CN206829167U - A kind of cast-in-place box beam bracket raft foundation with discharge orifice - Google Patents

A kind of cast-in-place box beam bracket raft foundation with discharge orifice Download PDF

Info

Publication number
CN206829167U
CN206829167U CN201720450017.6U CN201720450017U CN206829167U CN 206829167 U CN206829167 U CN 206829167U CN 201720450017 U CN201720450017 U CN 201720450017U CN 206829167 U CN206829167 U CN 206829167U
Authority
CN
China
Prior art keywords
concrete
leak conduit
raft
raft plate
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720450017.6U
Other languages
Chinese (zh)
Inventor
吴增猛
张楚安
石培义
郭航
许淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720450017.6U priority Critical patent/CN206829167U/en
Application granted granted Critical
Publication of CN206829167U publication Critical patent/CN206829167U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of cast-in-place box beam bracket raft foundation with discharge orifice, the raft plate portion is deployed in river course, Bailey truss is provided with above raft plate, raft plate includes pouring into cubical concrete structure basis and a plurality of leak conduit being parallel to each other therethrough;The leak conduit is the RCPIII level pipes of single or more series connection, and fixed steel bars are provided between adjacent leak conduit;The concrete structure basis is C30 concrete, and thickness is not less than 3m, including the concrete top layer above leak conduit, the concrete base below leak conduit, the packed layer between leak conduit;For the fixed steel bars perpendicular to raft plate, bottom is located at concrete base, and top connects the base of Bailey truss.Over-water construction is changed into land construction by the utility model, and speed of application is fast, safe;Raft plate sectional after the completion of bridge construction is all removed, small to the pollution of river;Reduce steel input, construction cost is low.

Description

A kind of cast-in-place box beam bracket raft foundation with discharge orifice
Technical field
A kind of cast-in-place box beam bracket raft of raft plate with discharge orifice is the utility model is related to, is showed suitable for shallow water river channel Pour box beam or other cast-in-situ concrete member bracket basis.
Background technology
It is more using few fulcrum steel pipe Bailey truss in conventional shallow water river channel cross a river section support cast-in-place box girder construction.Few branch Point steel pipe Bailey truss consumption steel material is big, and construction costs is high.Rack construction uses halieutics, and steel-pipe pile beats that to pull out speed slow, and Being constructed in pier stud, completion after-poppet is larger across Operation on pier top difficulty, and the duration is longer;Steel-pipe pile, which is set, is not suitable for solution cavity and rock Layer region, the single-point stress of steel-pipe pile easily cause solution cavity to puncture, difficulty are set in formation area;Steel-pipe pile spreading, shaped steel peace Dress, Bailey beam installation etc. are operation at sea, and potential safety hazard is larger.In the case of under-clearance is less, steel-pipe pile can not be pulled out, It is only capable of removing using imderwater cutting, it is big to the pollution of river.
Utility model content
The purpose of this utility model is a kind of cast-in-place box beam bracket raft foundation with discharge orifice of design, the raft plate portion administration Be provided with Bailey truss in river course, above raft plate, raft plate include pouring into cubical concrete structure basis with therethrough The a plurality of leak conduit being parallel to each other;The leak conduit be single or more series connection RCPIII level pipes, adjacent leak-off pipe Fixed steel bars are provided between road;The concrete structure basis is C30 concrete, and thickness is not less than 3m, including positioned at leak-off pipe Concrete top layer above road, the concrete base below leak conduit, the packed layer between leak conduit;It is described For fixed steel bars perpendicular to raft plate, bottom is located at concrete base, and top connects the base of Bailey truss.
Leak conduit made of for being connected by more RCPIII levels pipes, RCP pipes junction carry out waterproof sealing processing; RCP pipes caliber is not less than 1m.
The bearing of trend of leak conduit is consistent with streamflow direction.
It is packed layer immediately below the deployed position of Bailey truss.
The beneficial effects of the utility model are:The technology becomes over-water construction and constructed into land, and construction operation speed is fast, construction It is safe;Raft plate sectional after the completion of bridge construction is all removed, small to the pollution of river;Reduce steel-pipe pile, shaped steel, shellfish The steel such as thunder are put into, and construction cost is low.In shallow water river channel (in depth of water 50m) construction cast-in-situ box girder or other cast-in-situ concrete members With preferable application value.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Wherein, 1. concrete structures basis;2. leak conduit;
3. Bailey truss;4. concrete top layer;
5. concrete base;6. packed layer;
7. fixed steel bars.
Embodiment
Technology is carried out to a kind of cast-in-place box beam bracket raft foundation with discharge orifice of the present utility model referring to the drawings Explanation.
As shown in figure 1, a kind of cast-in-place box beam bracket raft foundation with discharge orifice, the raft plate portion are deployed in river course, raft Be provided with Bailey truss 3 above plate, raft plate includes pouring into cubical concrete structure basis 1 and therethrough a plurality of mutual Parallel leak conduit 2;The leak conduit 2 is the RCPIII level pipes of single or more series connection, is set between adjacent leak conduit 2 There are fixed steel bars 7;The concrete structure basis 1 is C30 concrete, and thickness is not less than 3m, including above leak conduit 2 Concrete top layer 4, the concrete base 5 positioned at the lower section of leak conduit 2, the packed layer 6 between leak conduit 2;It is described For fixed steel bars 7 perpendicular to raft plate, bottom is located at concrete base 5, and top connects the base of Bailey truss 3.
Leak conduit 2 made of for being connected by more RCPIII levels pipes, RCP pipes junction carry out waterproof sealing processing; RCP pipes caliber is not less than 1m.
The bearing of trend of leak conduit 2 is consistent with streamflow direction.
It is packed layer 6 immediately below the deployed position of Bailey truss 3.
Embodiment one:
Fig. 1 is the utility model band hardened composition of discharge orifice raft, and it is constructed mainly is let out by raft plate and basic infrastructure are embedded Flow tube road 2 forms.Suitable for shallow water river channel (in depth of water 5m) cast-in-situ box girder or other cast-in-situ concrete member bracket basis.
Raft plate is construction in layer, and raft plate construction process is as follows after basement process:River course work surface construction, basement process, Cushion construction, raft plate substructure construction, pipeline connection installation, raft plate Superstructure Construction.
River course work surface construction:Raft plate construction working face can be divided into 2 classes according to shallow water river channel (in depth of water 5m) condition:It is a kind of For the river that can stop temporarily, construction uses earth cofferdam river closure mode to provide the scope of operation for raft plate;One kind for can not dried-up riverway, Using bevelling mode, half range river course construction raft plate is first closed, re-closed half range in addition carries out raft plate construction after the region water flowing, tears open Except equally using bevelling mode, it is ensured that river course does not stop.
Basement process:Raft plate bottom must have enough bearing capacities to ensure not occur after loading sinking outside specification allowed band Drop, desilting can be taken directly to be constructed on top raft plate after being compacted in the case of riverbed geological conditions is preferable;It is more in riverbed sludge It can take to change and fill out or packing sedimentation by throwing stones mode ensures there are enough foundation bearing capacities.
Cushion construction:Basement process after-pouring 10cm concrete cushions are as raft plate bed course.
Raft plate substructure construction:Constructed when raft plate substructure is relatively thin using one-time-concreting, according to its thickness when thicker Carry out placement layer by layer construction.
Pipe installing and connection:Pipeline uses RCPIII level pipes, and connected mode is flexible connection;One is reserved between pipeline Fixed gap facilitates later stage concreting and vibrated, and Pipe installing precision must meet related specifications requirement, tube coupling interface section palpus Ensured using water-proofing treatment water-tight.
Raft plate Superstructure Construction:Binding structure layer distributing bar after the completion of Pipe installing, formwork pour raft plate top knot Structure is simultaneously conserved.
After the completion of above-mentioned steps, you can set up Bailey truss 3 in raft plate upper surface.

Claims (4)

1. a kind of cast-in-place box beam bracket raft foundation with discharge orifice, it is characterised in that the raft plate portion is deployed in river course, raft plate Top is provided with Bailey truss (3), and raft plate includes pouring into cubical concrete structure basic (1) and a plurality of phase therethrough Mutually parallel leak conduit (2);The leak conduit (2) be single or more series connection RCPIII level pipes, adjacent leak conduit (2) fixed steel bars (7) are provided between;The concrete structure basic (1) is C30 concrete, and thickness is not less than 3m, including positioned at Concrete top layer (4) above leak conduit (2), the concrete base (5) below leak conduit (2), positioned at leak-off pipe Packed layer (6) between road (2);For the fixed steel bars (7) perpendicular to raft plate, bottom is located at concrete base (5), top connection The base of Bailey truss (3).
2. a kind of cast-in-place box beam bracket raft foundation with discharge orifice as claimed in claim 1, it is characterised in that for by more Leak conduit (2) made of the series connection of root RCPIII levels pipe, RCP pipes junction carry out waterproof sealing processing;RCP pipe calibers are not less than 1m。
A kind of 3. cast-in-place box beam bracket raft foundation with discharge orifice as claimed in claim 1, it is characterised in that the aerial drainage The bearing of trend of pipeline (2) is consistent with streamflow direction.
A kind of 4. cast-in-place box beam bracket raft foundation with discharge orifice as claimed in claim 1, it is characterised in that the shellfish thunder It is packed layer (6) immediately below the deployed position of support (3).
CN201720450017.6U 2017-04-27 2017-04-27 A kind of cast-in-place box beam bracket raft foundation with discharge orifice Expired - Fee Related CN206829167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720450017.6U CN206829167U (en) 2017-04-27 2017-04-27 A kind of cast-in-place box beam bracket raft foundation with discharge orifice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720450017.6U CN206829167U (en) 2017-04-27 2017-04-27 A kind of cast-in-place box beam bracket raft foundation with discharge orifice

Publications (1)

Publication Number Publication Date
CN206829167U true CN206829167U (en) 2018-01-02

Family

ID=60768908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720450017.6U Expired - Fee Related CN206829167U (en) 2017-04-27 2017-04-27 A kind of cast-in-place box beam bracket raft foundation with discharge orifice

Country Status (1)

Country Link
CN (1) CN206829167U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064585A (en) * 2020-08-14 2020-12-11 中铁大桥局集团有限公司 Supporting structure on soft foundation of drainage channel and installation method thereof
CN114319069A (en) * 2022-02-23 2022-04-12 中国建筑土木建设有限公司 Large-span steel trestle structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064585A (en) * 2020-08-14 2020-12-11 中铁大桥局集团有限公司 Supporting structure on soft foundation of drainage channel and installation method thereof
CN114319069A (en) * 2022-02-23 2022-04-12 中国建筑土木建设有限公司 Large-span steel trestle structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN101806226B (en) Mined out space dam-type filling method
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN101270582B (en) Method for setting bracing column in underground cavity
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN106049379B (en) Temporary power generation method during construction lag of downstream of spillway and rockfill self-breaking dam
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN108385627A (en) Power station diversion tunnel plugging construction method based on karst landform
CN105951712A (en) Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition
CN107119624A (en) The countermeasure system and implementation of large-scale Dumping Sites in a kind of debris flow gully
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN206829167U (en) A kind of cast-in-place box beam bracket raft foundation with discharge orifice
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN105604075B (en) It is easy to the interim dock entrance cofferdam construction method and cofferdam structure recovered
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN207228038U (en) The countermeasure system of large-scale Dumping Sites in a kind of debris flow gully
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN105839653B (en) A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN102900092B (en) Artificial composite foundation of concrete face rockfill dam built on deep and thick coverage layer and construction method of artificial composite foundation
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN105970882A (en) Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
CN110206062A (en) The dark construction method of underground river shallow embedding is worn under a kind of Urban Underground pipe gallery
CN106522170A (en) Novel dam type adopting concrete anti-seepage wall as dam body anti-seepage body
CN204849791U (en) Structure of earth-rock cofferdam seepage-proofing system
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102