CN105274994B - Anti-suck sludge proof grouting process and grouting device in deep saturated sand - Google Patents

Anti-suck sludge proof grouting process and grouting device in deep saturated sand Download PDF

Info

Publication number
CN105274994B
CN105274994B CN201510756244.7A CN201510756244A CN105274994B CN 105274994 B CN105274994 B CN 105274994B CN 201510756244 A CN201510756244 A CN 201510756244A CN 105274994 B CN105274994 B CN 105274994B
Authority
CN
China
Prior art keywords
slip casting
outer tube
grouting
core pipe
slurry outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510756244.7A
Other languages
Chinese (zh)
Other versions
CN105274994A (en
Inventor
李建文
徐拴海
曹祖宝
李雄伟
袁克阔
王新锋
王祥任
邵红旗
王晓东
赵冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Science and Technology Co.,Ltd.
Original Assignee
Xian Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Research Institute Co Ltd of CCTEG filed Critical Xian Research Institute Co Ltd of CCTEG
Priority to CN201510756244.7A priority Critical patent/CN105274994B/en
Publication of CN105274994A publication Critical patent/CN105274994A/en
Application granted granted Critical
Publication of CN105274994B publication Critical patent/CN105274994B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

One kind anti-suck sludge proof grouting process and grouting device in deep saturated sand, grouting device includes slip casting outer tube and slip casting core pipe, the slip casting core pipe is inserted in the slip casting outer tube by a threaded sleeve, the periphery of the slip casting outer tube is dug multigroup slurry outlet, the rubber sleeve of multiple covering slurry outlets is provided with slip casting outer tube, its operation of the invention is simple, operation facility, slip casting will be carried out to deep full water thawing layer of sand exactly using surface drilling, can realize optional grouting pressure, and stop slip casting rear slurry will not suck-back enter Grouting Pipe.In addition, also can effectively prevent the heavy slurry of Grouting Pipe ttom of pipe, the slurry outlet in effective slip casting interval or Grouting Pipe is blocked, and clear water cleaning is carried out to Grouting Pipe after slip casting terminates, repeated and utilize injected hole and Grouting Pipe, realize the multiple slip casting of interval to stratum.

Description

Anti-suck sludge proof grouting process and grouting device in deep saturated sand
Technical field
The present invention relates to the technical field that mine shaft sandy-silt seepage is administered, more particularly to one kind is in deep saturated sand Anti-suck sludge proof grouting process and grouting device.
Background technology
Mine shaft (vertical or inclined shaft) when deep saturated sand is passed through, in order to improve shaft excavation efficiency and prevent water Blowout enters the shaft excavation scope of operation, and freezing process is one of more conventional reservoir treating method.Pit shaft is passed through using freezing process The a range of saturated sand in stratum freezed, flowable water and loose sand are cured as a class Seed harvest, Then shaft excavation operation is carried out in such Seed harvest, thus the shaft excavation scope of operation can keep a metastable few water Environment.After completion pit shaft sand section is constructed and enters basement rock, Freezing stratum as rapid can be stopped, saturated sand will gradually thaw.Freeze Fading away for wall, will link up the hydraulic connection between the saturated sand of pit shaft and frost wall periphery, and pit shaft is by few water frozen environment It is transferred to full water environment.
Preferable shaft structure is a water proof compression construction highly closed to surrounding formation, typically by multistory reinforced mixed Solidifying soil is poured and formed, but due to the actual construction technology reason of pit shaft, can be produced more construction gap and be connect in pit shaft total length Stubble.Further, since construction quality or working-procedure problem, it is also possible to occur weak part on pit shaft.In layer of sand still in freezing shape During state, thicker frost wall can bear larger water pressure, and pit shaft is enclosed in into a pressure in a balanced way in space.But when jelly After knot stratum thaws, pit shaft directly bears larger stratum water pressure, and pit shaft connects batch position because sealing is poor, it may occur however that , there is infiltration, gushing water, the disasters such as sand of bursting in infiltration disaster, and the possible compression damage in the weaker position of pit shaft, there is now multiple ore deposits Well occurred repeatedly to influence working face operation or flooded well disaster.For above-mentioned disaster, if only in the case of infiltration or gushing water, can By high intensity draining, while carrying out respective handling to well bore wall in the wellbore, the purpose for administering infiltration or gushing water is can reach.But If with routed sand in exiting water process, high intensity draining will be formed to large-scale layer of sand and disturbed, and cause layer of sand to liquefy, largely Blowout enters in pit shaft.Saturated sand around pit shaft pours in pit shaft, has emptied pit shaft surrounding formation, can change the part of pit shaft Stress, stability and integrality to shaft structure threaten.
Preventing treatment currently for the routed sand disaster of construction freezing method pit shaft water burst is still a technical barrier, works as pit shaft It has been be submerged that, and sand is gushed at well bore wall multiple position, how successfully by the layer of sand consolidation around pit shaft, prevents layer of sand to well Cylinder in burst gush be Treatment process key.In using the technology of the solid sand of slip casting, noted in deep saturated sand from surface drilling During slurry, using conventional grouting device and technique, often under larger hydraulic pressure, slurries can pass back into Grouting Pipe, and band Enter silt blocking Grouting Pipe, cause secondary grouting to implement.Further, since slurries segregation detection, at bottom hole or Grouting Pipe bottom Easily pile up compared with thick slurry liquid, shorten effective interval of injected hole and Grouting Pipe, slip casting effect is not good.
Therefore, designer of the invention is in view of drawbacks described above, it is comprehensive to be engaged in for many years for a long time by concentrating on studies and designing The experience and achievement of related industry, research and design go out one kind anti-suck sludge proof grouting process and note in deep saturated sand Sizing device, to overcome drawbacks described above.
The content of the invention
The purpose of the present invention is being to provide one kind anti-suck sludge proof grouting process and note in deep saturated sand Sizing device, its operation is simple, operation facility, will carry out slip casting to deep full water thawing layer of sand exactly using surface drilling, Can realize optional grouting pressure, and stop slip casting rear slurry will not suck-back enter Grouting Pipe.In addition, also can effectively prevent slip casting Grouting Pipe is carried out clearly after pipe ttom of pipe is heavy to starch, the slurry outlet on the effective slip casting interval of blocking or Grouting Pipe, and slip casting terminates Water is cleaned, and is repeated and is utilized injected hole and Grouting Pipe, realizes the multiple slip casting of interval to stratum.
To solve the above problems, the invention discloses one kind, the slip casting of anti-suck sludge proof is filled in deep saturated sand Put, including slip casting outer tube and slip casting core pipe, it is characterised in that:
One end closing of the slip casting outer tube, another end opening is simultaneously socketed on the slip casting core pipe, the slip casting core pipe The slip casting outer tube is inserted in middle part by a threaded sleeve,
The periphery of the slip casting outer tube is dug multigroup slurry outlet, one group of slurry outlet of same radial direction be disposed with two or Four, and slurry outlet equi-spaced apart multigroup in the axial direction or Unequal distance interval, multiple rubber sleeves, each rubber are provided with slip casting outer tube Gum cover is covered each by one group of slurry outlet, and each rubber sleeve lower end and the tight colligation of slip casting outer tube or bonding, upper end relies on bullet Property is posted by slip casting outer tube.
Wherein:The other end of the slip casting core pipe is socketed with another threaded sleeve.
Wherein:Each group slurry outlet on slip casting outer tube spacing in the axial direction is 500mm, between each group slurry outlet is equidistant Every being set to 4.
Wherein:Slurry outlet aperture on the slip casting outer tube is 8mm.
One kind anti-suck sludge proof grouting process in deep saturated sand is also disclosed, including at least following steps:
A grouting device) is made, thicker slip casting outer tube certain length, slip casting is inserted using thinner slip casting core pipe on ground Outer tube is fixed with slip casting core pipe using threaded sleeve, the bottom end closure of slip casting outer tube, in the axial direction of slip casting outer tube equidistantly or not Multigroup slurry outlet is equidistantly dug, slurry outlet is covered with rubber sleeve on slip casting outer tube, rubber sleeve lower end is tight with slip casting outer tube Colligation or bonding;
B injected hole) is formed, injected hole is drilled through in ground is to layer of sand, injected hole need not set orifice tube, the end of injected hole Hole site should exceed slip casting destination layer bottom circle certain length, to accommodate hole wall knockout;
C) to grouting device is divided into injected hole, to grouting device is divided into hole, slip casting target is entered under grouting device bottom Ceng Di circle depth;
D grouting device) is fixed in injected hole, after the completion of grouting device is divided into, is noted in injected hole by slip casting core pipe Enter sleeve shell material, treat that sleeve shell material is returned out by the gap between slip casting core pipe and injected hole, the sand amount of carrying is less as ending standard, After terminating note sleeve shell material, slip casting core pipe is rinsed to injected clear water in slip casting core pipe;
E) slip casing by pressure, after after sleeve shell material final set, by slip casting core pipe to slip casing by pressure in slip casting formation at target locations;
F) clear water washes pipe, when single injected hole plasma volume is larger, stops slip casting, and rush to injected clear water in slip casting core pipe Wash grouting pipeline;
G) secondary grouting, secondary grouting is carried out after grouting serous fluid reaches initial set after first time, i.e., this carries out step E and step again Rapid F.
By said structure, anti-suck sludge proof grouting process and slip casting in deep saturated sand of the invention Device has the effect that:
1st, using in entering inlet well under the grouting device of floor manufacture, and grouting device is consolidated using sleeve shell material It is fixed, slip casting then is carried out to formation at target locations, the problem of the grouting serous fluid suck-back in deep saturated sand can be effectively prevented, it is capable of achieving To the multiple slip casting of single borehole.
2nd, the mode of slip casting outer tube is socketed using slip casting core pipe, slurries are formed in grouting device and flowed without dead angle, effectively Isolation of the slurries in Grouting Pipe is avoided to precipitate.
3rd, it is easy to operate, slip casting efficiency high, and slip casting process control, it is good to layer of sand solidification effect.
Detailed content of the invention can be obtained by explanation described later and institute's accompanying drawing.
Brief description of the drawings
Fig. 1 shows the structural representation of the anti-suck sludge proof grouting device in deep saturated sand of the invention.
Fig. 2,3 show that the implementation steps of present invention anti-suck sludge proof grouting process in deep saturated sand are illustrated Figure.
Reference:
11st, slip casting outer tube;12nd, slip casting core pipe;13rd, threaded sleeve;14th, slurry outlet.
Specific embodiment
Referring to Fig. 1, it is shown that the anti-suck sludge proof grouting device in deep saturated sand of the invention.
The grouting device includes slip casting outer tube 11 and slip casting core pipe 12, and one end of the slip casting outer tube 11 is closed, another End opening is simultaneously socketed on the slip casting core pipe 12, wherein, institute is inserted in the middle part of the slip casting core pipe 12 by a threaded sleeve 13 Slip casting outer tube 11 is stated, optionally, the other end of the slip casting core pipe 12 is socketed with another threaded sleeve 13, to provide many notes Slurry core pipe 12 is socketed successively, to adapt to different length and scope.
Wherein, the periphery of the slip casting outer tube 11 is dug multigroup slurry outlet 14, in one group of slurry outlet 14 of same radial direction Can be disposed with two or four, and slurry outlet 14 multigroup in the axial direction can equi-spaced apart or Unequal distance interval, in slip casting outer tube 11 Be provided with multiple rubber sleeves 15, each rubber sleeve 15 is covered each by one group of slurry outlet 14, and each rubber sleeve 15 lower end and slip casting Outer tube 11 carries out close colligation or bonding, and upper end relies on elastic abutment in slip casting outer tube, and can be according to the specific pressure of slip casting Determine the intensity of rubber sleeve 15.Thus device, is capable of achieving slurries and enters slip casting outer tube 11 by slip casting core pipe 12, then by slip casting outside Slurry outlet 14 on the periphery of pipe 11 exits into slip casting stratum through the upper end of rubber sleeve 15, it can be seen that, in order to prevent slurries in note The bottom precipitation of outer tube is starched, so slip casting core pipe to be inserted the bottom of slip casting outer tube, and slurry outlet is not provided with slip casting core pipe, allowed All slurries are returned out from the bottom of slip casting core pipe, and the slurries in slip casting outer tube can be forced to be completely in flow regime.
Wherein, the slip casting core pipe is steel pipe, and outer diameter is 20mm, and wall thickness is 2.5mm, and the slip casting outer tube is steel Pipe, outer diameter is 50mm, and wall thickness is 3mm.
Wherein, the slip casting core pipe bottom and the distance of slip casting outer tube bottom are 20mm, and the bottom of slip casting outer tube is set to Tip.
Wherein, the spacing in the longitudinal direction of the slurry outlet on the slip casting outer tube is generally 500mm, pulp radially Hole is traditionally arranged to be 4, and slurry outlet radially is evenly arranged.
Wherein, the slip casting outer tube determines effective slip casting segment length, and effective slip casting segment length is according to slip casting formation at target locations Thickness is determined.
Wherein, the slurry outlet aperture on the slip casting outer tube is 8mm.
Wherein, the rubber sleeve allows certain deformation during slip casting, it is ensured that slurries are flowed out by upper end, and just Do not ruptured under normal grouting pressure and hydraulic pressure.
Wherein, the rubber sleeve can be selected according to design grouting pressure.
Wherein, the surface grout injection boring aperture is 133mm.
Wherein, the inlet well hole depth exceeds slip casting destination layer Wei Di circle 2m.
Wherein, the sleeve shell material is mixed by cement, flyash, bentonite, water.
Wherein, the grouting pressure of the slip casing by pressure specifically determines according to the physico-mechanical properties of slip casting formation at target locations.
Referring to Fig. 2,3, it is shown that grouting process of the invention, including at least following steps:
A grouting device) is made.The thicker certain length of slip casting outer tube 11 is inserted using thinner slip casting core pipe 12 on ground, Slip casting outer tube 11 is fixed with slip casting core pipe 12 using threaded sleeve 13, the bottom end closure of slip casting outer tube 11.In slip casting outer tube 11 Equidistant or Unequal distance digs multigroup slurry outlet 14 on axial direction, and each group slurry outlet 14 is radially disposed two or four.In slip casting Slurry outlet 14 is covered with rubber sleeve 15 on outer tube 11, the lower end of rubber sleeve 15 and the colligation of slip casting outer tube 11 or relative close is bonded, The intensity of rubber sleeve 15 is determined according to grouting pressure.
B injected hole) is formed.Ground according to design in fixed position to layer of sand in drill through injected hole, injected hole need not set Orifice tube is put, drilling unsuitable hole flushing after finishing, the borehole bottom location of injected hole should exceed slip casting destination layer bottom circle certain length, so as to Accommodate hole wall knockout.
C) to dividing into grouting device in injected hole.After drilling is completed, to grouting device is divided into drilling, grouting device can Connected by threaded sleeve by root using many slip casting core pipes 12 and enter injected hole, slip casting destination layer bottom is entered under grouting device bottom Boundary's depth.
D) grouting device is fixed in injected hole.After the completion of grouting device is divided into, noted in injected hole by slip casting core pipe Enter sleeve shell material, treat that sleeve shell material is returned out by the gap between slip casting core pipe and injected hole, the sand amount of carrying is less as ending standard. After terminating note sleeve shell material, slip casting core pipe is rinsed to injected clear water in slip casting core pipe.
E) slip casing by pressure.After after sleeve shell material final set, by slip casting core pipe to slip casing by pressure in slip casting formation at target locations, slurries can Pressure break solidification sleeve shell material enter formation at target locations in, it is grout curing after can reach solidification layer of sand purpose.
F) clear water washes pipe.When single injected hole plasma volume is larger, it is necessary to interval slip casting.Stop slip casting, and to slip casting core Injected clear water rinses grouting pipeline in pipe.
G) secondary grouting.Secondary grouting is carried out after grouting serous fluid reaches initial set after first time, i.e., this carries out step E and step again Rapid F.Optionally, as needed with slip casting situation, multiple slip casting can be carried out, step E and step F has both repeatedly been repeated.
Grouting method of the invention is applied in the solid sand plug Hydraulic Projects of the huge thick saturated sand slip casting in northern Shensi colliery, Achieve following practical function:
1) down tube success rate realizes 100%.Because this method uses all steel material, divide into Grouting Pipe and grouting device is not received The influence of mud balance, sand content in injected hole, after entering injected hole under Grouting Pipe and grouting device, will not be because of hydraulic pressure and sandy soils Pressure causes grouting device to deform and rupture, and influences slip casting process and quality.
2) this grouting method is utilized, the grouting horizon depth in huge thick full water loose sand has reached 110m, and And this depth is not the limit depth that this grouting method is reached.According to stratum water and formation condition, slip casting depth is still expansible. Slip casting depth in the present embodiment, 80m is improve than conventional 30m depth.
3) grouting method in the present invention effectively increases the utilization ratio of injected hole.In the present embodiment, using this note Paste-making method, realizes the multiple slip casting of interval of single hole, according to actual effect from the point of view of, if slip casting and hole flushing suitable operation, interval note Slurry number of times is unrestricted.
4) grouting pressure is improve, the range of scatter of slurries in layer of sand is expanded.This method grout injection control pressure can reach 10MPa, and can ensure grouting device not by pressure break and destruction.Grouting pressure improves several times than conventional method.
Grouting method of the invention is applied in the present embodiment, hence it is evident that improve the quality of the solid sand plug Hydraulic Projects of slip casting, and Cost reduction is notable, and comprehensive benefit is more excellent.
By said structure, one kind multiple Cementer of anti-suck sludge proof in deep saturated sand of the invention Skill has the following advantages that:
First, anti-suck.Slurry outlet on slip casting outer tube wall is sealed using rubber sleeve, realizes the one-way flow of slurries Feature, i.e. slurries are only capable of from grouting device entering slip casting formation at target locations by slurry outlet and its with the gap of rubber sleeve, without Energy reverse flow, effectively prevent suck-back backflow.
Second, anti-precipitation.Slip casting core pipe is inserted into slip casting outer tube, slurries is returned upwards by the end of slip casting outer tube, passed through Slurry outlet flows out grouting device.The method makes slurries in grouting device all the time in flow disturbance state, will not be filled in slip casting Put and cause the phenomenons such as flow velocity reduction, slurries isolation, solid particle precipitation.
3rd, efficiency high.The length and pulp hole count of length and characteristics design grouting device according to slip casting formation at target locations Amount, it is more long that single slip casting can note section, and can the laggard slip casting of in the ranks having a rest of hole flushing.
4th, effect is good.When slip casting is carried out to deep and thick sand or the larger stratum of hydraulic pressure, using the sealing of rubber sleeve Effect, it is possible to achieve the pressurize after elevated pressures slip casting and slip casting, deposits and solidifies beneficial to slurries in space.
5th, benefit is excellent.Slip casting is carried out using the method, single hole slip casting success rate is higher, and grouting horizon is controllable, can save Cost.
It is readily apparent that the description of the above and record are only to illustrate rather than in order to limit in disclosure of the invention Hold, using or use.Although embodiment was described and be described in the drawings in embodiment, the present invention is not limited By accompanying drawing example and described in embodiment as it is now recognized that optimal mode implementing the particular case of the teachings of the present invention Son, the scope of the present invention will include falling into any embodiment of description and appended claims above.

Claims (5)

1. one kind anti-suck sludge proof grouting device in deep saturated sand, including slip casting outer tube and slip casting core pipe, it is special Levy and be:
One end closing of the slip casting outer tube, another end opening is simultaneously socketed on the slip casting core pipe, the middle part of the slip casting core pipe The slip casting outer tube is inserted in by a threaded sleeve,
The periphery of the slip casting outer tube is dug multigroup slurry outlet, and two or four are disposed with one group of slurry outlet of same radial direction It is individual, and slurry outlet equi-spaced apart multigroup in the axial direction or Unequal distance interval, multiple rubber sleeves, each rubber are provided with slip casting outer tube Set is covered each by one group of slurry outlet, and each rubber sleeve lower end and the tight colligation of slip casting outer tube or bonding, upper end is by elasticity Slip casting outer tube is posted by, thus, slurries enter slip casting outer tube by slip casting core pipe, are then passed through by the slurry outlet on slip casting outer tube periphery Rubber set upper side exits into slip casting stratum, and slurry outlet is not provided with slip casting core pipe, allows all slurries from the bottom of slip casting core pipe Return out, force the slurries in slip casting outer tube to be completely in flow regime.
2. grouting device as claimed in claim 1, it is characterised in that:One end of the slip casting core pipe is socketed with another thread bush Pipe.
3. grouting device as claimed in claim 1, it is characterised in that:Each group slurry outlet on the slip casting outer tube is in the axial direction Spacing be 500mm, each group slurry outlet equi-spaced apart is set to 4.
4. grouting device as claimed in claim 1, it is characterised in that:Slurry outlet aperture on the slip casting outer tube is 8mm.
5. one kind anti-suck sludge proof grouting process in deep saturated sand, including at least following steps:
A grouting device) is made, thicker slip casting outer tube certain length, slip casting outer tube is inserted using thinner slip casting core pipe on ground Fixed using threaded sleeve with slip casting core pipe, the bottom end closure of slip casting outer tube, the equidistant or Unequal distance in the axial direction of slip casting outer tube Multigroup slurry outlet is dug, slurry outlet is covered with rubber sleeve on slip casting outer tube, rubber sleeve lower end and the tight colligation of slip casting outer tube Or bond;
B injected hole) is formed, injected hole is drilled through in ground is to layer of sand, injected hole need not set orifice tube, the whole hole position of injected hole Putting should be beyond slip casting destination layer bottom circle certain length, to accommodate hole wall knockout;
C) to grouting device is divided into injected hole, slip casting destination layer bottom circle depth is entered under grouting device bottom;
D grouting device) is fixed in injected hole, after the completion of grouting device is divided into, by slip casting core pipe to injection set in injected hole Shell material, treats that sleeve shell material is returned out by the gap between slip casting core pipe and injected hole, and the sand amount of carrying is less as ending standard, terminates After note sleeve shell material, slip casting core pipe is rinsed to injected clear water in slip casting core pipe, thus, the slurries of flushing enter slip casting by slip casting core pipe Outer tube, then exits into slip casting stratum by the slurry outlet on slip casting outer tube periphery through rubber set upper side, is not set in slip casting core pipe Slurry outlet is put, allows all slurries to be returned out from the bottom of slip casting core pipe, force the slurries in slip casting outer tube to be completely in flow regime;
E) slip casing by pressure, after after sleeve shell material final set, by slip casting core pipe to slip casing by pressure in slip casting formation at target locations;
F) clear water washes pipe, when single injected hole plasma volume is larger, stops slip casting, and rinse note to injected clear water in slip casting core pipe Slurry pipeline;
G) secondary grouting, secondary grouting is carried out after grouting serous fluid reaches initial set after first time, i.e., carry out step E and step F again.
CN201510756244.7A 2015-11-06 2015-11-06 Anti-suck sludge proof grouting process and grouting device in deep saturated sand Active CN105274994B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510756244.7A CN105274994B (en) 2015-11-06 2015-11-06 Anti-suck sludge proof grouting process and grouting device in deep saturated sand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510756244.7A CN105274994B (en) 2015-11-06 2015-11-06 Anti-suck sludge proof grouting process and grouting device in deep saturated sand

Publications (2)

Publication Number Publication Date
CN105274994A CN105274994A (en) 2016-01-27
CN105274994B true CN105274994B (en) 2017-06-09

Family

ID=55144754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510756244.7A Active CN105274994B (en) 2015-11-06 2015-11-06 Anti-suck sludge proof grouting process and grouting device in deep saturated sand

Country Status (1)

Country Link
CN (1) CN105274994B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703038B (en) * 2016-11-30 2019-01-29 上海建工集团股份有限公司 A kind of horizontal reciprocating Grouting Pipe of mechanical non-return and its construction method
CN112523221A (en) * 2020-11-12 2021-03-19 温州竺陌机械科技有限公司 Pile foundation engineering slip casting pipe with self-cleaning function
CN112917660B (en) * 2021-01-27 2022-04-26 山东科技大学 Efficient anti-blocking backflow grouting pipe and method
CN113389201B (en) * 2021-06-30 2022-06-21 大连理工大学 Grouting method of efficient anchor rod pressure grouting system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3886754A (en) * 1973-07-27 1975-06-03 Lee A Turzillo Method of extending augered pile cavity through rock or like obstruction
CN2555288Y (en) * 2002-02-08 2003-06-11 江苏南水土建工程公司 High efficiency slurry pouring pipe for foundation engineering
CN1587544A (en) * 2004-07-30 2005-03-02 于来喜 Multipurpose controllable slip casting device after cleaving and utilizing process
CN102363958A (en) * 2011-11-21 2012-02-29 许瑞琴 Grouting pipe
CN104805842A (en) * 2015-04-20 2015-07-29 中铁建设集团有限公司 Steel flower pipe segmented grouting system and construction method thereof
CN205077490U (en) * 2015-11-06 2016-03-09 中煤科工集团西安研究院有限公司 Prevent suck -back and prevent slip casting device that deposits in deep full water sand bed

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3886754A (en) * 1973-07-27 1975-06-03 Lee A Turzillo Method of extending augered pile cavity through rock or like obstruction
CN2555288Y (en) * 2002-02-08 2003-06-11 江苏南水土建工程公司 High efficiency slurry pouring pipe for foundation engineering
CN1587544A (en) * 2004-07-30 2005-03-02 于来喜 Multipurpose controllable slip casting device after cleaving and utilizing process
CN102363958A (en) * 2011-11-21 2012-02-29 许瑞琴 Grouting pipe
CN104805842A (en) * 2015-04-20 2015-07-29 中铁建设集团有限公司 Steel flower pipe segmented grouting system and construction method thereof
CN205077490U (en) * 2015-11-06 2016-03-09 中煤科工集团西安研究院有限公司 Prevent suck -back and prevent slip casting device that deposits in deep full water sand bed

Also Published As

Publication number Publication date
CN105274994A (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN107761753B (en) A kind of foundation pit water burst rapid rescue slip casting method for blocking
CN105274994B (en) Anti-suck sludge proof grouting process and grouting device in deep saturated sand
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN106761835B (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN105821830A (en) Permeation increase siphon drainage system for low-permeability soil slope
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN105239984A (en) Method for controlling coal mine underground fracturing crack propagation
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN107152294A (en) High hydraulic pressure big flow Karst Tunnel underground water seal blocking method
CN111005760A (en) Drainage type drainage system for karst tunnel
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN112746849A (en) Shaft water-carrying digging and building method
CN108590716A (en) A kind of tunnel crosses rich water tomography tree root type and dredges water blockoff integral construction method
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
CN111441819A (en) Tunnel advanced exploratory hole karst high-pressure water burst plugging device and method
CN110130982A (en) A kind of traffic tunnel building safety construction method
CN105178966A (en) Grouting process for water blocking by wall breaking for mine vertical shafts
CN208502786U (en) Multilevel hierarchy suspension device for rich water sandy gravel stratum tunnel
CN116816389A (en) Tunnel water-rich karst collapse cavity treatment method
CN205077490U (en) Prevent suck -back and prevent slip casting device that deposits in deep full water sand bed
CN107218010B (en) Water plugging bridge plug for damaged drilling sleeve and double-bridge plug type water plugging method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210721

Address after: 300000 building 709, Minghai center, CCCC C Valley, pilot Free Trade Zone, Binhai New Area, Tianjin (Dongjiang Bonded Port Area)

Patentee after: China Coal Science and Technology Co.,Ltd.

Address before: No.82, Jinye 1st Road, hi tech Zone, Xi'an City, Shaanxi Province

Patentee before: XI'AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY & ENGINEERING Group Corp.

TR01 Transfer of patent right