind power arm head by a hinge pin, the upper part of the front end of the connecting arm head is connected with the wind power generator arm head by a foldable pulling plate, at least one arm head connecting hole matched with the front end of the foldable pulling plate is formed in the front end of the connecting arm head, a connecting hinge pin penetrates through the arm head connecting hole and a pulling plate connecting hole to connect the foldable pulling plate with the connecting arm head, and the front end of the wind power generator arm head is provided with suspended-weight pulley block and a drag wheel. Compared with adoption of fixed auxiliary arm hoisting and existing wind power generator dedicated arm head hoisting, the arm head special for wind power generator hoisting is reasonable in structure design, strong in comprehensive loading capability, safe and reliable in work, and convenient and quick for mounting and dismounting, thus improving the mounting efficiency of wind turbine generators.

Description

A kind of wind-powered electricity generation lifts special arm head
Technical field
The invention belongs to crane hanging component arm-head device technical field, relate in particular to a kind of wind-powered electricity generation and lift special arm head.
Background technology
At present, mainly use crawler crane to carry out lifting operation in wind-powered electricity generation lifting industry, because most wind-powered electricity generation installment work is all to carry out on the ground in limited spatial field, on lifting operation impact larger be mainly Lifting Capacity and the lifting efficiency of crane. It is mainly by fixing auxiliary (as shown in Figure 1) operating mode or the special arm head of wind-powered electricity generation (as shown in Figures 2 and 3) operating mode that wind power generating set is installed on market now. Use fixing auxiliary operating mode, in the time that jib is installed, the parts such as fixing auxiliary, auxiliary support, front arm-tie and rear arm-tie need to be installed on principal arm, the time-consuming effort of installing/dismounting; And it is more that principal arm top increases parts, and weight is heavier, larger to long-armed stability influence, thereby unit assembling of ship machinery ability declines to some extent. The special arm head of common wind-powered electricity generation in the market, mainly contain two kinds of forms, one is fixed special arm head (as shown in Figure 2), between special arm head and principal arm, there is fixing angle, in the time that being installed, jib principal arm middle node part need to be propped to certain height, ability Normal Takeoff and Landing jib, need to carry out aerial work; A kind of is movable special arm head (as shown in Figure 3), special arm head upper articulation, bottom is the connected mode of face contact, because bottom can freely separate, special arm head and principal arm be connected dislocation may cause face contact because of strain or mismachining tolerance time, and in the time of arm head Condition of Sudden Unloading, there is the danger of tipping backwards.
Summary of the invention
The object of this invention is to provide a kind of wind-powered electricity generation and lift special arm head, the problem producing while using fixing auxiliary lifting or the special arm head lifting of wind-powered electricity generation wind power generating set to solve, thus the set-up time saved, improve Lifting Capacity, reliable and stable work, enhances productivity.
The object of the invention is to realize in the following manner:
A kind of wind-powered electricity generation lifts special arm head, comprise and connect arm head and wind-powered electricity generation arm head two parts, connecting arm head rear end is connected with principal arm transition arm, the bottom that connects arm head front end is connected with wind-powered electricity generation arm head by bearing pin, the top that connects arm head front end is connected with wind-powered electricity generation arm head by collapsible arm-tie, connect arm head front end and be provided with the arm head connecting hole that at least one and foldable pull front edge of board match, connect bearing pin through arm head connecting hole and arm-tie connecting hole by collapsible arm-tie be connected arm head and be connected, wind-powered electricity generation arm head front end installation hoisting pulley block and tugboat.
Described connection arm head is High-strength plate Welding Structure.
Principal arm arm-tie is housed on described connection arm head and connects otic placode and leading block group.
Described collapsible arm-tie comprises the arm-tie that two joints are hinged, and wherein a joint arm-tie and wind-powered electricity generation arm head are hinged, and another joint end is provided with the arm-tie connecting hole matching with arm head connecting hole.
The first segment arm-tie being connected with wind-powered electricity generation arm head is monolithic arm-tie, and the second section arm-tie being connected with arm head connecting hole is biplate arm-tie, on biplate arm-tie, is provided with block.
Correspondingly be provided with fixing otic placode in the middle part that connects arm head and wind-powered electricity generation arm head end.
Reasonable in design of the present invention, integrated load ability is strong, safe and reliable, easy installation and removal is quick, the situation that particularly lifting needs frequent dismounting jib, transition to transport for wind-powered electricity generation, it is movable between wind-powered electricity generation arm head and principal arm that wind-powered electricity generation provided by the invention lifts special arm head in the time of installing/dismounting, and when work wind-powered electricity generation arm head and principal arm between fix, can improve the Lifting Capacity of wind-powered electricity generation operating mode, save the jib installing/dismounting time, greatly reduce workman's workload, improved the installation effectiveness of wind-powered electricity generation unit.
Brief description of the drawings
Jib installment state schematic diagram when Fig. 1 is the fixing auxiliary using at present;
Fig. 2 uses the special arm head jib of fixed wind-powered electricity generation installment state schematic diagram at present;
Fig. 3 uses the movable special arm head jib of wind-powered electricity generation installment state schematic diagram at present;
Fig. 4 is that wind-powered electricity generation of the present invention lifts special arm head jib installment state schematic diagram;
Fig. 5 is that wind-powered electricity generation of the present invention lifts special arm head jib travel position schematic diagram;
Fig. 6 is wind-powered electricity generation lifting Special arm header structure schematic diagram of the present invention;
Fig. 7 is that the present invention connects arm-tie top view.
Wherein, the 1st, tugboat; The 2nd, hoisting pulley block; The 3rd, wind-powered electricity generation arm head; The 4th, collapsible arm-tie; The 5th, connecting hole; The 6th, leading block group; The 7th, principal arm arm-tie connects otic placode; The 8th, connect arm head; The 9th, fixing otic placode; The 10th, principal arm transition arm, the 11st, arm-tie connecting hole; The 12nd, first segment arm-tie; The 13rd, second section arm-tie; The 14th, block.
Detailed description of the invention
As shown in accompanying drawing 4-7, a kind of wind-powered electricity generation lifts special arm head, comprise and connect arm head 8 and wind-powered electricity generation arm head 3 two parts, connecting arm head 8 rear ends is connected with principal arm transition arm 10, the bottom that connects arm head 8 front ends is connected with wind-powered electricity generation arm head 3 by bearing pin, the top that connects arm head 8 front ends is connected with wind-powered electricity generation arm head 3 by collapsible arm-tie 4, connect arm head 8 front ends and be provided with the arm head connecting hole 5 that at least one and collapsible arm-tie 4 front ends match, connect bearing pin through arm head connecting hole 5 and arm-tie connecting hole 11 by collapsible arm-tie 4 be connected arm head 8 and be connected, wind-powered electricity generation arm head front end is installed hoisting pulley block 2 and tugboat 1.
Wind-powered electricity generation arm head 3 is connected and changes operating angle from different arm head connecting holes 5 by collapsible arm-tie 4, and more Hoisting Program is provided. Wind-powered electricity generation arm head 3 adopts the truss structure of equal strength design, is connected and changes operating angle, by the rotation change of collapsible arm-tie 4 and the angle of principal arm by collapsible arm-tie 4 from different arm head connecting holes 5.
Connecting arm head 8 is High-strength plate Welding Structures, connects on arm head 8 otic placode 7 and the leading block group 6 that principal arm arm-tie connects is housed, and is used for improving principal arm stressing conditions, improves the loading capability that hangs of arm head, changes lift heavy steel wire rope direction.
As shown in Figure 7, collapsible arm-tie 4 of the present invention comprises the arm-tie that two joints are hinged, and wherein a joint arm-tie and wind-powered electricity generation arm head 3 are hinged, and another joint end is provided with the arm-tie connecting hole 11 matching with arm head connecting hole 5; The first segment arm-tie 12 being connected with wind-powered electricity generation arm head 3 is monolithic arm-ties, and the second section arm-tie 13 being connected with arm head connecting hole is biplate arm-ties, is provided with block 14 on biplate arm-tie.
Correspondingly be provided with fixing otic placode 9 in the middle part that connects arm head 8 and wind-powered electricity generation arm head 3 ends, can be by the rotation of described collapsible arm-tie 4 in the time of transport, connection arm head 8 and wind-powered electricity generation arm head 3 are combined into an entirety with fixing otic placode 9.
In the time that jib is installed, can make linking arm head 8 and wind-powered electricity generation arm head 3 centerline on same level position by the folding of collapsible arm-tie 4, conveniently install on ground. In the time that jib plate rises, along with the variation of principal arm angle, collapsible arm-tie 4 can be opened automatically, reaches duty, and is welded with block 14 on collapsible arm-tie 4, can prevent the tipping backwards danger of wind-powered electricity generation arm head 3. In transportation, can be by the rotation of described collapsible arm-tie 4, with fixing otic placode 9, connection arm head 8 and wind-powered electricity generation arm head 3 are combined into an entirety and process, greatly simplify installing/dismounting process.
Above-described is only the preferred embodiment of the present invention; should be understood that; for a person skilled in the art; do not departing under general idea prerequisite of the present invention; can also make some changes and improvements; these also should be considered as protection scope of the present invention, and these can not affect effect of the invention process and practical applicability.

Claims (6)

1. a wind-powered electricity generation lifts special arm head, comprise and connect arm head (8) and wind-powered electricity generation arm head (3) two parts, connecting arm head (8) rear end is connected with principal arm transition arm (10), it is characterized in that: the bottom that connects arm head (8) front end is connected with wind-powered electricity generation arm head (3) by bearing pin, the top that connects arm head (8) front end is connected with wind-powered electricity generation arm head (3) by collapsible arm-tie (4), connect arm head (8) front end and be provided with the arm head connecting hole (5) that at least one and collapsible arm-tie (4) front end match, connect bearing pin through arm head connecting hole (5) and arm-tie connecting hole (11) by collapsible arm-tie (4) be connected arm head (8) and be connected, wind-powered electricity generation arm head front end is installed hoisting pulley block (2) and tugboat (1).
2. wind-powered electricity generation according to claim 1 lifts special arm head, it is characterized in that: described connection arm head (8) is High-strength plate Welding Structure.
3. wind-powered electricity generation according to claim 1 lifts special arm head, it is characterized in that: principal arm arm-tie is housed on described connection arm head (8) and connects otic placode (7) and leading block group (6).
4. wind-powered electricity generation according to claim 1 lifts special arm head, it is characterized in that: described collapsible arm-tie (4) comprises the arm-tie that two joints are hinged, wherein a joint arm-tie and wind-powered electricity generation arm head (3) are hinged, and another joint end is provided with the arm-tie connecting hole (11) matching with arm head connecting hole (5).
5. wind-powered electricity generation according to claim 4 lifts special arm head, it is characterized in that: the first segment arm-tie (12) being connected with wind-powered electricity generation arm head (3) is monolithic arm-tie, the second section arm-tie (13) being connected with arm head connecting hole is biplate arm-tie, is provided with block (14) on biplate arm-tie.
6. wind-powered electricity generation according to claim 1 lifts special arm head, it is characterized in that: be correspondingly provided with fixing otic placode (9) in the middle part that connects arm head (8) and wind-powered electricity generation arm head (3) end.
CN201410569979.4A 2014-10-23 2014-10-23 A kind of wind-powered electricity generation lifts special arm head Active CN105584939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410569979.4A CN105584939B (en) 2014-10-23 2014-10-23 A kind of wind-powered electricity generation lifts special arm head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410569979.4A CN105584939B (en) 2014-10-23 2014-10-23 A kind of wind-powered electricity generation lifts special arm head

Publications (2)

Publication Number Publication Date
CN105584939A true CN105584939A (en) 2016-05-18
CN105584939B CN105584939B (en) 2017-08-22

Family

ID=55924893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410569979.4A Active CN105584939B (en) 2014-10-23 2014-10-23 A kind of wind-powered electricity generation lifts special arm head

Country Status (1)

Country Link
CN (1) CN105584939B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115508A (en) * 2016-08-26 2016-11-16 南通力威机械有限公司 A kind of combination type pontoon hangs
CN114408773A (en) * 2021-12-24 2022-04-29 湖南中联重科履带起重机有限公司 Wind-powered electricity generation hoist and mount arm head and hoist
WO2023274263A1 (en) * 2021-06-30 2023-01-05 湖南三一中型起重机械有限公司 Multi-working-condition lattice jib head and crane

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830404A (en) * 2010-05-13 2010-09-15 辽宁抚挖重工机械股份有限公司 Special boom head device of crawler crane for wind generating set
KR20110072560A (en) * 2009-12-23 2011-06-29 현대중공업 주식회사 Crane for upper part block package installation of wind power plant structure
CN202785397U (en) * 2012-09-25 2013-03-13 中联重科股份有限公司 Crane with a movable crane
CN103086283A (en) * 2013-01-24 2013-05-08 中联重科股份有限公司 Cargo boom and tower crane with same
CN103342301A (en) * 2013-07-24 2013-10-09 徐州重型机械有限公司 Special independent arm head for wind electricity
CN204211393U (en) * 2014-10-23 2015-03-18 郑州宇通重工有限公司 A kind of wind-powered electricity generation lifts special arm head

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110072560A (en) * 2009-12-23 2011-06-29 현대중공업 주식회사 Crane for upper part block package installation of wind power plant structure
CN101830404A (en) * 2010-05-13 2010-09-15 辽宁抚挖重工机械股份有限公司 Special boom head device of crawler crane for wind generating set
CN202785397U (en) * 2012-09-25 2013-03-13 中联重科股份有限公司 Crane with a movable crane
CN103086283A (en) * 2013-01-24 2013-05-08 中联重科股份有限公司 Cargo boom and tower crane with same
CN103342301A (en) * 2013-07-24 2013-10-09 徐州重型机械有限公司 Special independent arm head for wind electricity
CN204211393U (en) * 2014-10-23 2015-03-18 郑州宇通重工有限公司 A kind of wind-powered electricity generation lifts special arm head

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115508A (en) * 2016-08-26 2016-11-16 南通力威机械有限公司 A kind of combination type pontoon hangs
WO2023274263A1 (en) * 2021-06-30 2023-01-05 湖南三一中型起重机械有限公司 Multi-working-condition lattice jib head and crane
CN114408773A (en) * 2021-12-24 2022-04-29 湖南中联重科履带起重机有限公司 Wind-powered electricity generation hoist and mount arm head and hoist

Also Published As

Publication number Publication date
CN105584939B (en) 2017-08-22

Similar Documents

Publication Publication Date Title
CN109843777B (en) Method and apparatus for performing maintenance on wind turbine components
CN102267670B (en) Connecting frame, boom system with connecting frame, and lifting appliance
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN105584939A (en) Arm head special for wind power generator hoisting
CN101830404A (en) Special boom head device of crawler crane for wind generating set
CN204211393U (en) A kind of wind-powered electricity generation lifts special arm head
CN103061521B (en) Coliseum Steel Cantilever Truss torque type mounting method
CN202148134U (en) Dedicated hanging beam for hanging single blade of wind turbine
CN204474189U (en) A kind of tower machine standard knot
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN107140557B (en) Special arm support structure for wind power and crane
CN208378182U (en) Wind driven generation set main shaft lifting device
CN202465024U (en) Balance hoisting appliance for wind generator nacelle hoisting
CN201703997U (en) Special wind power arm head device for caterpillar crane
CN203401253U (en) Cage-type welding rotatable tire of tower crane cargo boom frame
CN201686393U (en) Derrick mast hoisting tool
CN105109665B (en) A kind of multi-functional wing jack nest
CN203439963U (en) Folding arm crane head winding device
CN102616681A (en) Cargo boom root segment and tower crane comprising same
CN207593154U (en) A kind of wind power foundation ring is turned over connection lifting lug
CN109747786A (en) 400 tons of pulling winch support constructions and installation method in ocean engineering cabin
CN204778489U (en) Large -scale super high load -lifting height crane barge
CN108928733B (en) Lifting tool and method suitable for marine supercharged boiler
CN105000492B (en) Scissor-like jack with body paint defencive function
CN212374668U (en) Foldable cage top railing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180608

Address after: 451482, three story, general office building, 88 oyu Road, Zhengzhou economic and Technological Development Zone, Henan.

Patentee after: Zhengzhou Zhengyu Heavy Industry Co., Ltd.

Address before: 451482 No. 88, Yu Gong Road, Zhengzhou economic and Technological Development Zone, Henan

Patentee before: Zhengzhou Yutong Heavy Industry Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 451482, three story, general office building, 88 oyu Road, Zhengzhou economic and Technological Development Zone, Henan.

Patentee after: Yutong heavy equipment Co.,Ltd.

Address before: 451482, three story, general office building, 88 oyu Road, Zhengzhou economic and Technological Development Zone, Henan.

Patentee before: ZHENGZHOU ZHENGYU HEAVY INDUSTRY Co.,Ltd.