CN105335897A CN201510523839.8A CN201510523839A CN105335897A CN 105335897 A CN105335897 A CN 105335897A CN 201510523839 A CN201510523839 A CN 201510523839A CN 105335897 A CN105335897 A CN 105335897A
Authority
CN
China
Prior art keywords
region
distribution network
grid
planning
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510523839.8A
Other languages
Chinese (zh)
Inventor
冯兆飞
陈学民
吴树茂
郑建春
杜彬
王玉磊
刘子华
陈勇强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510523839.8A priority Critical patent/CN105335897A/en
Publication of CN105335897A publication Critical patent/CN105335897A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a stepped type grid division method for a power distribution network. A planning sequence comprises five layers of a large region, a medium region, small regions, a power supply sub-region and grids, wherein the large region is formed according to administrative regions, regional economic development conditions and overhauling ranges of local operation and maintenance teams; the medium region is formed mainly according to trunk roads, industrial types, administrative ranks and current-state power grid maturity; the plurality of small regions are formed according to urban function region layouts, power supply ranges of transformer substations, roads and rivers, and industrial structures; a classification grid operation of the power supply region is performed in combination with an overall regional planning situation according to <<technical guide for power distribution network planning design>>; and each small region is divided into the plurality of grids according to construction land usage properties, development depths, load types and town roads.

Description

A kind of staged power distribution network Meshing Method
Technical field
The invention belongs to transmission line of electricity technical field, especially a kind of staged power distribution network Meshing Method.
Background technology
Current power distribution network stress and strain model neither one is unified, the division principle of specification, and level is clear and definite not, going forward one by one property is perfect not, and irrational differentiation will be unfavorable for analysis and the management of power distribution network.Planing method can not meet the requirement that world-class local transmission network is built in the degree of depth, granularity simultaneously, and program results directiveness is not strong simultaneously, gives prominence to and is reflected in 10 kilovolts of aspects.Specific as follows:
Area principle disunity.The foundation that current division principle neither one is reasonable, unified, can not provide the scope that accurate and suitable.
The planning degree of depth is not enough.Current distribution network planning in As-Is analysis mainly 10 KVs load factor, in dressing amount etc., the not profound supply path of circuit analysis one by one, line construction, contact situation etc.; The mode standard of target net is mainly proposed in target net, inreal establishing target rack.
Planning granularity is thicker.Current distribution network planning mainly lays particular emphasis on total amount in As-Is analysis, balance of electric power and ener etc., and non-layering and zoning is careful carries out; Planning simultaneously adopts unified or substantially unified standard and pattern, and consider less to the difference of user's request in difference in functionality district, present situation operation situation, thus specific aim is not enough.
Program results directiveness is not strong.Current program results is the power network construction project of 2 years from now on and the construction retrofit quantities of the five-year mainly, and the achievement of part distribution network planning proposes target net, but how does not provide present situation rack to target net transition.
Summary of the invention
The object of the invention is to overcome prior art deficiency, a kind of staged power distribution network Meshing Method effectively instructing power network development direction is provided.
The technical solution used in the present invention is:
A kind of staged power distribution network Meshing Method, its planning order is divided into great Qu, Zhong Qu, community, power supply zone, grid five layers successively, wherein,
Great Qu: divide according to administrative region, regional economic development situation and the local Yun Jian teams and groups scope of repair;
Middle district: Main Basis turnpike road, industry type, administrative grade, present situation electrical network degree of ripeness divide;
Community: be divided into several communities according to urban function region layout, transformer station's service area, road river, the industrial structure;
Service area: carry out service area's classification grid in conjunction with regional general plan situation according to " distribution network planning designing technique directive/guide ":
Grid: each microzonation is divided into several grids according to construction land character, Exploitation Depth, load type, town road.
Advantage of the present invention and good effect are:
1, the present invention establishes power distribution network grid division principle first at home, defines and instructs specification, has made the space layout of layering and zoning, have employed stepped zoned format, makes that subregion is more structured, level, is convenient to analyze.Reach the object based on gridding space layout, science, orderly " great Qu " that make, " middle district ", " community ", " power supply zone ", the space layout of " grid ", for follow-up pool, lean management provide zone of reasonableness simultaneously.
2, the invention provides staged power distribution network grid division principle, be conducive to strengthening distribution network construction transformation dynamics, the world-class urban power distribution network of Accelerating The Construction, strengthen fine-grained management, strengthen planning to lead and directive function, the resources allocation ability of General Promotion electrical network, safety and stability level and efficiency of economic operations, plan as a whole each specialty, unifiedly deal with problems and then ensure landing and effect of planning.According to the requirement on strengthening basis, precisely investment, lean management, plan as a whole capital construction, technological transformation, major repair project, improve scientific, the standardized level of distribution network construction transformation.
3, the present invention is on the basis of staged power distribution network grid planning principles; follow the theory of " do reality, run business into particular one, do deeply "; according to the mode of " from bottom to top "; with plot need for electricity for guiding; sort out according to the plot of regional regulatory control to different land use character and Exploitation Depth; in conjunction with load prediction; according to the Planning Standard of differentiation; 10 kilovolts of rack layouts are carried out in subregion; plan as a whole the contents such as distribution technological transformation, robotization, communication, relaying configuration; and extend to route, final form diversification program results, and plan with regional development and effectively dock.
Embodiment
Below by embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of staged power distribution network Meshing Method, its planning order is divided into great Qu, Zhong Qu, community, power supply zone, grid five layers successively, wherein,
Great Qu: divide according to administrative region, regional economic development situation and the local Yun Jian teams and groups scope of repair;
Middle district: Main Basis turnpike road, industry type, administrative grade, present situation electrical network degree of ripeness divide;
Community: be divided into several communities according to urban function region layout, transformer station's service area, road river, the industrial structure;
Service area: according to correlation technique clause requirement in " distribution network planning designing technique directive/guide " (Q/GDW738-2012), carries out service area's classification grid in conjunction with regional general plan situation:
Grid: each microzonation is divided into several grids according to construction land character, Exploitation Depth, load type, town road.
Wherein, the suitable object of planning and engineering philosophy are formulated in the division of service area, suit measures to local conditions to carry out distribution network planning and construction retrofit.Division of the power supply area should unifiedly under provincial company instructs be carried out.The load density in division of the power supply area Main Basis administrative grade or planning level year, also can determine with reference to factors such as economic development level, user's significance level, electricity consumption level, GDP.
Although disclose embodiments of the invention for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the present invention and claims, various replacement, change and amendment are all possible, therefore, scope of the present invention is not limited to the content disclosed in embodiment.

Claims (1)

1. a staged power distribution network Meshing Method, is characterized in that: its planning order is divided into great Qu, Zhong Qu, community, power supply zone, grid five layers successively, wherein,
Great Qu: divide according to administrative region, regional economic development situation and the local Yun Jian teams and groups scope of repair;
Middle district: Main Basis turnpike road, industry type, administrative grade, present situation electrical network degree of ripeness divide;
Community: be divided into several communities according to urban function region layout, transformer station's service area, road river, the industrial structure;
Service area: carry out service area's classification grid in conjunction with regional general plan situation according to " distribution network planning designing technique directive/guide ":
Grid: each microzonation is divided into several grids according to construction land character, Exploitation Depth, load type, town road.
CN201510523839.8A 2015-08-24 2015-08-24 Stepped type grid division method for power distribution network Pending CN105335897A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510523839.8A CN105335897A (en) 2015-08-24 2015-08-24 Stepped type grid division method for power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510523839.8A CN105335897A (en) 2015-08-24 2015-08-24 Stepped type grid division method for power distribution network

Publications (1)

Publication Number Publication Date
CN105335897A true CN105335897A (en) 2016-02-17

Family

ID=55286408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510523839.8A Pending CN105335897A (en) 2015-08-24 2015-08-24 Stepped type grid division method for power distribution network

Country Status (1)

Country Link
CN (1) CN105335897A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251064A (en) * 2016-07-28 2016-12-21 国网江苏省电力公司镇江供电公司 Power distribution network dispatching and monitoring method based on gridding
CN109389317A (en) * 2018-10-23 2019-02-26 国网天津市电力公司 A kind of power distribution network visual presentation method
CN109659935A (en) * 2018-12-29 2019-04-19 深圳供电局有限公司 A kind of power network resources grid-based management method
CN110458414A (en) * 2019-07-16 2019-11-15 深圳供电局有限公司 A kind of urban power distribution network Meshing Method and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251064A (en) * 2016-07-28 2016-12-21 国网江苏省电力公司镇江供电公司 Power distribution network dispatching and monitoring method based on gridding
CN109389317A (en) * 2018-10-23 2019-02-26 国网天津市电力公司 A kind of power distribution network visual presentation method
CN109659935A (en) * 2018-12-29 2019-04-19 深圳供电局有限公司 A kind of power network resources grid-based management method
CN110458414A (en) * 2019-07-16 2019-11-15 深圳供电局有限公司 A kind of urban power distribution network Meshing Method and system

Similar Documents

Publication Publication Date Title
Cheng et al. Operation challenges for fast-growing China's hydropower systems and respondence to energy saving and emission reduction
CN107742167A (en) The accurate planing method of middle voltage distribution networks based on three layers of macroscopical networking constraint
CN107038530A (en) A kind of power distribution network overall planning method and system
CN105205611A (en) Mesh generation method for power distribution network meshing planning
CN105335897A (en) Stepped type grid division method for power distribution network
CN105303259A (en) Gridding concept based power distribution network planning management method
CN105046449A (en) Evaluation method based on gridding power distribution network
CN101984533A (en) Method for assessing power distribution reliability of large-scale medium-voltage distribution network based on modes
CN111950106A (en) Power supply grid and unit optimization partitioning method based on global overall planning
CN110119888A (en) A kind of active gridding planing method based on distributed generation resource access
CN109447465A (en) A kind of power distribution network planning scheme evaluation method based on collaboration optimization Performance Coefficient
CN103107547A (en) Reactive compensation differentiation collocation method of 10kV distribution lines
CN105096019A (en) Provincial level power grid layering and partitioning typical power supply mode planning method
CN109978295A (en) A kind of lean decision system of data-driven power distribution network
CN107133748A (en) A kind of electric power Corridor planning method based on GIS information datas
CN110427392A (en) A kind of power distribution network grid-based management information system based on cloud platform
CN109858687A (en) Logistics corridor planing method under the conditions of a kind of large scale based on logistics demand
CN103793757A (en) Hierarchical modular power network planning scheme optimization method
CN112329991B (en) Subway power supply system double-layer planning model construction method based on resource sharing
CN107563591A (en) A kind of regional distribution network based on unit style builds priority computational methods
CN105224993A (en) A kind of substation planning method optimized power distribution network and run
CN202705984U (en) Combined flood-preventing optimized scheduling system for cascade reservoir group
CN108876103A (en) District power network planning scheme comparison method based on voltage class sequence measures of effectiveness
CN115619139A (en) Method, system, device and medium for calculating net load of source network load storage hierarchical partition
Zhang et al. A novel inter-country integrated power generation-transmission expansion planning model: case study on North-east Asia

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160217