CN105238891A - Direct connection type process for iron making and steel making interface - Google Patents

Direct connection type process for iron making and steel making interface Download PDF

Info

Publication number
CN105238891A
CN105238891A CN201510685906.6A CN201510685906A CN105238891A CN 105238891 A CN105238891 A CN 105238891A CN 201510685906 A CN201510685906 A CN 201510685906A CN 105238891 A CN105238891 A CN 105238891A
Authority
CN
China
Prior art keywords
iron
molten iron
ladle
workshop
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510685906.6A
Other languages
Chinese (zh)
Inventor
尚国普
向春涛
段晓彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang International Engineering Technology Co Ltd
Original Assignee
Beijing Shougang International Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang International Engineering Technology Co Ltd filed Critical Beijing Shougang International Engineering Technology Co Ltd
Priority to CN201510685906.6A priority Critical patent/CN105238891A/en
Publication of CN105238891A publication Critical patent/CN105238891A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The invention discloses a direction connection type process for an iron making and steel making interface, and belongs to the technical field of iron and steel procedure interfaces in metallurgy. According to the direct connection type process, a blast furnace iron making workshop, a molten iron conveying line, a molten iron jar conveying cart, a crane, a molten iron jar baking device, a converter steel making workshop and a pig casting machine workshop are involved. The blast furnace iron making workshop and the converter steel making workshop are directly connected through the molten iron conveying line, molten iron is received under a blast furnace and then is directly conveyed to the steel making workshop through the molten iron jar conveying cart on the molten iron conveying line, and the distance between the iron making workshop and the steel making workshop is shortened to the maximum extent; the traditional organization pattern that molten iron is conveyed through a huge railway system is changed, the molten iron conveying procedure comprising the multiples links of transition crossing, transferring crossing, buffering crossing and the like adopted by an iron making-steel making 'one jar to the end' interface is improved, and the molten iron conveying links are reduced; rapid and efficient molten iron conveying is achieved to the maximum extent, and the general layout is compact and orderly. By means of the process, the environmental benefits of reducing temperature decreasing of the molten iron, reducing iron losses, lowering energy consumption, reducing occupied space of projects, reducing the soot emission range and lowering soot pollution are achieved.

Description

Ironmaking-direct-connected technique in steel-making interface
Technical field
The invention belongs to metallurgy iron, steel operation interface tech field, particularly the direct-connected technique in interface is smelted iron-made steel to one.
Background technology
In recent ten years, along with the high speed development of metallurgical technology, interface tech is more and more by the concern of metallurgy industry, between ironmaking-steel-making interface, " tank on earth " Molten Iron Transportation technique progressively instead of the production technique that traditional torpedo tank car carries out tank switching operation, increasingly mature along with " tank on earth " production technique between iron-making and steel-making operation interface, it is more and more obvious that its superiority embodies in Steel Plant produce, and blast-melted undertaking, transport, buffer reservoir, hot metal pretreatment, converter are converted iron, container and to be had enough to meet the need fast and the function such as hot-metal insulating integrates by its technology.Reduce molten iron ladle pouring operation, shortened process, compact total figure arranges, reduces hot metal temperature drop, reduces energy consumption and smoke contamination, have larger economy, environmental and social benefits.
The space layout at ironmaking-steel-making interface is also undertaken being connected by the railway system that traditional employing is huge and is changed to shorter victory, efficiently mode of transport.Space layout between ironmaking, steel-making interface, mode of transport, transportation equipment is also to development in pluralism, it in recent years, domestic newly-built Steel Plant almost all consider " tank on earth " production technique, but the how target pursued of more efficient, Duan Jieshi modern steel factory, the metering the spatial relation of arranging from ironmaking, steel making working procedure, mode of transport, transportation equipment, transport courses, buffering, the aspects such as the emergency processing under the locating and tracking of iron ladle, hot-metal car, accidental state are kept on improving.
Existing ironmaking-steel-making interface shape layout mainly contains two profiles formula:
(1) the huge railway system is adopted to realize the Molten Iron Transportation of iron, steel inter process.Railways Stations system, signalling system, dispatching system, dimension check system are set, Along Railway arrange pig-casting machine system, roasting system built by laying by iron ladle, locomotive servicing maintenance system etc., system complex, bring ironmaking, steel making working procedure distant, haul-cycle time is long, and hot metal temperature drop is large, and smoke contamination scope is large, the railway system takes up an area larger, the inferior positions such as staffing is many, and accident point is many, deviate from modern steel factory and pursue the target realizing good economic benefits, environmental benefit.
(2) adopt the transport of track haulage, lifting machine to instead of traditional transportation by railroad, ironmaking, steel making working procedure close together, layout is regular, but iron, steel inter process arrange iron ladle transhipment across, transition across, cushion across etc. too many levels operation.Cargo handling operation is more, iron ladle transhipment across, transition across etc. factory building be the transhipment realizing iron ladle, need configure large-tonnage lifting machine, the corresponding factory building load that brings is large, free height, and investment is large.
To sum up, need the shorter victory of one, efficiently ironmaking-steel-making interface arrangement technology, shorten the distance of ironmaking, steel making working procedure to greatest extent, reduce cargo handling operation, integrate by the production process of crane job, realize higher economic benefit and environmental benefit.
Summary of the invention
The object of the present invention is to provide a kind of ironmaking-direct-connected technique in steel-making interface, it is direct-connected that Molten Iron Transportation line is passed through in blast furnace ironmaking workshop and converter steelmaking workshop, molten iron adopts molten iron transportation vehicle direct sending to steelshop from crossing Molten Iron Transportation line by Tie Tong State of Blast Furnace, shorten the distance of ironmaking workshop and steelshop to greatest extent, change the enterprise schema that the huge railway system of traditional employing carries out Molten Iron Transportation, improve ironmaking-steel-making " tank on earth " interface adopt transition across, transport across, cushion the Molten Iron Transportation operation across waiting too many levels, reduce Molten Iron Transportation cargo handling operation, realize the short victory of Molten Iron Transportation to greatest extent with efficient, it is compact and regular that total figure arranges.
The present invention includes ironmaking workshop 1, steelshop 2, Molten Iron Transportation line 3, hot-metal ladle transport vehicle 4, Weighing type liquid level meter 5, lifting machine 6, pig-casting machine 7, converter 8, iron ladle build by laying roasting device 9, ironmaking workshop and steelshop are arranged in parallel, Molten Iron Transportation line linearly from the pendulum groove of ironmaking workshop by iron spot to steelshop reinforced across, hot-metal ladle transport vehicle is two-way self-driven traveling on Molten Iron Transportation line, molten iron buffering (cast iron), pre-treatment, roasting device built by laying by iron ladle, and to be arranged in steel-making reinforced across interior, lifting machine carries out lifting job reinforced across interior, step is: hot-metal ladle transport vehicle 4 consigns iron ladle in ironmaking workshop 1 by iron, traveling on Molten Iron Transportation line 3, direct sending to steelshop reinforced across, after hot metal pretreatment station carries out pre-treatment, iron is converted directly to converter 8 by lifting machine 6 handling, iron ladle also carries out buffered by lifting machine 6 handling to pig-casting machine 7, the roasting operation of building by laying of iron ladle is built by laying roasting device 9 at iron ladle and is carried out.
Be connected under the pendulum groove of ironmaking workshop across straight line by iron spot and steelshop are reinforced by Molten Iron Transportation line, go out iron wire and vertically enter steelshop 2 under casting house, ironmaking workshop 1 casting house side column is 105 ~ 160 meters apart from steelshop 2 factory building side column distance; The linear transport distance 160 ~ 210 meters of Molten Iron Transportation line 3.
Molten Iron Transportation flow process adopts hot-metal ladle transport vehicle 4+ lifting machine 6 to transport two links and completes the full scale production converting iron by iron to converter from blast furnace and transport.Hot metal pretreatment, to convert iron to converter, molten iron storage, molten iron ingot pig, iron ladle build by laying roasting, iron ladle and deposit and all complete across interior steelshop is reinforced, all lifting jobs adopt lifting machine (6) to complete.
Iron is converted across interior Molten Iron Transportation line 3 handling iron ladle to converter 8 from reinforced, handling distance 105 ~ 170 meters by lifting machine 6; Buffered is carried out across interior Molten Iron Transportation line 3 handling iron ladle to pig-casting machine 7 from reinforced, handling distance 90 ~ 140 meters by lifting machine 6.
Hot-metal ladle transport vehicle 4 is two-way self-driven traveling on Molten Iron Transportation line 3, and traveling speed is 5 ~ 70m/min.
By iron spot position under blast furnace pendulum groove, Weighing type liquid level meter (5) is set below Molten Iron Transportation line 3.
The present invention achieves the short victory, efficient of Molten Iron Transportation between iron-making and steel-making interface to greatest extent, direct-connected track circuit instead of traditional railway system, ironmaking, steelshop are at a distance of only 105 ~ 160 meters, Molten Iron Transportation is without any transhipment and transitional link, converter reinforced across interiorly incorporating cast iron, iron ladle builds by laying the cargo handling operations such as roasting, hot metal pretreatment, therefore bring to reduce hot metal temperature drop, reduce iron loss, reduce energy consumption, reduce project occupation of land and reduce soot emissions scope, reduce smoke contamination.There is good economic benefit, environmental benefit and social benefit.Greatly improve the comprehensive benefit of " a tank system " Molten Iron Transportation.
Accompanying drawing explanation
Fig. 1 is plot plan of the present invention.Wherein, roasting device 9 built by laying by ironmaking workshop 1, steelshop 2, Molten Iron Transportation line 3, hot-metal ladle transport vehicle 4, Weighing type liquid level meter 5, lifting machine 6, pig-casting machine 7, converter 8, iron ladle.
Embodiment
Fig. 1 is a kind of embodiment of the present invention.
As shown in the figure, ironmaking workshop 1 and steelshop 2 are by the direct-connected layout of Molten Iron Transportation line 3, hot-metal ladle transport vehicle 4 is consigned iron ladle and is controlled to carry out precisely by after iron by Weighing type liquid level meter 5 under State of Blast Furnace, hot-metal ladle transport vehicle 4 keep straight on Molten Iron Transportation line 3 to steelshop 2 reinforced across, casting house side column is 105 ~ 160 meters apart from steelshop 2 factory building side column distance, the linear transport distance 160 ~ 210 meters of Molten Iron Transportation line 3; Lifting machine 6 is transported to iron ladle converts iron to converter 8 from reinforced to hang oneself across interior Molten Iron Transportation line 3 after preprocessing station carries out pre-treatment, and molten iron line is to the distance 105 ~ 170 meters of converter; Iron ladle also carries out buffered by lifting machine 6 handling to pig-casting machine 7, handling distance 90 ~ 140 meters; Slack tank to feeding in raw material across on interior molten iron transportation vehicle 4, by iron under State of Blast Furnace that Molten Iron Transportation line 3 is kept straight on, realizes turnover production and transport by lifting machine 6 handling; Iron ladle is built by laying roasting device 9 and is arranged in nearby near pig-casting machine 7.
The present invention is that two blast furnaces are arranged in juxtaposition, and Molten Iron Transportation line 3 centralized arrangement is at the middle part in ironmaking workshop 1, and 2 iron mouths established by every blast furnace, 2 pendulum grooves, 2 pendulum grooves establish 3 Molten Iron Transportation lines (wherein a line shares).Track adopts lifting rail, and track foundation adopts concrete integral channel bed.
The present invention by reinforced to pig-casting machine 7 and steelshop 2 across be arranged in vertical association reinforced across termination, cast iron operation and convert iron operation to converter and share reinforced across lifting machine 6; Iron ladle being built by laying roasting device 9, to be arranged in steelshop 2 reinforced across between interior pig-casting machine 7 and Molten Iron Transportation line 3, had both been conducive to the soot emissions source concentrated dust-removing that roasting device (9) built by laying by pig-casting machine 7 and iron ladle, and improved dust removing effects; Shorten again slack tank and winch to distance on molten iron transportation vehicle 4.
Molten iron transportation vehicle 4 of the present invention adopts two-way automatic drive device, is directly sitting on molten iron transportation vehicle by iron ladle, substitutes the operational mode of traditional locomotive traction tank car vehicle, significantly increases the flexibility ratio of Molten Iron Transportation.

Claims (4)

1. smelt iron-steel-making interface direct-connected a technique, comprise ironmaking workshop (1), steelshop (2), Molten Iron Transportation line (3), hot-metal ladle transport vehicle (4), Weighing type liquid level meter (5), lifting machine (6), pig-casting machine (7), converter (8), iron ladle build by laying roasting device (9), it is characterized in that: ironmaking workshop and steelshop are arranged in parallel, Molten Iron Transportation line linearly from the pendulum groove of ironmaking workshop by iron spot to steelshop reinforced across, hot-metal ladle transport vehicle is two-way self-driven traveling on Molten Iron Transportation line, molten iron cushions, pre-treatment, roasting device built by laying by iron ladle, and to be arranged in steel-making reinforced across interior, lifting machine carries out lifting job reinforced across interior, step is: hot-metal ladle transport vehicle (4) delivery iron ladle is smelting iron workshop (1) by iron, in the upper traveling of Molten Iron Transportation line (3), direct sending to steelshop reinforced across, iron is converted directly to converter (8) after carrying out pre-treatment by lifting machine (6) handling to hot metal pretreatment station, iron ladle also carries out buffered by lifting machine (6) handling to pig-casting machine (7), the roasting operation of building by laying of iron ladle is built by laying roasting device (9) at iron ladle and is carried out,
Be connected under the pendulum groove of ironmaking workshop across straight line by iron spot and steelshop are reinforced by Molten Iron Transportation line, go out iron wire under casting house and vertically enter steelshop (2), ironmaking workshop (1) casting house side column is 105 ~ 160 meters apart from steelshop (2) factory building side column distance; The linear transport distance 160 ~ 210 meters of Molten Iron Transportation line (3);
Molten Iron Transportation flow process adopts hot-metal ladle transport vehicle (4)+lifting machine (6) transport two links to complete the full scale production converting iron by iron to converter from blast furnace and transport; Hot metal pretreatment, to convert iron to converter, molten iron storage, molten iron ingot pig, iron ladle build by laying roasting, iron ladle and deposit and all complete across interior steelshop is reinforced, all lifting jobs adopt lifting machine (6) to complete.
2. ironmaking according to claim 1-direct-connected technique in steel-making interface, it is characterized in that, iron is converted across interior Molten Iron Transportation line (3) handling iron ladle to converter (8) from reinforced, handling distance 105 ~ 170 meters by lifting machine (6); Buffered is carried out across interior Molten Iron Transportation line (3) handling iron ladle to pig-casting machine (7) from reinforced, handling distance 90 ~ 140 meters by lifting machine (6).
3. ironmaking according to claim 1-direct-connected technique in steel-making interface, is characterized in that, hot-metal ladle transport vehicle (4) is in the upper two-way self-driven traveling of Molten Iron Transportation line (3), and traveling speed is 5 ~ 70m/min.
4. ironmaking according to claim 1-direct-connected technique in steel-making interface, is characterized in that, by iron spot position under blast furnace pendulum groove, Molten Iron Transportation line (3) below arranges Weighing type liquid level meter (5).
CN201510685906.6A 2015-10-20 2015-10-20 Direct connection type process for iron making and steel making interface Pending CN105238891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510685906.6A CN105238891A (en) 2015-10-20 2015-10-20 Direct connection type process for iron making and steel making interface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510685906.6A CN105238891A (en) 2015-10-20 2015-10-20 Direct connection type process for iron making and steel making interface

Publications (1)

Publication Number Publication Date
CN105238891A true CN105238891A (en) 2016-01-13

Family

ID=55036709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510685906.6A Pending CN105238891A (en) 2015-10-20 2015-10-20 Direct connection type process for iron making and steel making interface

Country Status (1)

Country Link
CN (1) CN105238891A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107175325A (en) * 2017-06-15 2017-09-19 中冶华天工程技术有限公司 A kind of system and method using remaining steel line of return off-line baking hot-metal bottle
CN110076331A (en) * 2019-06-10 2019-08-02 成渝钒钛科技有限公司 A kind of one tank technology of vanadium-titanium-iron-water transhipment
CN110405191A (en) * 2019-08-22 2019-11-05 中冶赛迪工程技术股份有限公司 Molten iron railway transportation to steelshop docking system and its improved method
CN111646687A (en) * 2020-07-06 2020-09-11 中冶东方工程技术有限公司 Production process of hot-melt slag rock wool
CN111763007A (en) * 2020-07-06 2020-10-13 中冶东方工程技术有限公司 Hot melt sediment rock wool production system
WO2021179752A1 (en) * 2020-03-09 2021-09-16 中冶南方工程技术有限公司 Blast furnace-converter production system based on molten iron ladle crossing vehicle, and operation method for system
CN114934141A (en) * 2022-05-09 2022-08-23 北京首钢国际工程技术有限公司 Smelting system
CN115007844A (en) * 2022-05-17 2022-09-06 湖南华菱涟源钢铁有限公司 Blast furnace iron receiving method for preheating scrap steel of hot metal ladle
RU2819401C1 (en) * 2020-03-09 2024-05-20 ВИСДРИ ИНЖИНИРИНГ энд РИСЕРЧ ИНКОРПОРЕЙШН ЛИМИТЕД Production system blast furnace - converter based on rail platform with reservoir for liquid iron and method of operation thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101108419A (en) * 2007-08-09 2008-01-23 首钢总公司 System and technique for transporting rail heterotype considerable tank truck
CN103343632A (en) * 2013-07-17 2013-10-09 中冶东方工程技术有限公司 Compact hot metal conveying system
CN103433474A (en) * 2013-08-16 2013-12-11 北京首钢国际工程技术有限公司 Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN103924014A (en) * 2013-01-13 2014-07-16 山东省冶金设计院股份有限公司 Iron-making steel-making method shortening interface distance of molten iron and molten steel and equipment combination thereof
CN103978167A (en) * 2014-05-24 2014-08-13 北京首钢国际工程技术有限公司 Multifunctional pig casting machine system for molten iron transportation one-jar-to-bottom process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101108419A (en) * 2007-08-09 2008-01-23 首钢总公司 System and technique for transporting rail heterotype considerable tank truck
CN103924014A (en) * 2013-01-13 2014-07-16 山东省冶金设计院股份有限公司 Iron-making steel-making method shortening interface distance of molten iron and molten steel and equipment combination thereof
CN103343632A (en) * 2013-07-17 2013-10-09 中冶东方工程技术有限公司 Compact hot metal conveying system
CN103433474A (en) * 2013-08-16 2013-12-11 北京首钢国际工程技术有限公司 Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN103978167A (en) * 2014-05-24 2014-08-13 北京首钢国际工程技术有限公司 Multifunctional pig casting machine system for molten iron transportation one-jar-to-bottom process

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107175325A (en) * 2017-06-15 2017-09-19 中冶华天工程技术有限公司 A kind of system and method using remaining steel line of return off-line baking hot-metal bottle
CN107175325B (en) * 2017-06-15 2023-07-18 中冶华天工程技术有限公司 System and method for off-line baking of hot-metal ladle by utilizing residual steel return line
CN110076331A (en) * 2019-06-10 2019-08-02 成渝钒钛科技有限公司 A kind of one tank technology of vanadium-titanium-iron-water transhipment
CN110405191A (en) * 2019-08-22 2019-11-05 中冶赛迪工程技术股份有限公司 Molten iron railway transportation to steelshop docking system and its improved method
WO2021179752A1 (en) * 2020-03-09 2021-09-16 中冶南方工程技术有限公司 Blast furnace-converter production system based on molten iron ladle crossing vehicle, and operation method for system
RU2819401C1 (en) * 2020-03-09 2024-05-20 ВИСДРИ ИНЖИНИРИНГ энд РИСЕРЧ ИНКОРПОРЕЙШН ЛИМИТЕД Production system blast furnace - converter based on rail platform with reservoir for liquid iron and method of operation thereof
CN111646687A (en) * 2020-07-06 2020-09-11 中冶东方工程技术有限公司 Production process of hot-melt slag rock wool
CN111763007A (en) * 2020-07-06 2020-10-13 中冶东方工程技术有限公司 Hot melt sediment rock wool production system
CN114934141A (en) * 2022-05-09 2022-08-23 北京首钢国际工程技术有限公司 Smelting system
CN115007844A (en) * 2022-05-17 2022-09-06 湖南华菱涟源钢铁有限公司 Blast furnace iron receiving method for preheating scrap steel of hot metal ladle
CN115007844B (en) * 2022-05-17 2024-02-23 湖南华菱涟源钢铁有限公司 Blast furnace iron receiving method for preheating scrap steel of hot-metal ladle

Similar Documents

Publication Publication Date Title
CN105238891A (en) Direct connection type process for iron making and steel making interface
CN101249558B (en) One tank to end technique for iron-smelting to steel-smelting
CN103924014B (en) The company's iron for shortening molten iron molten steel interface distance connects steel method and its equipment combination
CN103433474A (en) Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN100500332C (en) System for transporting standard-gauge heterotype high capacity tank truck
CN101280347A (en) Blast furnace-converter interface 'compact one tank mode' process
CN105170965B (en) Molten iron transport system
CN103924800A (en) Rapid molten iron conveying method and device combination between interfaces of molten iron and molten steel
CN112059163A (en) Molten iron transportation system of iron-making-steel interface
CN103343632B (en) Compact Iron Melt Transport System
CN204250957U (en) A kind of spray aftertreatment technology manufacturing line
CN204311077U (en) A kind of Iron Melt Transport System
CN201437154U (en) Molten iron conveying system
CN101892346B (en) Layout structure in converter steelmaking bidirectional steel supply system and method for arranging steel ladles and slag ladles
CN208532847U (en) A kind of pneumatic steelmaking system
CN106985832B (en) Short-distance molten iron transportation system for iron making-steelmaking interface
CN210702525U (en) Connection system for railway transportation of molten iron to steelmaking workshop
CN202380029U (en) Logistics system for charging of electric furnace in electric furnace smelting
CN114934141A (en) Smelting system
CN202279833U (en) Simple converter flue transition carriage
CN206749804U (en) Iron making-steel making interface short distance Iron Melt Transport System
CN106967858A (en) A kind of converter slag ladle movement system and technique
CN114164312A (en) Molten steel tapping transfer method for converter in steelmaking production
CN103924015B (en) Realize equipment combination and the method at the interface of steel zero
CN210789218U (en) Flexible connecting device in middle of one-pot bottom molten iron transportation process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160113