CN105201174B - Dried hanging hang structure is adjusted in steelframe - Google Patents
Dried hanging hang structure is adjusted in steelframe Download PDFInfo
- Publication number
- CN105201174B CN105201174B CN201510580445.6A CN201510580445A CN105201174B CN 105201174 B CN105201174 B CN 105201174B CN 201510580445 A CN201510580445 A CN 201510580445A CN 105201174 B CN105201174 B CN 105201174B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- adjusted
- steelframe
- pedestal
- strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of steelframes, and dried hanging hang structure is adjusted, including vertical steel pipe, lateral steel pipe and angle steel, the vertical steel pipe and Bolted angle connection, it further includes cuffs that dried hanging hang structure, which is adjusted, in the steelframe, first connector and pedestal, the vertical steel pipe is equipped with vertical strip-shaped hole, the transverse direction steel pipe is connect by cuffs with vertical strip-shaped hole, cuffs can be moved with respect to vertical steel pipe, the pedestal is equipped with the first slot hole, the transverse direction steel pipe is equipped with lateral strip-shaped hole, lateral steel pipe is connect with pedestal by the first connector, first connector is arranged in the first slot hole and lateral strip-shaped hole, pedestal can relatively transverse steel pipe movement.The present invention improves the accuracy of installation, and cost of labor is relatively low;Lateral steel pipe can carry out finely tuning up and down, and deviation, which occurs, in in-site installation to be adjusted flexibly, and only need to adjust cross bar position, greatly reduce consumptive material.
Description
Technical field
The present invention relates to a kind of decoration construction technology, more particularly to dried hanging hang structure is adjusted in a kind of steelframe.
Background technology
At present in building decoration installation field, to the cladding installation base keel construction of large area 3D moulding mainly with
Shaped steel is welded as leading.For the moulding of plane big rise and fall, because of cladding corner brace length limitation, traditional steelframe welding production needs root
It is made according to concave-convex rise and fall of molding surface, more demanding to the technical merit for making worker, space coordinate positioning needs to expend
A large amount of manpower and materials, while welding job, there are serious security risk, operating personnel must have special work post operation licence
Book, and be easy to cause fire when welding.
Invention content
The present invention in order to solve problems in the prior art, provides that a kind of cost of labor is relatively low, and installation can be adjusted flexibly,
Dried hanging hang structure is adjusted convenient for the steelframe of adjusting.
Specific technical solution is as follows:A kind of adjustable dried hanging hang structure of steelframe, including vertical steel pipe, lateral steel pipe and angle steel,
The vertical steel pipe and Bolted angle connection, it further includes cuffs, the first connector and pedestal that dried hanging hang structure, which is adjusted, in the steelframe, described
Vertical steel pipe is equipped with vertical strip-shaped hole, and the transverse direction steel pipe is connect by cuffs with vertical strip-shaped hole, and cuffs can be relatively vertical
Steel pipe moves, and the pedestal is equipped with the first slot hole, and the transverse direction steel pipe is equipped with lateral strip-shaped hole, and lateral steel pipe is logical with pedestal
The connection of the first connector is crossed, the first connector is arranged in the first slot hole and lateral strip-shaped hole, and pedestal can relatively transverse steel pipe movement.
It is the attached technical scheme of the present invention below.
Preferably, it further includes corner brace and the second connector that dried hanging hang structure, which is adjusted, in the steelframe, and the corner brace is equipped with the
Two slot holes, the second connector are arranged in the second slot hole and are connect with pedestal.
Preferably, the pedestal is equipped with extension, and extension is equipped with matching hole, and second connector, which is arranged in, matches
Connect hole.
Preferably, the matching hole is strip-shaped hole.
Preferably, the pedestal is equipped with U-lag, and the first slot hole setting is in U-lag both sides, the transverse direction steel pipe receiving
In U-lag.
Preferably, institute's cuffs includes groove, and the transverse direction steel pipe can be housed in the groove.
Preferably, the cuffs includes fastener and fixinig plate, and the fixinig plate is arranged in groove both sides, the fixinig plate
It is connect with vertical strip-shaped hole by fastener.
Preferably, the fastener is to wearing fastening bolt.
The technique effect of the present invention:The present invention steelframe be adjusted dried hanging hang structure, improve the accuracy of installation, manually at
This is relatively low;And professional's operation is not needed, popular construction improves speed of application, is conducive to standardized work;Secondly, horizontal
It can carry out finely tuning up and down to steel pipe, deviation, which occurs, in in-site installation to be adjusted flexibly, and only need to adjust cross bar position, greatly
Reduce consumptive material;Using lateral steel pipe lateral strip-shaped hole carry out left and right adjusting, it is front and back carry out it is secondary extension have enough tune
Pitch is from meeting the cladding demand of Different Plane finishing material.
Description of the drawings
Fig. 1 is the schematic diagram that dried hanging hang structure is adjusted in steelframe of the present invention.
Fig. 2 is another schematic diagram that dried hanging hang structure is adjusted in steelframe of the present invention.
Fig. 3 is the exploded view that dried hanging hang structure is adjusted in steelframe of the present invention.
Specific implementation mode
The present invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, it includes vertical steel pipe 1,2 He of lateral steel pipe that dried hanging hang structure, which is adjusted, in the steelframe of the present embodiment
Angle steel 3, the vertical steel pipe 1 with angle steel 3 by being connect to wearing part 31, by expansion bolt 32 and wall 100 fixed by angle steel 3,
To which vertical steel pipe 1 is fixed on wall 100.It further includes cuffs 4, the first connector 5 that dried hanging hang structure, which is adjusted, in the steelframe
With pedestal 6, the vertical steel pipe 1 is equipped with multiple vertical strip-shaped holes 11, and the transverse direction steel pipe 2 passes through cuffs 4 and vertical bar shaped
Hole 11 connects, to which when installing lateral steel pipe 2, cuffs 4 can be moved with respect to vertical steel pipe 1, and lateral steel pipe 2 can carry out downward
Section, if there is installation deviation, can facilitate to be adjusted.For being connect with decoration panel 200, pedestal 6 is equipped with the pedestal 6
First slot hole 61, the transverse direction steel pipe 2 are equipped with lateral strip-shaped hole 21, and lateral steel pipe 2 is connected with pedestal 6 by the first connector 5
It connects.First connector 5 is arranged in the first slot hole 61 and lateral strip-shaped hole 21, so that pedestal 6 can the fortune of relatively transverse steel pipe 2
It is dynamic, left, right, front and rear adjusting is carried out, more position installations may be implemented.The transverse direction strip-shaped hole 21 is arranged in lateral steel pipe 2
Opposite two faces on, in the present embodiment, the transverse direction steel pipe 2 and vertical steel pipe 1 are multi-hole square tube.
Further, it further includes corner brace 7 and the second connector 8 that dried hanging hang structure, which is adjusted, in the steelframe, is set in the corner brace 7
There are the second slot hole 71, the second connector 8 to be arranged in the second slot hole 71 and connect with pedestal 6.Pass through the second slot hole in corner brace 7
71 can carry out secondary extension when can realize front and back adjust, and increase adjustable range, meet the cladding demand of different finishing materials.It is described
Pedestal 6 is equipped with extension 62, and extension 62 is equipped with matching hole 621, and second connector 8 is arranged in matching hole 621, institute
It is strip-shaped hole to state matching hole 621.Adjustable range can be further expanded by extension 62.The pedestal 6 is equipped with U-lag 63, institute
The setting of the first slot hole 61 is stated in 63 both sides of U-lag, the transverse direction steel pipe 2 is housed in U-lag 63, to make lateral steel pipe 2 can
It is so more firm that be connect with pedestal 6.Institute's cuffs 4 includes groove 41, and the transverse direction steel pipe 2 can be housed in the groove 41 so that
Lateral steel pipe 2 connect more firm with vertical steel pipe 1.The cuffs 4 further includes fastener 42 and fixinig plate 43, the fixinig plate 43
It is arranged in 41 both sides of groove, the fixinig plate 43 is connect by fastener 42 with vertical strip-shaped hole 11, and the fastener 42 is pair
Fastening bolt is worn, consequently facilitating the connection of cuffs 4 and vertical steel pipe 1.In the present embodiment, first connector 5, the second connection
Part 8 is to wearing fastening bolt to wearing part 31;The strip-shaped hole and slot hole refer to the trepanning for having certain length.
Dried hanging hang structure is adjusted in the steelframe of the present embodiment, improves the accuracy of large-scale Different Plane 3D moulding installation, section
About a large amount of man power and material weld, antirust treatment, cost of labor is relatively low.And professional's operation is not needed, greatly
Crowdization is constructed, and speed of application is improved, and is conducive to standardized work;Secondly, lateral steel pipe can carry out finely tuning up and down, and in-site installation goes out
Existing deviation can be adjusted flexibly, and only need to adjust cross bar position, greatly reduce consumptive material;Using the lateral bar shaped of lateral steel pipe
Hole carry out left and right adjusting, it is front and back carry out it is secondary extension have enough adjustable ranges, meet the cladding of Different Plane finishing material
Demand.Dried hanging hang structure material uses hot rolling galvanized steel strip one-step die casting, and perception is beautiful, durable, securely and reliably.
It is pointed out that the technical concepts and features of above-mentioned preferred embodiment only to illustrate the invention, its object is to
Those skilled in the art can understand the contents of the present invention and implements according to this, and the protection of the present invention can not be limited with this
Range.Any equivalent change or modification in accordance with the spirit of the invention should be covered by the protection scope of the present invention.
Claims (7)
1. dried hanging hang structure, including vertical steel pipe, lateral steel pipe and angle steel is adjusted in a kind of steelframe, the vertical steel pipe connects with angle steel
It connects, it is characterised in that:It further includes cuffs, the first connector and pedestal, the vertical steel pipe that dried hanging hang structure, which is adjusted, in the steelframe
It is equipped with vertical strip-shaped hole, the transverse direction steel pipe is connect by cuffs with vertical strip-shaped hole, and cuffs can be moved with respect to vertical steel pipe,
The pedestal is equipped with the first slot hole, and the lateral steel pipe is equipped with lateral strip-shaped hole, and every lateral steel pipe is equipped with two groups of transverse directions
Strip-shaped hole, two groups of transverse direction strip-shaped holes are oppositely arranged, and lateral steel pipe is connect with pedestal by the first connector, and the pedestal is equipped with U
Shape slot, first slot hole setting are housed in U-lag both sides, the transverse direction steel pipe in U-lag, and the first connector is arranged in the
One slot hole and lateral strip-shaped hole, pedestal can relatively transverse steel pipe movements.
2. dried hanging hang structure is adjusted in steelframe as described in claim 1, it is characterised in that:Dried hanging hang structure is adjusted also in the steelframe
Including corner brace and the second connector, the corner brace be equipped with the second slot hole, the second connector be arranged in the second slot hole and with bottom
Seat connection.
3. dried hanging hang structure is adjusted in steelframe as claimed in claim 2, it is characterised in that:The pedestal is equipped with extension, prolongs
Extending portion is equipped with matching hole, and second connector is arranged in matching hole.
4. dried hanging hang structure is adjusted in steelframe as claimed in claim 3, it is characterised in that:The matching hole is strip-shaped hole.
5. dried hanging hang structure is adjusted in the steelframe as described in any claim in Claims 1-4, it is characterised in that:Institute's cuffs
Including groove, the transverse direction steel pipe can be housed in the groove.
6. dried hanging hang structure is adjusted in steelframe as claimed in claim 5, it is characterised in that:The cuffs includes fastener and fixation
Piece, the fixinig plate are arranged in groove both sides, and the fixinig plate is connect by fastener with vertical strip-shaped hole.
7. dried hanging hang structure is adjusted in steelframe as claimed in claim 6, it is characterised in that:The fastener is to wearing fastening spiral shell
Bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510580445.6A CN105201174B (en) | 2015-09-14 | 2015-09-14 | Dried hanging hang structure is adjusted in steelframe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510580445.6A CN105201174B (en) | 2015-09-14 | 2015-09-14 | Dried hanging hang structure is adjusted in steelframe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105201174A CN105201174A (en) | 2015-12-30 |
CN105201174B true CN105201174B (en) | 2018-07-13 |
Family
ID=54949101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510580445.6A Active CN105201174B (en) | 2015-09-14 | 2015-09-14 | Dried hanging hang structure is adjusted in steelframe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105201174B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113463869A (en) * | 2021-07-07 | 2021-10-01 | 浙江亚厦装饰股份有限公司 | Multi-curved-surface adjustable GRG hanging plate and mounting method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101197548B1 (en) * | 2009-05-18 | 2012-11-09 | (주)석촌 | Apparatus for fixing stone panel |
CN102312541A (en) * | 2011-06-29 | 2012-01-11 | 苏州金螳螂建筑装饰股份有限公司 | Vertical-surface stone dry-hang installing system |
KR20140045754A (en) * | 2012-10-09 | 2014-04-17 | 권종길 | Constructing apparatus for exterior panel of outer wall in buildings |
CN103276871B (en) * | 2013-05-29 | 2015-05-20 | 常熟市金龙装饰有限责任公司 | Modularized splice type steel keel structure for veneer decoration and construction method thereof |
CN204983518U (en) * | 2015-09-14 | 2016-01-20 | 苏州金螳螂建筑装饰股份有限公司 | Adjustable structure of hanging futilely of steelframe |
-
2015
- 2015-09-14 CN CN201510580445.6A patent/CN105201174B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105201174A (en) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201174B (en) | Dried hanging hang structure is adjusted in steelframe | |
CN206800622U (en) | A kind of assembled integral concrete shear force wall balcony attachment structure | |
CN104372911A (en) | Multi-direction adjustable assembly of decorative plate | |
CN206873739U (en) | A kind of triangular element formula aluminium sheet installation of ceiling fixing device | |
CN206233420U (en) | A kind of installation system of back-bolt type stone curtain wall | |
CN206053093U (en) | Furred ceiling component | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN204983518U (en) | Adjustable structure of hanging futilely of steelframe | |
CN106088516A (en) | A kind of double hook sheet material metope hanger structure and installation method thereof | |
CN207846823U (en) | A kind of construction and decoration indoor suspended ceiling horizontal position adjustment component | |
CN204899049U (en) | Curved surface glass daylighting roof system | |
CN204199554U (en) | Adjustable eaves plaque support | |
CN207244463U (en) | A kind of adjustable guardrail template | |
CN208748926U (en) | A kind of device for hanging installation for curtain wall and point | |
CN219569442U (en) | Integrated plate composite hanging piece structure | |
CN207921720U (en) | A kind of steel reinforced type steel firm banking | |
CN206110421U (en) | Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula | |
CN207672840U (en) | Steel construction ceiling | |
CN207079858U (en) | It is interior to hang fast keel | |
CN205685507U (en) | Button type extensible member for building | |
CN205153127U (en) | Stabilize steel construction | |
CN202882175U (en) | Connecting member of metal curtain wall and connecting system of metal curtain wall | |
CN207512996U (en) | A kind of sliding snap structure | |
CN205276487U (en) | Connection structure of light steel prefabricated exterior wall and major structure with adjustable it is three -dimensional | |
CN205444459U (en) | Biconjugate position steel construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |