CN105297791B - A kind of transformer substation monitoring system - Google Patents

A kind of transformer substation monitoring system Download PDF

Info

Publication number
CN105297791B
CN105297791B CN201510700137.2A CN201510700137A CN105297791B CN 105297791 B CN105297791 B CN 105297791B CN 201510700137 A CN201510700137 A CN 201510700137A CN 105297791 B CN105297791 B CN 105297791B
Authority
CN
China
Prior art keywords
monitoring
sensor
data
settlement
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510700137.2A
Other languages
Chinese (zh)
Other versions
CN105297791A (en
Inventor
刘晓宏
荀思超
王海军
徐荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Yancheng Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Yancheng Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN201710440297.7A priority Critical patent/CN107401190A/en
Priority to CN201710440299.6A priority patent/CN107401191A/en
Priority to CN201710440296.2A priority patent/CN107401189A/en
Priority to CN201510700137.2A priority patent/CN105297791B/en
Publication of CN105297791A publication Critical patent/CN105297791A/en
Application granted granted Critical
Publication of CN105297791B publication Critical patent/CN105297791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/10Miscellaneous comprising sensor means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

A kind of transformer substation foundation monitoring system, including:Multiple monitoring points, the multiple monitoring point set sensing device respectively;Multiple sensing devices, set corresponding to the multiple monitoring point, for monitoring the underlying parameter of each monitoring point, the sensing device sets wireless communication interface, the underlying parameter of each monitoring point can be carried out into Wireless transceiver;Data monitoring service device, the data monitoring service device carry out data analysis according to the underlying parameter of each monitoring point of reception, are controlled according to monitoring parameters of the analysis result for each sensing device.

Description

A kind of transformer substation monitoring system
Technical field
The present invention relates to a kind of pilot system of foundation structure, more particularly, to a kind of monitoring system of transformer substation foundation.
Background technology
Transformer station is electric power energy transmission and the important pivot of conversion, as the part of whole power transmission and transformation system, is held Carry on a shoulder pole the important function formed a connecting link.The usual addressing of past transformer station is in the higher area of physical features, to reduce amount of fill.With warp The development of Ji society.Land resource is increasingly reduced, and transformer station also has to build the area that should not be built a station in.
Newly-built transformer station for being in back filled region, after ground is after the time test in rainy season, dry season, can all occur not With the sedimentation of degree.The amplitude of sedimentation is according to the characteristic of soil, the quality of design and construction, the size of carrying and natural climate change Situation and change.If thinking little of these problems, toppling for electrical equipment may be caused, caused a serious accident, to operation maintenance Great inconvenience is brought, or even influences normal operation.
Therefore, strengthen the monitoring of transformer station's ground, find settlement of foundation hidden danger in time, reduce and become caused by settlement of foundation Electric facility damage, it is ensured that power system security stable operation, it has also become it is current in the urgent need to address the problem of.
In the prior art, the monitoring method for transformer substation foundation is to use levelling method, in transformer station's structure The main monitoring electricity installation settlement observation staff of thing is built, by survey crew's periodical inspection, uses optical level or electronic leveler Instrument and levelling rod complete each settlement point level high measurement.Traditional measurement of the level advantage is that precision is high, highly reliable;Cost is relative It is relatively low.But monitoring electric substation sedimentation is a long-term process, it is necessary to which substantial amounts of data are as support, if only dependence Measuring instrument gathered data manually is used, is not only taken time and effort, and easily receive environmental influence.
201220167119.4 with 201410192810.1 patent individually disclose that transformer substation foundation monitors automatically be System, but for ground monitoring point simultaneously there is multiple monitoring parameters, if for these monitoring parameters simultaneously supervise Survey, then monitoring parameter is excessive, and also heavier for system burden.
The content of the invention
The invention provides a kind of transformer substation monitoring system and method, the drawbacks described above of prior art can be overcome.
As one aspect of the present invention, there is provided a kind of transformer substation foundation monitoring system, including:Multiple monitoring points, it is described Multiple monitoring points set sensing device respectively;Multiple sensing devices, set corresponding to the multiple monitoring point, it is each for monitoring The underlying parameter of monitoring point, the sensing device set wireless communication interface, can carry out the underlying parameter of each monitoring point Wireless transceiver;Data monitoring service device, the data monitoring service device are carried out according to the underlying parameter of each monitoring point of reception Data analysis, it is controlled according to monitoring parameters of the analysis result for each sensing device.
Preferably, Zigbee, GPRS or CDMA are passed through between the sensing device and the data monitoring service device Carry out data transmission Deng wireless network.
Preferably, the monitoring parameters of each sensing device include monitoring cycle and monitoring object.
Preferably, the sensing device includes settlement sensor, soil pressure sensor, support column load-bearing monitor sensor with And temperature sensor.
Preferably, the soil pressure sensor, the startup of support column load-bearing monitor sensor and temperature sensor is by institute State the judgement for the settlement values that data monitoring service device monitors according to the settlement sensor of reception and triggered.
Preferably, the settlement sensor is monitored using the first monitoring cycle, and the settlement values that will be monitored in real time The data monitoring service device is sent to by wireless network;Base of the data monitoring service device to each monitoring point of reception Plinth parameter carries out data analysis, the settlement sensor according to the result of data analysis for the abnormal specific monitoring point of settlement values It is monitored using the second round different from the period 1, the second round is less than the period 1;The data monitoring clothes Business device also triggers the soil pressure sensor, support column load-bearing monitor sensor and temperature sensor, passes the soil pressure Sensor, support column load-bearing monitor sensor and temperature sensor are monitored with the respective cycle respectively.
Preferably, the temperature sensor of the abnormal specific monitoring point of the settlement values is monitored with second round, institute The monitoring cycle for stating soil pressure sensor and support column load-bearing monitor sensor is N times of the second round, and N is more than 1 Integer.
Preferably, after the data monitoring service device receives the settlement values of all monitoring points, all monitoring points are calculated Settlement values arithmetic mean of instantaneous value and mean square deviation, each monitoring point settlement values and institute are gone out according to the algorithm mean value calculation The shift value of arithmetic mean of instantaneous value is stated, when the absolute value of the monitoring point shift value is more than M times of the mean square deviation, is judged The settlement values of the monitoring point are abnormal.
Preferably, after the data monitoring service device data monitoring service device receives the settlement values of all monitoring points, This settlement values of all monitoring points and the difference S of last settlement values are calculated, and the arithmetic for calculating the difference is put down Average S1 and mean square deviation △ S, so as to calculate the difference of each monitoring point skew S-S1, when S-S1 absolute value is more than △ S M times when, M is integer more than 2, judges that the settlement values of the monitoring point are abnormal.
Preferably, after the data monitoring service device data monitoring service device receives the settlement values of all monitoring points, The difference S, the K for calculating the settlement values that this settlement values of all monitoring points monitor with kth before this monitoring be Integer more than 2, and the arithmetic mean of instantaneous value S1 and mean square deviation △ S of the difference are calculated, so as to calculate each monitoring point Difference offsets S-S1, when S-S1 absolute value is more than M times of △ S, judges that the settlement values of the monitoring point are abnormal.
Preferably, the settlement sensor is not provided with datum mark, when installing settlement sensor, measured value will be set to first A reference value, it is set to zero;The numerical value of later single measurement is with the difference of a reference value as settlement values.
Brief description of the drawings
Fig. 1 is the schematic diagram of transformer substation monitoring system of the present invention.
Embodiment
In order to illustrate more clearly of technical scheme, embodiment will be used simply to be situated between the present invention below Continue, it should be apparent that, in describing below is only one embodiment of the present of invention, is come for those of ordinary skill in the art Say, without having to pay creative labor, other technical schemes can also be obtained according to these embodiments, fallen within Disclosure of the invention scope.
The transformer substation foundation monitoring system of the present invention, as shown in figure 1, including multiple monitoring points, wireless network and data Monitoring server.Wherein, each multiple monitoring points set sensing device respectively, for monitoring the underlying parameter of each monitoring point. Sensing device includes settlement sensor, soil pressure sensor, support column load-bearing monitor sensor and temperature sensor.Wherein, Settlement sensor is used for the settling data for monitoring monitoring point, and observation stake can be set in monitoring point, is monitored using displacement transducer The observation stake, so as to obtain the settling data of the datum mark.Soil pressure sensor, support column load-bearing monitor sensor and temperature Sensor can use pressure sensor well known in the prior art and temperature sensor.
Wireless communication interface is provided with sensing device, the underlying parameter of each monitoring point can be passed by wireless network Data monitoring service device is sent to, by the operational order that data monitoring service device can be also received by wireless network.It can make Carried out data transmission with wireless networks such as known cordless communication network such as Zigbee, GPRS or CDMA.
Data monitoring service device carries out data analysis according to the underlying parameter of each monitoring point of reception, according to analysis result It is controlled for the monitoring parameters of each sensing device.In Basic monitoring, settling data is to influence substation equipment most Whole factor, and remaining monitoring parameters is to be used for auxiliary monitoring.Therefore, in the monitoring system of the present invention, sensed using sedimentation Condition of the abnormal data of device as triggering other sensors monitoring.Data monitoring service device controls the sedimentation of each monitoring point to pass Sensor is monitored using the first monitoring cycle, and the settlement values monitored are sent into data monitoring by wireless network in real time Server.
Data monitoring service device carries out data analysis to the underlying parameter of each monitoring point of reception, when monitoring single prison During the settling data exception of measuring point, used for the settlement sensor of the abnormal specific monitoring point of settlement values different from first week The second round of phase is monitored, and the second round is less than the period 1.Meanwhile data monitoring service device also triggers the monitoring point Soil pressure sensor, support column load-bearing monitor sensor and temperature sensor make the soil pressure sensor, support column by Power monitors sensor and temperature sensor is monitored with the respective cycle respectively.Due to soil pressure and support column stress Amplitude of variation is relatively small, can be by the temperature sensor of the abnormal specific monitoring point of settlement values and second round identical week Phase is monitored, and soil pressure sensor and support column load-bearing monitor sensor is monitored with the period 3, the period 3 For N times of the second round, N is the integer more than 1.
The settlement of foundation of transformer station is divided into uniform settlement and differential settlement.In general, ground produces uniform settlement, right Electrical equipment will not cause additional internal stress in itself, will not cause big harm, but should then cause foot to uneven settlement of foundation It is enough to pay attention to.When differential settlement, which exceedes, bears limit, the cracking of electrical equipment will be produced, tilts or even collapses, jeopardizes peace Entirely.Therefore, the settlement sensor of the application is not provided with datum mark, when installing settlement sensor, will be set to base by measured value first Quasi- value, is set to zero;The numerical value of later single measurement is with the difference of a reference value as settlement values;It is each by analyzing The bulk settling data of monitoring point are analyzed, and determine the abnormal ground of differential settlement.
After data monitoring service device receives the settlement values of all monitoring points, the settlement values of all monitoring points are calculated Arithmetic mean of instantaneous value and mean square deviation, each monitoring point settlement values and the arithmetic mean of instantaneous value are gone out according to the algorithm mean value calculation Shift value, when the absolute value of the monitoring point shift value is more than M times of the mean square deviation, M is the integer more than 2, Judge that the settlement values of the monitoring point are abnormal.
Sedimentation value it is excessive can to react monitoring point sedimentation, it is possible to create risk when more than threshold value.But monitoring When exceeding threshold value to sedimentation value, harm may have been produced.Preferably, data monitoring service device receives the heavy of all monitoring points After dropping numerical value, this settlement values of all monitoring points and the difference S of last settlement values are calculated, and calculate the difference Arithmetic mean of instantaneous value S1 and mean square deviation △ S, so as to calculate the difference of each monitoring point skew S-S1, when S-S1 absolute value During more than M times of △ S, judge that the settlement values of the monitoring point are abnormal.It is further preferred that the data monitoring service device receives To after the settlement values of all monitoring points, this settlement values and kth before this monitoring for calculating all monitoring points monitor Settlement values difference S, the K is the integer more than 2, and calculates the arithmetic mean of instantaneous value S1 and mean square deviation △ of the difference S, so as to calculate the difference of each monitoring point skew S-S1, when S-S1 absolute value is more than M times of △ S, judge the prison The settlement values of measuring point are abnormal.
Embodiment described above only expresses the embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.

Claims (4)

1. a kind of transformer substation monitoring system, for monitoring its basis, including:Multiple monitoring points, the multiple monitoring point are set respectively Put sensing device;Multiple sensing devices, set corresponding to the multiple monitoring point, for monitoring the basis ginseng of each monitoring point Number, the sensing device set wireless communication interface, the underlying parameter of each monitoring point can be carried out into Wireless transceiver;Data are supervised Survey server, the data monitoring service device according to the underlying parameter of each monitoring point of reception carry out data analysis, according to point Analysis result is controlled for the monitoring parameters of each sensing device;The sensing device includes settlement sensor, and soil pressure passes Sensor, support column load-bearing monitor sensor and temperature sensor;The soil pressure sensor, support column load-bearing monitor sensing The settlement values that the startup of device and temperature sensor is monitored by the data monitoring service device according to the settlement sensor of reception Judgement and triggered.
2. monitoring system according to claim 1, it is characterised in that:The sensing device and the data monitoring service Carried out data transmission between device by Zigbee, GPRS or CDMA wireless network.
3. monitoring system according to claim 2, it is characterised in that:The monitoring parameters of each sensing device include prison Survey cycle and monitoring object.
4. monitoring system according to claim 3, it is characterised in that:The settlement sensor is supervised using the first monitoring cycle Survey, and the settlement values monitored are sent to the data monitoring service device by wireless network in real time;The data prison Survey server and data analysis is carried out to the underlying parameter of each monitoring point of reception, according to the result of data analysis for settlement number The settlement sensor of the abnormal specific monitoring point of value uses the second round different from the period 1 to be monitored, the second week Phase is less than the period 1;The data monitoring service device also triggers the soil pressure sensor, support column load-bearing monitor sensor And temperature sensor, make the soil pressure sensor, support column load-bearing monitor sensor and temperature sensor are respectively with each From cycle be monitored.
CN201510700137.2A 2015-10-26 2015-10-26 A kind of transformer substation monitoring system Active CN105297791B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201710440297.7A CN107401190A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system
CN201710440299.6A CN107401191A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system
CN201710440296.2A CN107401189A (en) 2015-10-26 2015-10-26 Transformer substation monitoring system
CN201510700137.2A CN105297791B (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510700137.2A CN105297791B (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201710440296.2A Division CN107401189A (en) 2015-10-26 2015-10-26 Transformer substation monitoring system
CN201710440297.7A Division CN107401190A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system
CN201710440299.6A Division CN107401191A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system

Publications (2)

Publication Number Publication Date
CN105297791A CN105297791A (en) 2016-02-03
CN105297791B true CN105297791B (en) 2017-12-12

Family

ID=55195552

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201510700137.2A Active CN105297791B (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system
CN201710440299.6A Withdrawn CN107401191A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system
CN201710440296.2A Withdrawn CN107401189A (en) 2015-10-26 2015-10-26 Transformer substation monitoring system
CN201710440297.7A Withdrawn CN107401190A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201710440299.6A Withdrawn CN107401191A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system
CN201710440296.2A Withdrawn CN107401189A (en) 2015-10-26 2015-10-26 Transformer substation monitoring system
CN201710440297.7A Withdrawn CN107401190A (en) 2015-10-26 2015-10-26 A kind of transformer substation monitoring system

Country Status (1)

Country Link
CN (4) CN105297791B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905204B (en) * 2015-11-22 2020-05-15 江苏博智工程咨询有限公司 Foundation structure monitoring system
CN106546219A (en) * 2016-12-06 2017-03-29 国网山东省电力公司鄄城县供电公司 Electrical substation monitoring device, method and system
CN109655036B (en) * 2018-12-25 2021-04-20 云南电网有限责任公司迪庆供电局 Transformer substation subsides and pole stress monitoring system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201892535U (en) * 2010-11-10 2011-07-06 上海市电力公司 Settling amount monitoring device for power tunnel
CN102052915A (en) * 2010-11-24 2011-05-11 航天科工深圳(集团)有限公司 Geological disaster monitoring system and method
CN202559399U (en) * 2012-04-18 2012-11-28 北京市电力公司 Transformer substation monitoring system
US9970757B2 (en) * 2014-01-08 2018-05-15 Qualcomm Incorporated Method and apparatus for positioning with always on barometer
CN103953077B (en) * 2014-05-08 2016-02-17 国网上海市电力公司 For the sensor node of underground substation construction displacement monitoring

Also Published As

Publication number Publication date
CN107401190A (en) 2017-11-28
CN107401189A (en) 2017-11-28
CN105297791A (en) 2016-02-03
CN107401191A (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN102798367B (en) Wire icing of transmission line thickness detecting method, device
CN105466389B (en) A kind of infrastructure monitors system
CN105297791B (en) A kind of transformer substation monitoring system
CN106119897A (en) A kind of electrolyzer electric flow distribution and safety monitoring system and electrolytic aluminium equipment
CN108205874A (en) Geo-hazard early-warning method based on multi-parameter linkage, live master station and system
CN103884524A (en) Method for recognizing fault rod loads based on generalized displacement angle monitoring
CN204851219U (en) Oil well operating mode intelligent monitoring system
CN106153113A (en) Sensor assembly for structure health detection
CN103852285A (en) Recognition method for problematic cable loads through generalized displacement and cable force monitoring
CN103852304A (en) Method for recognizing damaged cables, loads and linear displacement based on cable force monitoring
CN105068035A (en) Voltage transformer error level dynamic detection method and system
CN102981061A (en) Direct earth capacitance gauge in converting station power distribution system
CN105067960B (en) A kind of Distribution Fault Location System and its method based on big data
CN204302495U (en) The change in location monitoring system of electric power line pole tower
CN103852317A (en) Angular displacement mixed-monitoring load progressive identification method for problematic cable
CN104992533A (en) Water-gas pressure sensor monitoring warning and forecasting system
CN103760420A (en) Electric transmission line power-frequency parameter on-line measurement method based on distribution parameter model
CN108362926A (en) A kind of voltage class recognition methods and device
RU2478975C1 (en) Method of controlling three-phase electric mains insulation condition
CN103886133A (en) Coverage statistical analysis method for anemometer towers
CN103913321A (en) Generalized displacement hybrid monitoring defective cable load identification method
CN103868717A (en) Strain monitoring-based identification method for defective cable, load and angular displacement
CN104743445B (en) Safety of tower crane device for detecting performance based on communicating pipe and attitude and the method for analysis thereof
CN205879242U (en) Healthy sensing module of structure based on principles of radar
CN205808475U (en) Sensor assembly for structure health detection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Xiaohong

Inventor after: Xun Sichao

Inventor after: Wang Haijun

Inventor after: Xu Rong

Inventor before: Jia Xiaoqing

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170811

Address after: 224000 Yancheng City Jiefang South Road, Jiangsu, No. 189

Applicant after: YANCHENG POWER SUPPLY COMPANY, STATE GRID JIANGSU ELECTRIC POWER COMPANY

Address before: 050051 Heping West Road, Hebei, Shijiazhuang, No. 348

Applicant before: Jia Xiaoqing

GR01 Patent grant
GR01 Patent grant