CN105369818B - Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast - Google Patents

Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast Download PDF

Info

Publication number
CN105369818B
CN105369818B CN201510868265.8A CN201510868265A CN105369818B CN 105369818 B CN105369818 B CN 105369818B CN 201510868265 A CN201510868265 A CN 201510868265A CN 105369818 B CN105369818 B CN 105369818B
Authority
CN
China
Prior art keywords
steel sheet
pile
cofferdam
storehouse
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510868265.8A
Other languages
Chinese (zh)
Other versions
CN105369818A (en
Inventor
吴留伟
郑国兵
徐轶慷
胡能永
吴蕾
施立军
沈贵华
袁文喜
彭银生
谢磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang water resources and Hydropower Survey and Design Institute Co.,Ltd.
Original Assignee
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Design Institute of Water Conservancy and Hydroelectric Power filed Critical Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority to CN201510868265.8A priority Critical patent/CN105369818B/en
Publication of CN105369818A publication Critical patent/CN105369818A/en
Application granted granted Critical
Publication of CN105369818B publication Critical patent/CN105369818B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a comb teeth trench type division and closure construction method of a double-row steel sheet-piled cofferdam of a coast. According to the technical scheme, the method comprises the following steps: a, determining the location and prepared width of a closure gap; b, constructing all double-row steel sheet-piled cofferdams, excepting the double-row steel sheet-piled cofferdams at the outsides of a closure chamber and a division chamber; c, constructing a steel sheet-pile wall of the division chamber and a diaphragm steel sheet-pile wall; d, cutting the steel sheet-pile wall of the division chamber at intervals of one or a plurality of steel sheet piles; e, pulling up the division chamber, and cutting an upper part structure of the steel sheet pile to form a comb teeth trench flowing channel; f, constructing a steel sheet-pile wall of the closure chamber; g, cutting the division chamber, and inserting back an upper component of the steel sheet pile. According to the method, the characteristics of the structure of the double-row steel sheet-piled cofferdam is fully utilized to solve the problem of division in the closure of the double-row steel sheet-piled cofferdam, and the cofferdam closure risk and the construction difficulty can be reduced; secondary cofferdams cannot be additionally constructed during the closure of the double-row steel sheet-piled cofferdam, so that the cofferdam construction is sped up, and the total cost of the cofferdam can be decreased.

Description

A kind of double steel sheet-pile cofferdam comb groove in strand leads river closure construction method
Technical field
The present invention relates to a kind of cofferdam river closure construction method in construction project field, double more particularly, to a kind of strand Steel sheet-pile cofferdam river closure construction method.
Background technology
At present, the coastal region engineering construction on the ground such as Zhejiang, Shanghai, Guangdong can use double steel sheet-pile cofferdam.Double steel Sheet-pile cofferdam is to connect to form two row's steel sheet-pile walls using the U-shaped steel sheet pile of multi-disc both sides belt lock catch, and in two row's steel sheet-pile walls Between Cast-in-situ Piles in Sand-filling or soil formed.Cofferdam has that Stability Analysis of Structures, floor space are little, speed of application is fast, environmental protection and investment reduction The advantages of.
It is accelerating construction progress during double steel sheet pile cofferdam construction, needs two construction teams and groups or multiple teams and groups Construction.For linear double steel sheet-pile cofferdam using two ends progressively to the arrangement and method for construction of middle propulsion, for annular double steel plate The arrangement and method for construction that pile cofferdam is advanced from a starting point to terminal, both schemes finally can all run into steel sheet pile closure opertation. Under the conditions of littoral environment, can be affected by tidewater fluctuation during closure, cause Longkou cofferdam both sides produce certain water-head and Larger flow velocity so that last several closures steel sheet pile produces huge swing, causes Longkou both sides steel sheet pile not in one plane, So that closure cannot be smoothed out.At present conventional construction method is to fill son by sandstone charging pipe bag on the outside of the closure section of cofferdam Dike, after small dike's closure double steel sheet-pile cofferdam river closure construction is carried out again.The subject matter that this kind of construction method is present is:In shore Sea is coordinated by under tidewater influence condition due to lacking water conservancy diversion, and small dike's closing construction has greater risk and difficulty, and needs to wait for son Double steel sheet-pile cofferdam river closure construction is carried out again after the completion of dike construction, small dike is finally also removed, and construction period length, investment are big.
The content of the invention
The purpose of the present invention is for above-mentioned problem, there is provided a kind of mutually to fit with double steel sheet pile cofferdam structure feature Cofferdam river closure construction method answer, easy construction, reduces technical difficulty and risk, reduces dam project total cost, contracting Short cofferdam closure total lever factor.
The technical solution adopted in the present invention is:A kind of double steel sheet-pile cofferdam comb groove in strand leads river closure construction method, Its step is as follows:
A, the Longkou position for determining double steel sheet-pile cofferdam and reserved width, the section arrangement closure storehouse in Longkou, in closure storehouse Both sides arrangement water conservancy diversion storehouse;
B, construction complete remaining the double steel sheet-pile cofferdam in addition to closure storehouse and water conservancy diversion storehouse;
C, water conservancy diversion storehouse steel sheet-pile wall and tabula steel sheet-pile wall are set, purlin and pull bar are enclosed in installation, the backfill design in water conservancy diversion storehouse Implant;
D, by water conservancy diversion storehouse steel sheet-pile wall according to the order for being spaced one or more steel sheet pile, leading at cutting setting elevation Stream storehouse steel sheet-pile wall cutting is divided into that water conservancy diversion storehouse cuts open steel sheet pile upper component and water conservancy diversion storehouse cuts open steel sheet pile lower member;
E, pull up water conservancy diversion storehouse and cut open steel sheet pile upper component, make water conservancy diversion storehouse steel sheet-pile wall form comb groove flow channels;
F, closure storehouse steel sheet-pile wall is set, purlin and pull bar are enclosed in installation, and backfill in closure storehouse designs implant to design altitude;
G, water conservancy diversion storehouse is cut open steel sheet pile upper component turn back to, and by the steel sheet-pile wall otch welding of water conservancy diversion storehouse at low tide Reinforcement, backfill design implant completes double steel sheet-pile cofferdam river closure construction to design altitude in water conservancy diversion storehouse.
The water conservancy diversion storehouse and closure storehouse are to be separated double steel cofferdam using tabula steel sheet-pile wall.
One or more water conservancy diversion storehouses are arranged in closure storehouse both sides.
The cutting setting elevation is more than mean tide tlevel.
Backfill design implant in the water conservancy diversion storehouse, is filled to below water conservancy diversion storehouse cutting setting elevation.
Beneficial effects of the present invention:
(1) present invention makes full use of double steel sheet-pile cofferdam own structural characteristics, creatively solves double steel sheet pile Water conservancy diversion problem when cofferdam joins the two sections of a bridge, etc, reduces cofferdam closure risk and difficulty of construction;
(2) present invention eliminates double steel sheet-pile cofferdam join the two sections of a bridge, etc when another facility brigade cofferdam, accelerate cofferdam construction speed, Reduce cofferdam total cost.
Description of the drawings
Fig. 1 is closure frontal plane schematic diagram in cofferdam Longkou in the embodiment of the present invention;
Fig. 2 is closure front water conservancy diversion storehouse comb groove excessively stream floor map in cofferdam in the embodiment of the present invention;
Fig. 3 is water conservancy diversion storehouse comb groove excessively stream floor map after cofferdam closure in the embodiment of the present invention;
Fig. 4 is floor map after water conservancy diversion storehouse closure in the embodiment of the present invention;
Fig. 5 is water conservancy diversion storehouse comb groove elevational schematic view in the embodiment of the present invention.
In figure:1 Longkou;2 water conservancy diversion storehouses;3 closure storehouses;4 enclose purlin;5 pull bars;21 water conservancy diversion storehouse steel sheet-pile walls;22 tabula steel sheet piles Wall;31 closure storehouse steel sheet-pile walls;211 water conservancy diversion storehouses retain steel sheet pile;212 water conservancy diversion storehouses cut open steel sheet pile superstructure;213 water conservancy diversion storehouses Cut open part-structure under steel sheet pile.
Specific embodiment
Lead river closure construction method to a kind of double steel sheet-pile cofferdam comb groove in strand of the invention below in conjunction with the accompanying drawings to say It is bright.
To be circular layout, cofferdam axis total length about 1500m is enclosed for double steel sheet-pile cofferdam general arrangement in the embodiment of the present invention Enclose the foundation ditch gross area and be about 140,000 m2.During double steel sheet-pile cofferdam dams, 1 Longkou, Longkou length 30m are set.It is logical Setting water conservancy diversion storehouse is crossed, outside flow channels in foundation ditch have been got through, outside water level and closure closures current speed in foundation ditch is reduced, is had Effect ensures smoothly damming for double steel sheet-pile cofferdam.
The concrete construction method of the present embodiment is as follows:
A, determine the position of Longkou 1 and reserved width;Longkou section selects less straightway, stormy waves, current smooth-going, tide dynamic force Relatively weak position, its width determines according to cofferdam closure hydraulics and construction requirement;Longkou section arrangement closure storehouse 3, closure 2 water conservancy diversion storehouses 2 are respectively arranged in the both sides of storehouse 3, and the quantity and width in water conservancy diversion storehouse 2 is true according to cofferdam closure hydraulics and construction requirement It is fixed;Water conservancy diversion storehouse 2 and closure storehouse 3 are to be separated double steel cofferdam using tabula steel sheet-pile wall 22;
B, construction complete remaining the double steel sheet-pile cofferdam in addition to closure storehouse 3 and water conservancy diversion storehouse 2;
C, water conservancy diversion storehouse steel sheet-pile wall 2-1 and tabula steel sheet-pile wall 2-2 is set using ship play or erection construction platform method, pacified Dress encloses purlin 4 and pull bar 5, the backfill design implant in water conservancy diversion storehouse 2, is filled to 0.5m under water conservancy diversion storehouse cutting setting elevation, and cutting sets Elevation is determined in mean tide tlevel above 0.5m;
D, by water conservancy diversion storehouse steel sheet-pile wall 21 according to interval a piece steel sheet pile order, cutting setting elevation at water conservancy diversion storehouse The cutting of steel sheet-pile wall 21 is divided into water conservancy diversion storehouse and cuts open partial component 212 and water conservancy diversion storehouse on steel sheet pile and cuts open steel sheet pile lower member 213;
E, pull up water conservancy diversion storehouse and cut open steel sheet pile upper component 212, make water conservancy diversion storehouse steel sheet-pile wall 21 form comb groove and cross circulation Road;
F, set closure storehouse steel sheet-pile wall 31, installation enclose purlin 4 and pull bar 5, cofferdam closure storehouse in backfill design implant To design altitude;
G, water conservancy diversion storehouse is cut open steel sheet pile upper component 212 turn back to, and cut water conservancy diversion storehouse steel sheet-pile wall 21 at low tide Mouth weld reinforcement, backfill design implant completes double steel sheet-pile cofferdam river closure construction to design altitude in water conservancy diversion storehouse 2.

Claims (5)

1. a kind of double steel sheet-pile cofferdam comb groove in strand leads river closure construction method, it is characterised in that:It is comprised the following steps:
A, Longkou (1) position for determining double steel sheet-pile cofferdam and reserved width, section arrangement closure storehouse (3) in Longkou, in closure Storehouse (3) both sides arrangement water conservancy diversion storehouse (2);
B, construction complete remaining the double steel sheet-pile cofferdam in addition to closure storehouse (3) and water conservancy diversion storehouse (2);
C, water conservancy diversion storehouse steel sheet-pile wall (21) and tabula steel sheet-pile wall (22) are set, purlin (4) and pull bar (5) are enclosed in installation, in water conservancy diversion storehouse (2) backfill design implant in;
D, by water conservancy diversion storehouse steel sheet-pile wall (21) according to the order for being spaced one or more steel sheet pile, leading at cutting setting elevation Stream storehouse steel sheet-pile wall (21) cutting is divided into that water conservancy diversion storehouse cuts open steel sheet pile upper component (212) and water conservancy diversion storehouse cuts open steel sheet pile bottom structure Part (213);
E, pull up water conservancy diversion storehouse and cut open steel sheet pile upper component (212), make water conservancy diversion storehouse steel sheet-pile wall (21) form comb groove and cross circulation Road;
F, closure storehouse steel sheet-pile wall (31) is set, purlin (4) and pull bar (5) are enclosed in installation, backfill in closure storehouse and design implant to setting Meter elevation;
G, water conservancy diversion storehouse is cut open steel sheet pile upper component (212) turn back to, and cut in water conservancy diversion storehouse steel sheet-pile wall (21) at low tide Mouth weld reinforcement, backfill design implant completes double steel sheet-pile cofferdam river closure construction to design altitude in water conservancy diversion storehouse (2).
2. a kind of double steel sheet-pile cofferdam comb groove in strand according to claim 1 leads river closure construction method, and its feature exists In:The water conservancy diversion storehouse (2) and closure storehouse (3) are to be separated double steel cofferdam using tabula steel sheet-pile wall (22).
3. a kind of double steel sheet-pile cofferdam comb groove in strand according to claim 1 leads river closure construction method, and its feature exists In:One or more water conservancy diversion storehouses (2) are arranged in closure storehouse (3) both sides.
4. a kind of double steel sheet-pile cofferdam comb groove in strand according to claim 1 leads river closure construction method, and its feature exists In:The cutting setting elevation is more than mean tide tlevel.
5. a kind of double steel sheet-pile cofferdam comb groove in strand according to claim 1 leads river closure construction method, and its feature exists In:Backfill design implant in water conservancy diversion storehouse described in step c (2), is filled to below water conservancy diversion storehouse (2) cutting setting elevation.
CN201510868265.8A 2015-12-02 2015-12-02 Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast Active CN105369818B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510868265.8A CN105369818B (en) 2015-12-02 2015-12-02 Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510868265.8A CN105369818B (en) 2015-12-02 2015-12-02 Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast

Publications (2)

Publication Number Publication Date
CN105369818A CN105369818A (en) 2016-03-02
CN105369818B true CN105369818B (en) 2017-04-12

Family

ID=55372403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510868265.8A Active CN105369818B (en) 2015-12-02 2015-12-02 Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast

Country Status (1)

Country Link
CN (1) CN105369818B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024637B (en) * 2018-07-21 2020-07-14 四川启创建设工程有限公司 Combined cofferdam and construction method thereof
CN113417303B (en) * 2021-07-10 2022-06-07 乐清市大禹水利水电工程有限公司 Coastal double-row steel sheet pile cofferdam diversion and interception structure and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892632B (en) * 2009-05-19 2012-05-30 上海市基础工程有限公司 Construction method of structural system of river under no-cutoff working condition
KR100936161B1 (en) * 2009-07-31 2010-01-12 현대엔지니어링 주식회사 Nature friendly polygon cell type coffering method for harbor, river and dam construction
KR101038598B1 (en) * 2009-09-02 2011-06-03 한창헌 A Retaining Wall And Method For It
JP2015129372A (en) * 2014-01-06 2015-07-16 五洋建設株式会社 Sheet pile and cutoff method
CN104452785B (en) * 2014-11-06 2016-01-06 中铁十五局集团有限公司 Larsen steel sheet pile cofferdam folding construction method
CN104805854B (en) * 2015-04-29 2017-03-08 中铁四局集团第二工程有限公司 A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment

Also Published As

Publication number Publication date
CN105369818A (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN106320351A (en) Small-spacing long and large underwater steel sheet pile cofferdam construction method
CN105369818B (en) Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast
CN104947697A (en) Construction method for rapidly enclosing weir by utilizing Larsen steel sheet piles
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
CN203977437U (en) The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam
CN203821306U (en) Flexible anti-scour protection pad
CN208604552U (en) For the stake woods dam under complex geological condition
CN108411934B (en) Floating tubular pile, dam retaining structure and construction method thereof
CN206829167U (en) A kind of cast-in-place box beam bracket raft foundation with discharge orifice
CN108677880B (en) Pile-forest dam for complex geological conditions
CN106939580A (en) A kind of pipe laying type permeable spur that interlocks
CN212335895U (en) Improved generation assembled mountain area river course shore protection structure
CN212506341U (en) Cofferdam group structure with broken line type earth-rock cofferdam
CN213390185U (en) Cofferdam structure that earth-rock cofferdam and concrete cofferdam combined together
CN107130644A (en) Coffering composite geo-membrane and gravelly clay combination against seepage construction method
CN102704489B (en) Foundation pit support structure and construction method thereof
CN208055988U (en) Bank protection structure of soft rock river bank
CN206438524U (en) A kind of geomembrane steel framework cofferdam structure
CN206655221U (en) A kind of double sheet-pile wall revetment structure suitable for deep soft soil foundation
CN206570772U (en) A kind of ecological earth and rockfill dam
CN204199238U (en) Mud-rock flow Composite pile-geonets device
CN208996005U (en) A kind of steel sheet pile diversion canal structure
CN205475148U (en) River course truss -like draws anchor to prevent floating device
CN105568943B (en) A kind of river truss-like draws anchor means for preventing driftage and its construction method
CN215887944U (en) Island platform is built in advancing of deep water high flow velocity river course embankment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310002, No. 66, Funing lane, Shangcheng District, Zhejiang, Hangzhou

Patentee after: Zhejiang water resources and Hydropower Survey and Design Institute Co.,Ltd.

Address before: 310002, No. 66, Funing lane, Shangcheng District, Zhejiang, Hangzhou

Patentee before: ZHEJIANG DESIGN INSTITUTE OF WATER CONSERVANCY & HYDROELECTRIC POWER