CN105318531A - Vertical warming and water heating dual-purpose electric boiler - Google Patents

Vertical warming and water heating dual-purpose electric boiler Download PDF

Info

Publication number
CN105318531A
CN105318531A CN201510836901.9A CN201510836901A CN105318531A CN 105318531 A CN105318531 A CN 105318531A CN 201510836901 A CN201510836901 A CN 201510836901A CN 105318531 A CN105318531 A CN 105318531A
Authority
CN
China
Prior art keywords
water
shell
electric boiler
purpose electric
hot water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510836901.9A
Other languages
Chinese (zh)
Inventor
曹尚生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510836901.9A priority Critical patent/CN105318531A/en
Publication of CN105318531A publication Critical patent/CN105318531A/en
Pending legal-status Critical Current

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The invention discloses a vertical warming and water heating dual-purpose electric boiler. A liner (2) is arranged at the inner end of a shell (1) through an insulation layer (3); a pressure gauge (4), an automatic exhaust valve (5) and a safe pressure relief valve (6) are respectively arranged at the top of the liner (2); heating bodies (13) are arranged at the inner lower end of the liner (2) at equal intervals; an overtemperature protector (7), a water temperature inductor (8) and a water level probe (9) are arranged at the front upper end of the shell (1), and are connected with a control plate (11); the control plate (11) and a main control plate (12) are respectively arranged at the front middle part of the shell (1), and are connected with a main switch (10); and a peak-valley control module (18) is positioned in the main control plate (12). The vertical warming and water heating dual-purpose electric boiler adopts an intelligent silicon conduction frequency conversion module, the peak-valley control module and a nickel chromium alloy heating body, uses a circulating pump and the wide-temperature and movable thermostatic control, is free of heat loss, achieves dual purposes through one machine, greatly improves the heat efficiency, avoids from the power utilization peak, is stable in working performance, is long in service life, is safe, is low in carbon, is environment-friendly, and largely reduces the use cost.

Description

A kind of vertical heating hot water two purpose electric boiler
Technical field: the present invention relates to a kind of one vertical heating hot water two purpose electric boiler being widely used in heating life and bath water and water for industrial use and using.
Background technology: the existing electric boiler commercially used, general utility functions are single, or can only heat, or can only supplying hot water, and heating element is mostly resistance wire, electric conversion rate is low, service behaviour and temperature instability, programming rate is slow and temperature is low, power ubiquity is decayed, and can not be consistent within service life, service life is short, poor stability, wastes the energy.
Summary of the invention: instant invention overcomes the deficiency that prior art exists, provide and adopt Intelligent silicon to lead frequency-variable module, peak valley control module and nichrome calandria, stable work in work, long service life, one machine double-purpose, the one that the thermal efficiency significantly improves vertical heating hot water two purpose electric boiler.
The technical scheme that the present invention is adopted for achieving the above object is: a kind of inner bag 2 of vertical heating hot water two purpose electric boiler is arranged on shell 1 the inner by heat-insulation layer 3; Pressure gauge 4, automatic exhaust steam valve 5 and safety relief valve 6 are separately positioned on inner bag 2 top; calandria 13 is equidistantly arranged on lower end in inner bag 2; overtemperature prote 7, water temperature inductor 8 and water level probe 9 are arranged on the front upper end of shell 1; and be connected with control panel 11; control panel 11 and master control borad 12 are separately positioned on shell 1 front middle part; and be connected with master switch 10, the built-in peak valley control module 18 of master control borad 12.
The invention has the beneficial effects as follows: 1, adopt German MKNT technology, in conjunction with Britain, the high-end Heating, Ventilation and Air Conditioning (HVAC) Technology of the U.S., utilize thermochrome, silicon leads resistance oxygen red copper, the outer silver-plated and die casting aluminium electric heating body of stainless steel 840, surface temperature is balanced, electric energy directly can be converted efficiently to the heat energy in water, directly efficiently, save operating cost, acid and alkali-resistance, electricity separation, heat transfer is fast, long service life.
2, adopt Intelligent silicon to lead frequency-variable module, power divides seven grades of automatic frequency-conversions, fully automatic operation, and configuration is high-grade, easy to operate, quiet pollution-free, clean room temperature, energy-saving safety low-carbon environment-friendly.
3, the one-touch energy-conservation program of peak-trough electricity is set, avoids peak times of power consumption, in low expense work at night, significantly can reduce use cost, energy-efficient; Can realize the control of 24 hours sections, any time section switch, plug and play, sets itself is more energy-conservation.
4, utilize wide temperature, room temperature and water temperature to control, without thermal losses, the thermal efficiency significantly improves, stable work in work, thus realizes overtemperature prote, anti-frost protection, earth leakage protective, dry combustion method protection, excessive low water level protection.
5, heater element adopts the design principle of small-power majority amount, and energy-saving safe is more saved worry, and without thermal losses, thermal efficiency skyer more than 98%, with like product power saving 30-35%; Indoor design is reasonable, and water yield is large, and run continual and steady, strong interference immunity, winter is heating system, and summer is domestic water system.
6, outward appearance adopts the outer casing structure of international popular, and volume is little, lightweight, and profile is exquisite.One machine double-purpose, winter is heating system, and summer is domestic water system.
Accompanying drawing illustrates: Fig. 1 is structural scheme of mechanism of the present invention
Detailed description of the invention: as shown in Figure 1; a kind of inner bag 2 of vertical heating hot water two purpose electric boiler is arranged on shell 1 the inner by heat-insulation layer 3; Pressure gauge 4, automatic exhaust steam valve 5 and safety relief valve 6 are separately positioned on inner bag 2 top; calandria 13 is equidistantly arranged on lower end in inner bag 2; overtemperature prote 7, water temperature inductor 8 and water level probe 9 are arranged on the front upper end of shell 1; and be connected with control panel 11; control panel 11 and master control borad 12 are separately positioned on shell 1 front middle part; and be connected with master switch 10, the built-in peak valley control module 18 of master control borad 12.
As shown in Figure 1, inner bag 2 left end of described a kind of vertical heating hot water two purpose electric boiler arranges heating delivery port 14, water supplement port 15 and heating water return 16 respectively, and pipeline stretches out shell 1 left side, arranges sewage draining exit 17 bottom inner bag 2, sewage draining exit 17 pipeline stretches out shell 1 left side.
As shown in Figure 1, the master switch 10 of described a kind of vertical heating hot water two purpose electric boiler is arranged on shell 1 front middle part and water temperature inductor 8 and water level probe 9 lower end.
As shown in Figure 1, calandria 15 material of described a kind of vertical heating hot water two purpose electric boiler is thermochrome, silicon leads the silver-plated and die casting aluminium of resistance copper, stainless steel 840.
As shown in Figure 1, the master control borad 12 of described a kind of vertical heating/hot water supply electric boiler adopts Intelligent silicon to lead frequency-variable module and peak valley control module.
As shown in Figure 1, the control panel 11 of described a kind of vertical heating hot water two purpose electric boiler adopts PLC Programmable control technology, thus realizes Full-automatic variable-frequency operation function, full menu in Chinese, operational factor Dynamic Announce, easy to operate.
Operation sequence of the present invention is:
One, the operation sequence under electromagnetic valve work state is:
1, off-mode: LED color screen read clock, hot water temperature, indoor temperature, all firing equipments cut out, when hot water temperature being detected less than or equal to 5 degree, system performs antifreeze function, system forced working, first start circulating pump and after 10 seconds, start again first grade of power, stop heating after making hot water temperature reach 15 degree and stop circulating pump.(must be have water, time anhydrous, any load can not be started)
2, first time start, system presses the design temperature work (hot water temperature is 60 degree, and indoor temperature is 16 degree) of acquiescence, system default " winter ", and lights.Power is 7 grades, and the fire-bar on both sides is lighted, and when hot water temperature reaches 60 degree, starts Circulating Pump System, when indoor temperature reaches design temperature, closes Circulating Pump System and heating load.When water temperature is lower than 35 degree, close Circulating Pump System.(water must be had could to start water pump and heating load), start later runs by the design temperature of client.Each boot system is all 7 grades of power work.
3, start Circulating Pump System: first time starts: hot water temperature reaches design temperature, and indoor temperature is less than design temperature, second time starts: hot water temperature is greater than 30 degree, and indoor temperature is less than design temperature." water pump " printed words are lighted.
4, Circulating Pump System is closed: hot water temperature is less than 30 degree, and indoor temperature is more than or equal to design temperature." water pump " printed words go out
5, heating load (heated condition) is started: hot water temperature is less than design temperature, and indoor temperature is less than design temperature." heating " printed words are lighted, and the striation on both sides is glittering.
6, heating load (keeping warm mode) is closed: hot water temperature is more than or equal to design temperature; Or indoor temperature is more than or equal to design temperature." heating " printed words go out, and " insulation " printed words are lighted, the striation Chang Liang on both sides.
7, reheat: hot water temperature is less than or equal to 13 degree of hot water setting temperature, and indoor temperature is less than or equal to 2 degree of setting indoor temperature.
8, automatic frequency-conversion: after setting indoor temperature, if system (was less than or equal to 40 minutes) in 40 minutes when reaching the indoor temperature of setting, when the reheating an of next time, the power of system subtracts one grade automatically, by that analogy, until reduce to first grade; When system (was greater than 40 minutes) and reaches the indoor temperature of setting after 40 minutes, when the reheating an of next time, the power of system adds one grade automatically, by that analogy, until be added to the 7th grade.
9, when user is transformed into " summer " by " winter ", system enters domestic water function.(winter is heating function)
10, domestic water function: system default hot water temperature is set as 80 degree, capacity operation.(temperature and power all fix), water pump does not turn, and has nothing to do with indoor temperature.When hot water temperature reaches 80 degree, enter keeping warm mode, when temperature is less than or equal to 67 degree, capacity operation is to 80 degree again, so circulates.Have nothing to do with timing function.
11, under " winter " state, when water flow switch is after closed 40 seconds, system also enters domestic water function, after entering, after water flow switch disconnects 3 minutes, gets back to again heating function in winter.
12, exsiccosis: when systems axiol-ogy is to time anhydrous, light " lack of water " printed words, when there being water, " lack of water " printed words go out.
13, definition status: system controls firing equipment according to set temperature value, but works within the user-defined time period.Three time period timings, the open and close machine time of acquiescence is 00:00, when the open and close machine time is identical, represents that this timing section will be skipped.After setting the time, pin " function " key 3 seconds continuously, then enter definition status, if pin again " function " key 3 seconds continuously, then exit definition status.Or shutdown also can exit timing function.
14, external equipment function: when external selection mouth is low level, system is for entering external equipment function, now original indoor temperature probe invalidate (now can pull out during probe), the indoor temperature of setting is also invalid, but judge whether indoor temperature reaches by outer signal mouth, if outer signal mouth is high level, then represent that indoor temperature reaches (function reached according to original indoor temperature is run), if outer signal mouth is low level, then represent that indoor temperature does not reach (function do not reached according to original indoor temperature is run), when domestic water function, this external signal port is also inoperative.
15, power-failure memory: when system power failure, remembers the parameter of all settings and heating, definition status, does not remember fault.
Two, the one-touch power-save operation program of peak-trough electricity is:
Press " subtracting " key continuously 3 seconds, system enters the one-touch energy-conservation program state of peak-trough electricity, now flash the icon of display " timing 3 ", and to flash display acquiescence peak-trough electricity timing time of opening be 23:01, coordinate " adding ", " to subtract " and " function " can be 23:01 to the acquiescence peak-trough electricity time that open of timing, and the time of acquiescence peak-trough electricity timed-shutoff is that 06:58 regulates, (prevent the time of some places peak-trough electricity different).Time confirms after setting 5 seconds, enter the one-touch energy-conservation program of peak-trough electricity, when Beijing time to 23:01 time, shut electromagnetic valve 1, open magnetic valve 2, open water pump 1, start heating, now indoor temperature does not control (no matter how many degree are all paid no attention to), it is 80 degree that hot water arranges default temperature, when barrel temperature sensor detects water temperature 80 degree, stop heating (when barrel temperature sensor has fault, system still can normally work, now just be as the criterion with the hot water temperature sensor of heating water tank), 80 degree are heated to again when temperature drops to 70 degree, when Beijing time to 03:00 time, no matter how many barrel temperatures spends, all stop heating, but water pump 1 is still in work, when Beijing time to 03:10 time, shut electromagnetic valve 2, open magnetic valve 1, now hot water arranges default temperature is 75 degree, it is 27 degree that indoor arrange default temperature, this duty works Beijing time 06:58 always, then shut electromagnetic valve 1, shut electromagnetic valve 2, switch off the pump 1, when indoor temperature drops to 16 degree, open water pump 2, indoor temperature is allowed to reach 20 degree, now switch off the pump again 2, periodic duty like this, if when the hot water in bucket (being detected by barrel temperature temperature sensor) is lower than 28 degree, and indoor temperature lower than 18 degree time, automatically restore to the former setting program work before the one-touch energy-conservation program state of peak-trough electricity, switch off the pump 2 simultaneously, open magnetic valve 1, within one day, work like this, when not only to entering peak-trough electricity one-touch energy-conservation program state during second day 23:01, periodic duty like this, press " function " key more continuously 3 seconds, to cancel the one-touch energy-conservation program state of peak-trough electricity, only need to press " subtracting " key more continuously 3 seconds.

Claims (5)

1. a vertical heating hot water two purpose electric boiler, it is characterized in that: it is inner that inner bag (2) is arranged on shell (1) by heat-insulation layer (3), Pressure gauge (4), automatic exhaust steam valve (5) and safety relief valve (6) are separately positioned on inner bag (2) top, calandria (13) is equidistantly arranged on inner bag (2) interior lower end, overtemperature prote (7), water temperature inductor (8) and water level probe (9) are arranged on shell (1) front upper end, and be connected with control panel (11), control panel (11) and master control borad (12) are separately positioned on shell (1) front middle part, and be connected with master switch (10), the built-in peak valley control module (18) of master control borad (12).
2. vertical heating hot water two purpose electric boiler according to claim 1, it is characterized in that: described inner bag (2) left end arranges heating delivery port (14), water supplement port (15) and heating water return (16) respectively, and pipeline stretches out shell (1)) left side, inner bag (2) bottom arranges sewage draining exit (17), and sewage draining exit (17) pipeline stretches out shell (1) left side.
3. vertical heating hot water two purpose electric boiler according to claim 1, is characterized in that: described master switch (10) is arranged on shell (1) front middle part and water temperature inductor (8) and water level probe (9) lower end.
4. one according to claim 1 vertical heating hot water two purpose electric boiler, is characterized in that: described calandria (13) material is hot nichrome, silicon leads resistance oxygen red copper, the outer silver-plated and die casting aluminium electric heating body of stainless steel 840.
5. one according to claim 1 vertical heating hot water two purpose electric boiler, is characterized in that: described master control borad (12) leads frequency-variable module for Intelligent silicon, and power divides seven grades of automatic frequency-conversions.
CN201510836901.9A 2015-11-03 2015-11-03 Vertical warming and water heating dual-purpose electric boiler Pending CN105318531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510836901.9A CN105318531A (en) 2015-11-03 2015-11-03 Vertical warming and water heating dual-purpose electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510836901.9A CN105318531A (en) 2015-11-03 2015-11-03 Vertical warming and water heating dual-purpose electric boiler

Publications (1)

Publication Number Publication Date
CN105318531A true CN105318531A (en) 2016-02-10

Family

ID=55246474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510836901.9A Pending CN105318531A (en) 2015-11-03 2015-11-03 Vertical warming and water heating dual-purpose electric boiler

Country Status (1)

Country Link
CN (1) CN105318531A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106152540A (en) * 2016-08-29 2016-11-23 广东威博电器有限公司 The control system of electric water heater fitted mutually with electricity using at the peak time
CN107860121A (en) * 2017-12-07 2018-03-30 郑朝杰 A kind of energy-saving electric boiler and its control method
CN108800554A (en) * 2018-05-25 2018-11-13 中山市曼卡热能科技有限公司 A kind of intelligent frequency-conversion heat accumulation electric hot water module integrated stove
CN109028595A (en) * 2018-05-25 2018-12-18 中山市曼卡热能科技有限公司 A kind of intelligent frequency-conversion heat accumulation electric hot water peak interval of time control model
CN110160254A (en) * 2019-05-21 2019-08-23 中山市曼卡热能科技有限公司 A kind of multi-purpose heat accumulation furnace body of normal-pressure efficient energy-saving that band mixes water coincidence and domestic hot-water

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2474354A1 (en) * 1980-01-25 1981-07-31 Kaercher Gmbh & Co Alfred High pressure cleaning device using hot water jet - has electric heating element in chamber divided off from main boiler
CN1288136A (en) * 2000-07-24 2001-03-21 沈阳世纪节能有限公司 Intelligent, full automatic, all in one, heat supply electric boilet system
CN2731343Y (en) * 2004-07-02 2005-10-05 魏鸿申 Low valley power storage wall
CN201724377U (en) * 2010-06-07 2011-01-26 蔡钟坤 Water heater
CN201844545U (en) * 2010-09-24 2011-05-25 曹尚生 Wall-mounted type silicon nitride intelligent electric boiler
CN203533859U (en) * 2013-09-02 2014-04-09 广东万家乐燃气具有限公司 Frequency-conversion heating water-storing-type electric water heater
CN205208904U (en) * 2015-11-03 2016-05-04 曹尚生 Dual -purpose electric boiler of vertical confession warm water

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2474354A1 (en) * 1980-01-25 1981-07-31 Kaercher Gmbh & Co Alfred High pressure cleaning device using hot water jet - has electric heating element in chamber divided off from main boiler
CN1288136A (en) * 2000-07-24 2001-03-21 沈阳世纪节能有限公司 Intelligent, full automatic, all in one, heat supply electric boilet system
CN2731343Y (en) * 2004-07-02 2005-10-05 魏鸿申 Low valley power storage wall
CN201724377U (en) * 2010-06-07 2011-01-26 蔡钟坤 Water heater
CN201844545U (en) * 2010-09-24 2011-05-25 曹尚生 Wall-mounted type silicon nitride intelligent electric boiler
CN203533859U (en) * 2013-09-02 2014-04-09 广东万家乐燃气具有限公司 Frequency-conversion heating water-storing-type electric water heater
CN205208904U (en) * 2015-11-03 2016-05-04 曹尚生 Dual -purpose electric boiler of vertical confession warm water

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106152540A (en) * 2016-08-29 2016-11-23 广东威博电器有限公司 The control system of electric water heater fitted mutually with electricity using at the peak time
CN107860121A (en) * 2017-12-07 2018-03-30 郑朝杰 A kind of energy-saving electric boiler and its control method
CN108800554A (en) * 2018-05-25 2018-11-13 中山市曼卡热能科技有限公司 A kind of intelligent frequency-conversion heat accumulation electric hot water module integrated stove
CN109028595A (en) * 2018-05-25 2018-12-18 中山市曼卡热能科技有限公司 A kind of intelligent frequency-conversion heat accumulation electric hot water peak interval of time control model
CN110160254A (en) * 2019-05-21 2019-08-23 中山市曼卡热能科技有限公司 A kind of multi-purpose heat accumulation furnace body of normal-pressure efficient energy-saving that band mixes water coincidence and domestic hot-water

Similar Documents

Publication Publication Date Title
CN105318531A (en) Vertical warming and water heating dual-purpose electric boiler
CN105318530A (en) Wall-hung warming and water heating multifunctional electric boiler
CN106766232A (en) A kind of Double energy source water heater system with quick heat water supply functions
CN205026975U (en) Solar water -heating supplies controlling means
CN205208904U (en) Dual -purpose electric boiler of vertical confession warm water
CN208419192U (en) Console mode intelligent frequency-conversion heat accumulation electric heating water heater furnace body
CN203671913U (en) Super energy-saving mode of air source heat pump water heater
CN211695441U (en) Automatic temperature control system of electric water heater
CN201262474Y (en) Stream impulse control water heater
CN2934999Y (en) Water storage type quick-heating electric water heater
CN205174543U (en) Two water tank solar energy air source heat pump composite set
CN205208905U (en) Dual -purpose electric boiler of wall -hanging confession warm water
CN206739641U (en) A kind of Double energy source water heater system with quick heat water supply functions
CN205208903U (en) Wateriness function electric boiler of wall -hanging confession warm
CN204629656U (en) A kind of heating installation with solar energy and electric energy energy mix
CN209910157U (en) Novel water heater
CN210951826U (en) Novel big wall-hanging nanometer of intelligence adds heat electric boiler
CN209978417U (en) Interlocking type space energy water heater
CN208419186U (en) Wall-mounted intelligent frequency conversion heat accumulation electric heating water heater furnace body
CN207599866U (en) A kind of novel wall hanger stove hybrid heating system integrated controller
CN202012981U (en) Built-in closed type electric wall hanging stove
CN202919940U (en) Efficient and energy-saving water dispenser control system
CN111306786A (en) Novel water heater
CN201819307U (en) Integrated heating device of solar fuel gas
CN201129788Y (en) Energy-saving electric heating station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: Cao Shangsheng

Document name: Notification of Passing Preliminary Examination of the Application for Invention

DD01 Delivery of document by public notice

Addressee: Cao Shangsheng

Document name: Notification of Publication of the Application for Invention

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160210

WD01 Invention patent application deemed withdrawn after publication