CN105464689A - Steel trolley for tunnel construction - Google Patents

Steel trolley for tunnel construction Download PDF

Info

Publication number
CN105464689A
CN105464689A CN201410416105.5A CN201410416105A CN105464689A CN 105464689 A CN105464689 A CN 105464689A CN 201410416105 A CN201410416105 A CN 201410416105A CN 105464689 A CN105464689 A CN 105464689A
Authority
CN
China
Prior art keywords
steel
tunnel construction
trolley
operation platform
auxiliary operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410416105.5A
Other languages
Chinese (zh)
Inventor
肖志宏
周家园
王永祥
段江鹏
刘常伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 6 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 6 Engineering Co Ltd filed Critical China Gezhouba Group No 6 Engineering Co Ltd
Priority to CN201410416105.5A priority Critical patent/CN105464689A/en
Publication of CN105464689A publication Critical patent/CN105464689A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a steel trolley for tunnel construction. The steel trolley comprises a trolley framework. I-steel is welded to form the trolley framework, and a reinforcing mesh is laid on the top of the trolley framework; the trolley framework is provided with a plurality of levels of auxiliary operating platforms, and the multiple levels of auxiliary operating platforms have height difference; the auxiliary operating platforms comprise expansion steel pipes, the expansion steel pipes are fixedly connected onto the trolley framework and are provided with steel plates, and reinforcing meshes are laid on the auxiliary operating platforms; a main pipe for supplying water or wind is arranged on the trolley framework and is connected with a plurality of branch pipes. The steel trolley for tunnel construction has the advantages that the steel trolley can be voluntarily machined and is easy to manufacture, the tunnel excavation construction progress can be effectively guaranteed, and the tunnel construction quality can be guaranteed.

Description

A kind of steel chassis for tunnel construction
Technical field
The present invention relates to a kind of steel chassis, particularly a kind of steel chassis for tunnel construction.
Background technology
At present, in Construction of Hydropower Engineering, particularly in all Tunnel excavations, generally adopt rock bolting jumbo to carry out anchor pole, anchor pile construction, but use when light section cavern excavation rock bolting jumbo construction cost too high.
Summary of the invention
In order to overcome adopt rock bolting jumbo carry out anchor pole, anchor pile construction cause have high input, high in cost of production problem.The invention provides a kind of steel chassis for tunnel construction, for processing easy making voluntarily; Effective guarantee Tunnel excavation progress and guarantee tunnel construction quality.
The technical scheme that the present invention takes is: a kind of steel chassis for tunnel construction, comprises the car skeleton that i iron is welded, and described car skeleton top is equipped with steel mesh reinforcement; Described car skeleton is provided with multistage auxiliary operation platform, there is difference in height between multistage auxiliary operation platform; Described auxiliary operation platform comprises the telescopic steel pipe be fixedly connected on car skeleton, and telescopic steel pipe is provided with steel plate block, and described auxiliary operation platform is equipped with steel mesh reinforcement; Described car skeleton is provided with for supplying water or the supervisor of air feed, and supervisor connects multiple being in charge of.
Described steel mesh reinforcement is welded by Φ 32 screw-thread steel and the square crossing of Φ 25 screw-thread steel.
Described multistage auxiliary operation platform is three grades, along vertical short transverse, is equidistantly distributed in car skeleton both sides.Described multistage auxiliary operation platform is provided with cat ladder.
Described supervisor, be in charge of and be equipped with valve.
Describedly multiplely be in charge of caliber difference.
A kind of steel chassis for tunnel construction of the present invention.
1), multistage auxiliary operation platform is provided with scalable steel pipe, is convenient to the excavation supporting adapting to footpath, different hole.
2), the auxiliary operation platform of chassis divides three grades, and every one-level auxiliary operation platform can meet the excavation supporting of differing heights.
3), car skeleton is provided with for supplying water or air feed water main and air main, and supervisor is welded with being in charge of of different tube diameters, to meet water supply and the air feed demand of distinct device.
4), all adopt worked materials, carry out anchor pole and anchor pile construction, concrete spray protect construction.Quick and easy for installation, at the bottom of cost.Can ensure that construction speed can meet quality requirement again.
Accompanying drawing explanation
Fig. 1 is apparatus of the present invention plan structure schematic diagram;
Fig. 2 is that the A-A of Fig. 1 is to structural representation;
Fig. 3 is that the B-B of Fig. 1 is to structural representation;
Fig. 4 is that the C-C of Fig. 1 is to structural representation;
Fig. 5 is that the D-D of Fig. 1 is to structural representation;
Fig. 6 is that the E-E of Fig. 5 is to structural representation;
Fig. 7 is the F place enlarged diagram of Fig. 4.
Detailed description of the invention
As shown in Fig. 1 ~ Fig. 7, a kind of steel chassis for tunnel construction, comprise the car skeleton 1 adopting I32 i iron to be welded, described car skeleton 1 top is equipped with steel mesh reinforcement 2.Described steel mesh reinforcement 2 is welded by Φ 32 screw-thread steel and the square crossing of Φ 25 screw-thread steel.
Described car skeleton 1 is provided with multistage auxiliary operation platform 4, there is difference in height between multistage auxiliary operation platform 4.Every one-level auxiliary operation platform can meet the excavation supporting of differing heights.Described auxiliary operation platform 4 comprises the telescopic steel pipe 5 be fixedly connected on car skeleton 1, and telescopic steel pipe 5 adopts Φ 100 telescopic steel pipe, is convenient to the excavation supporting adapting to footpath, different hole.Telescopic steel pipe 5 is provided with steel plate block 6, and described auxiliary operation platform 4 is equipped with steel mesh reinforcement 2.
The preferred described multistage auxiliary operation platform 4 of the present invention is three grades, along vertical short transverse, is equidistantly distributed in car skeleton 1 both sides.Described multistage auxiliary operation platform 4 is provided with cat ladder 3.
Described car skeleton 1 two ends is welded with for supplying water or the supervisor 7 of Φ 100 of air feed respectively, and supervisor 7 connects and is multiplely in charge of 8.Described supervisor 7, be in charge of on 8 and be equipped with valve 9.It is described that multiple to be in charge of 8 calibers different, to meet water supply and the air feed demand of distinct device.First by pumping plant, supervisor 7 is supplied water, air feed, then according to the actual conditions of cavern excavation supporting, being in charge of of selecting to match 8 is connected with construction equipment, just can carry out the supply of construction wind, use water after opening valve 9.

Claims (6)

1. for a steel chassis for tunnel construction, comprise the car skeleton (1) that i iron is welded, it is characterized in that, described car skeleton (1) top is equipped with steel mesh reinforcement (2); Described car skeleton (1) is provided with multistage auxiliary operation platform (4), there is difference in height between multistage auxiliary operation platform (4); Described auxiliary operation platform (4) comprises the telescopic steel pipe (5) be fixedly connected on car skeleton (1), and telescopic steel pipe (5) is provided with steel plate block (6), and described auxiliary operation platform (4) is equipped with steel mesh reinforcement (2); Described car skeleton (1) is provided with for supplying water or the supervisor (7) of air feed, and supervisor (7) connects multiple being in charge of (8).
2. a kind of steel chassis for tunnel construction according to claim 1, it is characterized in that, described steel mesh reinforcement (2) is welded by Φ 32 screw-thread steel and the square crossing of Φ 25 screw-thread steel.
3. a kind of steel chassis for tunnel construction according to claim 1, it is characterized in that, described multistage auxiliary operation platform (4) is three grades, along vertical short transverse, is equidistantly distributed in car skeleton (1) both sides.
4. a kind of steel chassis for tunnel construction according to claim 1 or 3, is characterized in that, described multistage auxiliary operation platform (4) is provided with cat ladder (3).
5. a kind of steel chassis for tunnel construction according to claim 1, is characterized in that, described supervisor (7), is in charge of on (8) and is equipped with valve (9).
6. a kind of steel chassis for tunnel construction according to claim 1, is characterized in that, described multiple to be in charge of (8) caliber different.
CN201410416105.5A 2014-08-22 2014-08-22 Steel trolley for tunnel construction Pending CN105464689A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410416105.5A CN105464689A (en) 2014-08-22 2014-08-22 Steel trolley for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410416105.5A CN105464689A (en) 2014-08-22 2014-08-22 Steel trolley for tunnel construction

Publications (1)

Publication Number Publication Date
CN105464689A true CN105464689A (en) 2016-04-06

Family

ID=55602794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410416105.5A Pending CN105464689A (en) 2014-08-22 2014-08-22 Steel trolley for tunnel construction

Country Status (1)

Country Link
CN (1) CN105464689A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437116A (en) * 2016-12-08 2017-02-22 淮南矿业(集团)有限责任公司 Mining self-moving liftable scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437116A (en) * 2016-12-08 2017-02-22 淮南矿业(集团)有限责任公司 Mining self-moving liftable scaffold
CN106437116B (en) * 2016-12-08 2019-06-18 淮南矿业(集团)有限责任公司 Mining self-shifting Lifting scaffold

Similar Documents

Publication Publication Date Title
CN101899904B (en) Method for two-way hoisting construction of converter tower steel structure
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN104989434A (en) Method for treating landslide of tunneling working face with pipe penetration combined lagging jacks
CN204002876U (en) A kind of steel chassis for tunnel construction
CN106368714A (en) Tire type automatic lifting assembly rack for tunnel excavation construction
CN203640247U (en) Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN104818729B (en) Can be for the mutual foundation of big or small tower crane conversion
CN104314081A (en) Deep foundation pit driftway-free basement concrete pumping construction device
CN106246187B (en) Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility
CN105464689A (en) Steel trolley for tunnel construction
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN104164889A (en) Demountable tower crane foundation
CN106193279A (en) Agent structure wall prestressed structure and time building method of agent structure wall
CN204359161U (en) A kind of cooling stack with horizontal adapter ring girder construction
CN204174854U (en) A kind of vertical fragmentation Assembled rotary cat ladder
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN203497150U (en) Scaffold for hatch coaming of ship
CN204783059U (en) Poling combination bow member of tunnel work face of processing landslide
CN202989788U (en) Inner supporting member for steel corrugated culvert
CN104594631B (en) The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer
CN203686351U (en) Bridge-type pipe penetrating device
CN204021215U (en) A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam
CN204000814U (en) Steel casing is planted a platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160406

WD01 Invention patent application deemed withdrawn after publication