CN105447261A - Inspection tool used for virtual loop of intelligent substation - Google Patents

Inspection tool used for virtual loop of intelligent substation Download PDF

Info

Publication number
CN105447261A
CN105447261A CN201510901093.XA CN201510901093A CN105447261A CN 105447261 A CN105447261 A CN 105447261A CN 201510901093 A CN201510901093 A CN 201510901093A CN 105447261 A CN105447261 A CN 105447261A
Authority
CN
China
Prior art keywords
intelligent substation
inspection
empty
scd file
loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510901093.XA
Other languages
Chinese (zh)
Other versions
CN105447261B (en
Inventor
唐凡
乔辉
刘守瑞
张罡帅
王江涛
董默
崔宇
高龙
薄孔阳
张磊
芦佳硕
刘喆
王达飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510901093.XA priority Critical patent/CN105447261B/en
Publication of CN105447261A publication Critical patent/CN105447261A/en
Application granted granted Critical
Publication of CN105447261B publication Critical patent/CN105447261B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides an inspection tool used for a virtual loop of an intelligent substation. The inspection tool comprises a procedure inspection module, a virtual terminal list inspection module and an SCD file inspection module. Only if a virtual terminal list and SCD file information of an intelligent substation are imported into the inspection tool, the inspection tool can perform automatic comparison and verification; and an operation error of an SCD file can be found by means of virtual loop inspection before function debugging, so that the debugging can be targeted, thereby greatly improving acceptance efficiency of the intelligent substation, and largely shortening a total duration of debugging and acceptance work. Briefly speaking, the inspection tool used for the virtual loop of the intelligent substation is capable of effectively solving the problem of low acceptance efficiency due to the fact that the intelligent substation has no line checking link, and the inspection tool also makes the final check for a device integration provider and improves acceptance work quality.

Description

A kind of instruments of inspection for the empty loop of intelligent substation
Technical field
The invention belongs to detection system technical field, specifically, the present invention relates to a kind of intelligent substation capital construction examination and upkeep operation instrument, particularly relate to a kind of instruments of inspection for the empty loop of intelligent substation.
Background technology
Along with the construction of strong intelligent grid, the number of intelligent substation just rapidly increases, and how to improve intelligent substation examination efficiency and becomes pendulum problem demanding prompt solution in face of line teams and groups.The application of intelligent substation fiber optic information multiplexing technology, a large amount of cable is replaced with a small amount of optical fiber, also make traditional secondary loop become the empty loop of " cannot see; can not touch " simultaneously, cause a kind of wireless situation looked into, check Problems existing in empty loop by function debugging completely, and each defect elimination all will revise SCD file, again download in IED after deriving configuration file, and this process relies on integrator completely, greatly reduce intelligent substation and check and accept efficiency.In fact, the empty terminal table that designing institute issues is exactly intelligent substation secondary loop stretch-out view, it is exactly secondary circuit that the GOOSE/SV described in SCD file connects, only the form of the line inspection changes, managing loop by holding drawing in traditional transformer station, becoming and checking that whether SCD file is consistent with the empty loop described by empty terminal table.But logic connects (LC) huge number in empty terminal table, and show with the form of bivariate table, lose the advantage that traditional secondary loop diagram is visual in image, make manually to complete empty in-circuit testing workload large and uninteresting, dull.And the abstract data model that intelligent substation is set up based on IEC61850 standard, by loop information standardization, digitizing, make tradition need the process of manual read and identification to change and realized becoming possibility by automation tools.
Summary of the invention
The object of the present invention is to provide a kind of instruments of inspection for the empty loop of intelligent substation, at least to solve the technical matters that cannot detect the empty loop of intelligent substation that prior art exists, the intelligent substation that simultaneously can solve prior art existence checks and accepts inefficient technical matters.
In order to solve the problem, the invention provides a kind of instruments of inspection for the empty loop of intelligent substation, its technical scheme is as follows:
A kind of instruments of inspection for the empty loop of intelligent substation, comprise code inspection module, be connected with the empty loop of intelligent substation, in described code inspection module, be provided with duplicate system retrofit verification unit, double A/D sampling is with specified time delay verification unit and set logic contact LN verification unit, whether meet duplicate system retrofit standard, double A/D sampling and specified delay criteria and setting logic contact LN standard for verifying smart transformer station SCD file; Empty terminal table inspection module, is connected with the empty loop of intelligent substation, for the corresponding relation of verifying smart transformer station SCD file with virtual terminals of intelligent substation table, verifies whether intelligent substation constructs according to arrangement and method for construction; With SCD file inspection module, be connected with the empty loop of intelligent substation, for the record checking SCD file to revise front and back.
Described above for the instruments of inspection in the empty loop of intelligent substation, more preferably: in empty terminal table, in IED title and SCD file, IED name is called mapping settings.
Described above for the instruments of inspection in the empty loop of intelligent substation, more preferably: also comprise display module, for showing checking information.
Described above for the instruments of inspection in the empty loop of intelligent substation, more preferably: also comprise output port, for externally exporting checking information.
Analyze known, compared with prior art, advantage of the present invention and beneficial effect are:
One, the instruments of inspection for the empty loop of intelligent substation provided by the invention, as long as the empty terminal table of intelligent substation, SCD file information are imported the instruments of inspection of the present invention, the instruments of inspection of the present invention can realize automatic comparison, verification; Before function debugging, the Operational errors of SCD file can be found by empty in-circuit testing, debugging is shot the arrow at the target, greatly improve intelligent substation and check and accept efficiency, significantly shorten total duration of debugging checking and accepting.In simple terms, the calibration tool for the empty loop of intelligent substation provided by the invention can solve intelligent substation does not effectively have line inspection link, checks and accepts inefficient problem, for the work of integration of equipments business is checked on, improves checking and accepting quality yet.
Two, IED title in IED title in empty terminal table and SCD file is set up and is mapped by the present invention, and the instruments of inspection can be avoided in described empty terminal table inspection module to occur verify error.
Three, the described display module of the present invention's setting, can obtain the checking information of the instruments of inspection of the present invention intuitively.
Four, the described output port of the present invention's setting, externally can export checking information.
Accompanying drawing explanation
Fig. 1 is the structure principle chart of the instruments of inspection for the empty loop of intelligent substation of the preferred embodiment of the present invention.
Fig. 2 is the fundamental diagram of the instruments of inspection for the empty loop of intelligent substation of the preferred embodiment of the present invention.
In figure, 1-code inspection module; The empty terminal table inspection module of 2-; 3-SCD inspection of document module.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further details.
As Fig. 1, shown in Fig. 2, the instruments of inspection for the empty loop of intelligent substation of the preferred embodiment of the present invention, by the empty terminal table in empty for intelligent substation loop, SCD file information imports the instruments of inspection, the empty loop of intelligent substation is connected with the instruments of inspection, the instruments of inspection mainly comprises code inspection module 1, duplicate system retrofit verification unit is provided with in code inspection module 1, double A/D sampling is with specified time delay verification unit and set logic contact LN verification unit, duplicate system retrofit standard whether is met for verifying smart transformer station SCD file, double A/D sampling is with specified delay criteria and set logic contact LN standard, empty terminal table inspection module 2, for the corresponding relation of verifying smart transformer station SCD file with virtual terminals of intelligent substation table, verifies whether intelligent substation constructs according to arrangement and method for construction, with SCD file inspection module 3, for the detailed record checking SCD file to revise front and back.
Generally speaking, the instruments of inspection for the empty loop of intelligent substation provided by the invention, as long as the empty terminal table of intelligent substation, SCD file information are imported the instruments of inspection of the present invention, the instruments of inspection of the present invention can realize automatic comparison, verification; Before function debugging, the Operational errors of SCD file can be found by empty in-circuit testing, debugging is shot the arrow at the target, greatly improve intelligent substation and check and accept efficiency, significantly shorten total duration of debugging checking and accepting.In simple terms, the calibration tool for the empty loop of intelligent substation provided by the invention can solve intelligent substation does not effectively have line inspection link, checks and accepts inefficient problem, for the work of integration of equipments business is checked on, improves checking and accepting quality yet.
In order to avoid the instruments of inspection occurs verify error in empty terminal table inspection module 2, the fileinfo of empty terminal table is being carried out Uniform Name with the information of the identical data of SCD file information, is needing IED title in IED title in empty terminal table and SCD file to set up before such as comparison to map.
In order to obtain the checking information of the instruments of inspection of the present invention intuitively, the present invention also comprises display module (not shown), for showing checking information.Further, in order to obtain checking information, the present invention also comprises output port, for externally exporting checking information.
As shown in Figure 2, the course of work of the present invention is described in detail:
Reading in of SCD file and empty terminal;
Empty terminal table needs to carry out pre-service to empty terminal table before reading in, comprise typical interval to specialize and the normalization of IED title, when so-called typical interval is specialized and is referred to lower apprehensive terminal table, be spaced apart example with typical case to issue, and empty terminal table is read in and will be read in empty loop, full station, therefore typical interval is specialized is exactly that i.e. two numbering, is expanded to concrete interval to adding a prefix before IED title in typical interval.In addition in read-in process, require that same IED title must be unique, such as main transformer high-pressure side merge cells, be sometimes referred to as main transformer 220kV side merge cells, different IED names causes program automatically to identify, and the normalization of IED title is searched whole empty terminal table, replaced exactly, the title of same IED is unified.
The comparison of empty terminal table and SCD file;
Need IED title in IED title in empty terminal table and SCD file to set up before comparison to map.IED represents with Chinese character in empty terminal table, but represent with the form of " English+numeral ", and each producer IED naming method is not quite similar in SCD file.Therefore the disunity of IED naming method needs before comparison, set up a contingency table, makes program understand the corresponding relation of IED in empty terminal table and SCD file.
Comparison principle: different from traditional transformer station, there is the situation of " multicast " in each IED signal exchange of intelligent substation, for the empty terminal of a publisher, the empty terminal of subscriber may be multiple, and determine the empty terminal of the subscriber of a LC, the empty terminal of publisher will uniquely be determined.Based on this, for a LC, if empty terminal table is consistent with the empty terminal of subscriber in SCD file, then the empty terminal of publisher is necessarily identical, otherwise judges this LC configuration error; If the empty terminal of subscriber exists in empty terminal table, do not find in SCD file, be then judged to Lou to connect LC; If the empty terminal of subscriber exists in SCD file, do not find in empty terminal table, be then judged to be redundancy LC.Finally, counters count is set and leaks company, redundancy and wrong even LC number.
Comparison before and after SCD file amendment;
When intelligent station increase-volume or defect elimination, integrated unit needs amendment IED configuration file, have modified which content, why revises, and change can or can not run other IED and have an impact, and these problems need to make a record on the one hand.Operations staff should possess discrimination capabilities on the other hand, and can not rely on merely the source book that integrated unit provides, if integrator is because of reasons such as hand mistakes, deleted a LC, then consequence is hardly imaginable by mistake.Adopt the instruments of inspection of the present invention to SCD file comparison before and after amendment, the two difference clear and definite is also for the work of integrated unit is checked on, and improves functional reliability.
In addition, intelligent station increases sharply in number in recent years, the file of SCD file becomes an important process, from newly-built station puts into operation, to defect elimination, increase-volume, enlarging, which LC the file of amendment front and back SCD file, have modified each time, all will have a detailed record, and empty in-circuit testing instrument contributes to setting up this archives.
The Regulations inspection of SCD file
Automatically detect SCD file by program whether to meet intelligent substation and to be correlated with Regulations, mainly comprise following 3 points at present:
1) dual inspection.
According to the requirement of " intelligent substation Protection Technology specification " 5.1, GOOSE, SV network that duplicate system retrofit protection uses should follow separate principle, when a Network Abnormal or out of service time should not affect the operation of another network.
According to above regulatory requirements, protect A, B to overlap institute by program programming count and connects IED, whether have intersection between A, B cover IED in analysis GOOSE/SV network, judge whether thus to meet protection dual configuration configuration requirement.
2) inspection of double A/D sampling and specified time delay.
According to the requirement of " route protection and servicing unit standardized designs specification " 4.2.5, MU adopts TCTR or TVTR modeling, and double A/D should configure identical TCTR or TVTR example, and double A/D sampled data need connect empty terminal simultaneously, only can not connect one of them.
According to the requirement of appendix C intelligent station protective device interface message in " route protection and servicing unit standardized designs specification "; MU concentrates to the SV sample values that protective device send should be had " specified time delay Timedelay ", is the necessary condition realizing interpolation sample-synchronous again.
According to above-mentioned regulatory requirements, whether whether automatically detecting MU to the SV data set that protection is sent by program is double A/D sampling, containing specified time delay field.
3) inspection of certain logic node LN (namely setting logic node LN).
According in " route protection and servicing unit standardized designs specification " 4.2 requirement, in protection model, corresponding each isolating switch that will trip respectively uses a PTRC example, should containing tripping operation, start failure protection (if any), lock-reclosing lock (if any) etc. signal and relevant soft pressing plate thereof; Reclosing action adopts RREC modeling; Malfunctioning tripping goes out to adopt RBRF modeling; Teletransmission is outputed and is adopted PSCH modeling; MU adopts TCTR or TVTR modeling, and double A/D should configure identical TCTR or TVTR example, and phase-splitting mutual inductor should by building example mutually; Intelligent terminal: isolating switch adopts XCBR modeling, disconnecting link adopts XSWI modeling, and phase-splitting isolating switch should by building example mutually; And the empty terminal information of GOOSE should be configured to DA level, the empty terminal information of SV should be configured to DO level.
According to above-mentioned Regulations, realize correlation function with program self-verifying IED and whether employ above-mentioned logic node.
Result exports
1) SCD and empty terminal table comparison
A newly-built book, called after " empty in-circuit testing result ", comprises 3 worksheets altogether, worksheet 1 reads in result for empty terminal table, worksheet 2 called after SCD file reads in result, worksheet 3 called after " assay ", writes leaking company, redundancy and the wrong LC connected one by one.For ease of checking, background color that wrong LC is expert at is filled to redness by worksheet 1 and worksheet 2, leaks even LC and redundancy LC and is filled to yellow.
2) comparison before and after SCD file amendment
A newly-built book, called after " SCD comparison result ", comprises 3 worksheets altogether, worksheet 1 is for reading in result before SCD amendment, worksheet 2 called after SCD reads in result, worksheet 3 called after " comparison result " after revising, and is write one by one by the LC deleting, increase and revise.For ease of checking, the background color that LC is expert at of amendment is filled to redness by worksheet 1 and worksheet 2, and LC and the newly-increased LC of deletion are filled to yellow.
3) SCD file Regulations inspection
A newly-built book, exports dual inspection respectively in its worksheet 1,2,3, the result that double A/D sampling is checked with specified time delay inspection and certain logic node.
Analyze known, compared with prior art, advantage of the present invention and beneficial effect are:
One, the instruments of inspection for the empty loop of intelligent substation provided by the invention, as long as the empty terminal table of intelligent substation, SCD file information are imported the instruments of inspection of the present invention, the instruments of inspection of the present invention can realize automatic comparison, verification; Before function debugging, the Operational errors of SCD file can be found by empty in-circuit testing, debugging is shot the arrow at the target, greatly improve intelligent substation and check and accept efficiency, significantly shorten total duration of debugging checking and accepting.In simple terms, the calibration tool for the empty loop of intelligent substation provided by the invention can solve intelligent substation does not effectively have line inspection link, checks and accepts inefficient problem, for the work of integration of equipments business is checked on, improves checking and accepting quality yet.
Two, IED title in IED title in empty terminal table and SCD file is set up and is mapped by the present invention, and the instruments of inspection can be avoided in empty terminal table inspection module to occur verify error.
Three, the display module of the present invention's setting, can obtain the checking information of the instruments of inspection of the present invention intuitively.
Four, the output port of the present invention's setting, externally can export checking information.
As known by the technical knowledge, the present invention can be realized by other the embodiment not departing from its Spirit Essence or essential feature.Therefore, above-mentioned disclosed embodiment, with regard to each side, all just illustrates, is not only.Within the scope of the present invention all or be all included in the invention being equal to the change in scope of the present invention.

Claims (4)

1., for the instruments of inspection in the empty loop of intelligent substation, it is characterized in that, comprising:
Code inspection module, be connected with the empty loop of intelligent substation, in described code inspection module, be provided with duplicate system retrofit verification unit, double A/D sampling is with specified time delay verification unit and set logic contact LN verification unit, whether meet duplicate system retrofit standard, double A/D sampling and specified delay criteria and setting logic contact LN standard for verifying smart transformer station SCD file;
Empty terminal table inspection module, is connected with the empty loop of intelligent substation, for the corresponding relation of verifying smart transformer station SCD file with virtual terminals of intelligent substation table, verifies whether intelligent substation constructs according to arrangement and method for construction; With
SCD file inspection module, is connected with the empty loop of intelligent substation, for the record checking SCD file to revise front and back.
2. the instruments of inspection for the empty loop of intelligent substation according to claim 1, is characterized in that:
In empty terminal table, in IED title and SCD file, IED name is called mapping settings.
3. the instruments of inspection for the empty loop of intelligent substation according to claim 1 and 2, is characterized in that, also comprise:
Display module, for showing checking information.
4. the instruments of inspection for the empty loop of intelligent substation according to claim 1 and 2, is characterized in that, also comprise:
Output port, for externally exporting checking information.
CN201510901093.XA 2015-12-08 2015-12-08 A kind of instruments of inspection for intelligent substation void circuit Active CN105447261B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510901093.XA CN105447261B (en) 2015-12-08 2015-12-08 A kind of instruments of inspection for intelligent substation void circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510901093.XA CN105447261B (en) 2015-12-08 2015-12-08 A kind of instruments of inspection for intelligent substation void circuit

Publications (2)

Publication Number Publication Date
CN105447261A true CN105447261A (en) 2016-03-30
CN105447261B CN105447261B (en) 2019-02-12

Family

ID=55557432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510901093.XA Active CN105447261B (en) 2015-12-08 2015-12-08 A kind of instruments of inspection for intelligent substation void circuit

Country Status (1)

Country Link
CN (1) CN105447261B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106055684A (en) * 2016-06-08 2016-10-26 国家电网公司 SCD file comparison method of transformer substation
CN107025329A (en) * 2017-02-27 2017-08-08 湖北省电力勘测设计院 The empty loop automatic connection method of intelligent substation
CN109992571A (en) * 2019-03-26 2019-07-09 国网河南省电力公司电力科学研究院 A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN113533885A (en) * 2021-07-13 2021-10-22 国网河北省电力有限公司电力科学研究院 Transformer substation secondary circuit model inspection method and device and terminal equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090149972A1 (en) * 2006-03-10 2009-06-11 Edsa Micro Corporation Real-time system for verification and monitoring of protective device settings within an electrical power distribution network and automatic correction of deviances found
CN103077093A (en) * 2013-01-14 2013-05-01 山东电力集团公司 Substation configuration description (SCD) calibration method based on model objectification semantics
CN103632307A (en) * 2013-09-27 2014-03-12 国家电网公司 Method for checking consistency between SCD and virtual loop table of intelligent substation
CN104242460A (en) * 2014-09-29 2014-12-24 国家电网公司 System and method for analog display of internal logic contacts of protection device of intelligent substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090149972A1 (en) * 2006-03-10 2009-06-11 Edsa Micro Corporation Real-time system for verification and monitoring of protective device settings within an electrical power distribution network and automatic correction of deviances found
CN103077093A (en) * 2013-01-14 2013-05-01 山东电力集团公司 Substation configuration description (SCD) calibration method based on model objectification semantics
CN103632307A (en) * 2013-09-27 2014-03-12 国家电网公司 Method for checking consistency between SCD and virtual loop table of intelligent substation
CN104242460A (en) * 2014-09-29 2014-12-24 国家电网公司 System and method for analog display of internal logic contacts of protection device of intelligent substation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁冬: "基于KMS9000的SCD文件与虚回路对比在智能变电站的应用分析", 《科技创新与应用》 *
吴恒福 等: "基于设计规范的智能变电站SCD文件规范性检查", 《电网与清洁能源》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106055684A (en) * 2016-06-08 2016-10-26 国家电网公司 SCD file comparison method of transformer substation
CN107025329A (en) * 2017-02-27 2017-08-08 湖北省电力勘测设计院 The empty loop automatic connection method of intelligent substation
CN107025329B (en) * 2017-02-27 2020-07-07 湖北省电力勘测设计院有限公司 Virtual circuit automatic connection method of intelligent substation
CN109992571A (en) * 2019-03-26 2019-07-09 国网河南省电力公司电力科学研究院 A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN109992571B (en) * 2019-03-26 2023-02-17 国网河南省电力公司电力科学研究院 Online closed-loop checking system and checking method for configuration file of intelligent substation
CN113533885A (en) * 2021-07-13 2021-10-22 国网河北省电力有限公司电力科学研究院 Transformer substation secondary circuit model inspection method and device and terminal equipment

Also Published As

Publication number Publication date
CN105447261B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN106597947B (en) Transformer substation equipment testing method, server, tester and system
CN104734364B (en) The method and system of relay protection device of intelligent substation SV, GOOSE input test
CN202533519U (en) Fully automatic closed loop test system of protective relaying device
CN101706816B (en) Method for detecting digitized transformer station model
CN102043719B (en) Method for testing IEC61850 configuration description file
CN107292769B (en) Substation reconstruction and extension configuration consistency comparison and verification method based on RCD
CN105447261A (en) Inspection tool used for virtual loop of intelligent substation
CN107045706B (en) Automatic generation method for secondary safety measure operation ticket of intelligent substation
CN108733928B (en) SCD file virtual circuit automatic checking method based on intermediate model file
CN103632521B (en) A kind of power information gathers the local channel detection method of fault detection system
CN106329720B (en) Detection and debugging method for secondary system of reconstruction and extension project of intelligent substation
CN102445941B (en) Method for automatically determining and analyzing interoperability test results of on-board equipment of train control system
CN104246521A (en) Method and device for automatic test of relay protection function of intelligent susbstation
WO2015149596A1 (en) Iec61850-based communication simulation method for leakage current on-line monitoring device
CN104319891B (en) Maintenance O&M device and method for transformer station process layer
CN102355062A (en) IEC (International Electrotechnical Commission) 61850 relay protection model checking method
CN115599750A (en) Intelligent substation virtual circuit checking method, system, equipment and storage medium
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN106199258A (en) A kind of microcomputer protective relay Auto-Test System
CN113095059B (en) Method, device, equipment and storage medium for verifying substation configuration description file
CN109374994A (en) A kind of detection system suitable for protective relaying device
CN111984656B (en) Method and system for checking basic data key parameters of intelligent substation automation equipment
CN109933450A (en) A kind of method of calibration and device of intelligent substation secondary void loop configuration file
CN105321126A (en) SCD-based method for checking intelligent substation device
CN106855850A (en) Based on portable equipment intelligent substation secondary void terminal figure reality symbol detection method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant