CN105466389B - A kind of infrastructure monitors system - Google Patents

A kind of infrastructure monitors system Download PDF

Info

Publication number
CN105466389B
CN105466389B CN201510806550.7A CN201510806550A CN105466389B CN 105466389 B CN105466389 B CN 105466389B CN 201510806550 A CN201510806550 A CN 201510806550A CN 105466389 B CN105466389 B CN 105466389B
Authority
CN
China
Prior art keywords
monitoring
data
monitoring point
point
settlement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510806550.7A
Other languages
Chinese (zh)
Other versions
CN105466389A (en
Inventor
贾晓轻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Anping Electric Power Construction Co ltd
Original Assignee
Chuzhou Bo Ming Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Bo Ming Mdt Infotech Ltd filed Critical Chuzhou Bo Ming Mdt Infotech Ltd
Priority to CN201510806550.7A priority Critical patent/CN105466389B/en
Priority to CN201711300054.XA priority patent/CN107905204B/en
Publication of CN105466389A publication Critical patent/CN105466389A/en
Application granted granted Critical
Publication of CN105466389B publication Critical patent/CN105466389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/08Investigation of foundation soil in situ after finishing the foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/10Miscellaneous comprising sensor means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Paleontology (AREA)
  • Remote Sensing (AREA)
  • General Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Alarm Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

A kind of transformer substation foundation monitoring system, including:Multiple monitoring points, are respectively set sensing device;Multiple sensing devices are arranged wireless communication interface, the underlying parameter of each monitoring point can be carried out Wireless transceiver for monitoring the underlying parameter of each monitoring point;Data monitoring service device, the underlying parameter of each monitoring point carries out data analysis based on the received, and the monitoring parameters of each sensing device are controlled based on the analysis results;The sensing device includes the settlement sensor for being fixed on monitoring point;Monitoring system further includes the shared movable sensor in each monitoring point, can be moved between each monitoring point, and the analysis result of the settlement values for each monitoring point that data monitoring service device is monitored according to settlement sensor triggers the movement and monitoring of movable sensor.

Description

A kind of infrastructure monitors system
Technical field
The present invention relates to a kind of pilot systems of foundation structure, more particularly, to a kind of monitoring system of transformer substation foundation.
Background technique
Substation is that electric power energy transmission and the important pivot of transformation are held as the component part of entire power transmission and transformation system Carry on a shoulder pole the important function formed a connecting link.The usual addressing of past substation is in the higher area of topography, to reduce amount of fill.With warp The development of Ji society.Land resource is increasingly reduced, and substation also has to build the area that should not be built a station in.
Can all occur not for being in the newly-built substation of back filled region after ground is after the time test in rainy season, dry season With the sedimentation of degree.The amplitude of sedimentation is according to the characteristic of soil, the quality of design and construction, the size of carrying and natural climate variation Situation and change.If thinking little of these problems, toppling for electrical equipment may be caused, caused a serious accident, give operation and maintenance Great inconvenience is brought, or even influences to operate normally.
Therefore, reinforce the monitoring of substation's ground, find settlement of foundation hidden danger in time, reduce because becoming caused by settlement of foundation Electric facility damage, it is ensured that safe and stable operation of power system, it has also become current problem in the urgent need to address.
It in the prior art, is using levelling method, in substation's structure for the monitoring method of transformer substation foundation The main monitoring point installation settlement observation staff for building object uses optical level or electronic leveler by survey crew's periodical inspection Instrument and levelling rod complete each settlement point level high measurement.Traditional measurement of the level advantage is that precision is high, highly reliable;Cost is opposite It is lower.But monitoring substation sedimentation is a long-term process, needs a large amount of data as support, if only by Data manually are acquired using measuring instrument, are not only taken time and effort, but also be easy to receive environmental influence.
201220167119.4 with 201410192810.1 patent individually disclose that transformer substation foundation monitors automatically be System and method, but multiple monitoring parameters are existed simultaneously for the monitoring point of ground, if simultaneously for these monitoring parameters It is monitored, then monitoring parameter is excessive, and also heavier for system burden;Also, for multiple monitoring points, if be all arranged Fixed sensor then needs higher cost.
Summary of the invention
The present invention provides a kind of transformer substation monitoring system and methods, can overcome the drawbacks described above of the prior art.
As one aspect of the present invention, a kind of transformer substation foundation monitoring system is provided, including:Multiple monitoring points, institute It states multiple monitoring points and sensing device is respectively set;Multiple sensing devices correspond to the multiple monitoring point and are arranged, each for monitoring Wireless communication interface is arranged in the underlying parameter of a monitoring point, the sensing device, can by the underlying parameter of each monitoring point into Row Wireless transceiver;Data monitoring service device, the data monitoring service device based on the received each monitoring point underlying parameter into The analysis of row data, based on the analysis results controls the monitoring parameters of each sensing device;The sensing device includes solid It is scheduled on the settlement sensor of monitoring point;It further include the shared movable sensor in each monitoring point, the movable sensor can be It is moved between each monitoring point, the sedimentation for each monitoring point that the data monitoring service device is monitored according to the settlement sensor The analysis result of numerical value triggers the movement and monitoring of the movable sensor.
Preferably, the movable sensor includes horizontal angle sensor;The sensing device further includes being fixed on monitoring The settlement sensor of point, soil pressure sensor, support column load-bearing monitor sensor and temperature sensor.
Preferably, pass through Zigbee, GPRS or CDMA between the sensing device and the data monitoring service device Equal wireless networks carry out data transmission.
Preferably, when the settling data exception of the data monitoring monitoring server to specific monitoring point, described in triggering Movable sensor is moved to the specific monitoring point and the specific monitoring point is monitored.
It preferably, further include data-storage system, the data-storage system stores the location information of each monitoring point, when When the monitoring data exception of multiple monitoring points, the data monitoring server reads multiple monitoring in the data-storage system The location information of point, the movement routine of the movable sensor is set according to the location information, makes the movement routine is all can It is shortest in energy path.
Preferably, after the data monitoring service device receives the settlement values of all monitoring points, all monitoring points are calculated Settlement values arithmetic mean of instantaneous value and mean square deviation, each monitoring point settlement values and institute are gone out according to the algorithm mean value calculation The shift value for stating arithmetic mean of instantaneous value, when the absolute value of the monitoring point shift value is greater than M times of the mean square deviation, judgement The settlement values of the monitoring point are abnormal.
Preferably, after the data monitoring service device data monitoring service device receives the settlement values of all monitoring points, This settlement values of all monitoring points and the difference S of last settlement values are calculated, and the arithmetic for calculating the difference is flat Mean value S1 and mean square deviation △ S, so that the difference offset S-S1 of each monitoring point is calculated, when the absolute value of S-S1 is greater than △ S M times when, M is integer greater than 2, judges that the settlement values of the monitoring point are abnormal.
Preferably, after the data monitoring service device data monitoring service device receives the settlement values of all monitoring points, Calculate all monitoring points this settlement values and this monitoring before the difference S, the K of settlement values that monitors of kth be Integer greater than 2, and the arithmetic mean of instantaneous value S1 and mean square deviation △ S of the difference are calculated, to calculate each monitoring point Difference deviates S-S1, when the absolute value of S-S1 is greater than M times of △ S, judges that the settlement values of the monitoring point are abnormal.
Preferably, the settlement sensor is not provided with datum mark, when installing settlement sensor, measured value will be set to for the first time A reference value is set to zero;The numerical value of later single measurement and the difference of a reference value are as settlement values.
Detailed description of the invention
Fig. 1 is the schematic diagram of transformer substation monitoring system of the present invention.
Specific embodiment
In order to illustrate more clearly of technical solution of the present invention, embodiment will be used simply to be situated between the present invention below Continue, it should be apparent that, be described below in be only one embodiment of the present of invention, for those of ordinary skill in the art come It says, without any creative labor, other technical solutions can also be obtained according to these embodiments, also belonged to Disclosure of the invention range.
Transformer substation foundation of the invention monitors system, as shown in Figure 1, including multiple monitoring points, movable sensor, wireless network Network, data monitoring service device and data storage server.Wherein, fixed sensing device is respectively set in each multiple monitoring points, For monitoring the underlying parameter of each monitoring point.Fixed sensing device includes settlement sensor, soil pressure sensor, support column by Power monitors sensor and temperature sensor.Wherein, settlement sensor is used to monitor the settling data of monitoring point, can monitor Point setting observation stake, monitors the observation stake using displacement sensor, to obtain the settling data of the datum mark.Soil pressure sensing Pressure sensor well known in the prior art and temperature can be used in device, support column load-bearing monitor sensor and temperature sensor Sensor.
Movable sensor is the sensor that each monitoring point shares, and can be moved between each monitoring point according to instruction It is dynamic, to reduce the cost in each monitoring point setting sensor.The measurement parameter of the movable sensor is not need to be arranged I.e. measurable parameter, such as the horizontal angle sensor etc. that measurement level angle uses are mounted below basis.
It is provided with wireless communication interface in fixed sensing device and movable sensor, it can be by each prison by wireless network The underlying parameter of measuring point is transmitted to data monitoring service device, by that also can receive data monitoring service device by wireless network Operational order.The wireless networks such as known cordless communication network such as Zigbee, GPRS or CDMA can be used and carry out data biography It is defeated.
Data monitoring service device based on the received each monitoring point underlying parameter carry out data analysis, based on the analysis results The monitoring parameters of each sensing device are controlled.In Basic monitoring, settling data is to influence substation equipment most Whole factor, and remaining monitoring parameters is for auxiliary monitoring.Therefore, whole in monitoring system of the invention, it is sensed using sedimentation Condition of the abnormal data of device as triggering other sensors monitoring.The sedimentation that data monitoring service device controls each monitoring point passes Sensor is monitored using the first monitoring cycle, and the settlement values monitored are transmitted to data monitoring by wireless network in real time Server.
Data monitoring service device carries out data analysis to the underlying parameter of received each monitoring point, when monitoring individually to supervise When the settling data exception of measuring point, the settlement sensor of the specific monitoring point of settlement values exception is used and is different from first week The second round of phase is monitored, which is less than the period 1.Meanwhile the data monitoring service device triggering mobile biography Sensor is moved to the specific monitoring point and the specific monitoring point is monitored.
Preferably, transformer substation foundation of the invention monitoring system further includes data-storage system, stores each monitoring point Location information, when the monitoring data exception of multiple monitoring points, data monitoring server reads in data-storage system that this is more The location information of a monitoring point sets the movement routine of movable sensor according to the location information, keeps the movement routine all It is shortest in possible path.
The settlement of foundation of substation is divided into uniform settlement and differential settlement.In general, ground generates uniform settlement, right Electrical equipment itself will not cause additional internal stress, not will cause big harm, but should then cause foot to uneven settlement of foundation It is enough to pay attention to.When differential settlement is more than to bear limit, the cracking of electrical equipment will be generated, tilts or even collapses, jeopardizes peace Entirely.Therefore, the settlement sensor of the application is not provided with datum mark, when installing settlement sensor, will be set to base by measured value for the first time Quasi- value, is set to zero;The numerical value of later single measurement and the difference of a reference value are as settlement values;It is each by analyzing The bulk settling data of monitoring point are analyzed, and determine the ground of differential settlement exception.
After data monitoring service device receives the settlement values of all monitoring points, the settlement values of all monitoring points are calculated Arithmetic mean of instantaneous value and mean square deviation go out each monitoring point settlement values and the arithmetic mean of instantaneous value according to the algorithm mean value calculation Shift value, when the absolute value of the monitoring point shift value is greater than M times of the mean square deviation, M is the integer greater than 2, Judge that the settlement values of the monitoring point are abnormal.
Sedimentation value it is excessive can to react monitoring point sedimentation, it is possible to create risk when being more than threshold value.But it is monitoring When being more than threshold value to sedimentation value, harm can have been generated.Preferably, data monitoring service device receives the heavy of all monitoring points After dropping numerical value, this settlement values of all monitoring points and the difference S of last settlement values are calculated, and calculate the difference Arithmetic mean of instantaneous value S1 and mean square deviation △ S, thus calculate each monitoring point difference offset S-S1, when the absolute value of S-S1 When greater than M times of △ S, judge that the settlement values of the monitoring point are abnormal.It is further preferred that the data monitoring service device data After monitoring server receives the settlement values of all monitoring points, this settlement values and this monitoring of all monitoring points are calculated The difference S of the settlement values of kth monitoring before, the K is the integer greater than 2, and calculates the arithmetic average of the difference Value S1 and mean square deviation △ S, so that the difference offset S-S1 of each monitoring point is calculated, when the absolute value of S-S1 is greater than the M of △ S Times when, judge that the settlement values of the monitoring point are abnormal.
A specific embodiment of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.

Claims (3)

1. a kind of transformer substation foundation monitors system, including:Sensing device is respectively set in multiple monitoring points, the multiple monitoring point; Multiple sensing devices correspond to the multiple monitoring point and are arranged, for monitoring the underlying parameter of each monitoring point, the sensing dress Wireless communication interface is installed, the underlying parameter of each monitoring point can be subjected to Wireless transceiver;Data monitoring service device, it is described Data monitoring service device based on the received each monitoring point underlying parameter carry out data analysis, based on the analysis results for each The monitoring parameters of sensing device are controlled;The sensing device includes the settlement sensor for being fixed on monitoring point;It further include each The shared movable sensor in a monitoring point, the movable sensor can move between each monitoring point;It is characterized in that:Institute The analysis result for stating the settlement values for each monitoring point that data monitoring service device is monitored according to the settlement sensor triggers institute State the movement and monitoring of movable sensor;It further include data-storage system, the data-storage system stores each monitoring point Location information, when the monitoring data exception of multiple monitoring points, the data monitoring server reads the data-storage system In multiple monitoring point location information, the movement routine of the movable sensor is set according to the location information, makes the movement Path is shortest in all possible paths;After the data monitoring service device receives the settlement values of all monitoring points, meter The arithmetic mean of instantaneous value and mean square deviation for calculating the settlement values of all monitoring points calculate each monitoring point according to the arithmetic mean of instantaneous value The shift value of settlement values and the arithmetic mean of instantaneous value, when the absolute value of the monitoring point shift value is greater than the mean square deviation M times when, M is integer greater than 2, judges that the settlement values of the monitoring point are abnormal.
2. monitoring system according to claim 1, it is characterised in that:The movable sensor includes level angle sensing Device.
3. monitoring system according to claim 2, it is characterised in that:When the data monitoring monitoring server to specific prison When the settling data exception of measuring point, triggers the movable sensor and be moved to the specific monitoring point for specific monitoring point progress Monitoring.
CN201510806550.7A 2015-11-22 2015-11-22 A kind of infrastructure monitors system Active CN105466389B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510806550.7A CN105466389B (en) 2015-11-22 2015-11-22 A kind of infrastructure monitors system
CN201711300054.XA CN107905204B (en) 2015-11-22 2015-11-22 Foundation structure monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510806550.7A CN105466389B (en) 2015-11-22 2015-11-22 A kind of infrastructure monitors system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201711300054.XA Division CN107905204B (en) 2015-11-22 2015-11-22 Foundation structure monitoring system

Publications (2)

Publication Number Publication Date
CN105466389A CN105466389A (en) 2016-04-06
CN105466389B true CN105466389B (en) 2018-11-23

Family

ID=55604349

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201711300054.XA Active CN107905204B (en) 2015-11-22 2015-11-22 Foundation structure monitoring system
CN201510806550.7A Active CN105466389B (en) 2015-11-22 2015-11-22 A kind of infrastructure monitors system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201711300054.XA Active CN107905204B (en) 2015-11-22 2015-11-22 Foundation structure monitoring system

Country Status (1)

Country Link
CN (2) CN107905204B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052640A (en) * 2016-08-04 2016-10-26 郑州铁路局科学技术研究所 AliCloud-based on-line monitoring method and system for high-speed rail bridge settlement
CN106546219A (en) * 2016-12-06 2017-03-29 国网山东省电力公司鄄城县供电公司 Electrical substation monitoring device, method and system
CN109186543A (en) * 2018-10-29 2019-01-11 国网新疆电力有限公司昌吉供电公司 For the sedimentation of monitoring device basic foundation and the monitoring system of gradient
CN109883388B (en) * 2019-03-21 2021-03-02 华思(广州)测控科技有限公司 Real-time early warning and monitoring system and monitoring method for settlement deformation of road and bridge

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3238277B2 (en) * 1994-04-20 2001-12-10 カヤバ工業株式会社 Method and apparatus for measuring differential settlement amount of structures
JP2005331242A (en) * 2004-05-18 2005-12-02 Taisei Corp Settlement measuring method for road surfaces
FR2901291B1 (en) * 2007-07-06 2020-10-09 Soc Du Canal De Provence Et Damenagement De La Region Provencale DEVICE FOR MEASURING THE SETTLEMENT OF SOIL SUPPORTING A CONSTRUCTION
KR20100041996A (en) * 2008-10-15 2010-04-23 박종진 Apparatus and method for measuring ground settlement of whole section
CN101787711A (en) * 2009-01-23 2010-07-28 北京益路安技术开发有限公司 Wireless settlement sensor and method for measuring settlement values
CN202255368U (en) * 2011-08-24 2012-05-30 付梓修 Integrated system for measuring non-uniform settlement of building foundation
CN103374930B (en) * 2012-04-18 2016-04-27 国家电网公司 transformer substation monitoring system and monitoring method
CN104142137B (en) * 2013-09-13 2016-04-20 同济大学 A kind of tunnel Longitudinal Settlement monitoring method based on wireless tilt angle sensor and device
CN103542835B (en) * 2013-10-22 2016-08-24 国家电网公司 A kind of subsidence monitoring of foundation system
CN105297791B (en) * 2015-10-26 2017-12-12 国网江苏省电力公司盐城供电公司 A kind of transformer substation monitoring system

Also Published As

Publication number Publication date
CN107905204A (en) 2018-04-13
CN107905204B (en) 2020-05-15
CN105466389A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105466389B (en) A kind of infrastructure monitors system
CN107843195A (en) A kind of active breaking belt tunnel structure DEFORMATION MONITORING SYSTEM and method
CN206410668U (en) Building safety monitoring equipment based on big-dipper satellite and sensor
CN106767378A (en) Building safety monitoring equipment and monitoring method based on big-dipper satellite and sensor
CN110987057A (en) Hydraulic pressure is automatic monitoring system in high in clouds for creeping formwork
CN106119897A (en) A kind of electrolyzer electric flow distribution and safety monitoring system and electrolytic aluminium equipment
CN105297791B (en) A kind of transformer substation monitoring system
CN108205874A (en) Geo-hazard early-warning method based on multi-parameter linkage, live master station and system
KR101353387B1 (en) Communication tower-structure status monitoring system using displacement sensor
CN206959776U (en) High-rise building safe monitoring system based on big-dipper satellite
CN103852285A (en) Recognition method for problematic cable loads through generalized displacement and cable force monitoring
CN103852304A (en) Method for recognizing damaged cables, loads and linear displacement based on cable force monitoring
CN204302495U (en) The change in location monitoring system of electric power line pole tower
CN104992533A (en) Water-gas pressure sensor monitoring warning and forecasting system
CN103913321A (en) Generalized displacement hybrid monitoring defective cable load identification method
CN104743445B (en) Safety of tower crane device for detecting performance based on communicating pipe and attitude and the method for analysis thereof
CN103852308A (en) Recognition method for problem cable load linear displacement based on mixing monitoring
CN103868717A (en) Strain monitoring-based identification method for defective cable, load and angular displacement
CN211552804U (en) Underground soil deformation measurement packaging module and underground soil deformation measurement system
CN206803981U (en) A kind of surface drag-line force-measuring type geological disaster automatic monitoring device
CN103868713A (en) Hybrid monitoring damaged cable load angular displacement identification method
CN103852298A (en) Problem cable load recognition method based on mixing monitoring
CN103852310A (en) Problem cable load angular displacement recognition method based on space coordinate monitoring
CN103913317A (en) Hybrid monitoring defective cable load angular displacement progressive identification method
CN103913325A (en) Generalized displacement hybrid monitoring defective cable load progressive identification method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180925

Address after: 239599 917, 918 Television Building, Ru Lin Road, Xianghe Town, Quanjiao, Chuzhou, Anhui

Applicant after: Chuzhou Bo Ming Mdt InfoTech Ltd.

Address before: 050051 Heping West Road, Shijiazhuang, Hebei Province, No. 348

Applicant before: Jia Xiaoqing

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191125

Address after: 243000 Anhui city of Ma'anshan province high tech Zone at 1669 North Road Huo sparkle Building No. 2

Patentee after: MAANSHAN NIUMENG INTELLECTUAL PROPERTY MANAGEMENT SERVICES Co.,Ltd.

Address before: 239599 917, 918 Television Building, Ru Lin Road, Xianghe Town, Quanjiao, Chuzhou, Anhui

Patentee before: Chuzhou Bo Ming Mdt InfoTech Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221017

Address after: 421200 Room 202, Building 3, No. 18, Furong Road, Zhengxiang District, Hengyang City, Hunan Province

Patentee after: Luo Chao

Address before: 243000 2, 1669 north section of Huo Li Shan Road, Ma'anshan high tech Zone, Anhui

Patentee before: MAANSHAN NIUMENG INTELLECTUAL PROPERTY MANAGEMENT SERVICES Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221028

Address after: No. 169, Daiyingling Industrial Park, Zhengyang Avenue, Zhengxiang District, Hengyang City, Hunan Province, 421200

Patentee after: Hunan Anping Electric Power Construction Co.,Ltd.

Address before: 421200 Room 202, Building 3, No. 18, Furong Road, Zhengxiang District, Hengyang City, Hunan Province

Patentee before: Luo Chao

TR01 Transfer of patent right