CN105569203B - The optimization method of buttress node - Google Patents

The optimization method of buttress node Download PDF

Info

Publication number
CN105569203B
CN105569203B CN201510975949.8A CN201510975949A CN105569203B CN 105569203 B CN105569203 B CN 105569203B CN 201510975949 A CN201510975949 A CN 201510975949A CN 105569203 B CN105569203 B CN 105569203B
Authority
CN
China
Prior art keywords
muscle
buttress
gluten
indulge
stirrup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510975949.8A
Other languages
Chinese (zh)
Other versions
CN105569203A (en
Inventor
梁潮柱
钟灿辉
梁慧文
詹伟澍
周碧
刘剑
黄建中
梁广勇
何燕芳
孔志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Academy Of Building Sciences Group Co ltd
Guangzhou Jishi Construction Group Co ltd
Original Assignee
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority to CN201510975949.8A priority Critical patent/CN105569203B/en
Publication of CN105569203A publication Critical patent/CN105569203A/en
Application granted granted Critical
Publication of CN105569203B publication Critical patent/CN105569203B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses the optimization methods of buttress node, including buttress and built-in fitting, built-in fitting includes embedded board, affixed multiple pre-embedded bolts and multiple rivets vertical with embedded board, buttress has buttress steel member, buttress steel member includes that beam gluten indulges muscle and the vertical muscle of column, and it includes vertically anchoring into section and bending section that column, which indulges muscle,;When column indulges muscle and pre-embedded bolt there are space crossed, 0.35-0.4 times for anchoring into that length is the antidetonation anchorage length that column indulges muscle of section is vertically anchored into, the anchorage length of bending section is 15-20 times of the vertical muscle diameter of column;When column indulges muscle and pre-embedded bolt there are space crossed, the plan-position and buried depth for adjusting pre-embedded bolt make pre-embedded bolt and column indulge muscle interval;When beam gluten indulges muscle and rivet there are space crossed, the quantity for keeping beam gluten to indulge muscle is constant, and adjacent beams gluten is adjusted according to the embedding position of rivet and indulges the distance between muscle, so that the vertical muscle of beam gluten and rivet space;Built-in fitting is set smoothly to place, be mounted on buttress.

Description

The optimization method of buttress node
Technical field
The present invention relates to building fields, the in particular to optimization method of buttress node.
Background technique
Seismic isolation technology is to achieve the purpose that shock insulation by establishing Seismic Isolation of Isolation Layer, and Seismic Isolation of Isolation Layer includes lower buttress, two built-in fittings, soft Property shock isolating pedestal and upper buttress, two built-in fittings be separately mounted on lower buttress and upper buttress on, shock isolating pedestal is mounted on lower buttress Between upper buttress, there are the vertically and horizontally vertical muscle of beam, floor bottom muscle and gluten, column vertical muscle, buttress water in lower buttress and upper buttress position The components such as flat muscle, buttress distributing bar, node location steel member is more, interlocks, and built-in fitting includes embedded board and is fixed in pre- Pre-embedded bolt and rivet on buried plate, when installing built-in fitting, pre-embedded bolt and column indulge muscle there may be space crossed, may lead Embedded board, pre-embedded bolt and rivet is caused to be difficult to place;The horizontal bar of buttress surface layer, buttress construction stirrup and vertically and horizontally beam gluten, Floor gluten etc. mutually forms intersection, and arrangement is closeer, also results in embedded board, bolt and rivet and is difficult to place, built-in fitting is difficult to Smoothly it is installed on buttress.
Summary of the invention
In view of the deficiencies of the prior art, the purpose of the present invention is to provide the optimization method of buttress node, enable built-in fitting It smoothly places, be mounted on buttress.
To achieve the above object, the present invention adopts the following technical scheme that:
The optimization method of buttress node, buttress node include buttress and built-in fitting, and installation of embedded parts is on the top of buttress, in advance Embedded part includes embedded board, multiple pre-embedded bolts and multiple rivets, and pre-embedded bolt and rivet are solid with the plane perpendicular of embedded board respectively It connects, buttress has buttress steel member, and buttress steel member includes that a plurality of beam gluten indulges muscle and the vertical muscle of column, and beam gluten indulges muscle positioned at pre-buried The lower section of plate, the length direction that beam gluten indulges muscle is vertical with the pre-embedded bolt and rivet, and column indulges muscle and is located at the vertical muscle of beam gluten Lower section, column indulge muscle include extend along the vertical direction vertically anchor into section and horizontally extending bending section, bending section and hang down Directly anchor into the top connection of section.
The buttress steel member further includes beam bottom flaccidity of tendon and muscle muscle, and beam bottom flaccidity of tendon and muscle muscle is located at lower section and the beam bottom muscle that beam gluten indulges muscle The length direction of vertical muscle is consistent with the vertical length direction of muscle of beam gluten;
The buttress steel member further includes that buttress construction stirrup, floor gluten and floor bottom muscle, the buttress construct stirrup Including a horizontal segment, two first vertical sections, two tilting sections and two second vertical sections, the both ends of horizontal segment and two first vertical sections Top connection, two first vertical sections are symmetrical with the middle line of horizontal segment, and the top of horizontal segment is bonded with the bottom end of embedded board, two inclinations The top of section connect with the bottom end of two first vertical sections respectively, and two tilting sections intersection, the top of two second vertical sections is respectively with two The bottom end of tilting section connects, and flooring plate muscle is located at the embedded board and the beam gluten is indulged between muscle and the length side of flooring plate muscle To indulging with beam gluten, the length direction of muscle is consistent, and bottom of the building plate muscle is located between the vertical muscle of beam gluten and beam bottom flaccidity of tendon and muscle muscle and floor bottom muscle Length direction and beam gluten to indulge the length direction of muscle consistent.
The buttress steel member further includes that muscle is indulged in longitudinal beam face, muscle and buttress horizontal bar are indulged in longitudinal beam bottom, and longitudinal beam face is vertical Muscle be interspersed in the beam gluten indulge muscle and the buttress construction stirrup horizontal segment between, longitudinal beam face indulge muscle length direction with Plane where the buttress construction stirrup is vertical, and buttress horizontal bar is interspersed in the inside of the buttress construction muscle, and buttress is horizontal Muscle is multiple and is alternatively arranged on the inside of buttress construction stirrup that the length direction of buttress horizontal bar indulges the length of muscle with longitudinal beam face Spend that direction is consistent, the longitudinal beam bottom indulge muscle be located at beam bottom flaccidity of tendon and muscle muscle the vertical muscle in lower section and longitudinal beam bottom length direction with it is described The length direction that muscle is indulged in longitudinal beam face is consistent.
Preferably, the embedded board is thickness 30-45mm, and side length is the square steel plate of 960-1600mm, the rivet Using No. 45 solid round steel, using being threadedly coupled between rivet and embedded board, the length of screw thread is not less than the thickness of embedded board, institute The top for stating embedded board is equipped with a through-hole for mixed mud casting, and the diameter of the through-hole is 96-104mm;Including:
When the column indulge muscle and the pre-embedded bolt there are it is space crossed when, adjust the plan-position of pre-embedded bolt and embedding Depth makes pre-embedded bolt and column indulge muscle interval;
When the beam gluten indulge muscle and the rivet there are it is space crossed when, the quantity for keeping beam gluten to indulge muscle is constant, root Adjacent beams gluten is adjusted according to the embedding position of rivet and indulges the distance between muscle, so that beam gluten indulges muscle and rivet space.
When the beam bottom flaccidity of tendon and muscle muscle and the column indulge muscle there are it is space crossed when, keep the quantity of beam bottom flaccidity of tendon and muscle muscle constant, Spacing between adjustment beam bottom flaccidity of tendon and muscle muscle enables the vertical muscle of column to pass through between beam bottom flaccidity of tendon and muscle muscle.
When the buttress construction stirrup and the beam gluten indulge muscle there are it is space crossed when, keep buttress construction stirrup number Constant, the spacing of adjustment buttress construction stirrup is measured, so that beam gluten is indulged muscle and can be passed through between buttress construction stirrup;
When the buttress construction stirrup and the pre-embedded bolt there are it is space crossed when, adjust the plane position of pre-embedded bolt It sets, so that pre-embedded bolt and buttress construct stirrup interval;
When the buttress construction stirrup and the rivet there are it is space crossed when, the plan-position of rivet is adjusted, so that riveting Nail constructs stirrup interval with buttress;
When the buttress construction stirrup and the floor gluten there are it is space crossed when, keep buttress construction stirrup quantity Constant, the distance between adjustment buttress construction stirrup passes through so that floor gluten can construct between stirrup from buttress.
When the longitudinal beam face indulge muscle and the beam gluten indulge muscle there are it is space crossed when, increase the buttress construction stirrup Horizontal segment and beam gluten indulge the distance between muscle so that the upper end of embedded board is 80-100mm with floor gluten at a distance from;
When there are the levels for when space, increasing the buttress construction stirrup for the floor gluten and buttress construction stirrup Duan Yuliang gluten indulges the distance between muscle, so that the upper end of embedded board is 80-100mm at a distance from floor gluten;
When there are the water for when space, increasing the buttress construction stirrup for the buttress horizontal bar and buttress construction stirrup Flat section and beam gluten indulge the distance between muscle, so that the upper end of embedded board is 80-100mm at a distance from floor gluten;
When the longitudinal beam face indulge muscle and buttress construction stirrup there are it is space crossed when, keep buttress construction stirrup Quantity is constant, the distance between adjustment buttress construction stirrup, so that longitudinal beam face is indulged muscle and can be passed through between buttress construction stirrup;
When the longitudinal beam face indulge muscle and the rivet there are it is space crossed when, the plan-position for adjusting rivet makes rivet Muscle interval is indulged with longitudinal beam face.
When the longitudinal beam face indulge muscle and the beam gluten indulge muscle there are it is space crossed when, increase the buttress construction stirrup Horizontal segment and beam gluten indulge the distance between muscle so that the upper end of embedded board is 100mm with floor gluten at a distance from.
When the longitudinal beam face indulge muscle, floor gluten in the built-in fitting pre-embedded bolt and rivet there are space crossed When, the erection sequence of the buttress steel member is adjusted, erection sequence is followed successively by:Indulge muscle, beam bottom flaccidity of tendon and muscle muscle, buttress structure in longitudinal beam bottom It makes stirrup, buttress horizontal bar, floor bottom muscle, built-in fitting, beam gluten and indulges muscle, longitudinal beam face vertical muscle, floor gluten.
Compared with the prior art, the beneficial effects of the present invention are:By in optimization buttress steel member all kinds of reinforcing bars it is flat Face arrangement and erection sequence, by optimizing the horizontal layout and buried depth of pre-embedded bolt and rivet, enable embedded board it is smooth, It is accurately mounted on buttress, reduces all kinds of reinforcing bars in buttress steel member and the obstruction of pre-embedded bolt and rivet is accelerated pre- The erection schedule of embedded part saves the time, meanwhile, so that the connection of built-in fitting and buttress becomes more to consolidate, security performance is mentioned It is high.
Detailed description of the invention
Fig. 1 is the sectional view of the optimization method of buttress node of the present invention;
Fig. 2 is the plan view of the optimization method of buttress node of the present invention;
Wherein, 1, buttress;10, buttress steel member;11, column indulges muscle;111, section is vertically anchored into;112, bending section;12, buttress Construct stirrup;121, the first vertical section;122, tilting section;123, the second vertical section;124, horizontal segment;13, buttress horizontal bar; 14, beam gluten indulges muscle;15, beam bottom flaccidity of tendon and muscle muscle;16, muscle is indulged in longitudinal beam face;17, muscle is indulged at longitudinal beam bottom;18, pre-embedded bolt;19, riveting Nail;20, embedded board;21, floor bottom muscle;22, floor gluten;30, through-hole.
Specific embodiment
In the following, being described further in conjunction with attached drawing and specific embodiment to the present invention:
As depicted in figs. 1 and 2, buttress node, including buttress 1 and built-in fitting, installation of embedded parts is on the top of buttress 1, in advance Embedded part includes embedded board 20, multiple pre-embedded bolts 18 and multiple rivets 19, pre-embedded bolt 18 and rivet 19 respectively with embedded board 20 Plane perpendicular it is affixed, it is preferable that the rivet 19 uses No. 45 solid round steel, and screw thread is used between rivet 19 and embedded board 20 Connection, the length of screw thread are not less than the thickness of embedded board 20.Buttress 1 has buttress steel member 10, and buttress steel member 10 includes more Bar beam gluten indulges muscle 14 and column indulges muscle 11, and beam gluten indulges the lower section that muscle 14 is located at embedded board 20, the length side of the vertical muscle 14 of beam gluten To vertical with the pre-embedded bolt and rivet 19, column indulges muscle 11 and is located at the lower section that beam gluten indulges muscle 14, and it includes along erecting that column, which indulges muscle 11, Histogram vertically anchors into section 111 and horizontally extending bending section 112 to extension, and bending section 112 anchors into section 111 with vertical Top connection.
Referring to Fig. 1 and Fig. 2, in order to further optimize the overall structure of buttress steel member 10, the buttress steel member 10 It further include beam bottom flaccidity of tendon and muscle muscle 15, beam bottom flaccidity of tendon and muscle muscle 15 is located at beam gluten and indulges the lower section of muscle 14 and the length direction of beam bottom flaccidity of tendon and muscle muscle 15 It is consistent that the length direction of muscle 14 is indulged with beam gluten.
As depicted in figs. 1 and 2, in order to advanced optimize the overall structure of buttress steel member 10, increase buttress steel member 10 Stability, the buttress steel member 10 further includes buttress construction stirrup 12, floor gluten 22 and floor bottom muscle 21, the buttress Constructing stirrup 12 includes a horizontal segment 124, two first vertical sections 121, two tilting sections 122 and two second vertical sections 123, horizontal segment 124 both ends are connect with the top of two first vertical sections 121, and two first vertical sections 121 are symmetrical with the middle line of horizontal segment 124, water The top of flat section 124 is bonded with the bottom end of embedded board 20, the top of two tilting sections 122 bottom with two first vertical sections 121 respectively End connection, two tilting sections 122 intersect, and the top of two second vertical sections 123 is connect with the bottom end of two tilting sections 122 respectively, flooring Plate muscle is located at the embedded board 20 and the beam gluten is indulged between muscle 14 and the length direction of flooring plate muscle and beam gluten indulge muscle 14 Length direction it is consistent, bottom of the building plate muscle is located at beam gluten and indulges between muscle 14 and beam bottom flaccidity of tendon and muscle muscle 15 and the length side of floor bottom muscle 21 It is consistent to the length direction of muscle 14 is indulged with beam gluten.
As depicted in figs. 1 and 2, the buttress steel member 10 further includes that muscle 16 is indulged in longitudinal beam face, 17 and of muscle is indulged at longitudinal beam bottom Buttress horizontal bar 13, longitudinal beam face indulge muscle 16 and are interspersed in the horizontal segment that the beam gluten indulges muscle 14 with buttress construction stirrup 12 Between 124, the length direction that muscle 16 is indulged in longitudinal beam face is vertical with the plane where buttress construction stirrup 12, buttress horizontal bar 13 are interspersed in the inside of the buttress construction muscle, and buttress horizontal bar 13 is multiple and arranges along the inside interval that buttress constructs stirrup 12 The length direction of column, buttress horizontal bar 13 is consistent with the vertical length direction of muscle 16 in longitudinal beam face, and 17, muscle is indulged at the longitudinal beam bottom The length direction of muscle 16 is indulged in the length direction of the vertical muscle 17 in lower section and longitudinal beam bottom of beam bottom flaccidity of tendon and muscle muscle 15 and the longitudinal beam face Unanimously.
When the column indulge muscle 11 and the pre-embedded bolt 18 there are it is space crossed when, column indulges muscle 11 and vertically anchors into section 111 0.35-0.4 times that length is the antidetonation anchorage length that column indulges muscle 11 is anchored into, the anchorage length of bending section 112 is that column indulges muscle 11 directly 15-20 times of diameter.In this way, by change column indulge muscle 11 vertically anchor into section 111 anchorage length and bending section 112 anchoring it is long Degree so that column is indulged muscle 11 and pre-embedded bolt 18 and is spaced always, will not generate it is space crossed, avoid pre-embedded bolt 18 receive obstruction and So that built-in fitting can not be installed.
In addition to the method as described above, when the column indulge muscle 11 and the pre-embedded bolt 18 there are it is space crossed when, adjustment is pre- Plan-position and the buried depth of bolt 18 are buried, the certain distance so that pre-embedded bolt 18 and the vertical muscle 11 of column are staggered, pre-embedded bolt 18 Muscle 11 is indulged with column not contact always.
When the beam gluten indulge muscle 14 and the rivet 19 there are it is space crossed when, keep beam gluten to indulge the quantity of muscle 14 not Become, the distance between vertical muscle 14 of beam gluten is adjusted according to the embedding position of rivet 19, beam gluten is indulged between muscle 14 and rivet 19 Every.
Thereby, muscle 14 is indulged by optimization beam gluten and column indulges plan-position and the length of muscle 11, optimize 18 He of pre-embedded bolt The horizontal layout and buried depth of rivet 19, enable built-in fitting that embedded board 20 smoothly, is accurately mounted on buttress 1, And the erection schedule accelerated for built-in fitting, saves the time.
When the beam bottom flaccidity of tendon and muscle muscle 15 and the column indulge muscle 11 there are it is space crossed when, keep the quantity of beam bottom flaccidity of tendon and muscle muscle 15 It is constant, it adjusts the spacing between beam bottom flaccidity of tendon and muscle muscle 15 and to pass through between the vertical 11 beam bottom flaccidity of tendon and muscle muscle 15 of muscle of column.
When the buttress construction stirrup 12 and the beam gluten indulge muscle 14 there are it is space crossed when, keep buttress construct stirrup 12 quantity is constant, and the spacing of adjustment buttress construction stirrup 12, which makes beam gluten indulge muscle 14, to wear between buttress construction stirrup 12 It crosses.
When buttress construction stirrup 12 and the pre-embedded bolt 18 there are it is space crossed when, adjustment pre-embedded bolt 18 it is flat Face position, so that pre-embedded bolt 18 and buttress construction stirrup 12 are spaced.
When the buttress construction stirrup 12 and the rivet 19 there are it is space crossed when, adjust rivet 19 plan-position, So that rivet 19 and buttress construction stirrup 12 are spaced.
When the buttress construction stirrup 12 and the floor gluten 22 there are it is space crossed when, keep buttress construct stirrup 12 Quantity it is constant, adjustment buttress construction the distance between stirrup 12, so that floor gluten 22 can construct between stirrup 12 from buttress It passes through.
Therefore, by indulging above-mentioned buttress distributing bar, beam gluten the rational deployment and adjustment of muscle 14 and floor gluten 22, The overall structure for optimizing buttress steel member 10, avoid constructing stirrup 12 because of buttress, beam gluten indulge muscle 14 and floor gluten 22 it Between formed and intersect or arrangement is close and built-in fitting is caused to be difficult to place and install, meanwhile, the connection between a reinforcing bar is more firm, Safety greatly improves.
When the longitudinal beam face indulge muscle 16 and the beam gluten indulge muscle 14 there are it is space crossed when, increase the buttress construction The horizontal segment 124 of stirrup 12 is indulged the distance between muscle 14 with beam gluten and is made at a distance from upper end and the floor gluten 22 of embedded board 20 For 80-100mm, it is preferable that the horizontal segment 124 and beam gluten for increasing the buttress construction stirrup 12 indulge the distance between muscle 14, So that the upper end of embedded board 20 is 100mm at a distance from floor gluten 22.
When there are the levels for when space, increasing the buttress construction stirrup for the floor gluten and buttress construction stirrup Duan Yuliang gluten indulges the distance between muscle, so that the upper end of embedded board is 80-100mm at a distance from floor gluten;
When the buttress horizontal bar 13 and the buttress construct stirrup 12, there are spaces, increase the buttress construction stirrup 12 Horizontal segment 124 and beam gluten indulge the distance between muscle 14 so that the upper end of embedded board 20 is 80- with floor gluten 22 at a distance from 100mm, it is preferable that increase the distance between horizontal segment 124 and the vertical muscle 14 of beam gluten of buttress construction stirrup 12 make it is pre- The upper end of buried plate 20 is 100mm at a distance from floor gluten 22, that is, the exposed height for increasing buttress reaches exposed height 100mm ensure that buttress horizontal bar 13, longitudinal beam face indulge the installation space of muscle 16 and buttress construction stirrup 12, avoid because of it Between intersect and built-in fitting caused to be difficult to place.
When the longitudinal beam face indulge muscle 16 and buttress construction stirrup 12 there are it is space crossed when, keep buttress construction hoop The quantity of muscle 12 is constant, the distance between adjustment buttress construction stirrup 12, so that longitudinal beam face indulges muscle 16 and can construct hoop from buttress It is passed through between muscle 12.
When the longitudinal beam face indulge muscle 16 and the rivet 19 there are it is space crossed when, the plan-position of adjustment rivet 19 makes It obtains rivet 19 and longitudinal beam face is indulged muscle 16 and is spaced.
In addition, the erection sequence of all kinds of reinforcing bars also has a great impact to the placement of built-in fitting, in order to avoid embedded board 20 Muscle 14 is indulged with beam gluten, muscle 16 is indulged in longitudinal beam face, floor gluten 22 intersects with the generation of pre-embedded bolt 18, the buttress steel member 10 In the erection sequences of all kinds of reinforcing bars be followed successively by:Indulge muscle 17, beam bottom flaccidity of tendon and muscle muscle 15, buttress construction stirrup 12, buttress water in longitudinal beam bottom Flat muscle 13, floor bottom muscle 21, built-in fitting, beam gluten indulge muscle 14, longitudinal beam face indulge muscle 16, floor gluten 22, first by built-in fitting into Then row installation is indulged muscle 14, the vertical muscle 16 in longitudinal beam face and floor gluten 22 to beam gluten again and is installed one by one, avoids pre-buried Bolt 18 generates intersection therewith.
Referring to fig. 2, in order to facilitate the casting of mixed mud and ensure buttress mixed mud cast closely knit, the embedded board 20 Top be equipped with one for mixed mud casting through-hole 30.The embedded board 20 is thickness 30-45mm, side length 960-1600mm Square steel plate, the diameter of the through-hole 30 is 96-104mm, it is preferable that the diameter of through-hole 30 is 100mm.
It will be apparent to those skilled in the art that can make various other according to the above description of the technical scheme and ideas Corresponding change and deformation, and all these changes and deformation all should belong to the protection scope of the claims in the present invention Within.

Claims (5)

1. the optimization method of buttress node, the buttress node includes buttress and built-in fitting, installation of embedded parts on the top of buttress, Built-in fitting includes embedded board, multiple pre-embedded bolts and multiple rivets, pre-embedded bolt and rivet respectively with the plane perpendicular of embedded board Affixed, buttress has buttress steel member, and buttress steel member includes that a plurality of beam gluten indulges muscle and the vertical muscle of column, and beam gluten indulges muscle positioned at pre- The lower section of buried plate, the length direction that beam gluten indulges muscle is vertical with the pre-embedded bolt and rivet, and column indulges muscle and is located at the vertical muscle of beam gluten Lower section, column indulge muscle include extend along the vertical direction vertically anchor into section and horizontally extending bending section, bending section with Vertically anchor into the top connection of section;The buttress steel member further includes beam bottom flaccidity of tendon and muscle muscle, and beam bottom flaccidity of tendon and muscle muscle is located at beam gluten and indulges muscle Lower section and length direction and the beam gluten of beam bottom flaccidity of tendon and muscle muscle to indulge the length direction of muscle consistent;The buttress steel member further includes branch Pier constructs stirrup, floor gluten and floor bottom muscle, and the buttress construction stirrup inclines including a horizontal segment, two first vertical sections, two Oblique section and two second vertical sections, the both ends of horizontal segment are connect with the top of two first vertical sections, and two first vertical sections are with horizontal segment Middle line it is symmetrical, the top of horizontal segment is bonded with the bottom end of embedded board, the top of two tilting sections respectively with two first vertical sections Bottom end connection, two tilting sections intersect, and the top of two second vertical sections is connect with the bottom end of two tilting sections respectively, and flooring plate muscle is located at The embedded board and the beam gluten are indulged between muscle and the length direction of flooring plate muscle is consistent with the vertical length direction of muscle of beam gluten, Bottom of the building plate muscle is located between the vertical muscle of beam gluten and beam bottom flaccidity of tendon and muscle muscle and the length direction and beam gluten of floor bottom muscle indulge the length of muscle Direction is consistent;The buttress steel member further includes that muscle is indulged in longitudinal beam face, muscle and buttress horizontal bar are indulged in longitudinal beam bottom, and longitudinal beam face is vertical Muscle be interspersed in the beam gluten indulge muscle and the buttress construction stirrup horizontal segment between, longitudinal beam face indulge muscle length direction with Plane where the buttress construction stirrup is vertical, and buttress horizontal bar is interspersed in the inside of the buttress construction muscle, and buttress is horizontal Muscle is multiple and is alternatively arranged on the inside of buttress construction stirrup that the length direction of buttress horizontal bar indulges the length of muscle with longitudinal beam face Spend that direction is consistent, the longitudinal beam bottom indulge muscle be located at beam bottom flaccidity of tendon and muscle muscle the vertical muscle in lower section and longitudinal beam bottom length direction with it is described The length direction that muscle is indulged in longitudinal beam face is consistent;It is characterised in that it includes:
When the column indulge muscle and the pre-embedded bolt there are it is space crossed when, column indulge muscle vertically anchor into section to anchor into length vertical for column 0.35-0.4 times of the antidetonation anchorage length of muscle, the anchorage length of bending section are 15-20 times that column indulges muscle diameter;
When the column indulge muscle and the pre-embedded bolt there are it is space crossed when, adjust plan-position and the buried depth of pre-embedded bolt So that pre-embedded bolt and column indulge muscle interval;
When the beam gluten indulge muscle and the rivet there are it is space crossed when, the quantity for keeping beam gluten to indulge muscle is constant, according to riveting The embedding position of nail and adjust adjacent beams gluten and indulge the distance between muscle so that beam gluten indulges muscle and rivet space.
2. the optimization method of buttress node according to claim 1, it is characterised in that:
When the beam bottom flaccidity of tendon and muscle muscle and the column indulge muscle there are it is space crossed when, keep the quantity of beam bottom flaccidity of tendon and muscle muscle constant, adjustment Spacing between beam bottom flaccidity of tendon and muscle muscle enables the vertical muscle of column to pass through between beam bottom flaccidity of tendon and muscle muscle;
When the buttress construction stirrup and the beam gluten indulge muscle there are it is space crossed when, keep buttress construction stirrup quantity not Become, the spacing of adjustment buttress construction stirrup, so that beam gluten is indulged muscle and can be passed through between buttress construction stirrup;
When the buttress construction stirrup and the pre-embedded bolt there are it is space crossed when, adjust the plan-position of pre-embedded bolt, make It obtains pre-embedded bolt and buttress constructs stirrup interval;
When the buttress construction stirrup and the rivet there are it is space crossed when, adjust the plan-position of rivet so that rivet with Buttress constructs stirrup interval;
When the buttress construction stirrup and the floor gluten there are it is space crossed when, keep buttress construction stirrup quantity not Become, the distance between adjustment buttress construction stirrup passes through so that floor gluten can construct between stirrup from buttress.
3. the optimization method of buttress node according to claim 2, it is characterised in that:
When the longitudinal beam face indulge muscle and the beam gluten indulge muscle there are it is space crossed when, increase the water of the buttress construction stirrup Flat section and beam gluten indulge the distance between muscle, so that the upper end of embedded board is 80-100mm at a distance from floor gluten;
When the floor gluten and buttress construction stirrup there are when space, increase the horizontal segment of buttress construction stirrup with Beam gluten indulges the distance between muscle, so that the upper end of embedded board is 80-100mm at a distance from floor gluten;
When there are the horizontal segments for when space, increasing the buttress construction stirrup for the buttress horizontal bar and buttress construction stirrup The distance between muscle is indulged with beam gluten, so that the upper end of embedded board is 80-100mm at a distance from floor gluten;
When the longitudinal beam face indulge muscle and the buttress construction stirrup there are it is space crossed when, keep buttress construction stirrup quantity It is constant, the distance between adjustment buttress construction stirrup, so that longitudinal beam face is indulged muscle and can be passed through between buttress construction stirrup;
When the longitudinal beam face indulge muscle and the rivet there are it is space crossed when, the plan-position for adjusting rivet makes rivet and vertical Muscle interval is indulged to beam face.
4. the optimization method of buttress node according to claim 3, it is characterised in that:
When the longitudinal beam face indulge muscle and the beam gluten indulge muscle there are it is space crossed when, increase the water of the buttress construction stirrup Flat section and beam gluten indulge the distance between muscle, so that the upper end of embedded board is 100mm at a distance from floor gluten.
5. the optimization method of buttress node according to claim 3, it is characterised in that:
When the longitudinal beam face indulge muscle, the pre-embedded bolt in floor gluten and the built-in fitting and rivet there are it is space crossed when, The erection sequence of the buttress steel member is adjusted, erection sequence is followed successively by:Indulge muscle, beam bottom flaccidity of tendon and muscle muscle, buttress construction in longitudinal beam bottom Stirrup, buttress horizontal bar, floor bottom muscle, built-in fitting, beam gluten indulge muscle, muscle, floor gluten are indulged in longitudinal beam face.
CN201510975949.8A 2015-12-21 2015-12-21 The optimization method of buttress node Active CN105569203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510975949.8A CN105569203B (en) 2015-12-21 2015-12-21 The optimization method of buttress node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510975949.8A CN105569203B (en) 2015-12-21 2015-12-21 The optimization method of buttress node

Publications (2)

Publication Number Publication Date
CN105569203A CN105569203A (en) 2016-05-11
CN105569203B true CN105569203B (en) 2018-11-23

Family

ID=55879780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510975949.8A Active CN105569203B (en) 2015-12-21 2015-12-21 The optimization method of buttress node

Country Status (1)

Country Link
CN (1) CN105569203B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162305A (en) * 2011-05-16 2011-08-24 江苏兴邦建工集团有限公司 Construction process for installing elastic slippage shock isolation support
CN102287006A (en) * 2011-07-12 2011-12-21 尚守平 Compound shock-isolating pier
CN203487640U (en) * 2013-05-13 2014-03-19 上海申元岩土工程有限公司 Beam column connection T type node applied in top-down method
CN203741994U (en) * 2014-01-24 2014-07-30 上海建工二建集团有限公司 Connecting structure of latticed column and first structural beam plate of reverse building method
CN104018521A (en) * 2014-06-25 2014-09-03 中铁第一勘察设计院集团有限公司 Metro double-column elevated station steel reinforced concrete transformation structure reinforcing bar and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162305A (en) * 2011-05-16 2011-08-24 江苏兴邦建工集团有限公司 Construction process for installing elastic slippage shock isolation support
CN102287006A (en) * 2011-07-12 2011-12-21 尚守平 Compound shock-isolating pier
CN203487640U (en) * 2013-05-13 2014-03-19 上海申元岩土工程有限公司 Beam column connection T type node applied in top-down method
CN203741994U (en) * 2014-01-24 2014-07-30 上海建工二建集团有限公司 Connecting structure of latticed column and first structural beam plate of reverse building method
CN104018521A (en) * 2014-06-25 2014-09-03 中铁第一勘察设计院集团有限公司 Metro double-column elevated station steel reinforced concrete transformation structure reinforcing bar and construction method thereof

Also Published As

Publication number Publication date
CN105569203A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
AU2015209142B2 (en) System and method for retrofitting walls with retaining ties
CN103790322B (en) Method for installing and connecting small assembly type heat preservation prefabricated plates on wall made of low-strength materials
US9834894B1 (en) Drain channel
CN102979221B (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
CN102418425B (en) Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system
KR101432087B1 (en) Composite rahman bridge using preflex beam and horizontal shear connectors and construction method thereof
CN104929279A (en) Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN205242268U (en) Anchor triangular bracket
CN105569203B (en) The optimization method of buttress node
CN103938755B (en) The isolation structure of hanging conversion beam and construction method thereof under a kind of hoistway
KR20170044437A (en) Exterior panel anchorage for building, and outer wall and exterior panel install method with form combined with insulation
KR20130074626A (en) Vertical shear connector for precast concrete bridge pier
JP6473877B2 (en) Precast concrete foundation beam members
JP5946779B2 (en) Cloth foundation
JP2014020137A (en) Precast floor slab and erection method of precast floor slab
KR20130121271A (en) Assemblies for supporting earth anchor of soil retaining wall and soil retaining wall constructing method using the same
CN207260476U (en) It is a kind of can accurately leveling installation armored concrete precast stair dry connecting device
EP2339091A2 (en) Mounting assembly
KR101058784B1 (en) Molding beam connection method for temporary facilities considering traffic treatment
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN203531349U (en) Novel high-bearing easily-dismantled overhanging type scaffold
JP2021079775A (en) Movable type platform fence installation structure and method for the same
CN207633583U (en) A kind of connection structure of prefabricated post and prefabricated partition wall
CN106638650B (en) Fabricated concrete foundation structure
JP5000387B2 (en) Post-installation anchor installation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201207

Address after: 510000 26, Whampoa East Road No. 1080 (1 self compiled), Whampoa District, Guangzhou, Guangdong.

Patentee after: GUANGZHOU JISHI CONSTRUCTION GROUP Co.,Ltd.

Patentee after: GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co.,Ltd.

Address before: 510000, No. two, No. 28, South Embankment, Yuexiu District, Guangdong, Guangzhou

Patentee before: GUANGZHOU JISHI CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510000 26 / F, No. 1080, Huangpu East Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: GUANGZHOU JISHI CONSTRUCTION GROUP Co.,Ltd.

Country or region after: China

Patentee after: Guangzhou Academy of Building Sciences Group Co.,Ltd.

Address before: 510000 26 / F, No. 1080, Huangpu East Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU JISHI CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

Patentee before: GUANGZHOU INSTITUTE OF BUILDING SCIENCE Co.,Ltd.