CN105364291A - Bridge reinforcement cage ground mold roll welding frame and application thereof - Google Patents

Bridge reinforcement cage ground mold roll welding frame and application thereof Download PDF

Info

Publication number
CN105364291A
CN105364291A CN201510956448.5A CN201510956448A CN105364291A CN 105364291 A CN105364291 A CN 105364291A CN 201510956448 A CN201510956448 A CN 201510956448A CN 105364291 A CN105364291 A CN 105364291A
Authority
CN
China
Prior art keywords
main muscle
draw
groove
reinforcement cage
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510956448.5A
Other languages
Chinese (zh)
Inventor
王勇
柯宇庆
马传书
吴体俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201510956448.5A priority Critical patent/CN105364291A/en
Publication of CN105364291A publication Critical patent/CN105364291A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/36Auxiliary equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bridge reinforcement cage ground mould roll welding frame and application thereof, which is characterized in that ground mould clamping grooves are arranged, a steel truss is arranged on a horizontal plane, each clamping groove is fixedly welded on the steel truss, and each reinforcement cage main reinforcement is placed in the clamping groove according to a one-to-one corresponding position to obtain positioning; and the reinforcing ribs of the steel reinforcement cage sequentially roll through the clamping grooves on the steel truss and are welded with the main ribs in the clamping grooves one by one until the integral forming of the steel reinforcement cage is completed. The invention completes the forming of the reinforcement cage by utilizing the bridge reinforcement cage ground mold roll welding frame, effectively ensures the forming quality of the reinforcement cage and greatly improves the working efficiency.

Description

A kind of bridge reinforcement cage topotype roll welding frame and application thereof
Technical field
The present invention relates to shaped device and the forming method of the steel reinforcement cage of a kind of bridge pile foundation and pier stud.
Background technology
In engineering, bridge on highway pile foundation, pier stud reinforcement cage skeleton carry the shearing resistance effect of pier stud and pile foundation, all have very strict requirement to spacing between the straight degree of main muscle and main muscle.In construction now, the processing and forming for steel reinforcement cage mainly adopts the manually main muscle of arranging section on the reinforcement of steel reinforcement cage, and again fills other main muscle, or utilizes reinforcing bar cage seam welding roll welding shaping.But artificial mode of filling processing is easy to cause that main muscle irregularity, spacing are uneven, steel reinforcement cage distortion, and wastes time and energy very much, basic guarantee not steel reinforcement cage Forming Quality, this just certainly will cause bridge pile foundation, pier stud to construct to there is quality for inscribing.Although use, reinforcing bar cage seam welding roll welding is shaping can meet the requirement of steel reinforcement cage processing indices, and seam welder machinery involves great expense, maintenance cost is high, occupied ground is large, efficiency of construction is low, certainly will cause duration and fund waste.
Summary of the invention
The present invention is the weak point for avoiding existing for above-mentioned prior art, a kind of bridge reinforcement cage topotype roll welding frame and application thereof are provided, to utilizing bridge reinforcement cage topotype roll welding frame to complete the shaping of steel reinforcement cage, thus ensureing the Forming Quality of steel reinforcement cage, increasing work efficiency.
The present invention is that technical solution problem adopts following technical scheme:
The design feature of bridge reinforcement cage topotype roll welding frame of the present invention is:
The steel reinforcement cage excircle main muscle be on A1 point position is made to be main muscle A1, with main muscle A1 for starting point, the each main muscle distributed successively along steel reinforcement cage excircle is main muscle A1, main muscle A2, main muscle A3 respectively ... main muscle A2n-2, main muscle A2n-1 and main muscle A2n, wherein 2n is the quantity along the main muscle of steel reinforcement cage excircle distribution on steel reinforcement cage excircle, and n is positive integer;
Topotype draw-in groove is set, it is the square steel arranged in the horizontal plane linearly, the each draw-in groove of fixing welding on described square steel, the draw-in groove that order is in square steel one end is draw-in groove A1, with draw-in groove A1 for starting point, the draw-in groove that the length direction along square steel is arranged successively is draw-in groove A1, draw-in groove A2, draw-in groove A3 respectively ... draw-in groove A2n-2, draw-in groove A2n-1 and draw-in groove A2n; Wherein:
Air line distance between draw-in groove A1 with draw-in groove A2 is equal with the arc length of main muscle A1 and main muscle A2;
Air line distance between draw-in groove A2 with draw-in groove A3 is equal with the arc length of main muscle A2 and main muscle A3;
……
Air line distance between draw-in groove A2n-2 with draw-in groove A2n-1 is equal with the arc length of main muscle A2n-2 and main muscle A2n-1;
Air line distance between draw-in groove A2n-1 with draw-in groove A2n is equal with the arc length of main muscle A2n-1 and main muscle A2n;
Described main muscle A1, main muscle A2, main muscle A3 ... main muscle A2n-2, main muscle A2n-1 and main muscle A2n are placed on described draw-in groove A1, draw-in groove A2, draw-in groove A3 correspondingly ... location is obtained in draw-in groove A2n-2, draw-in groove A2n-1 and draw-in groove A2n.
Described square steel is parallel and be arranged at intervals with multiple tracks and form steel truss, and the draw-in groove in each road square steel is by identical position distribution, and same main muscle is by the common positioning supports of draw-in groove in same position in described each road square steel.
The design feature of bridge reinforcement cage topotype roll welding frame of the present invention is also: described steel truss Zhong Ge road square steel distributes by the spacing of steel reinforcement cage reinforcement, makes the desired location one_to_one corresponding of per pass square steel and steel reinforcement cage reinforcement.
The feature utilizing bridge reinforcement cage topotype of the present invention roll welding to put up the method for steel bar cage is carried out as follows:
Step 1, steel reinforcement cage reinforcement is supported on main muscle A1 and main muscle A2, uses welding machine that steel reinforcement cage reinforcement and main muscle A1 and main muscle A2 are welded into the steel reinforcement cage profiled member B1 with main muscle A1 and main muscle A2;
Step 2, described steel reinforcement cage profiled member B1 is rolled into main muscle A3 and main muscle A4 along steel truss, and utilize Y shape support to be positioned by described steel reinforcement cage profiled member B1, re-use welding machine and steel reinforcement cage profiled member B1 and main muscle A3 and main muscle A4 is welded into the steel reinforcement cage profiled member B2 with main muscle A3 and main muscle A4;
Step 3, to carry out successively by the mode that step 2 is identical, until by described steel reinforcement cage profiled member Bn-1, be rolled into main muscle A2n-1 and main muscle A2n along steel truss, and utilize Y shape support to be positioned by described steel reinforcement cage profiled member Bn-1, re-use welding machine and steel reinforcement cage profiled member Bn-1 and main muscle A2n-and main muscle A2n is welded into the steel reinforcement cage profiled member Bn with main muscle A2n-1 and main muscle A2n, complete the welding of all main muscle, steel reinforcement cage is shaping.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, each road main muscle of steel reinforcement cage is placed in the topotype draw-in groove in advance according to main muscle pitch arrangement by the present invention, ensure that the main muscle spacing of steel reinforcement cage and the straight degree of steel reinforcement cage, substantially increases steel reinforcement cage crudy.
2, the present invention is with steel reinforcement cage reinforcement for blank, utilizes the rolling of steel reinforcement cage reinforcement to implement the welding of main muscle, rolling process rapid and convenient, does not need to implement lifting, namely ensure that the position of main muscle is accurate, drastically increases again welding job efficiency.
3, the inventive method compared to existing technology in by manually first fixing steel reinforcement cage reinforcement, main for part steel reinforcement cage muscle is being welded on reinforcement, the mode of then filling other main muscle drastically increases operating efficiency, has saved cost of labor, ensure that steel reinforcement cage Forming Quality.
4, the inventive method designs for steel reinforcement cage, in actual use, by size and the spacing of adjustment topotype draw-in groove, is applicable to the steel reinforcement cage of any diameter.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is topotype draw-in groove distribution map in the present invention;
Fig. 3 is partial structurtes enlarged diagram of the present invention;
Number in the figure: 101 square steel, 102 screw-thread steels, 103 draw-in grooves, 104 main muscle, 105 is Y shape support, 106 steel reinforcement cage reinforcements, 107 gusseted.
Detailed description of the invention
See Fig. 1, Fig. 2 and Fig. 3, the version of the present embodiment Bridge steel reinforcement cage topotype roll welding frame is:
The steel reinforcement cage excircle main muscle be on A1 point position is made to be main muscle A1, with main muscle A1 for starting point, the each main muscle distributed successively along steel reinforcement cage excircle is main muscle A1, main muscle A2, main muscle A3 respectively ... main muscle A2n-2, main muscle A2n-1 and main muscle A2n, wherein 2n is the quantity along the main muscle of steel reinforcement cage excircle distribution on steel reinforcement cage excircle, and n is positive integer;
Topotype draw-in groove is set, it is the square steel arranged in the horizontal plane linearly, the each draw-in groove of fixing welding on described square steel, the draw-in groove that order is in square steel one end is draw-in groove A1, with draw-in groove A1 for starting point, the draw-in groove that the length direction along square steel is arranged successively is draw-in groove A1, draw-in groove A2, draw-in groove A3 respectively ... draw-in groove A2n-2, draw-in groove A2n-1 and draw-in groove A2n; Wherein:
Air line distance between draw-in groove A1 with draw-in groove A2 is equal with the arc length of main muscle A1 and main muscle A2;
Air line distance between draw-in groove A2 with draw-in groove A3 is equal with the arc length of main muscle A2 and main muscle A3;
……
Air line distance between draw-in groove A2n-2 with draw-in groove A2n-1 is equal with the arc length of main muscle A2n-2 and main muscle A2n-1;
Air line distance between draw-in groove A2n-1 with draw-in groove A2n is equal with the arc length of main muscle A2n-1 and main muscle A2n;
Described main muscle A1, main muscle A2, main muscle A3 ... main muscle A2n-2, main muscle A2n-1 and main muscle A2n are placed on described draw-in groove A1, draw-in groove A2, draw-in groove A3 correspondingly ... location is obtained in draw-in groove A2n-2, draw-in groove A2n-1 and draw-in groove A2n.
In concrete enforcement, square steel is parallel and be arranged at intervals with multiple tracks and form steel truss, and the draw-in groove in each road square steel is by identical position distribution, and same main muscle is by the common positioning supports of draw-in groove in same position in described each road square steel; Steel truss Zhong Ge road square steel distributes by the spacing of steel reinforcement cage reinforcement, makes the desired location one_to_one corresponding of per pass square steel and steel reinforcement cage reinforcement.
The method utilizing the roll welding of the present embodiment Bridge steel reinforcement cage topotype to put up steel bar cage is carried out as follows:
Step 1, steel reinforcement cage reinforcement is supported on main muscle A1 and main muscle A2, uses welding machine that steel reinforcement cage reinforcement and main muscle A1 and main muscle A2 are welded into the steel reinforcement cage profiled member B1 with main muscle A1 and main muscle A2;
Step 2, described steel reinforcement cage profiled member B1 is rolled into main muscle A3 and main muscle A4 along steel truss, and utilize Y shape support to be positioned by described steel reinforcement cage profiled member B1, re-use welding machine and steel reinforcement cage profiled member B1 and main muscle A3 and main muscle A4 is welded into the steel reinforcement cage profiled member B2 with main muscle A3 and main muscle A4;
Step 3, to carry out successively by the mode that step 2 is identical, until by described steel reinforcement cage profiled member Bn-1, be rolled into main muscle A2n-1 and main muscle A2n along steel truss, and utilize Y shape support to be positioned by described steel reinforcement cage profiled member Bn-1, re-use welding machine and steel reinforcement cage profiled member Bn-1 and main muscle A2n-and main muscle A2n is welded into the steel reinforcement cage profiled member Bn with main muscle A2n-1 and main muscle A2n, complete the welding of all main muscle, steel reinforcement cage is shaping.
Shown in Fig. 2, in the present embodiment, the spacing of steel reinforcement cage reinforcement 106 is set to 2m, therefore, in steel truss, in four road square steel 101, the spacing of adjacent square steel is set to 2m equally, it can be 9m or 12m that the length of main muscle 104 presses factory length, and the two ends of four road square steel are fixedly connected to form steel truss with φ 25 screw-thread steel 102 respectively; The width of draw-in groove 103 should be greater than main muscle diameter 5mm, and to ensure that main muscle can firmly be placed in draw-in groove 103, draw-in groove 103 is fixedly welded on square steel correspondence position by the round steel of two φ 20 formed;
After steel truss is shaping, the main muscle 105 of a dead lift is placed in topotype draw-in groove, gusseted 107 should be welded with in annular steel reinforcement cage reinforcement 106, to ensure the full circle form of steel reinforcement cage reinforcement 106, Y shape supports 105 for supporting steel reinforcement cage reinforcement 106 at sidepiece, ensures the firm of steel reinforcement cage reinforcement 106.
The steel reinforcement cage entirety utilizing the inventive method shaping is straight, attractive in appearance, and indices reaches specification and designing requirement, and pile foundation, pier stud construction quality are guaranteed, and drastically increase construction effect simultaneously.

Claims (3)

1. a bridge reinforcement cage topotype roll welding frame, is characterized in that:
The steel reinforcement cage excircle main muscle be on A1 point position is made to be main muscle A1, with main muscle A1 for starting point, the each main muscle distributed successively along steel reinforcement cage excircle is main muscle A1, main muscle A2, main muscle A3 respectively ... main muscle A2n-2, main muscle A2n-1 and main muscle A2n, wherein 2n is the quantity along the main muscle of steel reinforcement cage excircle distribution on steel reinforcement cage excircle, and n is positive integer;
Topotype draw-in groove is set, it is the square steel arranged in the horizontal plane linearly, the each draw-in groove of fixing welding on described square steel, the draw-in groove that order is in square steel one end is draw-in groove A1, with draw-in groove A1 for starting point, the draw-in groove that the length direction along square steel is arranged successively is draw-in groove A1, draw-in groove A2, draw-in groove A3 respectively ... draw-in groove A2n-2, draw-in groove A2n-1 and draw-in groove A2n; Wherein:
Air line distance between draw-in groove A1 with draw-in groove A2 is equal with the arc length of main muscle A1 and main muscle A2;
Air line distance between draw-in groove A2 with draw-in groove A3 is equal with the arc length of main muscle A2 and main muscle A3;
……
Air line distance between draw-in groove A2n-2 with draw-in groove A2n-1 is equal with the arc length of main muscle A2n-2 and main muscle A2n-1;
Air line distance between draw-in groove A2n-1 with draw-in groove A2n is equal with the arc length of main muscle A2n-1 and main muscle A2n;
Described main muscle A1, main muscle A2, main muscle A3 ... main muscle A2n-2, main muscle A2n-1 and main muscle A2n are placed on described draw-in groove A1, draw-in groove A2, draw-in groove A3 correspondingly ... location is obtained in draw-in groove A2n-2, draw-in groove A2n-1 and draw-in groove A2n;
Described square steel is parallel and be arranged at intervals with multiple tracks and form steel truss, and the draw-in groove in each road square steel is by identical position distribution, and same main muscle is by the common positioning supports of draw-in groove in same position in described each road square steel.
2. bridge reinforcement cage topotype roll welding frame according to claim 1, is characterized in that: described steel truss Zhong Ge road square steel distributes by the spacing of steel reinforcement cage reinforcement, makes the desired location one_to_one corresponding of per pass square steel and steel reinforcement cage reinforcement.
3. utilize the bridge reinforcement cage topotype roll welding described in claim 1 to put up the method for steel bar cage, it is characterized in that:
Step 1, steel reinforcement cage reinforcement is supported on main muscle A1 and main muscle A2, uses welding machine that steel reinforcement cage reinforcement and main muscle A1 and main muscle A2 are welded into the steel reinforcement cage profiled member B1 with main muscle A1 and main muscle A2;
Step 2, described steel reinforcement cage profiled member B1 is rolled into main muscle A3 and main muscle A4 along steel truss, and utilize Y shape support to be positioned by described steel reinforcement cage profiled member B1, re-use welding machine and steel reinforcement cage profiled member B1 and main muscle A3 and main muscle A4 is welded into the steel reinforcement cage profiled member B2 with main muscle A3 and main muscle A4;
Step 3, to carry out successively by the mode that step 2 is identical, until by described steel reinforcement cage profiled member Bn-1, be rolled into main muscle A2n-1 and main muscle A2n along steel truss, and utilize Y shape support to be positioned by described steel reinforcement cage profiled member Bn-1, re-use welding machine and steel reinforcement cage profiled member Bn-1 and main muscle A2n-and main muscle A2n is welded into the steel reinforcement cage profiled member Bn with main muscle A2n-1 and main muscle A2n, complete the welding of all main muscle, steel reinforcement cage is shaping.
CN201510956448.5A 2015-12-16 2015-12-16 Bridge reinforcement cage ground mold roll welding frame and application thereof Pending CN105364291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510956448.5A CN105364291A (en) 2015-12-16 2015-12-16 Bridge reinforcement cage ground mold roll welding frame and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510956448.5A CN105364291A (en) 2015-12-16 2015-12-16 Bridge reinforcement cage ground mold roll welding frame and application thereof

Publications (1)

Publication Number Publication Date
CN105364291A true CN105364291A (en) 2016-03-02

Family

ID=55367183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510956448.5A Pending CN105364291A (en) 2015-12-16 2015-12-16 Bridge reinforcement cage ground mold roll welding frame and application thereof

Country Status (1)

Country Link
CN (1) CN105364291A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105710553A (en) * 2016-05-03 2016-06-29 常州中铁城建构件有限公司 Reinforcement cage body molding device and use method thereof
CN108080778A (en) * 2017-12-13 2018-05-29 中交公局海威工程建设有限公司 Auxiliary welding equipment and welding method
CN111962876A (en) * 2020-06-30 2020-11-20 葛军锋 Auxiliary device is tied up to steel reinforcement cage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4658867A (en) * 1984-06-14 1987-04-21 Landshuter Baueisenbiegerei Gmbh Process and equipment for the production of reinforcement baskets for large-bore piles
JP2001150078A (en) * 1999-11-30 2001-06-05 High Frequency Heattreat Co Ltd Manufacturing method and facility for cylindrical reinforcement cage with spiral reinforcement
CN102094417A (en) * 2010-12-22 2011-06-15 中铁四局集团第一工程有限公司 Method for producing steel reinforcement cage by using setting die
CN202479408U (en) * 2012-03-29 2012-10-10 中交一公局第五工程有限公司 Rolling mould for processing steel reinforcement cage frames
CN103586374A (en) * 2013-11-20 2014-02-19 中交二航局第四工程有限公司 Serration-type steel reinforcement cage machining jig frame and construction method thereof
CN204524117U (en) * 2015-01-30 2015-08-05 中铁三局集团有限公司 Bridge pile foundation fabrication of reinforcing cage simple platform
CN205200789U (en) * 2015-12-16 2016-05-04 中铁四局集团有限公司 Bridge reinforcement cage ground mould seam welding frame

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4658867A (en) * 1984-06-14 1987-04-21 Landshuter Baueisenbiegerei Gmbh Process and equipment for the production of reinforcement baskets for large-bore piles
JP2001150078A (en) * 1999-11-30 2001-06-05 High Frequency Heattreat Co Ltd Manufacturing method and facility for cylindrical reinforcement cage with spiral reinforcement
CN102094417A (en) * 2010-12-22 2011-06-15 中铁四局集团第一工程有限公司 Method for producing steel reinforcement cage by using setting die
CN202479408U (en) * 2012-03-29 2012-10-10 中交一公局第五工程有限公司 Rolling mould for processing steel reinforcement cage frames
CN103586374A (en) * 2013-11-20 2014-02-19 中交二航局第四工程有限公司 Serration-type steel reinforcement cage machining jig frame and construction method thereof
CN204524117U (en) * 2015-01-30 2015-08-05 中铁三局集团有限公司 Bridge pile foundation fabrication of reinforcing cage simple platform
CN205200789U (en) * 2015-12-16 2016-05-04 中铁四局集团有限公司 Bridge reinforcement cage ground mould seam welding frame

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105710553A (en) * 2016-05-03 2016-06-29 常州中铁城建构件有限公司 Reinforcement cage body molding device and use method thereof
CN105710553B (en) * 2016-05-03 2019-03-26 常州中铁城建构件有限公司 Steel reinforcement cage cage body molding machine and application method
CN108080778A (en) * 2017-12-13 2018-05-29 中交公局海威工程建设有限公司 Auxiliary welding equipment and welding method
CN111962876A (en) * 2020-06-30 2020-11-20 葛军锋 Auxiliary device is tied up to steel reinforcement cage

Similar Documents

Publication Publication Date Title
CN105364291A (en) Bridge reinforcement cage ground mold roll welding frame and application thereof
CN204052739U (en) Make the adjustable locator of major diameter bridge pile foundation steel reinforcement cage
CN103350165A (en) Processing device and method capable of manufacturing reinforcement cages with different diameters
CN102601182B (en) Corrugated plate rolling machine
CN205975382U (en) Adjustable device of cast -in -situ box girder prestressing force bellows coordinate
CN201799767U (en) Spiral reinforcement wheel welding and forming device
CN204524120U (en) The vertical loopful of large diameter pile foundation steel reinforcement cage is to location moulding bed device
CN205200789U (en) Bridge reinforcement cage ground mould seam welding frame
CN105178198A (en) Adjustable formwork for variable cross-section high pier of bridge
CN104358251A (en) Main reinforcement distance control device during pile foundation project reinforcement cage manufacturing and pile foundation project reinforcement cage manufacturing method
CN204817843U (en) Prefabricated utility tunnel's steel reinforcement cage processingequipment
CN203390128U (en) Moulding bed of concrete pipe sheet steel reinforcement cage
CN202527885U (en) Pedestal for manufacturing framework of subway pipe piece
CN103276851B (en) Steel core concrete column with ribbing and method for designing thereof
CN203430027U (en) Adjustable large steel formwork
CN209760607U (en) steel bar lapping connector
CN202356549U (en) Tool for machining spiral stirrups made of steel bar waste
CN209681496U (en) Positioning welding mould for main reinforcement of steel reinforcement cage
CN206873926U (en) A kind of circular columns bean column node template of 3D printing
CN202299429U (en) Circulation adjustable angle iron stiffening system
CN206337832U (en) Suitable for 3 d space coordinate system quick assembling multifunctional regulation device
CN211638157U (en) Adjustable and reusable steel bar positioning jig frame device
CN205743032U (en) Simple and easy steel reinforcement cage seam welding auxiliary assembly
CN205036162U (en) Basis is kept off to prefabricated enclosing of repeatedly usable
CN211464660U (en) Construction tool for correcting steel bars

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160302