CN105303335A - Province-prefecture-county integrated relay overall process control method - Google Patents
Province-prefecture-county integrated relay overall process control method Download PDFInfo
- Publication number
- CN105303335A CN105303335A CN201510886799.3A CN201510886799A CN105303335A CN 105303335 A CN105303335 A CN 105303335A CN 201510886799 A CN201510886799 A CN 201510886799A CN 105303335 A CN105303335 A CN 105303335A
- Authority
- CN
- China
- Prior art keywords
- province
- county
- management
- relay protection
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention relates to a province-prefecture-county integrated relay overall process control method, characterized by comprising: setting a relay protection project home location; setting relay protection information; setting a relay protection flow; and downloading and reporting the relay protection flow to realize province-prefecture-county information synchronization. According to the invention, an overall process control method is employed for province-prefecture-county relay protection to realize province-prefecture-county information synchronization; with project management ''source end maintenance and whole network sharing'' as a target, province-prefecture-county relay protection programs are integrated, and the flow and criterion are standardized, thereby forming a project management and control method of province-prefecture-county whole network sharing. The method reasonably and effectively controls projects from different levels, from macrocosm to microcosm, and from the global to the individual, greatly increases project management and control quality and efficiency, improves power grid equipment safety, and realizes the management effect of ''one network'' of a power grid system.
Description
Technical field
The present invention relates to a kind of province ground county integration relay overall process management-control method.
Background technology
Along with the quickening of power grid construction speed, quantity that is newly-built, enlarging transformer station is multiplied, various relay protection devices is constantly increasing, the project information such as capital construction, technological transformation, maintenance also in continuous accumulation, with traditional documents format management at power industry particularly common.
In power department routine work, the data such as most relay protection project information are all leave in the computer of all departments with document, when needs carry out carrying out coordinated management project between message exchange or ground county of province, the information of project and progress can because region and artificial factor produce difference and delayed, and existing technology exists following shortcoming.
1. project flow process is different because of people or department's difference;
2. project dispersion, information transmission is not convenient;
3. easily cause manpower, the cost in man-hour to increase.
Summary of the invention
The object of the invention is to the problems referred to above of solution prior art existence and a kind of province ground county integration relay overall process management-control method is provided; the relay protection in ground county of province is adopted the method for overall process management and control; realize the synchronous of province's ground county information; be target with project management " source is safeguarded; the whole network is shared ", province's ground county's relay protection project integrated, Formal description; unified standard, forms the project management-control method that province's ground county the whole network is shared.
Above-mentioned technical purpose of the present invention mainly solves by the following technical programs: province's ground county integration relay overall process management-control method, is characterized in that:
Relay protection final engineering cost ground is arranged;
Relay protection information is arranged;
Relay protection flow setting;
The download of relay protection flow process and reporting, realizes the synchronizing information in ground county of province.
Be target with project management " source safeguard, the whole network share ", propose ground county of province integration relay protection project overall process management-control method; province's ground county's relay protection project is integrated; Formal description, unified standard, forms the project control platform that province's ground county the whole network is shared.
As improving further and supplementing technique scheme, the present invention adopts following technical measures: described relay protection flow setting comprises:
Project initial time is set;
The project information content is set;
Setting procedure action;
Setting option object is audited;
The overdue prompting of the project that arranges.
Described relay protection final engineering cost ground all arranges server, and the server of each ownership place is downloaded and/or reports described relay protection flow process.
Described flow process action comprises:
Collect and record the procedure information of province Di Xian various places;
Difference in the flow process of comparative analysis province Di Xian various places, go different deposit with, form unified standard flow process.
Also comprise management and control work:
Province's tune management and control project information at the corresponding levels also supervision ground mediation county adjusts project information;
Ground is adjusted management and control project information at the corresponding levels and is supervised county and adjusts project information, accepts to economize simultaneously and adjusts management and control;
County adjusts management and control project information at the corresponding levels and accepts province and adjusts and/or ground tune management and control.
The beneficial effect that the present invention has: the method relay protection in ground county of province being adopted overall process management and control; realize the synchronous of province's ground county information; with project management " source safeguard; the whole network share " be target; province's ground county's relay protection project is integrated; Formal description, unified standard, forms the project management-control method that province's ground county the whole network is shared.To project management and control from different levels, from macroscopic view to microcosmic, from the overall situation to individuality, carry out rationally effective management, substantially increase quality and the efficiency of project management and control.Improve the security of grid equipment, the real management effect achieving network system " one throws the net ".
Embodiment
Below by embodiment, technical scheme of the present invention is described in further detail.
Embodiment: province's ground county integration relay overall process management-control method:
Relay protection final engineering cost ground is arranged;
Relay protection information is arranged;
Relay protection flow setting;
The download of relay protection flow process and reporting, realizes the synchronizing information in ground county of province.
As preferably, described relay protection flow setting comprises:
Project initial time is set;
The project information content is set;
Setting procedure action;
Setting option object is audited;
The overdue prompting of the project that arranges.
As preferably, all arrange server, the server of each ownership place is downloaded and/or reports described relay protection flow process described relay protection final engineering cost.
As preferably, described flow process action comprises:
Collect and record the procedure information of province Di Xian various places;
Difference in the flow process of comparative analysis province Di Xian various places, go different deposit with, form unified standard flow process.
Management-control method is by collecting, and the difference of project flow process between department of ground county of comparative analysis province, goes different depositing with the standardization that project flow process unitized.Method requires that project information needs to comprise project status, project state pause judgments time, the key messages such as final engineering cost ground.Managerial personnel can carry out strict control by these information to project, and distinguish interdepartmental project, avoid confusion.
As preferably, consider that the confusion easily caused between project is concentrated in electrical network distribution, and Project Exhibition is attractive in appearance, adopts regional hierarchy to show, also comprises management and control work:
Province's tune management and control project information at the corresponding levels also supervision ground mediation county adjusts project information;
Ground is adjusted management and control project information at the corresponding levels and is supervised county and adjusts project information, accepts to economize simultaneously and adjusts management and control;
County adjusts management and control project information at the corresponding levels and accepts province and adjusts and/or ground tune management and control.
The theory of relay protection project overall process management and control adapts to power network development reality; embody feature and the technical merit of the management and control of relay protection project; to ensure that power network safety operation is for target; direction is turned to intensive, flattening, specialty; longitudinal direction advances province and district, the management and control of county's relay protection project is optimized and revised; by Innovative Management Mode, optimize operation flow, build comprehensively and improve ground county of the province integration relay protection project overall process management and control operation architecture adapting to prefecture-level company's development.
The scope of relay protection project overall process management and control comprises all capital construction in provincial scheduling, regional dispatch, county-level scheduling compass of competency, maintenance, technological transformation project.The relay protection project overall process management and control target of province's ground county's integration for advancing province to adjust, adjust, county adjusts relay protection project management and control uniform service; realize standardization, My Perspective On The Co-building; lean, intensive management; comprise professional technique standard, Regulations is unified; calculating parameter source distribution maintaining, the whole network are shared; interface definite value exchanges strict workflow management etc.; comprehensive structure is centralized and unified, power and responsibility is distinct, work is collaborative, specification efficient project management and control system; improve relay protection management level, ensure area power grid safe and stable operation.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention.In the above-described embodiments, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (5)
1. province ground county integration relay overall process management-control method, is characterized in that:
Relay protection final engineering cost ground is arranged;
Relay protection information is arranged;
Relay protection flow setting;
The download of relay protection flow process and reporting, realizes the synchronizing information in ground county of province.
2. province according to claim 1 ground county integration relay overall process management-control method, is characterized in that described relay protection flow setting comprises:
Project initial time is set;
The project information content is set;
Setting procedure action;
Setting option object is audited;
The overdue prompting of the project that arranges.
3. province according to claim 2 ground county integration relay overall process management-control method, it is characterized in that described relay protection final engineering cost ground all arranges server, the server of each ownership place is downloaded and/or reports described relay protection flow process.
4. province according to claim 3 ground county integration relay overall process management-control method, is characterized in that described flow process action comprises:
Collect and record the procedure information of province Di Xian various places;
Difference in the flow process of comparative analysis province Di Xian various places, go different deposit with, form unified standard flow process.
5. province according to claim 4 ground county integration relay overall process management-control method, characterized by further comprising management and control work:
Province's tune management and control project information at the corresponding levels also supervision ground mediation county adjusts project information;
Ground is adjusted management and control project information at the corresponding levels and is supervised county and adjusts project information, accepts to economize simultaneously and adjusts management and control;
County adjusts management and control project information at the corresponding levels and accepts province and adjusts and/or ground tune management and control.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510886799.3A CN105303335A (en) | 2015-12-07 | 2015-12-07 | Province-prefecture-county integrated relay overall process control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510886799.3A CN105303335A (en) | 2015-12-07 | 2015-12-07 | Province-prefecture-county integrated relay overall process control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105303335A true CN105303335A (en) | 2016-02-03 |
Family
ID=55200572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510886799.3A Pending CN105303335A (en) | 2015-12-07 | 2015-12-07 | Province-prefecture-county integrated relay overall process control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105303335A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102768750A (en) * | 2012-07-13 | 2012-11-07 | 云南云电同方科技有限公司 | Implementation method of province, city and county integrated relay protection setting calculation overall-process management system |
CN103632231A (en) * | 2013-12-04 | 2014-03-12 | 国家电网公司 | Province, prefecture and county comprehensive planning whole-process control integration platform |
CN104504485A (en) * | 2014-11-18 | 2015-04-08 | 国家电网公司 | Integrative power system relay protection setting calculation method |
-
2015
- 2015-12-07 CN CN201510886799.3A patent/CN105303335A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102768750A (en) * | 2012-07-13 | 2012-11-07 | 云南云电同方科技有限公司 | Implementation method of province, city and county integrated relay protection setting calculation overall-process management system |
CN103632231A (en) * | 2013-12-04 | 2014-03-12 | 国家电网公司 | Province, prefecture and county comprehensive planning whole-process control integration platform |
CN104504485A (en) * | 2014-11-18 | 2015-04-08 | 国家电网公司 | Integrative power system relay protection setting calculation method |
Non-Patent Citations (1)
Title |
---|
刘群: "洛阳市县供电公司继电保护整定一体化管理研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107241397A (en) | A kind of multistage TDCS based on cloud platform | |
CN103093312A (en) | Railway passenger service integrated management system | |
CN102999815A (en) | Multi-dimensional risk assessment and control method for power system safety and model | |
CN103150618A (en) | Generating system and method for working plan of power transmission network | |
CN107798489A (en) | A kind of electric network operation site safety management method based on wechat platform | |
CN106251052A (en) | The county's grid power blackout management and control of a kind of ground and analysis decision plateform system | |
CN109461090A (en) | A kind of integrated framework of EMPS | |
CN104504483B (en) | Method for realizing province and local integration of anti-misoperation tickets | |
CN103246630A (en) | Distribution network integrated platform information integration method based on model data center | |
CN103699956A (en) | Method for carrying out lean management of asset value of power grid transmission and transformation project | |
CN102609547A (en) | Method and system for maintaining panoramic model of digital power supply grid | |
CN105262227A (en) | Fool-proof lockout system | |
CN109218433A (en) | Distribution network dispatching and commanding system based on mobile terminal | |
CN110689214A (en) | Material supply intelligent collection management control platform | |
CN102968691A (en) | Power-cut scheme decision making system and application method thereof | |
RU103790U8 (en) | DISTRIBUTION CENTRALIZED SYSTEM OF OPERATIONAL MANAGEMENT OF OBJECTS OF RAILWAY INFRASTRUCTURE | |
CN104678773B (en) | Intelligent construction group and its control method based on public cloud service | |
EP3444913B1 (en) | Energy distribution method | |
CN109299196A (en) | Data managing method, network and data acquisition storage application method and its system | |
CN104333131A (en) | Method for establishing prefecture and county power grid regulation data integration | |
CN105303335A (en) | Province-prefecture-county integrated relay overall process control method | |
CN108196493A (en) | A kind of wisdom water utilities control system and method based on cloud platform | |
CN115600968A (en) | Regional industry collaborative management method for power generation enterprises | |
CN202939638U (en) | Intelligent warehouse logistics system | |
CN104050527A (en) | Regional power grid dispatching intelligent operation order system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160203 |