CN105373895A - Green building power distribution management system - Google Patents

Green building power distribution management system Download PDF

Info

Publication number
CN105373895A
CN105373895A CN201510820407.3A CN201510820407A CN105373895A CN 105373895 A CN105373895 A CN 105373895A CN 201510820407 A CN201510820407 A CN 201510820407A CN 105373895 A CN105373895 A CN 105373895A
Authority
CN
China
Prior art keywords
data
module
processing module
data set
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510820407.3A
Other languages
Chinese (zh)
Inventor
吴征天
朱树先
朱学莉
胡惠轶
郭胜辉
李长宁
祝勇俊
高涵文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University of Science and Technology
Original Assignee
Suzhou University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University of Science and Technology filed Critical Suzhou University of Science and Technology
Priority to CN201510820407.3A priority Critical patent/CN105373895A/en
Publication of CN105373895A publication Critical patent/CN105373895A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a green building power distribution management system. The green building power distribution management system includes a data acquisition module, a data storage module, a data processing module, a data set establishment module, a data set processing module, a loading module, a data warehouse and an algorithm processing module; the data storage module and the data acquisition module are in control connection; the data acquisition module is connected with the data processing module; the loading module is in control connection with the data warehouse and the algorithm processing module; and the loading module is connected with the data set establishment module through the data set processing module. According to the green building power distribution management system provided by the invention, a large quantity of initial data are cleared, and recorded data associated with analysis factors are extracted according to the characteristics of the safe operation of a power distribution system, and the recorded data are loaded to the data warehouse, and then, corresponding mining algorithm processing is performed on the recorded data, and required information can be obtained, and therefore, support can be provided for the application of the data of the power distribution system to green building operating management and environmental monitoring and the like.

Description

Green building Distribution Management System
Technical field
The present invention relates to a kind of green building management devices, particularly relate to green building Distribution Management System.
Background technology
Energy-saving and emission-reduction are national strategy policies, develop low-carbon economy especially, keep the only way of national economy sustainable development.The power producer that electric power operates as national economy is major fields and the main force of energy-saving and emission-reduction.Along with China's sustained and rapid development of economy, the green offfice building that unit concentrates, the density of population is large become a lot of landscape in city, its power consumption characteristics establishes the large-scale current consuming apparatus such as central air conditioner, express elevator, watch-dog, office facility, modern communications facility in being, power consumption is very big.Thus, the distribution in research friendly building is energy-conservation and operation management technology is significant for the energy-saving and emission-reduction of building.
Summary of the invention
The technical matters that the present invention mainly solves how to pass through the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide green building Distribution Management System, comprise: data acquisition module, data memory module, data processing module, data set sets up module, for carrying out the data set processing module for the treatment of and analyses to data set, loading module, data warehouse and algorithm processing module, wherein, control linkage between described data memory module and data acquisition module, described data acquisition module is connected with between data processing module, described loading module and data warehouse, control linkage between algorithm processing module, described loading module is connected to data set by data set processing module and sets up module.
In a preferred embodiment, collecting unit, retrieval unit, integral unit and screening unit is included in described data processing module, described collecting unit, retrieval unit, control linkage successively between integral unit and screening unit, described screening unit is connected to data set and sets up module.
In a preferred embodiment, described architectural electric management system is also provided with intelligent analysis module, and described intelligent analysis module between described data set processing module, loading module, and described data set processing module, to communicate to connect between loading module.
The invention has the beneficial effects as follows: by the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of green building Distribution Management System one specific embodiment of the present invention.
Embodiment
Be clearly and completely described to the technical scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Refer to Fig. 1, green building Distribution Management System is provided in one particular embodiment of the present invention, described green building Distribution Management System comprises: data acquisition module, data memory module, data processing module, data set sets up module, for carrying out the data set processing module for the treatment of and analyses to data set, loading module, data warehouse and algorithm processing module, wherein, control linkage between described data memory module and data acquisition module, described data acquisition module is connected with between data processing module, described loading module and data warehouse, control linkage between algorithm processing module, described loading module is connected to data set by data set processing module and sets up module.
Include collecting unit, retrieval unit, integral unit and screening unit in described data processing module, described collecting unit, retrieval unit, control linkage successively between integral unit and screening unit, described screening unit is connected to data set and sets up module.Described architectural electric management system is also provided with intelligent analysis module, and described intelligent analysis module between described data set processing module, loading module, and described data set processing module, to communicate to connect between loading module.
In a specific embodiment, first data mining obtains and stores data, carries out data acquisition, retrieval and integration, and screen data according to demand in large data, comprise denoising, sampling, filtration, merging, standardization etc. and remove redundancy and redundant data, set up pending data set.Then data set processed and analyze, comprise the process such as linear, non-linear, factorial analysis, time series analysis, linear regression, variable curve, bavariate statistics and analyze, according to certain way, data are classified, and analyze the relation etc. between data and between classification.Then, by the various algorithm models in Data Mining, intellectual analysis is carried out to the electrical equipment fault data of electrical network, service data, by the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
Data acquisition module described in literary composition, data memory module, data processing module, data set set up all functional modules and the unit such as module, data set processing module, loading module, data warehouse and algorithm processing module, collecting unit, retrieval unit, integral unit and screening unit, be device of the prior art, as long as can realize corresponding function just can, structurally do not limited.
Therefore, the present invention has the following advantages: by the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.

Claims (3)

1. green building Distribution Management System, it is characterized in that, comprise: data acquisition module, data memory module, data processing module, data set sets up module, for carrying out the data set processing module for the treatment of and analyses to data set, loading module, data warehouse and algorithm processing module, wherein, control linkage between described data memory module and data acquisition module, described data acquisition module is connected with between data processing module, described loading module and data warehouse, control linkage between algorithm processing module, described loading module is connected to data set by data set processing module and sets up module.
2. green building Distribution Management System according to claim 1, it is characterized in that, collecting unit, retrieval unit, integral unit and screening unit is included in described data processing module, described collecting unit, retrieval unit, control linkage successively between integral unit and screening unit, described screening unit is connected to data set and sets up module.
3. green building Distribution Management System according to claim 1, it is characterized in that, described architectural electric management system is also provided with intelligent analysis module, described intelligent analysis module between described data set processing module, loading module, and described data set processing module, to communicate to connect between loading module.
CN201510820407.3A 2015-11-24 2015-11-24 Green building power distribution management system Pending CN105373895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510820407.3A CN105373895A (en) 2015-11-24 2015-11-24 Green building power distribution management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510820407.3A CN105373895A (en) 2015-11-24 2015-11-24 Green building power distribution management system

Publications (1)

Publication Number Publication Date
CN105373895A true CN105373895A (en) 2016-03-02

Family

ID=55376074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510820407.3A Pending CN105373895A (en) 2015-11-24 2015-11-24 Green building power distribution management system

Country Status (1)

Country Link
CN (1) CN105373895A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101075304A (en) * 2006-05-18 2007-11-21 河北全通通信有限公司 Method for constructing decision supporting system of telecommunication industry based on database
CN104484734A (en) * 2014-11-17 2015-04-01 国家电网公司 Low-carbon city energy optimized configuration data center architecture
CN105069690A (en) * 2015-06-11 2015-11-18 国家电网公司 Power grid operating data processing method
CN205230111U (en) * 2015-11-24 2016-05-11 苏州科技学院 Green building distribution management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101075304A (en) * 2006-05-18 2007-11-21 河北全通通信有限公司 Method for constructing decision supporting system of telecommunication industry based on database
CN104484734A (en) * 2014-11-17 2015-04-01 国家电网公司 Low-carbon city energy optimized configuration data center architecture
CN105069690A (en) * 2015-06-11 2015-11-18 国家电网公司 Power grid operating data processing method
CN205230111U (en) * 2015-11-24 2016-05-11 苏州科技学院 Green building distribution management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李德仁 等: "智慧城市中的大数据", 《武 汉 大 学 学 报 信 息 科 学 版》 *

Similar Documents

Publication Publication Date Title
CN204022161U (en) A kind of elevator management system for internet of things
CN110378809A (en) A kind of intelligent check method of supervisory control of substation information table information data
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN104715340A (en) Cloud computing energy management system and method based on green energy resources
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN105303316A (en) National power grid distribution network fault processing system
CN100550564C (en) Electric power system transient stability and thermally-stabilised coordination emergency control method
CN108183814B (en) Troubleshooting method and device for communication channel of electricity utilization information acquisition system
CN105958652A (en) Unattended operation transformer substation pre-warning system and method based on big data analysis
CN105634122A (en) Ammeter remote control system
CN205230111U (en) Green building distribution management system
CN104156888A (en) Power system operation risk monitoring method based on comprehensive risk evaluation model
CN105608637A (en) Substation equipment model topology-based wiring diagram automatic generation method
CN111242509B (en) Service management system and service management method for intelligent community
CN104317868A (en) Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application
CN105373895A (en) Green building power distribution management system
CN111556108A (en) Cloud platform-based electric power big data acquisition system and method
CN204179747U (en) A kind of power grid accident automatic analysis process system
CN102030022A (en) Track traffic management device and method
CN204355078U (en) A kind of track traffic signal control convenience
CN202815641U (en) Moisture-proof apparatus for electrical equipment
CN109118385A (en) Urban distribution network status data modeling method and system towards big data
CN205246804U (en) Power distribution network failure locating device
CN204190490U (en) A kind of guarantor's level platform power information synthetical collection system
CN204028235U (en) Load detection system for urban track traffic DC traction system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302

RJ01 Rejection of invention patent application after publication