CN105401718B - Floor hole blocks hanging mould structure - Google Patents

Floor hole blocks hanging mould structure Download PDF

Info

Publication number
CN105401718B
CN105401718B CN201510899440.XA CN201510899440A CN105401718B CN 105401718 B CN105401718 B CN 105401718B CN 201510899440 A CN201510899440 A CN 201510899440A CN 105401718 B CN105401718 B CN 105401718B
Authority
CN
China
Prior art keywords
hole
template
floor
hanging
mould structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510899440.XA
Other languages
Chinese (zh)
Other versions
CN105401718A (en
Inventor
谭云泉
周奕君
周在辉
邱生
金煜
甘文彬
俞国华
秦庆春
朱庆玲
王铁峰
李娴
张俊恒
张劲松
赵永城
雍忠孟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201510899440.XA priority Critical patent/CN105401718B/en
Publication of CN105401718A publication Critical patent/CN105401718A/en
Application granted granted Critical
Publication of CN105401718B publication Critical patent/CN105401718B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Floor Finish (AREA)

Abstract

The present invention relates to a kind of floor hole to block hanging mould structure; there is hole on the flooring of the floor; the mould that hangs includes template; template-setup is below hole; the mould that hangs also includes dovetail groove; rubber string; by hanging piece and hang spring; the dovetail groove is arranged on template surface; rubber string is embedded in the dovetail groove, and the rubber string protrudes from template surface and may be provided between flooring and template, described to be arranged on by hanging piece in hole; connected between by hanging piece and template by hang spring, be provided with the hole above the template and pour layer.The floor hole closure hanging mould structure of the present invention can Fast Installation, prevent from producing spillage during cast, closure is closely knit, avoids the later stage and causes leak, seepage problem, meanwhile, template is reusable, improves the utilization rate of template.

Description

Floor hole blocks hanging mould structure
Technical field
The present invention relates to a kind of floor hole plugging structure of building, mould knot is hung in more particularly to a kind of floor hole closure Structure.
Background technology
At present, progress floor hole, hole waterproof closure is needed to handle in decorative engineering indoors, in existing construction technology, Problems with generally be present:1st, from lower layer support mold materials dosage is big, more than recruitment and influences lower floor's work progress, same layer is taken to hang The hang spring of mould mode is exposed, produces persistently corrosion and forms hole;Hardly possible when the 2nd, having space placing concrete between template and former floor Exempt from spillage cause closure after leakiness exist leak, infiltration even concrete have the problems such as loose or dislocation.
The content of the invention
The present invention is in order to solve problem of the prior art, there is provided it is a kind of can Fast Installation, the hanging mould structure of dismounting, together When can prevent the leak of floor hole, infiltration the problems such as.
Concrete technical scheme is as follows:A kind of floor hole blocks hanging mould structure, has hole on the flooring of the floor, The mould that hangs includes template, and template-setup is below hole, and the mould that hangs also includes dovetail groove, rubber string, by hanging piece and hang spring, The dovetail groove is arranged on template surface, and rubber string is embedded in the dovetail groove, the rubber string protrude from template surface and It may be provided between flooring and template, it is described to be arranged on by hanging piece in hole, connected between by hanging piece and template by hang spring, It is provided with hole above the template and pours layer.
Preferably, the template is provided with lifting hole(eyelet), and the hang spring can be arranged in lifting hole(eyelet), and the dovetail groove is set around lifting hole(eyelet) Put.
Preferably, the mould that hangs also includes fixture, and fixture is arranged on template bottom surface, and hang spring one end can with fixture Separation or connection.
Preferably, the fixture is screw, and the hang spring one end can be around being located on screw.
Preferably, multiple inclined holes are offered in the side wall of the hole, inclined hole connects with hole.
Preferably, in the end insertion inclined hole by hanging piece.
Preferably, it is described to pour the layer covering end by hanging piece.
Preferably, described by hanging piece is reinforcing bar.
The technique effect of the present invention:The present invention floor hole closure hanging mould structure can Fast Installation, prevent cast when Spillage is produced, closure is closely knit, avoids the later stage and causes leak, seepage problem;Meanwhile template is reusable, template is improved Utilization rate.
Brief description of the drawings
Fig. 1 is the schematic diagram of floor of embodiment of the present invention hole closure hanging mould structure.
Fig. 2 is another schematic diagram of floor of embodiment of the present invention hole closure hanging mould structure.
Fig. 3 is the schematic diagram of template of the embodiment of the present invention.
Fig. 4 is the schematic diagram of dovetail groove of the embodiment of the present invention.
Fig. 5 is the schematic diagram of rubber string of the embodiment of the present invention.
Fig. 6 is the sectional view of template of the embodiment of the present invention.
Fig. 7 is another schematic diagram of template of the embodiment of the present invention.
Fig. 8 is the sectional view of flooring of the embodiment of the present invention.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, floor hole of the invention blocks hanging mould structure, has hole on the flooring 1 of the floor Hole 11, the mould that hangs include template 2, and template 2 is arranged on the lower section of hole 11, and the mould that hangs also includes dovetail groove 3, rubber string 4, by Hanging piece 5 and hang spring 6, the dovetail groove 3 are arranged on the surface of template 2, and rubber string 4 is embedded in the dovetail groove 3, the rubber string 4 protrude from the surface of template 2 and may be provided between flooring 1 and template 2, when template 2 is arranged on 1 lower section of flooring, rubber String 4 can be close to the lower surface of flooring 1, and hole 11 is blocked, and rubber string 4 can prevent that spillage occurs when pouring.It is described to be set by hanging piece 5 Put in hole 11, connected between by hanging piece 5 and template 2 by hang spring 6, be provided with and pour in the hole 11 of the top of template 2 Layer 7, pouring 7 can pour to be formed by cement mortar, for blocking hole 11.The floor hole closure of above-mentioned technical proposal is hung Mode structure can Fast Installation, prevent from producing spillage during cast, closure is closely knit, avoids the later stage and causes leak, seepage problem.
As shown in Figures 3 to 8, further, the template 2 is provided with lifting hole(eyelet) 21, and the hang spring 6 can be arranged in lifting hole(eyelet) 21 In(As shown in Figure 1), lifting hole(eyelet) 21 is the through hole for penetrating template 2, and the dovetail groove 3 is set around lifting hole(eyelet) 21.The mould that hangs also wraps Fixture 8 is included, fixture 8 is arranged on the bottom of template 2, and the one end of hang spring 6 is connected with fixture 8.The one end of hang spring 6 is passed through and hung Behind hole 21, it is connected with fixture 8, hang spring 6 is held template 2.In the present embodiment, the fixture 8 is screw, and it is followed closely The bottom of template 2, the one end of the hang spring 6 can be looped around on screw, be easy to connect and discharge.Offered on the flooring 1 Multiple inclined holes 12, inclined hole 12 are connected with hole 11, and the inclined hole 12 can be formed by the hole wall in electric hammer drill Durchgangshohle hole 11, so as to shape Into eight word holes of eight shape.In the end insertion inclined hole 12 by hanging piece 5 so that template 2 more firm can must hang and be located at building The lower section of ground 1.The layer 7 that pours covers the end by hanging piece 5, and loose or dislocation is produced so as to prevent from pouring layer 7.This implementation In example, described by hanging piece 5 be reinforcing bar, and steel-bar arrangement is in hole 11, in both ends insertion inclined hole 12, one end of the hang spring 6 and Connected in the middle part of reinforcing bar.As shown in figure 5, the rubber string 4 is in " returning " font, hole 11 is relative with the middle part perforate of rubber string 4, makes rubber Glue string 4 can be between Sealing formboard 2 and flooring 1 gap.
The floor hole closure hanging mould structure of the present embodiment when in use, will be inserted in inclined hole 12, by hanging by the both ends of hanging piece 5 The one end of silk 6 tenses hang spring 6 through the lifting hole(eyelet) 21 in template 2 and pushes the bottom surface of template 2, and the one end of the hang spring 6 is surround On the bottom surface fixture 8 of template 2.Pour after layer 7 solidifies and unclamp the connection end of hang spring 6 and fixture 8, can be by template 2 Separated with fixture 8, so as to which template 2 is disassembled, make template 2 reusable.The floor hole closure of the present embodiment Hanging mould structure can improve system demoulding work efficiency, not spillage during placing concrete, reach the closure of hole waterproof without hidden danger.
It is pointed out that the technical concepts and features of above-mentioned preferred embodiment only to illustrate the invention, its object is to Allow person skilled in the art to understand present disclosure and implement according to this, the protection of the present invention can not be limited with this Scope.Any equivalent change or modification in accordance with the spirit of the invention, it should all be included within the scope of the present invention.

Claims (8)

1. a kind of floor hole blocks hanging mould structure, there is hole on the flooring of the floor, the mould that hangs includes template, mould Plate is arranged on below hole, it is characterised in that:The mould that hangs also includes dovetail groove, rubber string, by hanging piece and hang spring, the dovetail Groove is arranged on template surface, and rubber string is embedded in the dovetail groove, and the rubber string protrudes from template surface and may be provided at It is described to be arranged on by hanging piece in hole between flooring and template, connected between by hanging piece and template by hang spring, the template It is provided with the hole of top and pours layer.
2. floor hole as claimed in claim 1 blocks hanging mould structure, it is characterised in that:The template is provided with lifting hole(eyelet), institute Stating hang spring can be arranged in lifting hole(eyelet), and the dovetail groove is set around lifting hole(eyelet).
3. floor hole as claimed in claim 2 blocks hanging mould structure, it is characterised in that:The mould that hangs also includes fixture, Fixture is arranged on template bottom surface, and hang spring one end is separated or is connected with fixture.
4. floor hole as claimed in claim 3 blocks hanging mould structure, it is characterised in that:The fixture is screw, described Hang spring one end can be around being located on screw.
5. the floor hole closure hanging mould structure as described in any claim in Claims 1-4, it is characterised in that:It is described Multiple inclined holes are offered in the side wall of hole, inclined hole connects with hole.
6. floor hole as claimed in claim 5 blocks hanging mould structure, it is characterised in that:The end by hanging piece is inserted oblique Kong Zhong.
7. floor hole as claimed in claim 6 blocks hanging mould structure, it is characterised in that:Hung described in the pouring layer covering The end of part.
8. floor hole as claimed in claim 7 blocks hanging mould structure, it is characterised in that:Described by hanging piece is reinforcing bar.
CN201510899440.XA 2015-12-09 2015-12-09 Floor hole blocks hanging mould structure Active CN105401718B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510899440.XA CN105401718B (en) 2015-12-09 2015-12-09 Floor hole blocks hanging mould structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510899440.XA CN105401718B (en) 2015-12-09 2015-12-09 Floor hole blocks hanging mould structure

Publications (2)

Publication Number Publication Date
CN105401718A CN105401718A (en) 2016-03-16
CN105401718B true CN105401718B (en) 2017-11-28

Family

ID=55467438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510899440.XA Active CN105401718B (en) 2015-12-09 2015-12-09 Floor hole blocks hanging mould structure

Country Status (1)

Country Link
CN (1) CN105401718B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107245933A (en) * 2017-07-06 2017-10-13 中建六局土木工程有限公司 A kind of method for cast-in-situ box girder top plate preformed hole construction

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29705648U1 (en) * 1997-03-29 1997-06-12 Schneider, Michael, 14476 Töplitz Post template
CN203320574U (en) * 2013-06-30 2013-12-04 陕西建工集团第一建筑工程有限公司 Construction structure for retaining post-poured strip and construction joint on cast-in-situ plate
CN204081464U (en) * 2014-09-28 2015-01-07 中建四局第三建筑工程有限公司 Ruggedized construction bottom a kind of aluminum alloy mould plate
CN204098486U (en) * 2014-10-13 2015-01-14 中建七局(上海)有限公司 The concrete of building basement roof ater-casting hangs mould
CN104947719B (en) * 2015-05-20 2016-10-05 宁波建工股份有限公司 The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN205224589U (en) * 2015-12-09 2016-05-11 苏州金螳螂建筑装饰股份有限公司 Mode structure is hung in shutoff of floor hole

Also Published As

Publication number Publication date
CN105401718A (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN206495501U (en) A kind of cast-in-place concrete floor reserving hole template
CN105888077B (en) Fabricated shear wall attachment device and its construction method
CN105401718B (en) Floor hole blocks hanging mould structure
CN204185845U (en) A kind of water-proof pile board wall supporting and protection structure
CN208379831U (en) A kind of pseudo-classic architecture external wall structure
CN108818879B (en) Weight hanging structure of prefabricated inner partition plate and construction process of weight hanging structure
CN206173957U (en) Pore -forming is with protecting a section of thick bamboo
CN205224589U (en) Mode structure is hung in shutoff of floor hole
CN105178451B (en) The anticorrosion structure and its construction method of the cladding node of assembled architecture outer wall
CN206071050U (en) Mould is hung in a kind of pipeline pipe root closure
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN209652990U (en) The antiseepage plugging structure of the hole for hoist of basement computer room
CN209309459U (en) Pipeline balance briquetting
CN204357097U (en) A kind of building scaffold improving working security reinforces base
CN204475714U (en) A kind of ready-package precast stair
CN105064682B (en) Pore hangs die device
CN109056702A (en) The construction method of coercion underground continuous wall
CN105421725B (en) Exempt from formwork one-shot forming construction method in reserved residential ventilation road
CN107587723A (en) Top plate spool protection device and its construction method
CN107119808A (en) Induce crack structure and its construction method
CN106013568A (en) Cast-in-place floor structure based on detachable positioning control component and construction method
CN207714372U (en) Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail
CN207760848U (en) A kind of grouting component of composite foundation pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant