Prior art keywords
space planning
planning scheme
control line
electronic approval
line system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510703352.8A
Other languages
Chinese (zh)
Other versions
CN105354267B (en
Inventor
范海林
谭军辉
王大成
李姗迟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huiyu Intelligent Survey Technology Co Ltd
Original Assignee
Guangzhou Huiyu Intelligent Survey Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Huiyu Intelligent Survey Technology Co Ltd filed Critical Guangzhou Huiyu Intelligent Survey Technology Co Ltd
Priority to CN201510703352.8A priority Critical patent/CN105354267B/en
Publication of CN105354267A publication Critical patent/CN105354267A/en
Application granted granted Critical
Publication of CN105354267B publication Critical patent/CN105354267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Databases & Information Systems (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Remote Sensing (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method for realizing ''more rules one'' electronic approval of multi-type planning schemes. The method comprises: presetting a GIS (Geographic Information System) database; extracting/reading reference data from the GIS database; creating or entering a space planning scheme for an electronic approval system; comparing the space planning scheme with the reference data, and coordinating a land block; and storing the coordinated/processed space planning scheme into the GIS database. According to the method disclosed by the invention, contradiction of the space planning scheme among various departments can be solved, administrative examination efficiency is improved, and economic values of construction land are realized to a maximum limit.

Description

Realize the method for polymorphic type programme Electronic approval of " advising unification " more
Technical field
The present invention relates to space planning adjustment field, realize the method for polymorphic type programme Electronic approval of " advising unification " more in particular to one.
Background technology
The spatial planning system in each city of current National, such as urban and rural planning, overall plan for land use, environmental protection planning, forestry planning etc., also exist contradiction and conflict between " advising " more, cause Space resources distribution efficiency lower.Subject matter has: the data class of (1) plan for land is various, Data Source is extensive, all departments, unit is in statistical method, data mode and way to manage there are differences, wherein all departments comprise local planning construction department, land departments, environmental administration, forest department etc. have the department of legal space planning administration authority, the difference of statistical method is mainly reflected in the difference of Land resources classification, such as, what overall plan for land use was paid close attention to is construction land, and urban and rural planning concern is urban land, in addition, environmental protection is planned, forestry is planned, for water conservation district, wilderness area, forest resourceies etc. also have respective statistical requirements, (2) data semantic of plan for land differs, this is also mainly reflected in the difference of Land resources classification, such as, the operative norm of urban and rural planning is " Standard for classification of urban land and for planning of constructional land " (GB50137-2011) and " Village Planning land use class guide " (building No. [2014] 98, village), and the operative norm of overall plan for land use is overall plan for land use establishment code (TD/T1023-2010, TD/T1024-2010, TD/T1025-2010) reallocation of land purpose classification in, both concrete divisions are different with implication, and for example, forest land concrete meaning also difference to some extent in forest land in overall plan for land use and forestry planning, (3) data mode of plan for land, form are numerous and diverse, and general plan for land comprises drawing data, cad data and GIS data etc., (4) spatial frame of reference of all departments, unit is different.
At urban construction design field, research staff is devoted to utilize geographic information system technology (GeographicInformationSystem, GIS) Computer Aided Design.Chinese patent CN102592008A discloses a kind of Design of Urban Drainage Pipe Network system based on GIS technology, comprises the modules such as pipe network Element Drawing, wastewater quantity prediction, water pipeline optimization.This invention also provides a kind of How It Works of the Design of Urban Drainage Pipe Network system based on GIS technology, on the function basis such as graphic editing, data management, storage making full use of Geographic Information System, the layout of carrying out pipeline is drawn and adjustment, corresponding water force and diameter optimal are carried out to the pipeline in design proposal, is convenient to scientific and reasonable designing and arranging grid programme.
But, when all departments, unit formulate space planning scheme, except designing and producing except corresponding programme, also need to consider whether the space planning scheme of all departments can violate the regulation of other departments, this is a key element that must consider in the declaration process of space planning scheme.That is, in declaration space planning scheme, the GIS technology application process only possessing design function is inadequate.
Summary of the invention
For solving the problem of above-mentioned prior art, the object of the invention is to, providing one to realize the method for polymorphic type programme Electronic approval of " advising unification ", to solve the contradiction of all departments in space planning more; Another object of the present invention is to, said method is provided, the standardization of the space planning achievement of all departments and standardization are achieved; Another object of the present invention is also, maximally utilises idle land resource, and adjusts irrational Land arrangement.
For achieving the above object, the invention provides the method that one realizes polymorphic type programme Electronic approval of " advising unification " more, its function mainly relies on Electronic approval system to realize, and comprises at least following steps successively:
-step 1: preset gis database (GeographicInformationSystem, GIS), store geographic information data in described GIS storehouse, coordinate the control line system of gained and the legal space planning data of all departments through all departments;
-step 2: extract/read described geographic information data, control line system and space planning data from described GIS storehouse;
-step 3: with reference to described geographic information data, control line system and space planning data, and according to the requirement of statement of design task, make initial legal space planning scheme;
-step 4: described space planning scheme and described control line system are compared, conflict to differentiate whether to exist between described space planning scheme with described control line system, if it is determined that result is "Yes" there is conflict, then perform plot coordinator, described coordinator comprises amendment space attribute and/or merges plot and/or split plot, makes described space planning scheme meet the requirement of described statement of design task and the regulation of described control line system;
-step 5: the described space planning scheme coordinated/process is stored in described GIS storehouse.
In one embodiment, described step 3 comprises Computer Aided Design module further, and described Computer Aided Design module is for providing the wire design considerations relevant to the legal space planning of corresponding department and planar design considerations.
Present invention also offers the method that another kind realizes polymorphic type programme Electronic approval of " advising unification " more, its function mainly relies on Electronic approval system to realize, and comprises at least following steps successively:
-step 1: preset gis database (GeographicInformationSystem, GIS), store geographic information data in described GIS storehouse, coordinate the control line system of gained and the legal space planning data of all departments through all departments;
-step 2: extract/read described geographic information data, control line system and space planning data from described GIS storehouse;
-step 3: by general reading device, is input in described Electronic approval system by existing legal space planning scheme;
-step 4: described space planning scheme and described control line system are compared, conflict to differentiate whether to exist between described space planning scheme with described control line system, if it is determined that result is "Yes" there is conflict, then perform plot coordinator, described coordinator comprises amendment space attribute and/or merges plot and/or split plot, makes described space planning scheme meet the requirement of described statement of design task and the regulation of described control line system;
-step 5: the described space planning scheme coordinated/process is stored in described GIS storehouse.
In one embodiment, described step 4 is further comprising the steps:
-step 4.1: the conflict rule described in pre-programmed between control line system and described space planning;
Whether-step 4.2: utilize the described conflict rule of sequencing to differentiate described space planning scheme, determine to exist between described space planning scheme with described control line system to conflict thus;
-step 4.3: if the result of described differentiation is "Yes" there is conflict, then perform described plot coordinator;
-step 4.4: the quantity of adding up the various plot in the described space planning scheme coordinated/process;
-step 4.5: the described space planning scheme coordinated/process and described statement of design task are contrasted, the scope in adjustment plot, until described space planning scheme meets the requirement of described statement of design task;
-complete described step 4.5 after, described Electronic approval system performs described step 4.2 at least again to described space planning scheme, until the result of described differentiation is "No".
In another embodiment, described step 5 comprises gridding module further, for when stored described space planning scheme being divided into the grid that several have specific dimensions.
In a specific embodiment, it is further comprising the steps: regularly carry out updating maintenance to the described control line system in described step 1, and when upgrading described control line system, described Electronic approval system performs the method flow except described step 1, step 3 automatically successively.
In a specific embodiment, it is further comprising the steps: when there is another space planning scheme, another space planning scheme wherein said is compared with initial/existing legal space planning scheme of described step 3, more meet the requirement of statement of design task and/or described control line system, described Electronic approval system performs the method flow of described step 2-5 automatically again.
In a specific embodiment, when performing described step 5, correspondingly contrast each grid of former space planning scheme and new space planning scheme one by one, for the grid that described two editions schemes there are differences, storage mode is cover old grid with new grid, and defines the version of described grid simultaneously.
In another embodiment, when described space planning scheme needs the form becoming described Electronic approval system readable from other formal transformations, coordinate conversion and/or format conversion and/or the regular program of attribute are performed to described space planning scheme.
In another embodiment, described GIS storehouse is attached with sharing application module, for extracting data from described GIS storehouse, and the spatial information of described data space planning scheme for inquiring about, adding up, described in overlay analysis.
Compared with prior art, the present invention has following advantage:
(1) the present invention can from data source, solve the contradiction between all departments' space planning, the space planning scheme utilizing this method to work out is in data layout, data structure, statistical indicator, space layout, will be consistent with existing control line system, the final lifecycle management realizing many rule unification work;
(2) the present invention is conducive to realizing all departments' legal space planning achievement standardization and standardization, improve science and the standardization of Planning preparation, reduce the examination & approval cost of space planning scheme, and the conflict solved when the planning caused due to all departments' space planning contradiction performs, promote the efficiency of administrative examination and approval, be conducive to implementing of people's livelihood project, promote social development; Say from legal perspective, it can promote to implement many rule unification achievements;
(3) the present invention is by analyzing difference, coordinating plot, maximally utilise idle land resource, adjust irrational construction land layout and basic farmland layout, realize land used for urban and rural construction projects scale to plan as a whole, ensure that urban development construction needs, intensive utilization soil, realizes the economic worth of construction land to greatest extent.
Accompanying drawing explanation
Fig. 1 shows Electronic approval method flow diagram of the present invention, and wherein involved programme is newly-built space planning scheme; And
Fig. 2 shows the Electronic approval method flow diagram of another embodiment of the present invention, and wherein involved programme is existing space planning scheme.
Hereinafter, with exemplary forms, and with reference to appended accompanying drawing, the embodiment of the present invention will be described in detail.
Embodiment
Fig. 1 shows Electronic approval method flow diagram of the present invention, and wherein involved programme is newly-built space planning scheme.
-GIS storehouse: normally, in order to store the geography information of specific region, user can in public server building database---gis database (GeographicInformationSystem, GIS), general geographic information data is stored in this GIS storehouse, the control line system of gained is coordinated through all departments, and all departments are to the layout data in legal space, wherein, namely control line system can be considered the achievement of many rule unifications, these control lines can comprise Ecological Control line, Urban Scale control line, basic farmland control line, industry block control line, Forestry Ecological red line, water conservation district control line, infrastructure control line, city blue line, history culture control line, have ready conditions and build district etc., and described control line system regularly carries out updating maintenance by related software, in addition, all departments also regularly can carry out updating maintenance similarly to the layout data in legal space.But, mutually to coordinate through all departments although it should be noted that, obtain a unified control line system, but this part of control line system only comprises the part that all departments have reached common understanding, and the part of failing to reach common understanding then still is embodied in the independent control line system of all departments.
-reference data: when user needs the newly-built scheme of submission to carry out declaration, first need to extract/read reference data from GIS storehouse, namely the control line system in GIS storehouse has been stored in, the Universal Geographical information data within the scope of the legal space planning data of all departments and this plot involved by newly-built space planning scheme.
-Computer Aided Design: user is with reference to described geographic information data, control line system and space planning data, such as provide relevant wire design considerations if highway layout information, planar design considerations are as plot design information, and according to the requirement of statement of design task, the drawing of rendering space programme, this space planning scheme comprises such as road, soil, functional areas etc., and the drawing of space planning scheme is generally made into the text of the readable dwg format text of AutoCAD, gis format text or other suitable format.
-standard format is changed: if the form that the drawing of space planning scheme is dwg format text or other suitable format texts, preferably can by the drawing of these space planning schemes by format conversion and attribute regular, convert the gis format text of standard to, " GIS achievement " namely shown in Fig. 1.
-data management: the space planning scheme and described reference data that make complete gis form are compared, particularly, user can by the conflict rule sequencing in advance of the control line system of all departments, the conflict rule of sequencing is utilized to carry out discriminant space programme subsequently, this discriminating program can such as be performed by the concrete processor of Electronic approval system, determine thus whether to exist between this space planning scheme with described control line system to conflict, if it is determined that result is "Yes" there is conflict, then need to coordinate plot.For overall plan for land use, if planned land use itself does not belong to farming land, and this plot is positioned at the scope of basic farmland control line at least partly, then probably need the scope in revised planning plot, the plot being endowed specific planning/attribute has been occupied with planning-free plot, on the other hand, the scope in the planning plot after adjustment still needs to meet the total amount requirement about planning plot in statement of design task.Normally, this coordinator can not complete once, and in fact coordinator carries out and each coordinator all by statistics in GIS storehouse, can conflict until no longer exist between space planning scheme with described control line system repeatedly.
-warehouse-in instrument: the space planning scheme processed through " data management " is stored in GIS storehouse subsequently again.In the present embodiment, involved programme is newly-built space planning scheme, and therefore this space planning scheme is stored in GIS storehouse first, and preferably, while storage, performs gridding process to this space planning scheme.And, as mentioned above, control line system and all departments all regularly can carry out updating maintenance to the layout data in legal space, when described control line system and layout data change, may be only that the planning/attribute in wherein part plot changes, or the coverage of control line system changes to some extent, Electronic approval system can identify the grid being covered with update area automatically, and the above-mentioned flow process automatically performed except " Computer Aided Design " program, the grid that these include update area is dynamically updated, namely again plot is coordinated, after this grid be updated and the grid do not carried out upgrading are stitched together again, form new space planning scheme and be again stored into GIS storehouse, and upgrade each time, Electronic approval system all can make special definition/mark to the version of the grid be updated automatically, the storage mode of the meshing that this particularly suitable changes can reduce each data total amount upgrading needs and store, effectively shorten storage time and reduce data redundancy.
-sharing application: the space planning scheme in GIS storehouse can be called, for the spatial information of inquiry, statistics, the overlay analysis program.
Fig. 2 shows the Electronic approval method flow diagram of another embodiment of the present invention, and wherein involved programme is existing space planning scheme.
-GIS storehouse: similarly, in order to store the geography information of specific region, user can in public server building database---gis database (GeographicInformationSystem, GIS), general geographic information data is stored in this GIS storehouse, the control line system of the coordinated gained of all departments, and all departments are to the layout data in legal space, wherein, namely control line system can be considered the achievement of many rule unifications, these control lines comprise such as Ecological Control line, Urban Scale control line, basic farmland control line, industry block control line, Forestry Ecological red line, water conservation district control line, infrastructure control line, city blue line, history culture control line, have ready conditions and build district etc., and described control line system regularly carries out updating maintenance by related software, in addition, all departments also regularly can carry out updating maintenance similarly to the layout data in legal space.
-reference data: when user need to submit existing scheme carry out declaration time, first need to extract/read reference data from GIS storehouse, namely the control line system in GIS storehouse has been stored in, the Universal Geographical information data within the scope of the legal space planning data of all departments and this plot involved by existing space planning scheme.
-existing scheme: all departments, unit have respective spatial planning system usually, and these spatial planning system are made into existing space planning scheme, these existing space planning scheme drawings are generally Freehandhand-drawing drawing, dwg format text, gis format text or other suitable format texts, preferably can by the space planning scheme drawing of non-gis form wherein by format conversion and attribute regular, convert the gis format text of standard to, " GIS achievement " namely shown in Fig. 2.
-data management: the space planning scheme of gis form and described reference data are compared, particularly, user can by the conflict rule sequencing in advance of the control line system of all departments, the conflict rule of sequencing is utilized to carry out discriminant space programme subsequently, this discriminating program can such as be performed by the concrete processor of Electronic approval system, determine thus whether to exist between this space planning scheme with described control line system to conflict, if it is determined that result is "Yes" there is conflict, then need to coordinate plot, coordination mode is identical with the coordination mode of previous embodiment, do not repeat them here.Normally, this coordinator can not complete once, and in fact coordinator carries out and each coordinator all by statistics in GIS storehouse, can conflict until no longer exist between space planning scheme with described control line system repeatedly.
-warehouse-in instrument: the space planning scheme processed through " data management " is stored in GIS storehouse subsequently again.In the present embodiment, involved programme is be logged the existing space planning scheme to Electronic approval system/GIS storehouse first, preferably, while storage, performs gridding process to this space planning scheme.And, as mentioned above, control line system and all departments all regularly can carry out updating maintenance to the layout data in legal space, when described control line system and layout data change, may be only that the planning/attribute in wherein part plot changes, or the coverage of control line system changes to some extent, Electronic approval system can identify the grid being covered with update area automatically, and the above-mentioned flow process automatically performed except " Computer Aided Design " program, the grid that these include update area is dynamically updated, namely again plot is coordinated, after this grid be updated and the grid do not carried out upgrading are stitched together again, form new space planning scheme and be again stored into GIS storehouse, and upgrade each time, Electronic approval system all can make special definition/mark to the version of the grid be updated automatically, the storage mode of the meshing that this particularly suitable changes can reduce each data total amount upgrading needs and store, effectively shorten storage time and reduce data redundancy.
-sharing application: the space planning scheme in GIS storehouse can be called, for the spatial information of inquiry, statistics, the overlay analysis program.
Should be appreciated that the above embodiment of the present invention is only used to embodiments of the present invention and principle of work are clearly described, and be not the restriction to embodiments of the present invention.For the those of ordinary skill in described field, can also make other changes in different forms on the basis of the above description.Here cannot give exhaustive to all embodiments.Every belong to technical scheme of the present invention the apparent change of amplifying out or change still be within protection scope of the present invention.

Claims (10)

1. realize a method for polymorphic type programme Electronic approval of " advising unification ", it relies on Electronic approval system to realize, and comprises at least following steps successively more:
-step 1: preset gis database (GeographicInformationSystem, GIS), store geographic information data in described GIS storehouse, coordinate the control line system of gained and the legal space planning data of all departments through all departments;
-step 2: extract/read described geographic information data, control line system and space planning data from described GIS storehouse;
-step 3: with reference to described geographic information data, control line system and space planning data, and according to the requirement of statement of design task, make initial legal space planning scheme;
-step 4: described space planning scheme and described control line system are compared, conflict to differentiate whether to exist between described space planning scheme with described control line system, if it is determined that result is "Yes" there is conflict, then perform plot coordinator, described coordinator comprises amendment space attribute and/or merges plot and/or split plot, makes described space planning scheme meet the requirement of described statement of design task and the regulation of described control line system;
-step 5: the described space planning scheme coordinated/process is stored in described GIS storehouse.
2. Electronic approval method according to claim 1, it is characterized in that, described step 3 comprises Computer Aided Design module further, and described Computer Aided Design module is for providing the wire design considerations relevant to the legal space planning of corresponding department and planar design considerations.
3. realize a method for polymorphic type programme Electronic approval of " advising unification ", it relies on Electronic approval system to realize, and comprises at least following steps successively more:
-step 1: preset gis database (GeographicInformationSystem, GIS), store geographic information data in described GIS storehouse, coordinate the control line system of gained and the legal space planning data of all departments through all departments;
-step 2: extract/read described geographic information data, control line system and space planning data from described GIS storehouse;
-step 3: by general reading device, is input in described Electronic approval system by existing legal space planning scheme;
-step 4: described space planning scheme and described control line system are compared, conflict to differentiate whether to exist between described space planning scheme with described control line system, if it is determined that result is "Yes" there is conflict, then perform plot coordinator, described coordinator comprises amendment space attribute and/or merges plot and/or split plot, makes described space planning scheme meet the requirement of described statement of design task and the regulation of described control line system;
-step 5: the described space planning scheme coordinated/process is stored in described GIS storehouse.
4. the Electronic approval method according to claim 1 or 3, is characterized in that, described step 4 is further comprising the steps:
-step 4.1: the conflict rule described in pre-programmed between control line system and described space planning;
Whether-step 4.2: utilize the described conflict rule of sequencing to differentiate described space planning scheme, determine to exist between described space planning scheme with described control line system to conflict thus;
-step 4.3: if the result of described differentiation is "Yes" there is conflict, then perform described plot coordinator;
-step 4.4: the quantity of adding up the various plot in the described space planning scheme coordinated/process;
-step 4.5: the described space planning scheme coordinated/process and described statement of design task are contrasted, the scope in adjustment plot, until described space planning scheme meets the requirement of described statement of design task;
-complete described step 4.5 after, described Electronic approval system performs described step 4.2 at least again to described space planning scheme, until the result of described differentiation is "No".
5. the Electronic approval method according to claim 1 or 3, is characterized in that, described step 5 comprises gridding module further, for when stored described space planning scheme being divided into the grid that several have specific dimensions.
6. Electronic approval method according to claim 5, it is further comprising the steps: regularly carry out updating maintenance to the described control line system in described step 1, and when upgrading described control line system, described Electronic approval system performs the method flow except described step 1, step 3 automatically successively.
7. Electronic approval method according to claim 5, it is further comprising the steps: when there is another space planning scheme, another space planning scheme wherein said is compared with initial/existing legal space planning scheme of described step 3, more meet the requirement of statement of design task and/or described control line system, described Electronic approval system performs the method flow of described step 2-5 automatically again.
8. the Electronic approval method according to claim 6 or 7, it is characterized in that, when performing described step 5, correspondingly contrast each grid of former space planning scheme and new space planning scheme one by one, for the grid that described two editions schemes there are differences, storage mode is cover old grid with new grid, and defines the version of described grid simultaneously.
9. the Electronic approval method according to claim 1 or 3, it is characterized in that, when described space planning scheme needs the form becoming described Electronic approval system readable from other formal transformations, coordinate conversion and/or format conversion and/or the regular program of attribute are performed to described space planning scheme.
10. the Electronic approval method according to claim 1 or 3, it is characterized in that, described GIS storehouse is attached with sharing application module, for extracting data from described GIS storehouse, and the spatial information of described data space planning scheme for inquiring about, adding up, described in overlay analysis.
CN201510703352.8A 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval Active CN105354267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510703352.8A CN105354267B (en) 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510703352.8A CN105354267B (en) 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval

Publications (2)

Publication Number Publication Date
CN105354267A true CN105354267A (en) 2016-02-24
CN105354267B CN105354267B (en) 2019-04-12

Family

ID=55330240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510703352.8A Active CN105354267B (en) 2015-10-23 2015-10-23 The method for realizing polymorphic type programme " more rule unifications " Electronic approval

Country Status (1)

Country Link
CN (1) CN105354267B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106157216A (en) * 2016-06-29 2016-11-23 贵州北斗空间信息技术有限公司 A kind of spatial information data management method and system
CN106933987A (en) * 2017-02-21 2017-07-07 广州市城市规划勘测设计研究院 The dynamic updating method and device of a kind of " rule unification more " " figure "
CN106971260A (en) * 2017-03-07 2017-07-21 广州市城市规划勘测设计研究院 " many rule unifications " " figure " Planning preparation achievement inspection method and device
CN107146026A (en) * 2017-05-09 2017-09-08 南京市城市规划编制研究中心 A kind of space planning land used difference automatic synchronization method
CN107516191A (en) * 2017-08-10 2017-12-26 广州市城市规划勘测设计研究院 " more rule unifications " " figure " Project cooperation approval system, method and instrument
CN109829024A (en) * 2019-01-21 2019-05-31 辽宁省国土资源调查规划局 A kind of space planning conflict diagnostic method and system
CN110599024A (en) * 2019-09-05 2019-12-20 广州图测智能科技有限公司 System and method for implementing supervision and evaluation of 'one picture' of homeland space planning
CN112085357A (en) * 2020-08-27 2020-12-15 东南大学 System and method for recognizing and processing important points of conflict of plot planning conditions
CN112529387A (en) * 2020-12-04 2021-03-19 国网天津市电力公司建设分公司 Multi-rule-in-one-based power grid early-stage technology aided decision research method
CN112988788A (en) * 2021-05-20 2021-06-18 四川省林业和草原调查规划院 Method for checking mutation of spatial data in territorial space planning, application system and cloud platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006053179A (en) * 2004-08-09 2006-02-23 Hitachi Ltd Device and method for processing geographic information
CN102043809A (en) * 2009-10-23 2011-05-04 镇江雅迅软件有限责任公司 Spatial database engine system
CN103150614A (en) * 2013-03-26 2013-06-12 武汉大学 Automatic configuration method for land utilization space
CN103150613A (en) * 2013-03-26 2013-06-12 武汉大学 Intelligent optimization method for land utilization layout

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006053179A (en) * 2004-08-09 2006-02-23 Hitachi Ltd Device and method for processing geographic information
CN102043809A (en) * 2009-10-23 2011-05-04 镇江雅迅软件有限责任公司 Spatial database engine system
CN103150614A (en) * 2013-03-26 2013-06-12 武汉大学 Automatic configuration method for land utilization space
CN103150613A (en) * 2013-03-26 2013-06-12 武汉大学 Intelligent optimization method for land utilization layout

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王俊,何正国: """三规合一"基础地理信息平台研究与实践—以云浮市"三规合一"地理信息平台建设为例"", 《新技术应用》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106157216A (en) * 2016-06-29 2016-11-23 贵州北斗空间信息技术有限公司 A kind of spatial information data management method and system
CN106933987A (en) * 2017-02-21 2017-07-07 广州市城市规划勘测设计研究院 The dynamic updating method and device of a kind of " rule unification more " " figure "
CN106933987B (en) * 2017-02-21 2019-10-15 广州市城市规划勘测设计研究院 A kind of dynamic updating method and device of " more rule unifications " " figure "
CN106971260A (en) * 2017-03-07 2017-07-21 广州市城市规划勘测设计研究院 " many rule unifications " " figure " Planning preparation achievement inspection method and device
CN107146026A (en) * 2017-05-09 2017-09-08 南京市城市规划编制研究中心 A kind of space planning land used difference automatic synchronization method
CN107146026B (en) * 2017-05-09 2020-05-19 南京市城市规划编制研究中心 Space planning land difference automatic coordination method
CN107516191A (en) * 2017-08-10 2017-12-26 广州市城市规划勘测设计研究院 " more rule unifications " " figure " Project cooperation approval system, method and instrument
CN109829024A (en) * 2019-01-21 2019-05-31 辽宁省国土资源调查规划局 A kind of space planning conflict diagnostic method and system
CN110599024A (en) * 2019-09-05 2019-12-20 广州图测智能科技有限公司 System and method for implementing supervision and evaluation of 'one picture' of homeland space planning
CN112085357A (en) * 2020-08-27 2020-12-15 东南大学 System and method for recognizing and processing important points of conflict of plot planning conditions
CN112529387A (en) * 2020-12-04 2021-03-19 国网天津市电力公司建设分公司 Multi-rule-in-one-based power grid early-stage technology aided decision research method
CN112988788A (en) * 2021-05-20 2021-06-18 四川省林业和草原调查规划院 Method for checking mutation of spatial data in territorial space planning, application system and cloud platform

Also Published As

Publication number Publication date
CN105354267B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN105354267A (en) Method for realizing ''more rules one'' electronic approval of multi-type planning scheme
Agugiaro et al. The Energy Application Domain Extension for CityGML: enhancing interoperability for urban energy simulations
CN112084243B (en) Method, device and storage medium for constructing homeland space planning' one-map
Fabbri et al. Heritage buildings and energy performance: Mapping with GIS tools
CN105022769A (en) Data interaction system of urban underground pipeline, and method thereof
CN104408564A (en) Digital water resource system
CN109658510B (en) Substation site selection method, device and server
CN101853305A (en) Method for establishing comprehensive agricultural environmental information database
CN101593210A (en) A kind of demographic method and system that improve spatial resolution and renewal speed
CN102842072A (en) Town cadastre management method and system
CN101286210A (en) Populace space distribution numerical simulation system
CN103177103A (en) Three-dimensional geographical information system management platform
CN101477549A (en) Knowledge base supported spatial database design method
Chognard et al. Digital construction permit: A round trip between GIS and IFC
Ladu The role of city dashboards in managing public real estate in Italy: Proposals for a conceptual framework
Chen et al. Intelligent management information system of urban planning based on GIS
Tornberg et al. A GIS energy model for the building stock of Goteborg
Ezekwem Environmental information modeling: An integration of Building Information Modeling and Geographic Information Systems for lean and green developments
Brisaboa et al. Collecting and publishing large multiscale geographic datasets
Herzig A GIS-based module for the multiobjective optimization of areal resource allocation
Eicker et al. On The Design Of An Urban Modeling Platform And Its Application For A New York District Analysis
CN108170720A (en) Plan display system
Yang et al. A review on resilient cities research from the perspective of territorial spatial planning: a bibliometric analysis
Truong et al. GIS application to build models for exploitation of land use planning databases
Hu et al. Dynamo conversion of traffic information management from GIS to BIM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510000 R&D Building, 1/F 102, Oubit Science Park, No. 1 Baisha Road, Tangjiawan Town, Haizhu District, Zhuhai City, Guangdong Province

Applicant after: Guangdong Eyu intelligent Survey Technology Co., Ltd.

Address before: 510665 Room 501, 69 Second Society Yongbian Road, Tangxia, Tianhe District, Guangzhou City, Guangdong Province

Applicant before: GUANGZHOU HUIYU INTELLIGENT SURVEY TECHNOLOGY CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CI03 Correction of invention patent

Correction item: Applicant|Address

Correct: Guangdong Eyu intelligent Survey Technology Co., Ltd.|510000 R&D Building, 1/F 102, Obit Science Park, No. 1 Baisha Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province

False: Guangdong Eyu intelligent Survey Technology Co., Ltd.|510000 R&D Building, 1/F 102, Obit Science Park, No. 1 Baisha Road, Tangjiawan Town, Haizhu District, Guangdong Province

Number: 13-01

Volume: 35

CI03 Correction of invention patent