CN110119888A - A kind of active gridding planing method based on distributed generation resource access - Google Patents

A kind of active gridding planing method based on distributed generation resource access Download PDF

Info

Publication number
CN110119888A
CN110119888A CN201910335583.6A CN201910335583A CN110119888A CN 110119888 A CN110119888 A CN 110119888A CN 201910335583 A CN201910335583 A CN 201910335583A CN 110119888 A CN110119888 A CN 110119888A
Authority
CN
China
Prior art keywords
planning
grid
gridding
distributed generation
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910335583.6A
Other languages
Chinese (zh)
Inventor
袁颖
赵婷婷
郑伟民
李建明
徐驰名
雷瑾
陈逸川
曾飞
郭正欣
梁铭
张占凯
师玉东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Guodian Electric Power Science And Technology Development Co Ltd
Original Assignee
Hangzhou Guodian Electric Power Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Guodian Electric Power Science And Technology Development Co Ltd filed Critical Hangzhou Guodian Electric Power Science And Technology Development Co Ltd
Priority to CN201910335583.6A priority Critical patent/CN110119888A/en
Publication of CN110119888A publication Critical patent/CN110119888A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of active gridding planing methods based on distributed generation resource access, comprising the following steps: economy, power supply and power grid status in S1, analysis planning region;S2, gridding division is carried out to planning region, determines the powered types object of planning in each grid;S3: prediction is respectively powered electricity needs and distributed generation resource in grid in distant view year, influence of the analysis distribution formula plant-grid connection to load prediction;S4: according to electricity needs and distributed generation resource prediction result, the distribution net gridding programme under a variety of scenes is determined;S5: analysis power grid distributed generation resource digestion capability status formulates transition rack scheme;S6: active gridding planning investment and Effect on construction are analyzed.The application is worked out by stock assessment, consumption analysis, target and the transition rack to distributed generation resource, is realized while ensureing that power distribution network is orderly built, and for " access entirely, totally disappeared and receive " of distributed generation resource, promotes new energy and electric network coordination development.

Description

A kind of active gridding planing method based on distributed generation resource access
Technical field
The present invention relates to electric power network technique fields, advise more particularly, to a kind of active gridding based on distributed generation resource access The method of drawing.
Background technique
Demand with the mankind to the energy increasingly increases and exhaustion, the development of new energy increasingly of traditional fossil energy obtain It greatly develops, photovoltaic is that the distributed generation resource grid-connected project of representative growth at full speed occurs in a distributed manner in recent years.Largely Distributed generation resource it is grid-connected can bring tremendous influence to the planning operation of power distribution network, existing distribution net gridding planning is only examined The one-way flow of the direction of energy is considered, has lacked and analysis method and technological means are accessed to distributed generation resource, lead to power distribution network grid Energy development demand of new generation can not have been adapted to by changing planning.
Summary of the invention
The object of the present invention is to provide a kind of active gridding planing methods based on distributed generation resource access, in existing net On the basis of lean of formatting analysis, analyzed by the stock assessment to distributed generation resource, consumption, target and transition rack system It orders, while having ensured that power distribution network is orderly built, realizes distribution network planning " accessing, totally disappeared entirely for distributed generation resource Receive ", promote new energy and electric network coordination development.
Foregoing invention purpose of the invention has the technical scheme that
A kind of active gridding planing method based on distributed generation resource access, comprising the following steps:
Economy, power supply and power grid status in S1, analysis planning region;
S2, gridding division is carried out to planning region, determines the powered types object of planning in each grid;
S3: prediction is respectively powered electricity needs and distributed generation resource in grid in distant view year, and analysis distribution formula plant-grid connection is pre- to load The influence of survey;
S4: according to electricity needs and distributed generation resource prediction result, the distribution net gridding programme under a variety of scenes is determined;
S5: analysis power grid distributed generation resource digestion capability status formulates transition rack scheme;
S6: active gridding planning investment and Effect on construction are analyzed.
The present invention is further arranged to: in step S1, comprising the following steps:
Socio-economic development history and planning situation in A1, analysis planning region;
Power grid overview in A2, analysis planning standard year planning region;
There are problems for distributed generation resource development and power grid in A3, analysis planning region.
The present invention is further arranged to: distributed generation resource development and power grid, which exist, in step A3, in analysis planning region asks Topic, the specific method is as follows:
Distributed generation resource general situation of development in B1, comprehensive examination planning standard year planning region;
Polynary load condition in B2, analysis planning region;
B3, main problem existing for power distribution network in planning region is analyzed according to voltage class.
The present invention is further arranged to: in step S2, being included the following steps:
C1, the relative independentability for considering region, rack integrality, administrative convenience requirement, according to target net, clear, power grid is advised Mould appropriateness, the specific principle of management responsibility draw planning region according to the city regulatory control unit of government's publication or the boundary in small towns It is divided into several power supply grids;
C2, according to distribution network planning designing technique directive/guide, the affiliated subregion of each power supply grid is determined, according to sub-zone dividing knot Fruit formulates the Electric Power Network Planning target of each power supply grid.
The present invention is further arranged to: in step S3, comprising the following steps:
D1, according to power supply grid in developing stage and industry nature, using prediction technique carry out distant view year power supply grid in year Load prediction, the prediction technique include load density method, natural growth method;
D2, each domestic-investment source situation of power supply grid of analysis, assessment distant view year, all types of distributed generation resources developed total amount;
D3, according to each power supply grid internal loading and all kinds of distributed generation resource power producing characteristics, analyze the credible of all kinds of distributed generation resources The influence of power output and access power grid to load prediction;
D4, according to load and all kinds of distributed electrical source time coupling results, when obtaining peak load, minimum distributed generation resource scene Electric network swim distribution, minimum load, maximum distribution formula power supply scene when electric network swim be distributed.
The present invention is further arranged to: in step S4, comprising the following steps:
E1, it is planned in conjunction with electric power demand forecasting as a result, carrying out distribution net gridding, determines preliminary planning scheme,
E2, in conjunction with electricity needs and distributed generation resource prediction result, carry out the distribution net gridding programme under a variety of scenes Verification, optimization planning scheme.
The present invention is further arranged to: determining preliminary planning scheme, comprising the following steps:
F1, on the basis of each power supply mesh space load prediction, in conjunction with power grid and electricity needs status, with higher level's Electric Power Network Planning For boundary condition, building saturation year target net;
F2,10 kilovolts of standard wiring group quantity and higher level's power supply power supply point quantity in grid of respectively powering in distant view year are determined.
The present invention is further arranged to: according to the contextual model determined in step S3, preliminary planning scheme verified, The following steps are included:
G1, peak load, minimum distributed generation resource boundary condition the most are chosen, trend point is carried out to target net in power supply grid Whether analysis, test-target rack meet distribution network planning directive/guide requirement, such as meet the requirements, then target net passes through;Such as it is unsatisfactory for It is required that specific aim adjusts target net, and target net adjusted is verified again, until meeting the requirements;
G2, minimum load, maximum distribution formula power supply boundary condition the most are chosen, trend point is carried out to target net in power supply grid Whether analysis, test-target rack meet distribution network planning and distributed generation resource access directive/guide requirement, such as meet the requirements, then target network Frame passes through;It being such as unsatisfactory for requiring, specific aim adjusts target net, and verifies again to target net adjusted, until It meets the requirements.
The present invention is further arranged to: in step S5, comprising the following steps:
H1, on the basis of recent load development level, according to substation build timing, plan as a whole substation's interval resource distribution, Science formulates status power grid to the transition scheme of target net;
H2, status power grid distributed generation resource maximum access capability in power supply grid is analyzed, calculates power supply grid power grid point Cloth power supply maximum can dissolve level;Developed according to distributed generation resource, optimization transition scheme builds timing.
The present invention is further arranged to: in step S5, according to power distribution network mature degree, being built to planning built-up areas, planning If area and organic growth area, subnetting lattice formulate transition rack using differentiation planning strategy, comprising the following steps:
R1, planning built-up areas in, for having formed the power supply unit of standard wiring, according to the least principle of revamping workload gradually to Cable ring-system, three contact target net transition of aerial three segmentation;Net that is complicated for grid structure, not yet forming standard wiring Lattice, appropriateness simplify connections mode, cancel redundancy contact and segmentation, and disposable transformation is completed;
R2, in planning construction area, on the basis of solidifying the existing line method of operation, in conjunction with substation's resource, user power utilization The factors such as timing, municipal accessory cables ditch construction situation, medium-voltage line utilization rate are minimum according to investment, later period construction waste is minimum Principle gradually to cable ring-system, aerial three segmentations, two contact or simply connected network diagram frame transition, grid of having ready conditions according to target build by rack If;R3, in organic growth area, urban planning wouldn't be defined, can not determine the grid of load growth point, it is single according to power supply Status power grid assessment result in member, emphasis solve power grid outstanding problem, promote short slab index, and combine load development, structure Build the standards wiring such as Single-ring network, three segmentations, two contact or simply connected network.
The present invention is further arranged to: in step S6, active gridding planning investment and Effect on construction in project period are analyzed, Include:
P1, list active gridding construction project, to construction project carry out investment estimate, list needs subitem investment and Gross investment, wherein to being listed year by year in the recent period;
P2, analysis power distribution network the status key technical index of problems for solving situation, active gridding construction;
The economic benefit that P3, the active gridding of analysis are built;
The social benefit that P4, the active gridding of analysis are built.
Compared with prior art, advantageous effects of the invention are as follows:
1. the application is analyzed by the stock assessment to distributed generation resource, consumption, target and transition rack are worked out, and are matched having ensured While power grid is orderly built, realize that distribution network planning for " access entirely, totally disappeared and receive " of distributed generation resource, promotes new energy Develop with electric network coordination;
2. further, the application is horizontal by analysis status power grid, collecting zone administration and new energy development plan;According to negative Region division is different grids by lotus level, using grid as unit estimation range new energy and electricity needs, carries out gridding Planning;3. further, the application carries out school to Electric Power Network Planning achievement by the multiple scenarios method after combining photovoltaic access Test analysis, it is ensured that power grid meets the safety operation level under most harsh conditions;
4. further, the application proposes transition rack scheme by assessment area maximum photovoltaic digestion capability;Ultimate analysis has Source gridding planning investment and Effect on construction, assessment planning effect.
Detailed description of the invention
Fig. 1 is the flowage structure schematic diagram of a specific embodiment of the invention.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of active gridding planing method based on distributed generation resource access, as shown in Figure 1, comprising the following steps:
Economy, power supply and power grid status in S1, analysis planning region;
S2, gridding division is carried out to planning region, determines the powered types object of planning in each grid;
S3: prediction is respectively powered electricity needs and distributed generation resource in grid in distant view year, and analysis distribution formula plant-grid connection is pre- to load The influence of survey;
S4: according to electricity needs and distributed generation resource prediction result, the distribution net gridding programme under a variety of scenes is determined;
S5: analysis power grid distributed generation resource digestion capability status formulates transition rack scheme;
S6: active gridding planning investment and Effect on construction are analyzed.
It is described active to refer to distributed generation resource.
In the specific embodiment of the application, in step S1, comprising the following steps:
Socio-economic development history and planning situation in A1, analysis planning region;It include: population size, urbanization rate, domestic life Produce total value (GDP) and the industrial structure etc..
Power grid overview in A2, analysis planning standard year planning region;It include: power supply area type, powering area, power supplier Mouth, whole society's maximum power load, Analyzing Total Electricity Consumption, electricity sales amount, capacity-load ratio, power supply reliability, comprehensive line loss per unit, comprehensive electricity Press qualification rate etc..
There are problems for distributed generation resource development and power grid in A3, analysis planning region, specifically, comprising the following steps:
Distributed generation resource general situation of development in B1, comprehensive examination planning standard year planning region;Include: resource situation, power supply type, Power supply scale, access voltage class, annual electricity generating capacity etc..
Polynary load condition in B2, analysis planning region;It can join including conventional electric power load and energy storage, electric car etc. The novel electric power load condition adjusted with power grid.
B3, main problem existing for power distribution network in planning region is analyzed according to voltage class, comprising: distributed generation resource access With consumption, grid structure, power supply capacity, equipment, power distribution automation, terminal communication access net, power distribution network management, construction ring The problem of border etc..
In the specific embodiment of the application, in step S2, include the following steps:
C1, the relative independentability for considering region, rack integrality, administrative convenience requirement, according to target net, clear, power grid is advised Mould appropriateness, the specific principle of management responsibility draw planning region according to the city regulatory control unit of government's publication or the boundary in small towns It is divided into several power supply grids;Specifically, generally corresponding with regulatory control unit in urban district and county domain core space power supply grid, in county domain Other block supply grids are generally corresponding with small towns.C2, according to distribution network planning designing technique directive/guide, determine each power supply grid Affiliated subregion, according to sub-zone dividing as a result, formulating the Electric Power Network Planning target of each power supply grid.For different subregions, The object of planning is as shown in table 1.
The object of planning of all types of power supply grids of table 1
In the specific embodiment of the application, in step S3, comprising the following steps:
D1, according to power supply grid in developing stage and industry nature, using predictions sides such as load density method, natural growth methods Method carries out yearly peak load in distant view year power supply grid;
D2, each domestic-investment source situation of power supply grid of analysis assess all types of distributed generation resources in distant view year power supply grid and develop total amounts, Resource includes that solar energy, wind energy, biomass energy, natural gas etc. are carried out distributed generation resource and predicted according to resource situation, Jin Erping Estimate all types of distributed generation resources in distant view year power supply grid and develops total amount;
D3, according to each power supply grid internal loading and all kinds of distributed generation resource power producing characteristics, analyze the credible of all kinds of distributed generation resources The influence of power output and access power grid to load prediction;
D4, according to load and all kinds of distributed electrical source time coupling results, when obtaining peak load, minimum distributed generation resource scene Electric network swim distribution, minimum load, maximum distribution formula power supply scene when electric network swim be distributed.
In the specific embodiment of the application, in step S4, according to electricity needs and distributed generation resource prediction result, really Distribution net gridding programme under fixed a variety of scenes, comprising the following steps:
E1, it is planned in conjunction with electric power demand forecasting as a result, carrying out distribution net gridding, determines preliminary planning scheme,
E2, in conjunction with electricity needs and distributed generation resource prediction result, carry out the distribution net gridding programme under a variety of scenes Verification, optimization planning scheme.
Specifically, it is determined that preliminary planning scheme, comprising the following steps:
F1, on the basis of each power supply mesh space load prediction, in conjunction with power grid and electricity needs status, with higher level's Electric Power Network Planning For boundary condition, building saturation year target net;
F2,10 kilovolts of standard wiring group quantity and higher level's power supply power supply point quantity in grid of respectively powering in distant view year are determined.
Specifically, should form 10 kilovolts of standard wiring groups of 1-3 group in distant view year each grid, each grid in principle preferably by 2 higher level's power supply point power supplies.
To meet distribution network planning for the object of planning of " access entirely, totally disappeared and receive " of distributed generation resource, power distribution network should be able to Meet the safe operation standard under most harsh conditions, according to the contextual model determined in step S3, preliminary planning scheme is carried out Verification, the following steps are included:
G1, peak load, minimum distributed generation resource boundary condition the most are chosen, trend point is carried out to target net in power supply grid Whether analysis, test-target rack meet distribution network planning directive/guide requirement, such as meet the requirements, then target net passes through;Such as it is unsatisfactory for It is required that specific aim adjusts target net, and target net adjusted is verified again, until meeting the requirements;
G2, minimum load, maximum distribution formula power supply boundary condition the most are chosen, trend point is carried out to target net in power supply grid Whether analysis, test-target rack meet distribution network planning and distributed generation resource access directive/guide requirement, such as meet the requirements, then target network Frame passes through;It being such as unsatisfactory for requiring, specific aim adjusts target net, and verifies again to target net adjusted, until It meets the requirements.
In the specific embodiment of the application, in step S5, comprising the following steps:
H1, on the basis of recent load development level, according to substation build timing, plan as a whole substation's interval resource distribution, Science formulates status power grid to the transition scheme of target net;
H2, status power grid distributed generation resource maximum access capability in power supply grid is analyzed, calculates power supply grid power grid point Cloth power supply maximum can dissolve level;Developed according to distributed generation resource, optimization transition scheme builds timing.
In the specific embodiment of the application, in step S5, according to power distribution network mature degree, to planning built-up areas, Planning construction area and organic growth area, subnetting lattice formulate transition rack using differentiation planning strategy, comprising the following steps:
R1, planning built-up areas in, for having formed the power supply unit of standard wiring, according to the least principle of revamping workload gradually to Cable ring-system, three contact target net transition of aerial three segmentation;Net that is complicated for grid structure, not yet forming standard wiring Lattice, appropriateness simplify connections mode, cancel redundancy contact and segmentation, and disposable transformation is completed;
R2, in planning construction area, on the basis of solidifying the existing line method of operation, in conjunction with substation's resource, user power utilization The factors such as timing, municipal accessory cables ditch construction situation, medium-voltage line utilization rate are minimum according to investment, later period construction waste is minimum Principle gradually to cable ring-system, aerial three segmentations, two contact or simply connected network diagram frame transition, grid of having ready conditions according to target build by rack If;R3, in organic growth area, urban planning wouldn't be defined, can not determine the grid of load growth point, it is single according to power supply Status power grid assessment result in member, emphasis solve power grid outstanding problem, promote short slab index, and combine load development, structure Build the standards wiring such as Single-ring network, three segmentations, two contact or simply connected network.
In the specific embodiment of the application, in step S6, analyzes active gridding planning investment in project period and build It is set as imitating, comprising:
P1, list active gridding construction project, to construction project carry out investment estimate, list needs subitem investment and Gross investment, wherein to being listed year by year in the recent period;Construction project, including it is project name, construction scale of projects, quantity, constructive Matter, is gone into operation time etc. at the time that goes into operation;
P2, analysis power distribution network the status key technical index of problems for solving situation, active gridding construction;Including distribution Formula power supply permeability, power supply reliability, capacity-load ratio, integrated voltage qualification rate etc.;
The economic benefit that P3, the active gridding of analysis are built, the increasing including specific investment cost is for load, increasing power supply volume, investment return Deng;P4, the social benefit, including distributed generation resource consumption level, energy-saving and emission-reduction level of the active gridding construction of analysis etc..
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of active gridding planing method based on distributed generation resource access, it is characterised in that: the following steps are included:
Economy, power supply and power grid status in S1, analysis planning region;
S2, gridding division is carried out to planning region, determines the powered types object of planning in each grid;
S3: prediction is respectively powered electricity needs and distributed generation resource in grid in distant view year, and analysis distribution formula plant-grid connection is pre- to load The influence of survey;
S4: according to electricity needs and distributed generation resource prediction result, the distribution net gridding programme under a variety of scenes is determined;
S5: analysis power grid distributed generation resource digestion capability status formulates transition rack scheme;
S6: active gridding planning investment and Effect on construction are analyzed.
2. active gridding planing method according to claim 1, it is characterised in that: in step S1, comprising the following steps:
Socio-economic development history and planning situation in A1, analysis planning region;
Power grid overview in A2, analysis planning standard year planning region;
There are problems for distributed generation resource development and power grid in A3, analysis planning region.
3. active gridding planing method according to claim 1, it is characterised in that: in step S2, include the following steps:
C1, the relative independentability for considering region, rack integrality, administrative convenience requirement, according to target net, clear, power grid is advised Mould appropriateness, the specific principle of management responsibility draw planning region according to the city regulatory control unit of government's publication or the boundary in small towns It is divided into several power supply grids;
C2, according to distribution network planning designing technique directive/guide, the affiliated subregion of each power supply grid is determined, according to sub-zone dividing knot Fruit formulates the Electric Power Network Planning target of each power supply grid.
4. active gridding planing method according to claim 1, it is characterised in that: in step S3, comprising the following steps:
D1, according to power supply grid in developing stage and industry nature, using prediction technique carry out distant view year power supply grid in year Load prediction, the prediction technique include load density method, natural growth method;
D2, each domestic-investment source situation of power supply grid of analysis, assessment distant view year, all types of distributed generation resources developed total amount;
D3, according to each power supply grid internal loading and all kinds of distributed generation resource power producing characteristics, analyze the credible of all kinds of distributed generation resources The influence of power output and access power grid to load prediction;
D4, according to load and all kinds of distributed electrical source time coupling results, when obtaining peak load, minimum distributed generation resource scene Electric network swim distribution, minimum load, maximum distribution formula power supply scene when electric network swim be distributed.
5. active gridding planing method according to claim 1, it is characterised in that: in step S4, comprising the following steps:
E1, it is planned in conjunction with electric power demand forecasting as a result, carrying out distribution net gridding, determines preliminary planning scheme,
E2, in conjunction with electricity needs and distributed generation resource prediction result, carry out the distribution net gridding programme under a variety of scenes Verification, optimization planning scheme.
6. active gridding planing method according to claim 6, it is characterised in that: determine preliminary planning scheme, including Following steps:
F1, on the basis of each power supply mesh space load prediction, in conjunction with power grid and electricity needs status, with higher level's Electric Power Network Planning For boundary condition, building saturation year target net;
F2,10 kilovolts of standard wiring group quantity and higher level's power supply power supply point quantity in grid of respectively powering in distant view year are determined.
7. active gridding planing method according to claim 6, it is characterised in that: according to the scene determined in step S3 Mode verifies preliminary planning scheme, comprising the following steps:
G1, peak load, minimum distributed generation resource boundary condition the most are chosen, trend point is carried out to target net in power supply grid Whether analysis, test-target rack meet distribution network planning directive/guide requirement, such as meet the requirements, then target net passes through;Such as it is unsatisfactory for It is required that specific aim adjusts target net, and target net adjusted is verified again, until meeting the requirements;
G2, minimum load, maximum distribution formula power supply boundary condition the most are chosen, trend point is carried out to target net in power supply grid Whether analysis, test-target rack meet distribution network planning and distributed generation resource access directive/guide requirement, such as meet the requirements, then target network Frame passes through;It being such as unsatisfactory for requiring, specific aim adjusts target net, and verifies again to target net adjusted, until It meets the requirements.
8. active gridding planing method according to claim 1, it is characterised in that: in step S5, comprising the following steps:
H1, on the basis of recent load development level, according to substation build timing, plan as a whole substation's interval resource distribution, Science formulates status power grid to the transition scheme of target net;
H2, status power grid distributed generation resource maximum access capability in power supply grid is analyzed, calculates power supply grid power grid point Cloth power supply maximum can dissolve level;Developed according to distributed generation resource, optimization transition scheme builds timing.
9. active gridding planing method according to claim 1, it is characterised in that: in step S5, sent out according to power distribution network Maturity is opened up, to planning built-up areas, planning construction area and organic growth area, subnetting lattice formulate transition using differentiation planning strategy Rack, comprising the following steps:
R1, planning built-up areas in, for having formed the power supply unit of standard wiring, according to the least principle of revamping workload gradually to Cable ring-system, three contact target net transition of aerial three segmentation;Net that is complicated for grid structure, not yet forming standard wiring Lattice, appropriateness simplify connections mode, cancel redundancy contact and segmentation, and disposable transformation is completed;
R2, in planning construction area, on the basis of solidifying the existing line method of operation, in conjunction with substation's resource, user power utilization The factors such as timing, municipal accessory cables ditch construction situation, medium-voltage line utilization rate are minimum according to investment, later period construction waste is minimum Principle gradually to cable ring-system, aerial three segmentations, two contact or simply connected network diagram frame transition, grid of having ready conditions according to target build by rack If;
R3, in organic growth area, urban planning wouldn't be defined, can not determine the grid of load growth point, according to power supply Status power grid assessment result in unit, emphasis solve power grid outstanding problem, promote short slab index, and combine load development, Construct the standards wiring such as Single-ring network, three segmentations, two contact or simply connected network.
10. a kind of active gridding planing method based on distributed generation resource access according to claim 1, feature exist In: in step S6, analyze active gridding planning investment and Effect on construction in project period, comprising:
P1, list active gridding construction project, to construction project carry out investment estimate, list needs subitem investment and Gross investment, wherein to being listed year by year in the recent period;
P2, analysis power distribution network the status key technical index of problems for solving situation, active gridding construction;
The economic benefit that P3, the active gridding of analysis are built;
The social benefit that P4, the active gridding of analysis are built.
CN201910335583.6A 2019-04-24 2019-04-24 A kind of active gridding planing method based on distributed generation resource access Pending CN110119888A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910335583.6A CN110119888A (en) 2019-04-24 2019-04-24 A kind of active gridding planing method based on distributed generation resource access

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910335583.6A CN110119888A (en) 2019-04-24 2019-04-24 A kind of active gridding planing method based on distributed generation resource access

Publications (1)

Publication Number Publication Date
CN110119888A true CN110119888A (en) 2019-08-13

Family

ID=67521415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910335583.6A Pending CN110119888A (en) 2019-04-24 2019-04-24 A kind of active gridding planing method based on distributed generation resource access

Country Status (1)

Country Link
CN (1) CN110119888A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111160599A (en) * 2019-11-18 2020-05-15 中国电力企业联合会电力建设技术经济咨询中心 Novel power grid planning calculation analysis method
CN111210058A (en) * 2019-12-26 2020-05-29 深圳供电局有限公司 Grid-based power distribution network top-down load prediction information method
CN111900733A (en) * 2020-08-04 2020-11-06 中国能源建设集团广东省电力设计研究院有限公司 Backbone net rack optimization method and system based on power supply and demand matching contour line model
CN113162094A (en) * 2020-12-24 2021-07-23 国网安徽省电力有限公司经济技术研究院 Planning method of hybrid direct-current transmission system
CN113408794A (en) * 2021-06-02 2021-09-17 国网河北省电力有限公司高邑县供电分公司 Power grid planning method for collaborative new energy development
CN114142469A (en) * 2021-12-02 2022-03-04 国网河南省电力公司经济技术研究院 Source network load storage hierarchical economic adaptation method considering multivariate adjusting resources
CN116136988A (en) * 2023-04-19 2023-05-19 国网浙江省电力有限公司宁波供电公司 Space-time compass distribution-based power distribution network power supply grid construction optimization sequencing method
US12027858B2 (en) 2021-07-01 2024-07-02 Robert Bosch Gmbh Distributed control for demand flexibility in thermostatically controlled loads

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111160599A (en) * 2019-11-18 2020-05-15 中国电力企业联合会电力建设技术经济咨询中心 Novel power grid planning calculation analysis method
CN111210058A (en) * 2019-12-26 2020-05-29 深圳供电局有限公司 Grid-based power distribution network top-down load prediction information method
CN111210058B (en) * 2019-12-26 2022-02-08 深圳供电局有限公司 Grid-based power distribution network top-down load prediction information method
CN111900733A (en) * 2020-08-04 2020-11-06 中国能源建设集团广东省电力设计研究院有限公司 Backbone net rack optimization method and system based on power supply and demand matching contour line model
CN113162094A (en) * 2020-12-24 2021-07-23 国网安徽省电力有限公司经济技术研究院 Planning method of hybrid direct-current transmission system
CN113408794A (en) * 2021-06-02 2021-09-17 国网河北省电力有限公司高邑县供电分公司 Power grid planning method for collaborative new energy development
US12027858B2 (en) 2021-07-01 2024-07-02 Robert Bosch Gmbh Distributed control for demand flexibility in thermostatically controlled loads
CN114142469A (en) * 2021-12-02 2022-03-04 国网河南省电力公司经济技术研究院 Source network load storage hierarchical economic adaptation method considering multivariate adjusting resources
CN116136988A (en) * 2023-04-19 2023-05-19 国网浙江省电力有限公司宁波供电公司 Space-time compass distribution-based power distribution network power supply grid construction optimization sequencing method
CN116136988B (en) * 2023-04-19 2023-07-07 国网浙江省电力有限公司宁波供电公司 Space-time compass distribution-based power distribution network power supply grid construction optimization sequencing method

Similar Documents

Publication Publication Date Title
CN110119888A (en) A kind of active gridding planing method based on distributed generation resource access
Luo et al. Optimal coordination of plug-in electric vehicles in power grids with cost-benefit analysis—Part I: Enabling techniques
CN103955777B (en) Photovoltaic generation accesses power distribution network conceptual design and analysis and evaluation accessory system
CN105071389B (en) The alternating current-direct current mixing micro-capacitance sensor optimizing operation method and device of meter and source net load interaction
CN109325608A (en) Consider the distributed generation resource Optimal Configuration Method of energy storage and meter and photovoltaic randomness
CN104836259B (en) Multi-energy resource ship micro-grid real-time energy optimal scheduling method
CN104751246A (en) Active distribution network planning method based on stochastic chance constraint
CN105186570B (en) Micro-capacitance sensor method for controlling power supply and device
CN106684915A (en) Wind-hydrogen coupling power generation system optimization method and device thereof
CN109149651A (en) It is a kind of meter and pressure regulation ancillary service income light-preserved system optimizing operation method
CN113326467B (en) Multi-target optimization method, storage medium and optimization system for multi-station fusion comprehensive energy system based on multiple uncertainties
CN109978404A (en) The passway for transmitting electricity Expansion Planning method that meter and uncertain factor and scene are cut down
CN106529737A (en) Planning and distribution method for peak load regulation power source on supply side of power distribution network
CN102708426B (en) Power supply capacity planning system and method for intelligent community including electric vehicle charging facilities
CN108717608A (en) Million kilowatt beach photovoltaic plant accesses electric network synthetic decision-making technique and system
CN105956693B (en) A kind of virtual plant economic load dispatching method based on distributed gradient algorithm
Zhang et al. Architecture design and demand analysis on application layer of standard system for ubiquitous power Internet of Things
CN105678415A (en) Method for predicting net load of distributed power supply power distribution network
CN102904248A (en) Electric power system dispatching method based on wind electricity output uncertainty aggregation
CN114301089A (en) Energy storage capacity configuration optimization method for wind-solar combined power generation system
CN104167731B (en) A kind of multizone polynary power supply coordinated planning method
CN109829599A (en) The assemblage classification method and device of power distribution network based on high proportion renewable energy
CN109245096A (en) A kind of active distribution network net capability calculation method
Cao et al. Parallel algorithms for islanded microgrid with photovoltaic and energy storage systems planning optimization problem: Material selection and quantity demand optimization
CN106227986A (en) A kind of distributed power source combines dispositions method and device with intelligent parking lot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190813

RJ01 Rejection of invention patent application after publication