CN105297952A - Prefabricated reinforced concrete shear wall - Google Patents

Prefabricated reinforced concrete shear wall Download PDF

Info

Publication number
CN105297952A
CN105297952A CN201510716716.6A CN201510716716A CN105297952A CN 105297952 A CN105297952 A CN 105297952A CN 201510716716 A CN201510716716 A CN 201510716716A CN 105297952 A CN105297952 A CN 105297952A
Authority
CN
China
Prior art keywords
wall
shearing resistance
pin key
resistance pin
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510716716.6A
Other languages
Chinese (zh)
Other versions
CN105297952B (en
Inventor
赵宏康
戴雅萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Original Assignee
SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd filed Critical SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority to CN201510716716.6A priority Critical patent/CN105297952B/en
Publication of CN105297952A publication Critical patent/CN105297952A/en
Application granted granted Critical
Publication of CN105297952B publication Critical patent/CN105297952B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a prefabricated reinforced concrete shear wall. The prefabricated reinforced concrete shear wall comprises an upper layer wall body, a lower layer wall body and a connecting device connecting the upper layer wall body with the lower layer wall body, the connecting device comprises shearing resistance pin keys which are vertically arranged and made of shape steel, anchor bars which are welded to the shearing resistance pin keys and also vertically arranged and grout sleeves which are vertically fixed in the upper layer wall body, the upper half of each shearing resistance pin key and the upper half of each grout sleeve are anchored in the upper layer wall body, the upper ends of the anchor bars are fixed in the grout sleeves, and the lower half of each shearing resistance pin key and the lower half of each grout sleeve are anchored in the lower layer wall body. The prefabricated reinforced concrete shear wall is high in structure stability and safety and particularly suitable as the shear wall with the working condition of tensile cracking of the total cross section.

Description

A kind of precast reinforced concrete shear wall
Technical field
The present invention relates to a kind of precast reinforced concrete shear wall.
Background technology
The connection of existing precast reinforced concrete shear wall is vertical distribution bar and adopts slurry anchor sleeve connection, and adds shear reinforcement.This kind of connection can accomplish reliable power transmission to the shear wall of total cross-section pressurized, even but shear wall total cross-section tension cracking time just can not be reliably stressed, bring very large potential safety hazard.Along with country is to the raising of earthquake fortification level, when coming earthquake, the shear wall of total cross-section tension is more and more common, to need when total cross-section tension also the shear wall of reliable power transmission to connect.
Summary of the invention
The present invention seeks to: for above-mentioned technical problem, a kind of structural stability and the high precast reinforced concrete shear wall of safety are provided.
Technical scheme of the present invention is: a kind of precast reinforced concrete shear wall, comprise upper strata body of wall, lower floor's body of wall and by the linkage of described upper strata body of wall together with lower floor wall connecting, described linkage comprises vertical layout and the shearing resistance pin key be made up of shaped steel, weld together with described shearing resistance pin key and the same dowel vertically arranged, and the grout sleeve be vertically fixed in the body of wall of described upper strata, the first half of described shearing resistance pin key and the first half of described grout sleeve are anchored in the body of wall of described upper strata, and the upper end of dowel is fixed in grout sleeve, the latter half of described shearing resistance pin key and the latter half of described grout sleeve are anchored in described lower floor body of wall.
The present invention, on the basis of technique scheme, also comprises following preferred version:
For making the cross section of the shaped steel of described shearing resistance pin key in " ten " font, described dowel is welded on the middle part of this " ten " font shaped steel, and the length of dowel is longer than shear-pin key length.
Beam is watered after being provided with level between described upper strata body of wall and lower floor's body of wall.
Also can be other shapes for making the cross section of the shaped steel of described shearing resistance pin key 3, as " work " font.
Advantage of the present invention is: the shearing resistance pin key that the linkage of this precast reinforced concrete shear wall of the present invention is made with shaped steel, the two ends up and down of shearing resistance pin key are anchored in upper strata body of wall and lower floor's body of wall respectively, after the concrete cracking at levels wall connecting place exits shearing resistance work, shear-carrying capacity is provided by shearing resistance pin key, shearing resistance pin key still can be reliably stressed, ensure that structural stability and the safety of shear wall.And do not lose efficacy under ultimate limit state can being ensured with the dowel that shearing resistance pin key is welded and fixed.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the facade view of this precast reinforced concrete shear wall of the embodiment of the present invention;
Fig. 2 is the top plan view of this precast reinforced concrete shear wall of the embodiment of the present invention;
Wherein: 1-upper strata body of wall, 2-lower floor body of wall, 3-shearing resistance pin key, 4-dowel, 5-grout sleeve, waters beam after 6-level.
Detailed description of the invention
Fig. 1 and Fig. 2 shows a specific embodiment of this precast reinforced concrete shear wall of the present invention, identical with traditional precast reinforced concrete shear wall is, it also comprises upper strata body of wall 1, lower floor's body of wall 2 and by the linkage of upper strata body of wall together with lower floor wall connecting, waters beam 6 after being provided with level between described upper strata body of wall 1 and lower floor's body of wall 2.
The key improvements of the present embodiment is that the form of structure of described linkage is different from traditional structure, in this example, described linkage comprises vertical arranged and the shearing resistance pin key 3 be made up of shaped steel, to weld together and the same vertical dowel 4 arranged and the grout sleeve 5 be vertically fixed in described upper strata body of wall 1 with described shearing resistance pin key 3.The first half of described shearing resistance pin key 3 and the first half of described grout sleeve 5 are anchored in described upper strata body of wall 1, and the upper end of dowel 4 is fixed in grout sleeve 5, the latter half of described shearing resistance pin key 3 and the latter half of described grout sleeve 5 are anchored in described lower floor body of wall 2.
With reference to shown in Fig. 2, in this example, for making the shaped steel of described shearing resistance pin key 3, its cross section is in " ten " font, and described dowel 4 is welded on the middle part of this " ten " font shaped steel, and the length of dowel is longer than shear-pin key length.
Certainly, also can be other shapes for making the cross section of the shaped steel of described shearing resistance pin key 3, such as " work " font.
The linkage of this precast reinforced concrete shear wall of the present embodiment have employed the shearing resistance pin key 3 that shaped steel is made, the two ends up and down of shearing resistance pin key 3 are anchored in upper strata body of wall and lower floor's body of wall respectively, after the part concrete cracking at levels wall connecting place exits shearing resistance work, shear-carrying capacity is provided by shearing resistance pin key, shearing resistance pin key still can be reliably stressed, ensure that structural stability and the safety of shear wall.The dowel be welded and fixed with shearing resistance pin key did not lose efficacy under can ensureing ultimate limit state.
Refer again to shown in Fig. 1, now the manufacturing process of this for the present embodiment precast reinforced concrete shear wall be simply described below:
First at factory's prefabricated described upper strata body of wall 1 and lower floor's body of wall 2 respectively.And when making lower floor's body of wall 1, the latter half of the latter half of shearing resistance pin key 3 and described dowel 4 being anchored in lower floor's body of wall 2, and the first half of shearing resistance pin key 3 and dowel 4 is stretched out outside lower floor's body of wall 2.Make upper strata body of wall 1 time, reserve vertical blind hole in the bottom of upper strata body of wall 1, and in this blind hole pre-buried grout sleeve 5.During practical application, upper strata body of wall 1 and lower floor's body of wall 2 are transported to erecting bed, after lower floor's body of wall 2 installs, beam 6 is watered after level is built on lower floor's body of wall 2 top, afterwards upper strata body of wall 2 is arranged in the top of lower floor's body of wall 2, and make the first half of shearing resistance pin key 3 and dowel 4 stretch into (upper end of dowel 4 is inserted in grout sleeve 5) in the reserved vertical blind hole in upper strata body of wall 1 bottom, pour special grouting material in the most backward vertical blind hole, the first half of shearing resistance pin key 3 and dowel 4 is anchored in upper strata body of wall 1.
Above-described embodiment, only for technical conceive of the present invention and feature are described, its object is to people can be understood content of the present invention and implement according to this, can not limit the scope of the invention with this.All equivalent transformations of doing according to the Spirit Essence of main technical schemes of the present invention or modification, all should be encompassed within protection scope of the present invention.

Claims (4)

1. a precast reinforced concrete shear wall, comprise upper strata body of wall (1), lower floor's body of wall (2) and by the linkage of described upper strata body of wall together with lower floor wall connecting, it is characterized in that: described linkage comprises vertical layout and the shearing resistance pin key (3) be made up of shaped steel, weld together with described shearing resistance pin key (3) and the same dowel (4) vertically arranged, and the grout sleeve (5) be vertically fixed in described upper strata body of wall (1), the first half of described shearing resistance pin key (3) and the first half of described grout sleeve (5) are anchored in described upper strata body of wall (1), and the upper end of dowel (4) is fixed in grout sleeve (5), the latter half of described shearing resistance pin key (3) and the latter half of described grout sleeve (5) are anchored in described lower floor body of wall (2).
2. precast reinforced concrete shear wall according to claim 1, it is characterized in that: for making the cross section of the shaped steel of described shearing resistance pin key (3) in " ten " font, described dowel (4) is welded on the middle part of this " ten " font shaped steel, and the length of dowel is longer than shear-pin key length.
3. precast reinforced concrete shear wall according to claim 1 and 2, is characterized in that: water beam (6) after being provided with level between described upper strata body of wall (1) and lower floor's body of wall (2).
4. precast reinforced concrete shear wall according to claim 1, is characterized in that: for making the cross section of the shaped steel of described shearing resistance pin key (3) in " work " font.
CN201510716716.6A 2015-10-29 2015-10-29 A kind of precast reinforced concrete shear wall Active CN105297952B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510716716.6A CN105297952B (en) 2015-10-29 2015-10-29 A kind of precast reinforced concrete shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716716.6A CN105297952B (en) 2015-10-29 2015-10-29 A kind of precast reinforced concrete shear wall

Publications (2)

Publication Number Publication Date
CN105297952A true CN105297952A (en) 2016-02-03
CN105297952B CN105297952B (en) 2018-01-09

Family

ID=55195703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716716.6A Active CN105297952B (en) 2015-10-29 2015-10-29 A kind of precast reinforced concrete shear wall

Country Status (1)

Country Link
CN (1) CN105297952B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760054A (en) * 2017-03-01 2017-05-31 同济大学 Precast reinforced concrete shear wall
CN107476586A (en) * 2017-08-09 2017-12-15 安徽兰兮工程技术开发有限公司 The erecting device of house PC prefabricated components and the installation method of PC prefabricated components

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1025840A (en) * 1996-07-11 1998-01-27 Fujita Corp Constructing method for building frame with precast anti-seismic wall
CN103726586A (en) * 2013-12-26 2014-04-16 北京工业大学 H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN104947831A (en) * 2015-07-07 2015-09-30 华北理工大学 Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN205134634U (en) * 2015-10-29 2016-04-06 苏州设计研究院股份有限公司 Precast reinforced concrete shear force wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1025840A (en) * 1996-07-11 1998-01-27 Fujita Corp Constructing method for building frame with precast anti-seismic wall
CN103726586A (en) * 2013-12-26 2014-04-16 北京工业大学 H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN104947831A (en) * 2015-07-07 2015-09-30 华北理工大学 Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN205134634U (en) * 2015-10-29 2016-04-06 苏州设计研究院股份有限公司 Precast reinforced concrete shear force wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760054A (en) * 2017-03-01 2017-05-31 同济大学 Precast reinforced concrete shear wall
CN106760054B (en) * 2017-03-01 2023-01-31 同济大学 Prefabricated reinforced concrete shear wall
CN107476586A (en) * 2017-08-09 2017-12-15 安徽兰兮工程技术开发有限公司 The erecting device of house PC prefabricated components and the installation method of PC prefabricated components
CN107476586B (en) * 2017-08-09 2020-04-10 东莞市建安住宅工业有限公司 Installation device and method for house PC prefabricated part

Also Published As

Publication number Publication date
CN105297952B (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN205134634U (en) Precast reinforced concrete shear force wall
CN104452784B (en) Composite bolt pile used for slope strengthening and construction technique of composite bolt pile
CN104389315B (en) Consolidation grouting drilled pile wall and construction method thereof
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
CN105714933A (en) Beam-column connection joint for frame structure
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN104018490A (en) Z-shaped rectangular-section anti-skidding pile and construction method thereof
CN201258481Y (en) Prefabricated uplift pile by post-tensioning method
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN102561212A (en) Method for strengthening vertical crack of single-pillar concrete pier
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
EP2108744B1 (en) Method for reinforcing supporting walls
CN105297952A (en) Prefabricated reinforced concrete shear wall
CN201794353U (en) Masonry structure capable of enhancing anti-collapse capacity and integrity under strong shock
CN101963002B (en) Masonry structure and method for enhancing collapse resistance and integrity under strong earthquake
CN112942327A (en) Pile-plate combined retaining structure for slope support
CN110206135B (en) Stone masonry house foundation reinforcing structure and method
CN201605588U (en) Structure for reinforcing and fixing slope surface of prestress anchoring frame beam
WO1997007295A1 (en) Building underpinning process
CN207597642U (en) A kind of substation structure antidetonation fills wall
CN204626424U (en) Step polygon for Channel slope plants raw building block
CN204311463U (en) A kind of Composite Bolt stake for slope reinforcement
CN107795033A (en) A kind of substation structure antidetonation fills wall
CN210857186U (en) Prestressed U-shaped sheet pile
CN203701104U (en) Connection structure for prefabricated open column and foundation pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Applicant after: Design group Limited by Share Ltd

Address before: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Applicant before: Suzhou Institute of Architectural Design Co., Ltd.

GR01 Patent grant
GR01 Patent grant