CN105220934A - An a kind of comprehensive steel tower point system of solutions founds aluminium-alloy pipe pole - Google Patents

An a kind of comprehensive steel tower point system of solutions founds aluminium-alloy pipe pole Download PDF

Info

Publication number
CN105220934A
CN105220934A CN201510716866.7A CN201510716866A CN105220934A CN 105220934 A CN105220934 A CN 105220934A CN 201510716866 A CN201510716866 A CN 201510716866A CN 105220934 A CN105220934 A CN 105220934A
Authority
CN
China
Prior art keywords
aluminium
pole
alloy pipe
flange
affixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510716866.7A
Other languages
Chinese (zh)
Other versions
CN105220934B (en
Inventor
赵爱民
王晓峰
李友
郑辉
于志峰
张国庆
殷海涛
孙宏宇
朱典
汪日东
李淑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Heilongjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510716866.7A priority Critical patent/CN105220934B/en
Publication of CN105220934A publication Critical patent/CN105220934A/en
Application granted granted Critical
Publication of CN105220934B publication Critical patent/CN105220934B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

An a kind of comprehensive steel tower point system of solutions founds aluminium-alloy pipe pole, and it relates to a kind of pole.The invention solves existing pole installs complicated, and need in construction repeatedly to adjust pole angle, pole itself is greatly stressed, poor stability, and material and the constructor of needs are more, ineffective problem.The present invention includes pole head, embrace bottom rod body and pole, embrace rod body and comprise at least two aluminium-alloy pipes and multiple first flange, linked together by two the first flange between adjacent two aluminium-alloy pipes, one end and the pole head of embracing rod body are affixed, and the other end embracing rod body is connected with first flange; Pole head comprises axle sleeve, upper pressure bearing, downforce bearing, lifting pulley, lifting pulley support and force controlled ring, comprises pole enhancing ring, candan universal joint, connection base, the second flange, two fixed heads, two the first bolts and two wire rope move towards pulley bottom pole.The present invention is used for steel tower and divides the system of solutions to stand.

Description

An a kind of comprehensive steel tower point system of solutions founds aluminium-alloy pipe pole
Technical field
The present invention relates to a kind of pole, particularly the comprehensive steel tower of an one point system of solutions founds aluminium-alloy pipe pole.
Background technology
At present, the old transmission line of electricity that national grid runs is more, and design level is relatively low, and the ability of withstanding natural calamities is poor.In recent years, by the impact of atmospheric environment and EI Nino phenomenon, the exceedingly odious weather such as blast, heavy rain frequently occurs, the situation that instantaneous wind-force reaches more than ten grades happens occasionally, safely serious threat is caused to the overhead wire shaft tower being chronically exposed to field, wilderness, even the accident of falling shaft tower occurs, and the geographical environment that the section of falling shaft tower occurs mostly is the special geological surrounding of the traffic difficulties such as low-level bog.Therefore, for ensureing that repairing work is carried out fast, the power failure reduced because shaft tower causes affects, and must organize vertical rod tower as early as possible and recover power transmission.Mostly special geological surrounding overhead line support towers method for assembling is to adopt a point system of solutions to stand, and the time that point system of solutions founds steel tower depends on the efficiency of pole, and therefore a point system of solutions is found pole and played an important role.Traditional pole is installed complicated, and need in construction repeatedly to adjust pole angle, pole itself is greatly stressed, poor stability, and material and the constructor of needs are more, inefficiency.
Summary of the invention
The present invention installs complicated to solve existing pole, and need in construction repeatedly to adjust pole angle, pole itself is greatly stressed, poor stability, the material needed and constructor more, ineffective problem, and then propose an a kind of comprehensive steel tower point system of solutions and found aluminium-alloy pipe pole.
The present invention in order to solve the problems of the technologies described above the technical scheme taked is: a comprehensive steel tower point system of solutions of the present invention is found aluminium-alloy pipe pole and comprised pole head, embraces bottom rod body and pole, embrace rod body and comprise at least two aluminium-alloy pipes and multiple first flange, linked together by two the first flange between adjacent two aluminium-alloy pipes, one end and the pole head of embracing rod body are affixed, and the other end embracing rod body is connected with first flange;
Pole head comprises axle sleeve, upper pressure bearing, downforce bearing, lifting pulley, lifting pulley support and force controlled ring, one end of axle sleeve stretch into described embrace rod body one end and aluminium-alloy pipe affixed, axle sleeve and aluminium-alloy pipe are coaxially arranged, the other end of axle sleeve is set with downforce bearing and upper pressure bearing successively, one end embedding aluminium-alloy pipe of downforce bearing is interior and affixed with aluminium-alloy pipe, force controlled ring is fixed on downforce bearing, lifting pulley support and upper pressure bearing affixed, lifting pulley is arranged on lifting pulley support;
Pole enhancing ring is comprised bottom pole, candan universal joint, connect base, second flange, two fixed heads, two the first bolts and two wire rope move towards pulley, first flange of the second flange and the described armful of rod body other end is affixed, two fixed heads are parallel to each other and be vertically fixed on the second flange, pole enhancing ring is fixed on one of them fixed head, one end of first bolt is passed successively after a fixed head moves towards pulley with a wire rope and is connected with another fixed head, one end and second flange of candan universal joint are affixed, the other end of candan universal joint is with to be connected base affixed.
The invention has the beneficial effects as follows:
1, pole of the present invention adopts built-in installation, namely steel tower inside is arranged on, during installation, only need be fixed on pole enhancing ring through force controlled ring with one end of hoisting wirerope, the other end of hoisting wirerope is walked around lifting pulley, is penetrated by axle sleeve again, moved towards to pass between pulley by two wire rope after be connected with pulling equipment, after pole being risen to correct position by pulling equipment, base and iron tower main material will be connected fix, install very convenient, the constructor needed is few, and installation effectiveness is high;
2, pole head of the present invention is provided with pressure bearing and downforce bearing, can rotate freely, the change of hanging piece any direction can be realized, embracing rod body adopts aluminium-alloy pipe to be connected with flange, can need to adjust length according to difference, realization lifting puts in place, candan universal joint is provided with bottom pole, pole loading angle can be adjusted at any time according to stressing conditions, achieve comprehensive, a multi-angle steel tower point system of solutions and stand work, easy to use, reduce the labour intensity that operating personnel regulates pole repeatedly, operating efficiency is high;
3, the present invention in use, lifting pulley is walked around in one end of hoisting wirerope, is penetrated by axle sleeve again, moved towards to pass between pulley by two wire rope after be connected with pulling equipment, the other end of hoisting wirerope connects hanging piece, because wire rope is in the walking of pole inside, and move towards pulley by lifting pulley and two wire rope and control its trend, decrease the flexibility of pole, increased the weight of hanging piece, improve operating efficiency and safety in utilization;
4, of the present invention armful of rod body adopts aluminium-alloy pipe, lightweight, and structure of the present invention is simple simultaneously, is convenient to install, uses flexibly, decrease operation intensity, is specially adapted to use the steel tower of the special geological surrounding of the vertical steel tower of machinery group to decompose vertical construction.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention;
The annexation schematic diagram that Fig. 2 is the second flange, wire rope moves towards pulley and candan universal joint.
Detailed description of the invention
Detailed description of the invention one: composition graphs 1 and Fig. 2 illustrate present embodiment, the comprehensive steel tower of an one point system of solutions for present embodiment is found aluminium-alloy pipe pole and is comprised pole head, embraces bottom rod body and pole, embrace rod body and comprise at least two aluminium-alloy pipes 6 and multiple first flange 8, linked together by two the first flange 8 between adjacent two aluminium-alloy pipes 6, one end and the pole head of embracing rod body are affixed, and the other end embracing rod body is connected with first flange 8;
Pole head comprises axle sleeve 1, upper pressure bearing 2, downforce bearing 3, lifting pulley 16, lifting pulley support 15 and force controlled ring 17, one end of axle sleeve 1 stretch into described embrace rod body one end and aluminium-alloy pipe 6 affixed, axle sleeve 1 and aluminium-alloy pipe 6 are coaxially arranged, the other end of axle sleeve 1 is set with downforce bearing 3 and upper pressure bearing 2 successively, one end embedding aluminium-alloy pipe 6 of downforce bearing 3 is interior and affixed with aluminium-alloy pipe 6, force controlled ring 17 is fixed on downforce bearing 3, lifting pulley support 15 is affixed with upper pressure bearing 2, lifting pulley 16 is arranged on lifting pulley support 15,
Pole enhancing ring 10 is comprised bottom pole, candan universal joint 13, connect base 12, second flange 18, two fixed heads 9, two the first bolts 11 and two wire rope move towards pulley 14, second flange 18 is affixed with the first flange 8 of the described armful of rod body other end, two fixed heads 9 are parallel to each other and be vertically fixed on the second flange 18, pole enhancing ring 10 is fixed on one of them fixed head 9, one end of first bolt 11 is moved towards pulley 14 through a fixed head 9 and a wire rope successively and is connected with another fixed head 9 afterwards, one end and second flange 18 of candan universal joint 13 are affixed, the other end of candan universal joint 13 is with to be connected base 12 affixed.
Detailed description of the invention two: composition graphs 1 illustrates present embodiment, a comprehensive steel tower point system of solutions for present embodiment is found aluminium-alloy pipe pole and is also comprised multiple second bolt 4, downforce bearing 3 is affixed with aluminium-alloy pipe 6 by multiple second bolt 4, and multiple second bolt 4 is along the uniform setting of circumference of aluminium-alloy pipe 6.Installation and removal are convenient in design like this.Other composition and annexation identical with detailed description of the invention one.
Detailed description of the invention three: composition graphs 1 illustrates present embodiment, a comprehensive steel tower point system of solutions for present embodiment is found aluminium-alloy pipe pole and is also comprised multiple 3rd bolt 5, and axle sleeve 1 is affixed with aluminium-alloy pipe 6 by multiple 3rd bolt 5.Installation and removal are convenient in design like this.Other composition and annexation identical with detailed description of the invention one or two.
Detailed description of the invention four: composition graphs 1 illustrates present embodiment, a comprehensive steel tower point system of solutions for present embodiment is found aluminium-alloy pipe pole and is also comprised multiple 4th bolt 7, connected by multiple 4th bolt 7 between two the first flange 8, connected by multiple 4th bolt 7 between the first flange 8 and the second flange 18.Installation and removal are convenient in design like this.Other composition and annexation identical with detailed description of the invention three.
Detailed description of the invention five: composition graphs 2 illustrates present embodiment, two the first bolts 11 of present embodiment are arranged with any one shaft section mirror image of aluminium-alloy pipe 6.Design like this can ensure that hoisting wirerope is passed by the middle part of aluminium-alloy pipe 6, reduces the flexibility of pole.Other composition and annexation and detailed description of the invention one, two or four identical.
Detailed description of the invention six: composition graphs 1 and Fig. 2 illustrate present embodiment, the candan universal joint 13 of present embodiment initiatively pitch 13-1 and the second flange 18 is affixed, candan universal joint 13 from moving fork 13-2 with to be connected base 12 affixed.Meet design and use requirement.Other composition and annexation identical with detailed description of the invention five.
Detailed description of the invention seven: composition graphs 1 illustrates present embodiment, the connection base 12 of present embodiment is right angle base, connects the middle part of base 12 and is provided with reinforcing rib 12-1, candan universal joint 13 affixed from moving fork 13-2 and reinforcing rib 12-1.Connection base 12 is convenient in design like this and iron tower main material is fixed, and meets design and use requirement.Other composition and annexation identical with detailed description of the invention six.
Detailed description of the invention eight: composition graphs 1 and Fig. 2 illustrate present embodiment, two fixed heads 9 of present embodiment are arranged with any one shaft section mirror image of aluminium-alloy pipe 6.Meet design and use requirement.Other composition and annexation and detailed description of the invention one, two, four or seven identical.
The course of work
Composition graphs 1 and Fig. 2 explanation, the comprehensive steel tower of an one of the present invention point system of solutions founds aluminium-alloy pipe pole, need coordinate with hoisting wirerope and pulling equipment when installing and use, when pole is installed, one end of hoisting wirerope is fixed on pole enhancing ring 10 through force controlled ring 17, the other end of hoisting wirerope is walked around lifting pulley 16, is penetrated by axle sleeve 1 again, moved towards to pass between pulley 14 by two wire rope after be connected with pulling equipment, after pole being risen to correct position by pulling equipment, connection base 12 and iron tower main material are fixed; When pole uses, one end of hoisting wirerope walked around lifting pulley 16, penetrated by axle sleeve 1 again, moved towards to pass between pulley 14 by two wire rope after be connected with pulling equipment, the other end of hoisting wirerope connects hanging piece, by pulling equipment, hanging piece is hung correct position and carries out tower erection work.

Claims (8)

1. a comprehensive steel tower point system of solutions founds aluminium-alloy pipe pole, it is characterized in that: it comprises pole head, embraces bottom rod body and pole, embrace rod body and comprise at least two aluminium-alloy pipes (6) and multiple first flange (8), linked together by two the first flange (8) between adjacent two aluminium-alloy pipes (6), one end and the pole head of embracing rod body are affixed, and the other end embracing rod body is connected with first flange (8);
Pole head comprises axle sleeve (1), upper pressure bearing (2), downforce bearing (3), lifting pulley (16), lifting pulley support (15) and force controlled ring (17), one end of axle sleeve (1) stretch into described embrace rod body one end and aluminium-alloy pipe (6) affixed, axle sleeve (1) and aluminium-alloy pipe (6) are coaxially arranged, the other end of axle sleeve (1) is set with downforce bearing (3) and upper pressure bearing (2) successively, one end embedding aluminium-alloy pipe (6) of downforce bearing (3) is interior and affixed with aluminium-alloy pipe (6), force controlled ring (17) is fixed on downforce bearing (3), lifting pulley support (15) is affixed with upper pressure bearing (2), lifting pulley (16) is arranged on lifting pulley support (15),
Pole enhancing ring (10) is comprised bottom pole, candan universal joint (13), connect base (12), second flange (18), two fixed heads (9), two the first bolts (11) and two wire rope move towards pulley (14), second flange (18) is affixed with first flange (8) of the described armful of rod body other end, two fixed heads (9) are parallel to each other and be vertically fixed on the second flange (18), pole enhancing ring (10) is fixed on one of them fixed head (9), one end of first bolt (11) is moved towards pulley (14) through a fixed head (9) with a wire rope successively and is connected with another fixed head (9) afterwards, one end and second flange (18) of candan universal joint (13) are affixed, the other end of candan universal joint (13) is with to be connected base (12) affixed.
2. a comprehensive steel tower point system of solutions according to claim 1 founds aluminium-alloy pipe pole, it is characterized in that: a described comprehensive steel tower point system of solutions is found aluminium-alloy pipe pole and also comprised multiple second bolt (4), downforce bearing (3) is affixed by multiple second bolt (4) and aluminium-alloy pipe (6), and multiple second bolt (4) is along the uniform setting of circumference of aluminium-alloy pipe (6).
3. a comprehensive steel tower point system of solutions according to claim 1 and 2 founds aluminium-alloy pipe pole, it is characterized in that: a described comprehensive steel tower point system of solutions is found aluminium-alloy pipe pole and also comprised multiple 3rd bolt (5), axle sleeve (1) is affixed by multiple 3rd bolt (5) and aluminium-alloy pipe (6).
4. a comprehensive steel tower point system of solutions according to claim 3 founds aluminium-alloy pipe pole, it is characterized in that: a described comprehensive steel tower point system of solutions is found aluminium-alloy pipe pole and also comprised multiple 4th bolt (7), connected by multiple 4th bolt (7) between two the first flange (8), connected by multiple 4th bolt (7) between the first flange (8) and the second flange (18).
5. the comprehensive steel tower point system of solutions according to claim 1,2 or 4 founds aluminium-alloy pipe pole, it is characterized in that: two the first bolts (11) are arranged with any one shaft section mirror image of aluminium-alloy pipe (6).
6. a comprehensive steel tower point system of solutions according to claim 5 founds aluminium-alloy pipe pole, it is characterized in that: the active of candan universal joint (13) fork (13-1) is affixed with the second flange (18), candan universal joint (13) from moving fork (13-2) with to be connected base (12) affixed.
7. a comprehensive steel tower point system of solutions according to claim 6 founds aluminium-alloy pipe pole, it is characterized in that: connecting base (12) is right angle base, the middle part connecting base (12) is provided with reinforcing rib (12-1), candan universal joint (13) affixed from moving fork (13-2) and reinforcing rib (12-1).
8. the comprehensive steel tower point system of solutions according to claim 1,2,4 or 7 founds aluminium-alloy pipe pole, it is characterized in that: two fixed heads (9) are arranged with any one shaft section mirror image of aluminium-alloy pipe (6).
CN201510716866.7A 2015-10-28 2015-10-28 A kind of vertical aluminium-alloy pipe pole of comprehensive steel tower decomposition group Active CN105220934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510716866.7A CN105220934B (en) 2015-10-28 2015-10-28 A kind of vertical aluminium-alloy pipe pole of comprehensive steel tower decomposition group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716866.7A CN105220934B (en) 2015-10-28 2015-10-28 A kind of vertical aluminium-alloy pipe pole of comprehensive steel tower decomposition group

Publications (2)

Publication Number Publication Date
CN105220934A true CN105220934A (en) 2016-01-06
CN105220934B CN105220934B (en) 2017-06-06

Family

ID=54990165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716866.7A Active CN105220934B (en) 2015-10-28 2015-10-28 A kind of vertical aluminium-alloy pipe pole of comprehensive steel tower decomposition group

Country Status (1)

Country Link
CN (1) CN105220934B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201437648U (en) * 2009-06-23 2010-04-14 浙江省送变电工程公司 Holding pole
CN202187601U (en) * 2011-05-17 2012-04-11 王海兵 Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line
KR20130141813A (en) * 2012-06-18 2013-12-27 주식회사 시스매니아 Street lamp for the maintenance of convenience
CN103726711A (en) * 2013-12-31 2014-04-16 国家电网公司 Single column type derrick of electric transmission line
CN205063510U (en) * 2015-10-28 2016-03-02 国网黑龙江省电力有限公司绥化供电公司 All -round iron tower decomposes assemblage aluminum alloy tube and embraces pole

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201437648U (en) * 2009-06-23 2010-04-14 浙江省送变电工程公司 Holding pole
CN202187601U (en) * 2011-05-17 2012-04-11 王海兵 Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line
KR20130141813A (en) * 2012-06-18 2013-12-27 주식회사 시스매니아 Street lamp for the maintenance of convenience
CN103726711A (en) * 2013-12-31 2014-04-16 国家电网公司 Single column type derrick of electric transmission line
CN205063510U (en) * 2015-10-28 2016-03-02 国网黑龙江省电力有限公司绥化供电公司 All -round iron tower decomposes assemblage aluminum alloy tube and embraces pole

Also Published As

Publication number Publication date
CN105220934B (en) 2017-06-06

Similar Documents

Publication Publication Date Title
CN201458596U (en) Crane with self-dismounting device
CN204917742U (en) Portable portal crane is used in piping erection
CN103982045B (en) A kind of roofing latticed shell structure is encorbelmented construction method of installation without support
CN105442458B (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN202358849U (en) Small-size suspension crane
CN104477788B (en) Spanning self-climbing type translational crane of wind power generation tower
CN102383815B (en) Suspension type driftage temporary supporting device and use method thereof
CN204899238U (en) Unitized curtain wall plate hoist device
CN205063510U (en) All -round iron tower decomposes assemblage aluminum alloy tube and embraces pole
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN104265166A (en) Eight-arm fully-hydraulic anchor rod-anchor cable drill carriage used with continuous miner
CN111719860A (en) Construction process of large-span complex arch truss roof
CN104061372A (en) Pipeline fixing device
CN108190808B (en) Color steel plate anti-suspended ceiling high-altitude sliding device and anti-suspended ceiling construction method
CN105220934A (en) An a kind of comprehensive steel tower point system of solutions founds aluminium-alloy pipe pole
CN203927078U (en) A kind of piping fixing structure
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN103539020B (en) Novel hoisting construction method and special hanging device
CN105110205A (en) Reverse disassembling method for tower crane
CN203927079U (en) Pipeline erecting by overhang
CN203402879U (en) Rotatable and portable elevator
CN202268651U (en) Fixing device of transmission wire lifter
CN204676439U (en) A kind of Bailey beam formula can be hung by supertronic tower top
CN206447493U (en) Turbine-generator units scroll case hoisting suspender
CN203855358U (en) Vertical hoisting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant