CN105417203B - Lift steel ore storage bin - Google Patents

Lift steel ore storage bin Download PDF

Info

Publication number
CN105417203B
CN105417203B CN201510813932.2A CN201510813932A CN105417203B CN 105417203 B CN105417203 B CN 105417203B CN 201510813932 A CN201510813932 A CN 201510813932A CN 105417203 B CN105417203 B CN 105417203B
Authority
CN
China
Prior art keywords
storage bin
ore storage
funnel
bin body
lower bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510813932.2A
Other languages
Chinese (zh)
Other versions
CN105417203A (en
Inventor
王建群
李大浪
杨怀东
黄恒平
代景艳
李长良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201510813932.2A priority Critical patent/CN105417203B/en
Publication of CN105417203A publication Critical patent/CN105417203A/en
Application granted granted Critical
Publication of CN105417203B publication Critical patent/CN105417203B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/34Emptying devices
    • B65G65/40Devices for emptying otherwise than from the top
    • B65G65/44Devices for emptying otherwise than from the top using reciprocating conveyors, e.g. jigging conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/12Supports
    • B65D90/20Frames or nets, e.g. for flexible containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk
    • B65G2201/045Sand, soil and mineral ore

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The present invention relates to metallurgical mine engineering equipment field, specifically a kind of lift steel ore storage bin;Including support, ore storage bin body, funnel, for funnel below ore storage bin body bottom portion discharging opening, vibrating feed conveying equipment is located at the lower section of funnel bottom discharging opening, it is characterized in that:Support includes upper bracket, lower bracket and funnel stand, upper bracket is socketed with lower bracket and upper bracket can rise or fall along lower bracket, the threaded connection connect between upper bracket and lower bracket by lock bolt with bolt is fixed, ore storage bin body is fixed on upper bracket center, lower bracket is provided with funnel stand, and funnel is overlapped and is located in funnel stand with ore storage bin body.This steel ore storage bin uses above-mentioned design, the steel ore storage bin of conventional on-site fabrication and installation is realized into overall modularization by liftable support, it is final to be offered convenience for the installation of steel ore storage bin so as to reach the purpose for reducing steel ore storage bin itself center of gravity, reducing volume, being readily transported and install again.

Description

Lift steel ore storage bin
Technical field
The present invention relates to metallurgical mine engineering equipment field, specifically a kind of lift steel ore storage bin and its assembly and disassembly methods.
Background technology
In metallurgical mine Process of Engineering Construction, because steel ore storage bin volume is big, weight is not easy to greatly whole Transporting, therefore it is more By modular transportation, it is field erected in a manner of build.And by through modularization transport to destination steel ore storage bin each several part again , it is necessary to be supported with the bracing reinforcement part and binding piece of many during assembling, weight is carried out and it also requires taking a significant amount of time Heart adjustment makes it firm, therefore existing steel ore storage bin exists in terms of transport, component that cost is too high, installation accuracy is not high, installation The problem of time is long.
The content of the invention
It is an object of the present invention to provide a kind of liftable steel ore storage bin, in this way, it can reduce volume in order to entirety Transport, and be also convenient for building in destination progress restoration.
In order to achieve the above object, the present invention is realized in:
A kind of lift steel ore storage bin, including support, ore storage bin body, funnel and vibrating feed conveying equipment, wherein, funnel is set Below ore storage bin body bottom portion discharging opening, vibrating feed conveying equipment is located at the lower section of funnel bottom discharging opening, and support includes upper Portion's support, lower bracket and funnel stand, upper bracket is socketed with lower bracket and upper bracket can rise along lower bracket Or decline, the threaded connection connect between upper bracket and lower bracket by lock bolt with bolt is fixed, and ore storage bin body is fixed In upper bracket center, lower bracket is provided with funnel stand, and funnel is overlapped and is located in funnel stand with ore storage bin body.
Described lift steel ore storage bin, upper bracket, lower bracket include four root posts and for four root posts to be closed The crossbeam of rectangular frame structure is enclosed, four root posts of upper bracket are socketed on four root posts of lower bracket.
Described lift steel ore storage bin, funnel are realized by connecting bolt with ore storage bin body lap-joint and are threadedly coupled.
The assembly and disassembly methods of the lift steel ore storage bin, comprise the steps;
Step 1, make support, ore storage bin body, funnel respectively of steel section by design drawing, and preparation vibrating feed is defeated Send equipment;
It is step 2, pre-assembled;
By lower bracket, vibrating feed conveying equipment, funnel stand, funnel, upper bracket, the order of ore storage bin body successively Carry out pre-assembled;
Step 2.1, by lower bracket center by vibrating feed conveying equipment bolt connection,
Step 2.2, by funnel stand and lower bracket bolt connection and funnel stand is set to be located at vibrating feed conveying equipment Top;
Step 2.3, by funnel and funnel stand bolt connection;
Step 2.4, upper bracket set is connected in lower bracket and realizes that pin joint and bolt connect respectively with bearing pin and bolt Connect;
Step 2.5, by ore storage bin body and upper bracket bolt connection and ore storage bin body is set to be located above funnel;
Step 3, partition transport;
Step 3.1, with loop wheel machine ore storage bin body is hung, tighten lifting rope but do not sling ore storage bin body;
Step 3.2, the bearing pin and bolt connection for unclamping upper bracket and lower bracket;
Connecting bolt between step 3.3, release ore storage bin body and funnel;
Step 3.4, with loop wheel machine by the upper bracket with ore storage bin body along the downward downhill race of lower bracket, make ore storage bin body set Fall on steel funnel top;
Step 3.5, upper bracket and lower bracket are realized into pin joint and bolt connection by bearing pin and bolt again, formed The steel ore storage bin of centre of gravity is overall;
Step 4, formal establishment;
Bearing pin and connecting bolt between step 4.1, release upper bracket and lower bracket;
Step 4.2, with loop wheel machine or Lifting Equipment ore storage bin body is lifted up to design work position;
Step 4.3, again by upper bracket and lower bracket by bearing pin and bolt realize pin joint and bolt connection and Herringbone is set to support between ore storage bin body and support,
Step 4.4, connection ore storage bin body and funnel;
Step 4.5, adjustment ore storage bin body, the relative position of funnel, fasten all connecting bolts, installation.
This steel ore storage bin uses above-mentioned design, the steel ore storage bin of conventional on-site fabrication and installation is realized by liftable support whole The modularization of body, so as to reach the purpose for reducing steel ore storage bin itself center of gravity, reducing volume, being readily transported and install again, it is finally The installation of steel ore storage bin offers convenience.
Brief description of the drawings
Fig. 1 is this steel ore storage bin completion status schematic diagram.
Fig. 2 is this steel ore storage bin travel position schematic diagram.
Fig. 3 is the attachment structure schematic diagram of upper bracket and lower bracket.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of lift steel ore storage bin, including support 4, ore storage bin body 1, funnel 2 and vibrating feed are defeated Equipment 5 is sent, wherein, for funnel 2 below the bottom discharge mouth of ore storage bin body 1, vibrating feed conveying equipment 5 is located at the bottom of funnel 2 The lower section of discharging opening, support 4 include upper bracket 6, lower bracket 7 and funnel stand 3, and upper bracket 6 is socketed with lower bracket 7 And upper bracket can rise or fall along lower bracket, as shown in figure 3, passing through latch between upper bracket 6 and lower bracket 7 The threaded connection of 8 pin joint and bolt 9 is fixed, and ore storage bin body 1 is fixed on the center of upper bracket 6, and lower bracket 7 is provided with funnel Support 3, funnel 2 overlap with ore storage bin body 1 and in funnel stands 3.
Described lift steel ore storage bin, upper bracket 6, lower bracket 7 include four root posts and for by four root posts The crossbeam of rectangular frame structure is surrounded, four root posts of upper bracket 6 are socketed on four root posts of lower bracket 7.
Described lift steel ore storage bin, funnel 2 are realized by connecting bolt 10 with the lap-joint of ore storage bin body 1 and are threadedly coupled.
The assembly and disassembly methods of the lift steel ore storage bin, comprise the steps;
Step 1, make support, ore storage bin body, funnel respectively of steel section by design drawing, and preparation vibrating feed is defeated Send equipment;
It is step 2, pre-assembled;
By lower bracket, vibrating feed conveying equipment, funnel stand, funnel, upper bracket, the order of ore storage bin body successively Carry out pre-assembled;
Step 2.1, by lower bracket center by vibrating feed conveying equipment bolt connection,
Step 2.2, by funnel stand and lower bracket bolt connection and funnel stand is set to be located at vibrating feed conveying equipment Top;
Step 2.3, by funnel and funnel stand bolt connection;
Step 2.4, upper bracket set is connected in lower bracket and realizes that pin joint and bolt connect respectively with bearing pin and bolt Connect;
Step 2.5, by ore storage bin body and upper bracket bolt connection and ore storage bin body is set to be located above funnel;
Step 3, partition transport;
Step 3.1, with loop wheel machine ore storage bin body is hung, tighten lifting rope but do not sling ore storage bin body;
Step 3.2, the bearing pin and bolt connection for unclamping upper bracket and lower bracket;
Connecting bolt between step 3.3, release ore storage bin body and funnel;
Step 3.4, with loop wheel machine by the upper bracket with ore storage bin body along the downward downhill race of lower bracket, make ore storage bin body set Fall on steel funnel top;
Step 3.5, upper bracket and lower bracket are realized into pin joint and bolt connection by bearing pin and bolt again, formed The steel ore storage bin of centre of gravity is overall;
Step 4, formal establishment;
Bearing pin and connecting bolt between step 4.1, release upper bracket and lower bracket;
Step 4.2, with loop wheel machine or Lifting Equipment ore storage bin body is lifted up to design work position;
Step 4.3, again by upper bracket and lower bracket by bearing pin and bolt realize pin joint and bolt connection and Herringbone is set to support between ore storage bin body and support,
Step 4.4, connection ore storage bin body and funnel;
Step 4.5, adjustment ore storage bin body, the relative position of funnel, fasten all connecting bolts, installation.
Steel ore storage bin body and steel funnel that this steel ore storage bin installs traditional field fabrication etc. are combined as five submodules, and Assemble them into as a kind of liftable integral module steel ore storage bin, following advantage is brought for the transport and installation of steel ore storage bin:
1st, by integral module and lower the center of gravity, the sea-freight safety of tall and big steel ore storage bin equipment can be ensured, and significantly Extra bracing reinforcement and binding piece are reduced, reduces transport, making and installation cost and unsafe factor;
2nd, process and make without scene completely and reduce field erected workload to greatest extent, and then shorten work Phase, operating efficiency is improved, makes full use of resource, environmental protection;
3rd, making, the installation of all submodules can be completed in the pre-assembled base of the preferable modularization of condition, improve Installation accuracy and quality, avoid the equipment installation difficulty caused by transport deformation and site operation error from even can not pacifying Dress.

Claims (1)

1. a kind of lift steel ore storage bin, including support, ore storage bin body, funnel and vibrating feed conveying equipment, wherein, funnel is located at Below ore storage bin body bottom portion discharging opening, vibrating feed conveying equipment is located at the lower section of funnel bottom discharging opening, and support includes top Support, lower bracket and funnel stand, the assembly and disassembly methods of the lift steel ore storage bin, it is characterized in that:Comprise the steps;
Step 1, make support, ore storage bin body, funnel respectively of steel section by design drawing, and preparation vibrating feed conveying is set It is standby;
It is step 2, pre-assembled;
Carried out successively by lower bracket, vibrating feed conveying equipment, funnel stand, funnel, upper bracket, the order of ore storage bin body It is pre-assembled;
Step 2.1, by lower bracket center by vibrating feed conveying equipment bolt connection,
Step 2.2, by funnel stand and lower bracket bolt connection and funnel stand is set to be located above vibrating feed conveying equipment;
Step 2.3, by funnel and funnel stand bolt connection;
Step 2.4, upper bracket set is connected in lower bracket and realizes pin joint and bolt connection respectively with bearing pin and bolt;
Step 2.5, by ore storage bin body and upper bracket bolt connection and ore storage bin body is set to be located above funnel;
Step 3, partition transport;
Step 3.1, with loop wheel machine ore storage bin body is hung, tighten lifting rope but do not sling ore storage bin body;
Step 3.2, the bearing pin and bolt connection for unclamping upper bracket and lower bracket;
Connecting bolt between step 3.3, release ore storage bin body and funnel;
Step 3.4, with loop wheel machine by the upper bracket with ore storage bin body along the downward downhill race of lower bracket, fall ore storage bin body set Steel funnel top;
Step 3.5, upper bracket and lower bracket are realized into pin joint and bolt connection by bearing pin and bolt again, formed low heavy The steel ore storage bin of the heart is overall;
Step 4, formal establishment;
Bearing pin and connecting bolt between step 4.1, release upper bracket and lower bracket;
Step 4.2, with loop wheel machine or Lifting Equipment ore storage bin body is lifted up to design work position;
Step 4.3, upper bracket and lower bracket are realized into pin joint and bolt connection and in ore storage bin by bearing pin and bolt again Herringbone is set to support between body and support,
Step 4.4, connection ore storage bin body and funnel;
Step 4.5, adjustment ore storage bin body, the relative position of funnel, fasten all connecting bolts, installation.
CN201510813932.2A 2015-11-23 2015-11-23 Lift steel ore storage bin Active CN105417203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510813932.2A CN105417203B (en) 2015-11-23 2015-11-23 Lift steel ore storage bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510813932.2A CN105417203B (en) 2015-11-23 2015-11-23 Lift steel ore storage bin

Publications (2)

Publication Number Publication Date
CN105417203A CN105417203A (en) 2016-03-23
CN105417203B true CN105417203B (en) 2017-11-28

Family

ID=55495831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510813932.2A Active CN105417203B (en) 2015-11-23 2015-11-23 Lift steel ore storage bin

Country Status (1)

Country Link
CN (1) CN105417203B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3123107A (en) * 1964-03-03 Particulate material transfer
US3971493A (en) * 1974-08-26 1976-07-27 David Michael Williams Combination transportable container and dispensing receiver
CN2075632U (en) * 1990-07-13 1991-04-24 朱珍兴 Self unloading bulk cement container
CN2389728Y (en) * 1999-04-19 2000-08-02 西安建筑科技大学 Reciprocating wet concrete sprayer
CN202657704U (en) * 2012-05-23 2013-01-09 湖北俏牛儿牧业有限公司 Granular material packaging device
CN203006870U (en) * 2012-11-08 2013-06-19 广东易山重工股份有限公司 Loading and unloading device of vehicle-mounted joint sealing machine
CN205442067U (en) * 2015-11-23 2016-08-10 中国二十冶集团有限公司 Over -and -under type steel ore bin

Also Published As

Publication number Publication date
CN105417203A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN102146729B (en) Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN203728398U (en) Transporting device with lifting and overturning functions
CN202090611U (en) Modified concrete suspension bucket
CN205295950U (en) High mound steel reinforcement cage of cast -in -place thin wall installation strength nature location skeleton body system
CN209467471U (en) A kind of superimposed sheet pile pallet of sectional
CN105417203B (en) Lift steel ore storage bin
CN205442067U (en) Over -and -under type steel ore bin
CN211169571U (en) Wind power tower cylinder single-car hoisting and pulling device
CN210483094U (en) Inverted triangular pipe truss lifting device
CN102674212B (en) Simple detachable beam lifting and unloading equipment and construction method thereof
CN103982380A (en) Precast concrete tower member, assembly thereof, stacking method thereof and embedded part
AU2015295620B2 (en) Mobile hall construction
CN103920600B (en) Off-line assembling method for rotor of large-sized flotation machine
CN210885075U (en) Equipment secondary transportation and hoist and mount frame of taking one's place
CN203779680U (en) Turnover supporting framework device
CN208251142U (en) A kind of overhanging type Prefabricated steel construction basis of construction elevator
CN202282565U (en) Overhauling rack
CN107553082A (en) A kind of laborsaving extraction element of cantilever oscillating rod type
CN202061429U (en) Split type thickener transported and arranged in modularization manner
CN206591898U (en) A kind of installation conversion base for drawing substation framework
CN202131774U (en) Concrete hopper
CN101985839B (en) Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof
CN206734398U (en) A kind of platform skeleton structure of quarry tipper
CN110939473A (en) Prefabricated framework pillar for underground coal mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180411

Address after: 201900 Shanghai city Baoshan District Pangu Road No. 777

Co-patentee after: China Nerin Engineering Co., Ltd.

Patentee after: China Twenty Metallurgical Group Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Pangu Road No. 777

Patentee before: China Twenty Metallurgical Group Co., Ltd.

TR01 Transfer of patent right